Annex 1502000 C Facility Investment - Amend 0008.pdf
PDF 409 KB Posted
- Solicitation number
- N6247025R0020
About this file
This document is a Performance Work Statement (PWS) for Facility Investment (Section C, 1502000) for a Navy contract covering maintenance and repair services at naval installations in Italy. The contract requires comprehensive maintenance of various facility systems and equipment, including preventive maintenance, emergency/urgent/routine work, inspections, testing, and certification across multiple system types such as HVAC, electrical, mechanical, fire protection, transportation, and fuel systems.
Key performance objectives include maintaining facilities, ground structures, and equipment to ensure safe, fully functional, and operational conditions while minimizing breakdowns. The contractor must develop and implement multiple maintenance programs, including Preventive Maintenance (PM), Integrated Maintenance Program (IMP), and Other Recurring Services Program. Critical requirements include performing monthly and annual inspections, maintaining detailed logs, submitting monthly reports, complying with manufacturer specifications and industry standards, and responding to emergency work orders within specified timeframes. The contract covers both recurring work (with a $300,000 initial Facility Bullet value) and potential non-recurring work to be ordered separately.
View the file
Other files
Show 40 more
Latest 50 of 144 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C – 1502000 Facility Investment
1502000 – Facility Investment Spec Item Title 1 General Information
1.1 Outline of Services
2 Management and Administration
2.1 Definitions and Acronyms
2.2 Personnel
2.2.1 Certification, Training, and Licensing
2.3 Special Requirements
2.3.1 Service Interruptions
2.3.2 Workmanship and Material Standards
2.3.3 Compliance with Italian Law
2.3.4 Escorts
2.3.5 Coordination on Airfields
2.3.6 Historical Preservation
2.3.7 Systems Approach to Maintenance
2.4 References and Technical Documents
3 Recurring Work
3.1 Emergency, Urgent, and Routine (E/U/R) Work
3.1.1 Emergency
3.1.2 Urgent
3.1.3 Routine
3.2 Facility Bullets
3.3 Preventive Maintenance (PM) Program
3.3.1 Interior and Exterior Lighting Systems
3.3.2 Lightning Arrestors and Grounding Devices
3.3.3 Vertical Transportation Equipment (VTE)
3.3.4 Compressed Air Systems
3.3.5 Auxiliary Generators
3.3.6 Uninterruptable Power Supply Systems (UPS)
3.3.7 Swimming Pool
3.3.8 Facility Electric Systems
3.3.9 Aboveground (AST) and Underground (UST) Storage Tanks
3.3.10 Overhead and Roll-Up Doors
3.3.11 Hangar Door
3.3.12 Drinking Fountains/Water Coolers
3.3.13 Airfield Light Tower
3.3.14 Emergency Eye Wash Station
3.3.15 Irrigation System
3.3.16 POL Fuel Depot Facilities and Distribution Systems
3.3.17 Aviation Fuel Support Systems
3.3.18 Vehicle Fueling Station Systems
3.3.19 Vehicle Arrestor System
3.3.20 Flood Gate
3.4 Integrated Maintenance Program (IMP)
3.4.1 HVAC and Refrigeration Systems
3.4.2 Fire Protection Systems
3.4.3 Boilers and UPVs
3.5 Inspection, Testing, and Certification Program
3.5.1 Boilers and UPVs
3.5.2 Vertical Transportation Equipment (VTE)
3.6 Other Recurring Services Program
3.6.1 Exhaust Hoods and Ducts
Spec Item Title
3.6.2 HVAC Water Testing and Treatment Services
3.6.3 Boiler Water Testing and Treatment Services
3.6.4 Solar Panel Maintenance
3.6.5 Gutter and Roof Inspections
3.6.6 Gutter Maintenance
3.6.7 Magnetic Key Card System Maintenance
3.6.8 Roof Drain Cleaning
3.6.9 Vehicle Lift Maintenance
3.6.10 Swimming Pool Water Testing and Treatment Services
3.6.11 Fall Protection Lifeline Systems Inspection and Certification
3.6.12 Oil-Water Separator and Grease Traps Maintenance
3.6.13 Car Wash Water Treatment System
3.6.14 Fire Extinguisher Inspection and Maintenance
3.6.15 Lift Station Maintenance
4 Non-Recurring Work
Spec Item Title Description 1 General
Information
1.1 Outline of
Services
The intent of 1502000 Facility Investment is to specify the requirements for Sustainment, Restoration, and Modernization (SRM) sub-functions only. The Facility Investment requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work.
Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consist of major rehabilitation and capital improvements that is accomplished through other Navy programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of Facility Investment.
The system descriptions supporting the performance requirements of this Annex are documented in J-1502000-05 07 Base Systems Description.
