N6247022R0002 Amend 0006.pdf

PDF 137 KB Posted

Attached to
P-91331, Phase 3 Family Housing Villaggio at Vicenza, Italy
Solicitation number
N6247022R0002
Issued by

About this file

This document is an amendment to a solicitation for construction services related to Phase 3 of the Family Housing Villaggio at Vicenza, Italy project. The amendment revises the solicitation to add additional contract line item numbers (CLINs) 0007 through 0015 and establishes that pricing is required for all CLINs 0001 through 0015. It also establishes an amendment response due date of 28 June 2022 at 1400 for offerors to submit a revised Attachment E Schedule B Price Proposal Form. The scope of revisions is limited to updating pricing to comport with the additional CLINs. The solicitation is being conducted by the Department of the Navy, Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
Revised Attachment E - Schedule B Price Proposal Form_16JUN2022.pdf PDF
N6247022R0002 Amend 0007.pdf PDF
Revised Attachment E - Schedule B Price Proposal Form_16JUN2022.pdf PDF
N6247022R0002 Amend 0007.pdf PDF
Revised Attachment E - Schedule B Price Proposal Form_14JUN2022.pdf PDF
Attachment Q - Anti-Mafia Self-Certification Form for Contracts between 150000 and 5382000.pdf PDF
Attachment R - Anti-Mafia Self-Certification Form for Contracts greater than 5382000.pdf PDF
N6247022R0002 Amend 0005.pdf PDF
Attachment J - PSC Italian Revised Revised March 18 2022.pdf PDF
Attachment O - 1656273Amend0004 Revised Drawings .pdf PDF
N6247022R0002 Amend 0004.pdf PDF
Attachment P - Site Visit Attendance Log.pdf PDF
Attachment O - 1656273Amend0004 Revised Drawings.pdf PDF
Attachment J - PSC Italian Revised Revised March 24 2022.pdf PDF
Attachment N - 1656273Amend0004 Revised Specs.pdf PDF
Attachment E - Schedule B Price Proposal Form Revised March 24 2022.pdf PDF
N6247022R0002 Amend 0003.pdf PDF
ATTACHMENT M - 1656273Amend0003 Revised Drawings.pdf PDF
ATTACHMENT L - 1656273Amend0003 Revised Specs.pdf PDF
N6247022R0002 Amend 0002.pdf PDF
N6247022R0002 Amend 0001.pdf PDF
N6247022R0002.pdf PDF
Attachment H - 1656273dwg27of29.pdf PDF
Attachment D - Past Performance Questionnaire (PPQ).pdf PDF
Attachment H - 1656273dwg14of29.pdf PDF
Attachment H - 1656273dwg19of29.pdf PDF
Attachment H - 1656273dwg12of29.pdf PDF
Attachment H - 1656273dwg25of29.pdf PDF
Attachment H - 1656273dwg08of29.pdf PDF
Attachment H - 1656273dwg04of29.pdf PDF
Attachment H - 1656273dwg16of29.pdf PDF
Attachment K - DWG Index.pdf PDF
Attachment H - 1656273dwg28of29.pdf PDF
Attachment H - 1656273dwg18of29.pdf PDF
Attachment B - SEC-NAV_5512_1_11787 Form.pdf PDF
Attachment H - 1656273dwg17of29.pdf PDF
Attachment I - UXO Report.pdf PDF
Attachment H - 1656273dwg26of29.pdf PDF
Attachment H - 1656273dwg29of29.pdf PDF
Attachment H - 1656273dwg07of29.pdf PDF
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment H - 1656273dwg15of29.pdf PDF
Attachment H - 1656273dwg23of29.pdf PDF
Attachment E - Schedule B Price Proposal Form.pdf PDF
Attachment H - 1656273dwg20of29.pdf PDF
Attachment F - LRA Commercial Vehicle Inspection Procedures.pdf PDF
Attachment H - 1656273dwg13of29.pdf PDF
Attachment H - 1656273dwg11of29.pdf PDF
Attachment H - 1656273dwg06of29.pdf PDF
Attachment G - Specifications.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

MILCON PROJECT P-91331, PHASE 3 FAMILY HOUSING VILLAGIO AT VICENZA, ITALY

Please see Block 14 Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Jun-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247022R0002

X 9B. DATED (SEE ITEM 11)

24-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Jun-2022

CODE

COMNAVFACSYSCOM ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247022R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0006

The purpose of this amendment is for the following items:

1. Establish Amendment Response Due Date

2. Revise the Solicitation

3. Provide Attachment

This amendment is applicable to ONLY THOSE OFFERORS that previously submitted a proposal in response to the solicitation by the original proposal due date of 07 April 2022. Those offerors are invited to revise their existing price proposal in response to this amendment. Offerors are required to provide an acknowledged copy of this amendment and to provide a Revised Attachment E – Schedule B Price Proposal Form, included as an attachment to this amendment.

The scope of proposal revisions is limited to Revised Attachment E – Schedule B Price Proposal Form; thus, offerors are permitted only to revise their existing price proposal to comport with the changes of the amendment detail below, if necessary. Offerors are not permitted to make any changes to the previously submitted non-price technical binders or to the previously submitted price proposals with the exception of the Revised Attachment E – Schedule B Price Proposal Form. Changes to non-price technical binders, other portions of the price proposals, or any other change not specifically requested in this amendment will not be accepted.

If an offeror submits any changes other than those requested in this amendment, the proposal may be disqualified at the Government’s discretion.

Acknowledgement of this amendment and revised Attachment E – Schedule B Price Proposal Form shall be submitted electronically and directly to the Government’s point of contact, Ed Flint, via email at edward.d.flint.civ@us.navy.mil prior to the amendment response due date established by this amendment. Offerors shall not submit hard copy responses.

1. Establish amendment response due date: Tuesday, 28 June 2022 at 1400 Norfolk, VA local time.

2. Solicitation Revisions:

CURRENT:

2.1.5 The Government intends to award a contract to a single contractor for CLIN 0001, with CLINs 0002 through 0006 as priced options. The Government reserves the unilateral right to award CLINs 0002 through 0006 to the Contractor at the proposed price at the time of award or within 270 calendar days after the contract award. A firm fixed proposed price is required for ALL CLINs (CLINS 0001 through 0006). No provision is made for economic price adjustment. Offerors not submitting pricing for all CLINs will be considered nonresponsive to the solicitation and will not be evaluated.

N6247022R0002

REVISED TO:

2.1.5 The Government intends to award a contract to a single contractor for CLIN 0001, with CLINs 0002 through 0015 as priced options. The Government reserves the unilateral right to award CLINs 0002 through 0015 to the Contractor at the proposed price at the time of award or within 270 calendar days after the contract award. A firm fixed proposed price is required for ALL CLINs (CLINS 0001 through 0015). No provision is made for economic price adjustment. Offerors not submitting pricing for all CLINs will be considered nonresponsive to the solicitation and will not be evaluated.

3. Attachment:

• Revised Attachment E – Schedule B Price Proposal Form_14JUN2022

(End of Summary of Changes)

File details come from the government source that posted it. Updated .