This document is an amendment to a solicitation for the P-002 EDI: Rapid Airfield Damage Recovery Storage Facilities project at Aviano Air Base in Italy. The amendment provides responses to three pre-proposal inquiries regarding project details. Specifically, it clarifies that the direct access drive to the airfield should match the existing surface and be aligned in coordination with the contracting officer. It also states that oil/water separators shall consist of baffled separators and seepage pits sized for estimated inflows of 0.11 cubic meters/second for Site 1 and 0.1 cubic meters/second for Site 2, installed per manufacturer recommendations. Finally, it directs offerors to the attached gas line trench detail from the Aviano Design Guide for specifications on connecting a new gas line to the existing line.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
MILCON PROJECT P-002, EDI: Rapid Airf ield Damage Recovery Storage Facilities, Aviano Air Base, Italy
Please See Block 14 Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Feb-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247022R3000
X 9B. DATED (SEE ITEM 11)
30-Nov-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Feb-2023
CODE
COMNAVFACSYSCOM ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247022R3000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
The purpose of this amendment is to:
1. Provide Pre-Proposal Inquiry (PPI) responses.
2. Provide Attachment
Pre-Proposal Inquiry (PPI) responses:
10. Inquiry: Reference drawing CS101B note #18, “direct access drive to airfield”. Please provide details for this access road – material, thickness, total length, surface finish.
Response: Key note 18 on CS101B states “DIRECT ACCESS DRIVE TO AIRFIELD, COORDINATE
WITH CONTRACTING OFFICER FOR PRECISE ALIGNMENT AND SURFACE REQUIREMENTS”
11. Inquiry: Reference drawings CU101A (Site 1) & CU101B (Site 2), the plan shows two oil/water separators as part of storm water drainage system. Please provide oil/water separator details (material, capacity, etc.).
Response: Oil/water separators shall consist of a baffled oil/water separator and seepage pits (dry wells) superficial or sub irrigation systems. Separators shall be provided with pre-decantation chamber and sampling manhole before the seepage pit. Install per manufacturer’s recommendations. Inflow for Site 1 =
0.110 CUM/sec, Site 2 = 0.100 CUM/sec
12. Inquiry: Reference drawings CU101B & CU102B (Site 2), the plan shows a new gas line connected to existing gas line. Please provide details for this line (material, diameter, elevations and etc.).
Response: See attached Gas Line trench detail from the Aviano Design Guide, Section 12.6.0, Page 109.
Size and type of proposed line should match existing.
Provide Attachment:
Attachment N – Gas Line Trench Detail
(End of Summary of Changes)