The Contractor shall perform maintenance, repair, alteration, modification, inspection, testing and certification, demolition and minor construction and other recurring work on a broad variety of facilities, equipment, systems and components to include but not limited to the following:
Building and Structures -Interior and exterior finishes -Roofing -Foundation -Structural Components -Cathodic Protection Systems -Tanks -POL System -Pipelines -MOGAS Systems
Building Systems
-HVAC
-Fire Protection -Vertical Transportation Equipment (VTE) -Intrusion Detection Systems -Interior and Exterior Lighting Systems -Boilers (excluding Central Utility Plant Boilers) -Unfired Pressure Vessels (UPV) -Compressed Air Systems -Potable Water (including backflow prevention devices) -Wastewater -Electrical -Lightning Arrestors and Grounding Devices -Cathodic Protection Systems -Auxiliary Generator Systems (including emergency and portable generators) -Uninterruptible Power Systems (UPS) -Exhaust Hoods and Ducts
-WHE
Miscellaneous -Signs -Fences
Spec Item Title Description
-Locksmith -Drainage Ditches -Monuments -Flag Poles -Unpaved Roads (gravel roads) -Electric Vehicle Charging Stations/Facilities Roads and Paved Surfaces -Traffic Control Devices -Bicycle Paths -Pedestrian/Jogging Paths -Striping -Curbs -Sidewalks -Parking Lots -Drainage Systems -Outdoor Courts Airfields -Runways -Taxiways -Aircraft Parking Areas -Aviation Fuel Systems
Spec Item
Title Description
2 Management and Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-1502000-01.
2.2 Personnel In additions to the Employee Requirements specified in Annex 02, the Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations withing the FI function and as specified below:
2.2.1 Certification, Training, and Licensing
All maintenance and repair shall be performed by personnel trained and certified by the Original Equipment Manufacturer (OEM), where applicable. All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require certification by a governing directive shall be qualified at the journeyman level in the respective trade.
Fire Protection and Life Safety Systems:
Personnel performing work on fire protection systems shall be certified per UFC 3- 601-02, Appendix A – Navy Contract Technician Qualifications.
Personnel inspecting, certifying, and making recommendations for corrective actions for backflow preventers shall be certified per UG-2029-ENV.
Personnel inspecting and texting vertical transportation equipment (VTE) shall be qualified per ASME A171 – Safety Code for Elevators and Escalators, latest edition.
Personnel inspecting and testing engine test facilities shall be qualified per UFC 4- 212.01N.
Personnel conducting ground safety checks on lighting arrestors or grounding devices on facilities housing ammunition and explosives shall be certified per NAVSEA OP-5, include completion of AMMO-29 training.
Utilities and Environmental Systems:
Personnel inspecting, witnessing tests, preparing reports, and issuing certificates for boilers and unfired pressure vessels (UPVs) shall be qualified per UFC 3-430-07 and Italian Ministerial Decree (DM) dated 1 March 1974, published on G.U. No. 99 16 April 1974.
Personnel performing work or obtaining test data on cathodic protection systems shall be trained per UFC 3-570-06.
Personnel performing work on systems, containing chlorofluorocarbons (CFCs) and/or hydro-chlorofluorocarbons (HCFCs) shall be certified under an EPA approved technical certification program in accordance with OPNAVINST 5090.1 Chapter 6 and the Overseas Environmental Baseline Guidance Document/Final Governing Standard
(OEBDG/FGS).
Personnel performing work involving hazardous materials (HAZMAT) or hazardous waste (HAZWASTE) shall complete Government accepted HAZMAT/HAZWASTE handling course or have a minimum of one (1) year of verifiable experience.
Electrical and Mechanical Systems:
Item
Title Description
Personnel working with or on electrical or electronic equipment shall be trained and certified per NAVFAC MO-116, UFC 3-560-01 (latest edition), and the most current Italian/European norms CEI EN 50110-1 and CEI 11-27.
Personnel maintaining, repairing, inspecting, testing, operating, or rigging Weight Handling Equipment (WHE) shall be qualified per NAVFAC P-307 (latest edition).
Personnel inspecting and testing crane and railroad trackage shall be qualified per
NAVFACINST 11230.1.
Personnel inspecting, certifying, and making recommendations for corrective action for backflow preventers shall be certified per UG-2029-ENV.
Personnel performing inspections and tests on VTEs must be qualified per American Society of Mechanical Engineers (ASME) 17.1.
Personnel inspecting and testing engine test facilities shall be qualified per UFC 4- 212-01N.
The Contractor shall submit proof of all certifications, training, and licensing requirements per Section F.
2.3 Special
Requirements
2.3.1 Service
Interruptions
Except in emergency situations, all outage requests will be submitted to the KO no fewer than twenty-one (21) calendar days prior to a planned outage.
The Contractor shall coordinate with Government and other Contractors on outages that affect or interface with systems under their responsibility. The Contractor shall provide qualified, knowledgeable personnel to attend planning meetings or outage coordination briefing at no additional cost to the Government.
Emergency and Urgent Service Interruptions:
In the event of an unplanned or emergency service interruption, the Contractor shall:
notify the KO immediately upon discovery; provide an estimated times to restore services and propose any workaround or mitigation measures to reduce operational impacts impacted during the disruption.
Planned Service Outages:
For any work requiring a planned outage or reduction in service, including heating, ventilation, air conditioning (HVAC), electrical, water, or any other utility, the contractor shall:
Submit a formal outage request to the KO a minimum of 21 calendar days in advance;
include in the request: the specific area(s) affected, exact time and date of the planned outage, an estimated time of service restoration.
Outage approval is at the discretion of the KO and may be contingent on operational schedules, and mission requirements,
2.3.2 Workmanship
and Material Standards
The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond normal wear and tear and corrects deficiencies in a timely manner to preserve full life expectancy of the asset. Best commercial practices shall be applied in the performance of work.
Item
Title Description
All work shall be completed in accordance with approved and accepted industry standards, manufacturers guidelines, and shall comply with applicable building and safety codes, as well as Activity, local, state, federal, and Host Nation regulations, and other technical requirements identified within this technical sub-annex.
