Attachment C - Construction Experience Project Data Sheet.pdf

PDF 120 KB Posted

Attached to
P-002 EDI: Rapid Airfield Damage Recovery Storage Facilities, Aviano Air Base, Italy
Solicitation number
N6247022R3000
Issued by

About this file

This document contains an attachment for collecting construction and design experience project data to be submitted in response to Solicitation Number N6247022R3000 for P-002 EDI: Rapid Airfield Damage Recovery Storage Facilities at Aviano Air Base in Italy issued by the Department of the Navy Naval Facilities Engineering Command. Relevant experience includes projects as a prime contractor, subcontractor, or joint venture partner involving new construction, renovation, repair, or alteration of facilities. Respondents must provide details on up to five construction projects and five design projects, including award and completion dates, types of work, award and final prices for construction or design fees and total construction values for design, as well as descriptions of work performed and any sustainable features.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Attachment S - Revised Drawing CU101A.pdf PDF
Attachment O - Site Visit Sign In.pdf PDF
Attachment T - Revised Drawing CU101B.pdf PDF
Attachment R - Revised Drawing CS102B.pdf PDF
Attachment U - Revised Specification 01 50 00.pdf PDF
Amendment 0006.pdf PDF
Attachment P - Site 2 Access Road Aerial.pdf PDF
Attachment Q - Revised Drawing CD101A.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Attachment N - Gas Line Trench Detail.pdf PDF
Amendment 0002.pdf PDF
Attachment M - Installation Access Request Form.pdf PDF
Amendment 0001.pdf PDF
Attachment L - Installation Access Request Checklist.pdf PDF
Attachment E - Price Proposal Form.pdf PDF
Attachment F - LRA Commercial Vehicle Inspection Procedures.pdf PDF
Attachment K - Italian Safety Plan_Combined.pdf PDF
Attachment H 1659896dwgVOL1_3of3.pdf PDF
Attachment H 1659896dwgVOL1_1of3.pdf PDF
Attachment H 1659896dwgVOL1_2of3.pdf PDF
Attachment G - Specifications.pdf PDF
Attachment D - Past Performance Questionnaire (PPQ).pdf PDF
Attachment B - SEC-NAV_5512_1_11787 Form.pdf PDF
Attachment H 1659896dwgVOL2_1of4.pdf PDF
Attachment H 1659896dwgVOL2_3of4.pdf PDF
Attachment A - Pre-Proposal Inquiry Form.xls XLS spreadsheet
Attachment H 1659896dwgVOL2_2of4.pdf PDF
Attachment I - HAZMAT Report Summary.pdf PDF
Attachment J - Host Nation Code Compliance Certification.pdf PDF
N62470-22-R-3000.pdf PDF
Attachment H 1659896dwgVOL2_4of4.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A (April 2022)

ATTACHMENT A

CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : CON #1 CON #2 CON #3 CON #4 CON #5

DESIGN #1 DESIGN #2 DESIGN #3 DESIGN #4 DESIGN #5

1. Experience for: Offeror Joint-Venture Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

New Construction Renovation Repair Alteration Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

Firm-Fixed Price Cost/Time and Material Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

Design-Build RFP Development Designer of Record Engineering Services Full Plans & Specs

Other (explain):

Attachment A (April 2022)

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or Third Party sustainable certifications.

If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

11. Other Information:

File details come from the government source that posted it. Updated .