Workmanship for maintenance and repair shall include all work necessary to restore facility and system fully functional condition, including touch-up painting, operational checks, and completion of any incidental finish work. Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects that would affect the safety, appearance, or habitability of system functionality. All repairs shall meet applicable codes and standards and shall be in accordance with the manufacturer specifications and industry best practices.
Repairs shall be performed to a quality level that prevent repeat failures due to poor workmanship or materials. All restored or replaced components shall be fully compatible with adjacent surfaces or systems. Unless otherwise specified, replacements shall match existing dimensions, finish, color, design, and function and shall have a finished appearance consistent with original finished appearance, allowing only for minor unobjectionable deterioration resulting from normal use.
Material used in medical facilities shall comply with NFPA 99, Health Care Facilities Code.
The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area. All debris, excess material, and parts shall be cleaned up and removed daily and at the completion of the job. Upon completion of work, any stains and other unsightly marks resulting from the work shall be cleaned prior to final turnover.
2.3.3 Compliance with
Italian law
Prior to the purchase of any material that will come in contact with water intended for human consumption, the Contractor shall submit third-party certification documentation in accordance with Italian Ministerial Decree 174 of 6 April 2006 and, where applicable, Italian Ministerial Decree 25 of 7 February 2012, or NSF/ANSI 61 Annex G, as required per Section F.
Third party certifications shall reference the specific product or item that will be installed, clearly indicate its compliance with DM 174 2006, DM 25 2012 (as applicable), or NSF/ANSI 61 Annex G. Be issued by the manufacturer and include laboratory test results validating the material’s compliance with the applicable standards. No material in contact with potable water shall be installed without Government review and approval of the required certification.
The Contractor shall comply with all applicable Italian regulatory requirements for transport of water for human consumption including, but not limited to, Decree D.P.R.
327/80.
2.3.4 Escorts The Contractor personnel working in restricted areas require escort. The Contractor shall provide the Government a two-day notice prior to performance of work to enable proper coordination of escort personnel.
2.3.5 Coordination on
Airfields
When performing preventive maintenance or repair work to the existing light towers located inside the airport area, the Contractor shall coordinate work with the Airfield Officer and the Air Operation Officer through the KO or designated representative
(FSC-PAR).
Item
Title Description
Due to security directives, the Contractor is advised that work performance in the airport area may require armed US military escort.
The Contractor may be directed by the Airfield Officer and/or the Air Operation Officer, through the KO, to leave the airport site due to particular air operations, regardless if maintenance or repair work is complete. In these cases, the Contractor shall leave the airport site within 10 minutes from initial notification (which may occur via phone, verbally, or by other means). Once the particular air operations are over, the Contractor will be advised (via phone, verbally, or by other means) to return to the airport site to complete any pending work.
2.3.6 Historical
Preservation
Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, state, and local historical policies and regulations.
2.3.7 Systems
Approach to Maintenance
The Contractor shall implement maintenance plan based on a systems approach methodology. The systems approach emphasizes the interdependence and interactive nature of elements within and external to equipment systems. Systems include all major components and terminate at the point of delivery to include all mechanically and electrically interlocked ancillary parts, equipment, and components.
2.4 References and
Technical Documents
References and Technical Documents are listed in J-1502000-02
Spec Item Title Performance
Objective Related Information Performance
Standard 3 Recurring Work The Contractor shall maintain, repair, and perform minor alterations on facilities, ground structures, personal property equipment and installed equipment and systems to ensure they are fully functional and in normal working condition.
The Contractor shall develop, implement, and execute the following maintenance and service programs to support recurring work execution.
• Emergency, Urgent, and Routine (E/U/R) Work Program
• Facility Bullet Program
• Preventive Maintenance
Program
• Integrated Maintenance
Program
• Inspection, Testing, and
Certification Program
• Other Recurring
Service Program These programs shall ensure all Government-owned facilities, ground structures, installed systems, and equipment are maintained in a fully functional and safe operating condition.
The Contractor shall maintain all maintenance, repair, and alteration data and warranty records in the technical library and NAVFAC MAXIMO in accordance with Annex 0200000 (Management and Administration).
The Contractor shall furnish provide all necessary test instruments, equipment, and tools required to perform recurring maintenance and repair.
The Contractor shall submit a Monthly Maintenance Summary Report to the KO within two (2) working days after the end of each month, in accordance with Section F. The report shall include all completed work (maintenance inspection, service orders, recurring, and non-recurring work) and shall include the following details:
• Location of work
Facilities, ground structures, personal property equipment, and installed equipment and systems are maintained in normal working condition and function in accordance with applicable codes and standards.
All recurring maintenance is performed in compliance Spec Item 2.3.4 – Workmanship and Material Standards.
Objective Related Information Performance
Standard
• Work type
• Work description,
• Identified deficiencies not yet corrected
• Funding activity
• Effort expended in total labor hours
• Total material cost
A description of the current facilities is provided in J- 1502000-03.
Equipment and Systems Descriptions Inventories are provided in J-1502000-05.
3.1 Emergency, Urgent, and Routine (E/U/R) Work
The Contractor shall perform E/U/R work in a timely manner to address any deficiencies identified within the boundaries of the installation and ensure that all affected facilities, systems, ground structures, and assets are returned to normal operating condition and function properly in accordance with applicable codes, standards, and performance requirements.
The Contractor shall receive and process E/U/R work in accordance with the work reception requirements in Annex 0200000.
The Contractor shall schedule and perform E/U/R work in a manner that minimizes disruptions to Government operations and customer activities.
E/U/R work will include a wide range of services across all trades and systems. A sample of anticipated E/U/R work is provided in J-1502000-04.
The Government makes no warranty, express or implied, regarding the accuracy, completeness, or representativeness of historical E/U/R work data.
The Contractor shall maintain sufficient materials, parts, and equipment on hand to support timely response and resolution of E/U/R work. Lack of availability of materials, parts, and equipment shall not relieve the Contractor from the obligation to meet required completion timeframes.
E/U/R work is responded to and completed within the specified time.
Facilities, systems, ground structures medical equipment and systems, personal property equipment, installed equipment and systems, and other assets are fully functional, in normal working condition and function properly in accordance with
OEM
specifications, including recertification if applicable.
When an E/U/R work order is complete the facilities, systems, and systems, personal property equipment, installed equipment and systems, and other assets do not present danger to
Objective Related Information Performance
Standard
The Government reserves the right to consolidate multiple requirements for the same facility, system, ground structure or other asset at the same time into one work order, when appropriate.
The Contractor has full responsibility for any work up to the work order limit of liability of $5,000 in direct labor and direct material cost per work order.
The Government will only pay for the portion of direct labor and/or direct material that exceeds the E/U/R work order limits of liability.
The Contractor shall notify the KO upon identification that work order will exceed the specified limits of liability in accordance with reporting requirements in Annex 2. If a non-recurring work is issued for the portion exceeding the specified E/U/R work order limits of liability, the Government will only pay for the portion of direct labor and/or direct material that exceeds the work order limits.
Examples of work exceeding the E/U/R Work Order limits of liability:
• If an E/U/R work order requires $5,600 in direct labor and direct material cost, the Government may issue a facility bullet or Non-recurring work in accordance with the Non-recurring Work portion of the contract for the $600 in direct labor and direct material cost that exceeds the Work limit of liability.
personnel or equipment.
Work Orders are signed by the original requestor
Work order properly documented in NAVFAC Maximo in accordance with Annex 2, Spec Item 2.6.8
NAVFAC
Maximo.
Objective Related Information Performance
Standard The Contractor may invoice for completed E/U/R work orders.
The Contractor shall not invoice for incomplete work orders and work orders not issued. A modification will be processed at the end of each period of performance to deduct for work orders not issued and incomplete work orders. Deduction will be based on the unit prices specified in Attachment J-0200000-12 ELINs.
The Contractor shall submit a monthly summary of completed E/U/R work orders per Section F.
3.1.1 Emergency The Contractor
shall perform emergency work orders in a timely manner to accomplish any work identified within the entire boundary of the installation to ensure facilities, systems, ground structures and other assets are fully functional, in normal working condition and function properly in accordance with specified standards.
The Contractor shall perform emergency work orders 24 hours a day, seven days a week throughout the contract period.
The Contractor shall respond to emergency work orders with the appropriate service personnel and equipment to commence work immediately.
The Contractor shall remain at the work site until the emergency has been arrested.
If follow-up work is required (after the emergency condition is arrested) to complete the restoration and ensure facilities, systems, ground structures and other assets are fully functional and in normal working condition, the Contractor may request time extension equal to a Routine Work Order. The emergency mitigation and follow-up work shall be considered part of the original work order.
Related Information:
Historically, approximately 75 emergency work orders originate after normal working hours each month.
Emergency work orders responded to within one (1) hour of receipt of call.
Work continues without interruption until emergent condition is arrested and damage to facilities, systems, ground structures, other assets and personnel is mitigated.
Objective Related Information Performance
Standard
3.1.2 Urgent The Contractor
shall perform urgent work orders in a timely manner to accomplish any work identified within the entire boundary of the installation to ensure facilities, systems, ground structures and other assets are fully functional, in normal working condition and function properly in accordance with specified standards.
The Contractor shall perform urgent work orders without extended delay.
Urgent work orders are completed within five (5) working days.
3.1.3 Routine The Contractor
shall perform routine work orders in a timely manner to accomplish any work identified within the entire boundary of the installation to ensure facilities, systems, ground structures and other assets are fully functional, in normal working condition and function properly in accordance with specified standards.
Performance of routine work orders is not required outside of Government regular working hours.
Routine work orders are completed within 30 calendar days.
3.2 Facility Bullets The Contractor
shall complete Facility Bullets to accomplish work in the specified time frames.
The Contractor shall respond to and perform work ordered as Facility Bullets. The Government may order additional maintenance and repairs using Facility Bullets.
The initial cumulative Facility Bullet value is $300,000.
Facility Bullets may be ordered in any size and/or quantity up to
Facility Bullets are completed within specified time frames.
Facilities, systems, ground structures, and/or other assets are fully functional, in normal working condition, and
Objective Related Information Performance
Standard the cumulative Facility Bullet value annually. Individual Facility Bullets shall be invoiced at the actual cost for performance of services.
Individual Facility Bullet nominal values and completion time frames are as follows:
10K Bullet: Total cost of each Bullet should not exceed $10,000 in direct costs and completed within 60 days.
9K Bullet: Total cost of each Bullet should not exceed $9,000 in direct costs and completed within 60 days.
8K Bullet: Total cost of each Bullet should not exceed $8,000 in direct costs and completed within 45 days.
7K Bullet: Total cost of each Bullet should not exceed $7,000 in direct costs and completed within 45 days.
6K Bullet: Total cost of each Bullet should not exceed $6,000 in direct costs and completed within 45 days.
5K Bullet: Total cost of each Bullet should not exceed $5,000 in direct costs and completed within 45 days.
function properly in accordance with the specified, manufacturers’, workmanship and material standards, including recertification if applicable.
When individual facility bullet is complete the facilities, systems, ground structures and other assets do not present danger to personnel or
3.3 Preventive
Maintenance (PM) Program
The Contractor shall develop and implement a Preventive Maintenance (PM) program for facilities, ground structures, personal property equipment, and installed equipment and systems to ensure proper and
The Contractor shall develop and submit a Preventive Maintenance (PM) program In accordance with Section F. At a minimum, the PM program shall include:
• PM management and technical approach
• Procedures to evaluate equipment reliability and corrective actions.
Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.
PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.
Objective Related Information Performance
Standard reliable operation, to minimize unplanned breakdowns or service interruptions, and to maximize system performance and useful life.
• Job plans tailored to the OEM technical documentation.
• Qualification requirements of personnel performing PM tasks.
The Contractor shall be fully responsible for performing any incidental repairs identified during scheduled PM activities, up to a total of $5,000 per occurrence in direct labor and direct material cost under the recurring work portion of the contract. These repairs are not considered E/U/R work.
Notification of repair work exceeding the incidental repairs limit shall be submitted to the KO within two (2) hours of identification. The Government may issue E/U/R work or non-recurring work for the portion of the repairs exceeding the incidental repairs limits of liability. The Government will only pay for the portion of direct labor and/or direct material that exceeds the specified limits of liability.
Example: If an individual occurrence of incidental repair requires $5,250 in direct labor and/or direct material cost, the Government may issue E/U/R work or non-recurring work in accordance with the non-recurring work provisions of the contract for the $250 in direct labor and/or direct material cost that exceeds the specified incidental repair limit of liability.
The Contractor shall not use breakdown maintenance as part of the PM program.
The PM program shall provide an economical approach to
PM Work properly documented in NAVFAC Maximo in accordance with Annex 2, Spec Item 2.6.8
Objective Related Information Performance
Standard accomplish the manufacturers’ recommended maintenance in accordance with OEM standards, and maintenance required to satisfy equipment warranties and keep facilities, ground structures, personal property equipment, and installed equipment and systems in normal working condition.
Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program. These changes will be made at no additional cost to the Government.
The systems and equipment, including associated inventories that shall be included in the PM program are addressed in the PM Spec Items below.
The Contractor shall tag each equipment item during the initial PM service with a PM check-off tag. Each tag shall contain a unique tag number, equipment name and description, model number, serial number, equipment location, PM frequencies, a space to log actual PM performance date and performer’s initials. Tags are to remain on the equipment and updated as each PM or repair service is performed. Tags shall be able to withstand normal local weather conditions. The Contractor shall submit a tag sample to the KO for approval within 30 calendar days after contract award.
The Contractor shall submit the following monthly reports in accordance with Section F.
Monthly PM Work Schedule and Monthly Unaccomplished PM Report.
Objective Related Information Performance
Standard
Condition Assessment Program (ICAP) requirements for dynamic equipment are specified in 1501000 Facility Management.
Informational Note: Condition Assessments are typically performed by the maintenance technician on an annual basis during the most invasive PM circumstances. Requirements for condition assessment of dynamic equipment are specified in 1501000 Facility Management.
3.3.1 Interior and
Exterior Lighting Systems
The Contractor shall perform preventive maintenance on Interior and Exterior Lighting Systems to ensure systems are safe, fully functional, and operational, and to avoid unscheduled breakdowns while maximizing the service life of the equipment.
Description of interior and exterior lighting systems is provided in J-1502000-05.
The Contractor shall develop and implement a program to inspect, clean, relamp, and repairs to interior and exterior lighting systems.
Maintenance is performed in accordance with the Contractor’s PM program and work schedule.
Lighting fixtures shall remain operational 95% of the time.
Maintenance is performed in accordance with Contractor's PM schedule and in compliance with all referenced codes and standards.
Equipment is maintained in operable condition, free from performance deficiencies, and work is documented in
NAVFAC
MAXIMO.
3.3.2 Lightning
Arrestors and Grounding Devices
The Contractor shall perform preventive maintenance on Lightning Arrestor and Grounding Devices systems to ensure systems are safe, fully functional, and operational, and to avoid unscheduled breakdowns while maximizing the service life of the equipment.
Description of the lightning arrestors and grounding Devices is provided in J-1502000-05.
The Contractor shall maintain lightning arrestors and grounding devices in accordance with NFPA 780 “Standard for the Installation of Lighting Protection Systems”, MIL- HDBK-419A “Grounding, Bonding, and Shielding for Electronic Equipment and Facilities”, MIL-STD-188-124B “Grounding Bonding, and shielding for Common Long Haul and Tactical
Maintenance is performed per the Contractor’s PM schedule and in compliance with all referenced codes.
Equipment is maintained in operational, and to avoid unscheduled breakdowns while maximizing the service life of the
Objective Related Information Performance
Standard Communication Systems Including Ground-Based Communications-Electronics Facilities and Equipment”, MIL- HDBK-274 (AS) “Electrical Grounding for Aircraft Safety”, NAVSEA OP-5 “Ammunition and Explosives Safety Ashore”, NASSIG Instruction 8020.4, NAVSIG Instruction 8020.4, NAVAIR 00-80T-103
“NATOPS Conventional Weapons handling Procedures manual (Ashore), Italian Norms CEI 64,2 “Electrical installations in places with danger or explosion” and 64,8 “low-voltage electrical installations”.
Schematics of grounding systems and reporting formats are contained in NASSIG INST
8020.4 and will be made available by the Government.
The Contractor shall maintain cyclic records IAW NAVSEA
OP-05.
The Contractor shall coordinate with weapons, fuels, airfield, and hospital personnel prior to the performance of work to ensure escorts are provided where necessary.
The Contractor shall submit testing records electronically per NAVSEA OP-05 per Section F.
3.3.3 Vertical
Transportation Equipment
(VTE)
The Contractor shall perform preventive maintenance on VTE systems to ensure safe, fully functional, and operational, to avoid unscheduled breakdowns while maximizing the service life of the equipment.
Description of the VTE systems is provided in J-1502000-05.
The Contractor shall maintain VTE IAW manufacturers’ recommended procedures, OEM standards, ASME 17.1 ‘Safety Code for Elevator and Escalators’, NAVFAC MO-118 ‘Maintenance of Elevators and Escalators’, and European Standard EN81 ‘European Standard for Safety Rules for the Construction and Installation of
Maintenance is performed per the Contractor’s PM schedule and in compliance with all referenced codes and standards.
Equipment is maintained in operable condition, free from performance deficiencies, and
Objective Related Information Performance
Standard Lifts’, Legislative Decree No.
81/2008, D.P.R. 29 maggio 1963, no. 1497 and its additions and modifications.
The Contractor shall maintain logs during the contract performance period of all regularly scheduled and unscheduled maintenance and warranty work performed in a format approved by the KO.
The logs shall be transferred to the Government upon completion of the contract term.
The Contractor shall notify the facility occupants one (1) working day prior to any type of work on VTEs.
The Contractor shall notify the Building Managers prior to any type of work on VTEs in accordance with outage requirements.
Where elevators exist in pairs, only one elevator in a pair may be down at a time for maintenance or repair. At all times during maintenance or repair, the Contractor shall affix signage to each elevator door identifying that the elevator is out of service and shall remove this signage when the elevator is placed back into service.
work is documented in
NAVFAC
MAXIMO.
3.3.4 Compressed Air
Systems
The Contractor shall perform preventive maintenance on Compressed Air Systems to ensure systems safe, fully functional, and operational, and to avoid unscheduled breakdowns while maximizing the service life of the equipment.
Description of the compressed air systems is provided in J- 1502000-05.
The Contractor shall maintain compressed air systems in accordance with NAVFAC MO- 206 ‘Maintenance and Operation of Air Compressor Plants’, and
NAVFAC MO-209
‘Maintenance and Operation of Steam, Hot Water, and Compressed Air Distribution Systems’.
Maintenance is performed per the Contractor’s PM schedule and in compliance with all referenced codes and standards.
Equipment is maintained in operable condition, free from performance deficiencies, and work is
Objective Related Information Performance
Standard documented in
NAVFAC
MAXIMO.
3.3.5 Auxiliary
Generators
The Contractor shall perform preventive maintenance on Auxiliary Generators to ensure safe, reliable, uninterrupted service.
Description of the auxiliary generator systems is provided in J-1502000-05.
The Contractor shall comply with NAVFAC MO-912, established guidelines in the NFPA codes (e.g., NFPA 110), OEM standards, and commercial practices.
All maintenance and repair shall be performed by personnel trained and certified by the
OEM.
Preventative Maintenance shall include periodic startup, run and load tests.
All fuel tanks for diesel powered generators are to be kept at least 75% full. At no time shall a diesel-powered generator be rendered inoperative due to lack of fuel.
The Contractor shall ensure generators start up and provide proper voltage in a continuous manner when required.
The Contractor shall monitor throughout operations to ensure uninterrupted service, including responsibility for refueling.
Upon restoration of normal power, the Contractor shall ensure generators are shut down and reset for automatic operation.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
Auxiliary generators provide electrical power to meet the load demand for the duration of a power outage.
Equipment is maintained in operable condition, free from performance deficiencies, and work is documented in
NAVFAC
MAXIMO.
3.3.6 Uninterruptable
Power Supply System (UPS)
The Contractor shall perform preventive maintenance on UPS systems to ensure safe, reliable, Description of the UPS systems and equipment is provided in J- 1502000-05.
Maintenance shall comply with TM 5-693, applicable NFPA codes, manufacturers’ recommended maintenance
Maintenance is performed in accordance with Contractor's PM program and work schedule.
Objective Related Information Performance
Standard uninterrupted service.
requirements and OEM standards.
Maintenance shall include quarterly Battery Discharge Tests and periodic shutdown and load test of all uninterrupted power systems to ensure reliability.
UPS provides electrical power to meet the temporary load demand for the duration of a power outage or the designed time period.
UPS activates to restore temporary electrical power instantaneously following loss of power.
UPS activate to ensure uninterrupted service to critical systems.
3.3.7 Swimming Pool The Contractor
shall perform preventive maintenance on swimming pool equipment to ensure proper operation, to minimize breakdowns, and to maximize useful life.
Description of the swimming pool is provided in J-1502000- 05.
The Contractor shall maintain swimming pool equipment in accordance with OEM recommended procedures.
The Contractor shall ensure compliance with NAVMED P- 5010-4 ‘Manual of naval Preventive Medicine – Swimming Pools and Bathing Places’ – ‘Sanitary Control and Surveillance of Swimming Pools’, NAVFAC MO-210 – ‘Operation and Maintenance of Swimming Pools’, and local environmental regulations.
The Contractor shall provide all chemicals necessary to meet the required performance standards.
Maintenance is performed in accordance with the Contractor's PM schedule and applicable technical requirements.
Systems are maintained in fully operable condition, in compliance with
OEM, NAVFAC,
NEPA, UFC, CEI,
and Host Nation standards.
Documentation submitted per section F.
3.3.8 Facility Electric
Systems
The Contractor shall perform preventative maintenance on facility electric systems to ensure systems are fully functional, Description of the facility electric systems is provided in J- 1502000-05.
Facility electric systems typically operate at 600 volts or less. Exceptions include transformer primary voltage.
Maintenance is performed in accordance with Contractor's PM schedule and applicable technical
Objective Related Information Performance
Standard operational, and compliant with safety and regulatory standards, minimizing breakdowns, and to maximizing service useful life.
Typical equipment includes switchboards, circuit breakers, transformers, All assets are maintained per NAVFAC MO-200 – ‘Inspection and Certification of Electric Distribution Systems’ – ‘Electrical Power Distribution Systems’, and most current edition of the Italian/European norms CEI EN 50110-1 and CEI 11-27.
Facility Electric systems are maintained in fully operable condition, in compliance with
OEM, NAVFAC,
NFPA, UFC, CEI,
and Host Nation standards.
Documentation submitted per section F.
3.3.9 Aboveground
(AST) and Underground (UST) Storage Tanks
The Contractor shall perform preventative maintenance to ensure aboveground and underground storage tanks (including all piping and ancillary equipment) are fully functional, operational, and compliant with safety and regulatory standards, minimizing breakdowns and maximizing service life.
Description of the AST and UST is provided in J-1502000-05.
Checklists are provided in 1502000-06 08. a - ‘Monthly and Yearly Checklist for AST’;
1502000-06 08.b – ‘Monthly UST Checklist’; and 1502000-06 08.c – ‘Yearly UST Checklist’.
The Contractor’s shall maintain systems per UFC 3-460-03 – ‘Maintenance of Petroleum Systems’ – ‘Petroleum Fuel Facilities’, OPNAV M-5090.1 – ‘Environmental Readiness Program Manual’, STI SP001 (AST), PEI RP900 and
PEIRP11200 (UST), NFPA
codes, and applicable local environmental regulations.
The Contractor’s PM inspection and repair shall ensure compliance with OPNAV 5090.1, FSG Chapter 9 and Chapter 8, STI 001 (AST), PEI RP 900 (UST) and PEI RP12000
(UST), UFC 3-460-03, NFPA
and UFC code requirements, and local environmental regulations.
The Contractor shall maintain storage tanks containing petroleum, LPG, HW, and make repairs as noted in SPCC inspections and testing/certification reports.
Maintenance and inspection is performed in accordance with Contractor's PM program and work schedule.
Systems and equipment are maintained and repaired to sustain a fully functional and operable condition in accordance with
OEM
specifications.
Maintenance meets Federal and local environmental regulations, OPNAV 5090.1, 40 CFR 112, UFC
3-460-03 as well as applicable industry standards and applicable NFPA and UFC code requirements.
Rainwater does not accumulate in secondary containment areas such that the spill / release retention capacity of the area
Objective Related Information Performance
Standard Work includes inspection, testing and repair of aboveground and underground fuel oil storage tanks, including associated piping, HW tanks, gauges, controls, leak detection systems, cathodic protection devices, level indicating equipment, line leak detection equipment, solenoid valves, and normal and emergency vents, vapor recovery equipment, and secondary containment systems;
removal of debris/clutter from containment areas, drain water within containment areas, and cleaning spill buckets; used oil and oily wastewater collection tanks, propane, oil and fuel tanks integral to operating equipment (such as those associated with hydraulic lifts, generators, and boilers), portable petroleum containers with a capacity of 55 gallons or more. Secondary containment systems shall be drained of rainwater following storm events and kept free of debris.
The Contractor shall perform annual check and testing for proper operation (leaks, condensate buildup).
The Contractor shall submit all completed tank inspections to the KO and PWD Environmental within five 5 working days after closure of the inspection cycle.
The Contractor shall ensure that contaminants (to include dirt, debris, and water observed during monthly inspections) are removed from petroleum storage tanks as needed to ensure proper operation of the equipment (such as generators, boilers, and test equipment) supported by the storage tank. The Contractor shall dispose of debris, petroleum contaminated water, is reduced below the amount required by regulation.
Required records are maintained.
Objective Related Information Performance
Standard sludge, and residual fuel in accordance with local and Federal regulations.
Non-emergency spills/releases inside of secondary containment, including secondary containment buckets that provide overfill protection for UST fill ports, shall be cleaned up upon discovery.
Reporting of and response to emergency spills/releases and leaks shall follow local procedures.
The Contractor shall immediately notify the Government (including PWD Environmental) of any spills/releases or leaks occurring outside of secondary containment.
Non-emergency spills/releases and leaks occurring inside of secondary containment shall be reported to the Government (including PWD Environmental).
3.3.10 Overhead and
Roll-Up Doors
The Contractor shall perform preventive maintenance on overhead and roll-up doors to ensure systems operate reliably and as designed, minimizing downtime and maximizing system life.
Description of the overhead and roll-up doors is provided in J- 1502000-05.
The Contractor shall maintain overhead and roll-up door in accordance with manufacturers’ recommended procedures and OEM standards to ensure full functionality.
Ensure that maintenance does not create a hazard to personnel or interfere with operational requirements.
Maintenance is performed in accordance with Contractor's PM program and work schedule.
Doors are maintained and repaired to sustain a fully functional and operable condition in accordance with OEM requirements and standards and does not present any hazard or danger to personnel.
3.3.11 Hangar Doors The Contractor
shall perform
Description of the hangar doors is provided in J-1502000-05.
performed in
Objective Related Information Performance
Standard preventive maintenance on Hangar Doors to ensure systems operate reliably and as designed, minimizing downtime and maximizing system life.
The Contractor shall maintain hanger doors in accordance with manufacturers’ recommended procedures and OEM specifications.
Ensure fully functionality and that doors present no hazard to personnel.
accordance with the Contractor’s PM schedule and applicable references.
Systems and equipment remain in operable condition and in compliance with safety, OEM, and regulatory standards.
3.3.12 Drinking
Fountains/ Water Coolers
The Contractor shall perform preventive maintenance on drinking fountains and water coolers systems to ensure systems operate reliably and as designed, minimizing breakdowns, and maximizing systems life.
Description of the drinking fountains and water coolers is provided in J-1502000-05.
The Contractor shall perform maintenance, including filter changes per OEM standards.
The Contractor shall dispose of filters per environmentally approved procedures.
accordance with the Contractor’s PM schedule and applicable references.
Systems and equipment remain in operable condition and in compliance with safety, OEM, and regulatory standards.
3.3.13 Airfield Light
Towers
The Contractor shall perform preventive maintenance on airfield light towers to ensure proper operation, to minimize breakdowns, and to maximize useful life.
Description of the airfield light towers is provided in J-1502000- 05.
The Contractor shall maintain airfield light towers IAW manufacturers’ recommended procedures and OEM standards.
Maintenance is performed in accordance with Contractor's PM program and work schedule.
3.3.14 Emergency Eye
Wash Stations
The Contractor shall perform preventive maintenance on Emergency Eyewash Stations system to ensure systems operate reliable, and as designed, minimizing downtime and maximizing systems life.
Description of the emergency eyewash stations is provided in J-1502000-05.
All maintenance, repairs and testing shall be in accordance with ANSI Z358.1-2009 - ‘American National Standard for Emergency Eyewash and Shower Equipment’, and OSHA 29 CFR 1910.151 - Medical Services and First Aid.
accordance with the Contractor’s PM schedule and applicable references.
Systems and equipment remain in operable condition and in compliance with safety, OEM, and
Objective Related Information Performance
Standard A legible tag denoting date of inspection and inspector’s initials shall be affixed to each Emergency Eyewash Station at the conclusion of an acceptable test.
All incidental repairs found during tests shall be accomplished within five calendar days.
regulatory
3.3.15 Irrigation
Systems
The Contractor shall perform preventive maintenance to ensure irrigation systems operate reliably and as designed, minimizing downtime and maximizing system life.
Description of the irrigation systems is provided in J- 1502000-05.
Irrigation shall be performed in a manner that promotes the health and growth of all vegetation and minimizes water consumption regardless of irrigation system conditions (coverage or functionality).
The Contractor shall be responsible for the proper application of water to performance areas.
The Contractor shall notify the KO of any inoperable irrigation system components within 24 hours of discovery. The Contractor shall be fully responsible for repairs resulting from Contractor’s negligence.
Temporarily installed and portable irrigation systems shall be removed immediately following each use.
The Contractor shall provide and operate Government approved temporary irrigation systems during irrigation systems malfunctions and where permanent irrigation systems do not exist. Grass areas are irrigated as required to maintain acceptable growth, coverage, and healthy appearance.
Irrigation provided as necessary to maintain health and appearance of vegetation.
Irrigation does not damage/discolor surrounding structures.
Sprinkler heads and riser heads are operable, free of leaks, obstructions, or other defects that prevent proper operation.
Government approved temporary irrigation systems are provided and operated during irrigation systems malfunctions and where permanent irrigation systems do not exist.
Objective Related Information Performance
Standard The Contractor shall remove temporarily installed and portable irrigation systems immediately following each use.
3.3.16 POL Fuel
Depot Facilities and Distribution Systems
The Contractor shall perform preventive maintenance on POL fuel depot facilities and distribution systems to ensure safe, reliable, and compliant operation in support of mission requirements.
Services shall include recurring maintenance actions up to, but not including, quarterly maintenance thresholds as defined in UFC 3- 460-03.
Description of the POL fuel depot facilities and distribution Systems is provided in J- 1502000-05.a.
Maintenance tasks and frequencies shall align with the following:
UFC 3-460-03 – Operations and Maintenance: Maintenance of Petroleum Systems.
Periodic Inspection and Maintenance Actions are provided in J-1502000-05.e.
NAVFAC MO-119 –
Maintenance of Petroleum Facilities.
The Contractor shall:
Perform maintenance tasks and inspections in accordance with J- 1502000-05.e (Periodic Inspection and maintenance Actions) and J-1502000-05.f UFC 3-460-03 guidance.
Utilize checklists provided in J- 1502000-05.f (UFC 3-460-03 Checklist items).
Maintain a critical spare part inventory as identified in J- 1502000-05.b (Critical Spare Parts List).
Coordinate access to POL facilities with Fuels Department personnel prior to entry and upon exit.
Submit completed inspection and maintenance report in accordance with Section F.
Immediately report any maintenance discrepancies, Maintenance is performed in accordance with Contractor's PM program and work schedule.
10…