Attachment C - Construction Experience Project Data Sheet.pdf

PDF 16 KB Posted

Attached to
P-91331, Phase 3 Family Housing Villaggio at Vicenza, Italy
Solicitation number
N6247022R0002
Issued by

About this file

This document contains an attachment for construction experience project data sheets and details of a related federal contract opportunity for construction services. The attachment provides a template for offerors to submit details of up to five past construction projects as relevant experience. It requests information on the firm and project name, location, award and completion dates, value, work performed, description of performance and self-performed work. The related federal contract opportunity is solicitation number N6247022R0002 for construction services for Phase 3 of the Family Housing Villaggio at Vicenza, Italy. The work includes new construction of housing units with an anticipated award date of March 2022. Offerors should submit construction experience sheets using the template provided to demonstrate relevant qualifications for the work by the closing date of the solicitation.

View the file

Other files

File Type Posted
Revised Attachment E - Schedule B Price Proposal Form_16JUN2022.pdf PDF
N6247022R0002 Amend 0007.pdf PDF
Revised Attachment E - Schedule B Price Proposal Form_16JUN2022.pdf PDF
N6247022R0002 Amend 0007.pdf PDF
Revised Attachment E - Schedule B Price Proposal Form_14JUN2022.pdf PDF
N6247022R0002 Amend 0006.pdf PDF
Attachment Q - Anti-Mafia Self-Certification Form for Contracts between 150000 and 5382000.pdf PDF
Attachment R - Anti-Mafia Self-Certification Form for Contracts greater than 5382000.pdf PDF
N6247022R0002 Amend 0005.pdf PDF
Attachment J - PSC Italian Revised Revised March 18 2022.pdf PDF
Attachment O - 1656273Amend0004 Revised Drawings .pdf PDF
N6247022R0002 Amend 0004.pdf PDF
Attachment P - Site Visit Attendance Log.pdf PDF
Attachment O - 1656273Amend0004 Revised Drawings.pdf PDF
Attachment J - PSC Italian Revised Revised March 24 2022.pdf PDF
Attachment N - 1656273Amend0004 Revised Specs.pdf PDF
Attachment E - Schedule B Price Proposal Form Revised March 24 2022.pdf PDF
N6247022R0002 Amend 0003.pdf PDF
ATTACHMENT M - 1656273Amend0003 Revised Drawings.pdf PDF
ATTACHMENT L - 1656273Amend0003 Revised Specs.pdf PDF
N6247022R0002 Amend 0002.pdf PDF
N6247022R0002 Amend 0001.pdf PDF
N6247022R0002.pdf PDF
Attachment H - 1656273dwg27of29.pdf PDF
Attachment D - Past Performance Questionnaire (PPQ).pdf PDF
Attachment H - 1656273dwg14of29.pdf PDF
Attachment H - 1656273dwg19of29.pdf PDF
Attachment H - 1656273dwg12of29.pdf PDF
Attachment H - 1656273dwg25of29.pdf PDF
Attachment H - 1656273dwg08of29.pdf PDF
Attachment H - 1656273dwg04of29.pdf PDF
Attachment H - 1656273dwg16of29.pdf PDF
Attachment K - DWG Index.pdf PDF
Attachment H - 1656273dwg28of29.pdf PDF
Attachment H - 1656273dwg18of29.pdf PDF
Attachment B - SEC-NAV_5512_1_11787 Form.pdf PDF
Attachment H - 1656273dwg17of29.pdf PDF
Attachment I - UXO Report.pdf PDF
Attachment H - 1656273dwg26of29.pdf PDF
Attachment H - 1656273dwg29of29.pdf PDF
Attachment H - 1656273dwg07of29.pdf PDF
Attachment H - 1656273dwg15of29.pdf PDF
Attachment H - 1656273dwg23of29.pdf PDF
Attachment E - Schedule B Price Proposal Form.pdf PDF
Attachment H - 1656273dwg20of29.pdf PDF
Attachment F - LRA Commercial Vehicle Inspection Procedures.pdf PDF
Attachment H - 1656273dwg13of29.pdf PDF
Attachment H - 1656273dwg11of29.pdf PDF
Attachment H - 1656273dwg06of29.pdf PDF
Attachment G - Specifications.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C: CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : CON #1 CON #2 CON #3 CON #4 CON #5

1. Experience for: Offeror Joint-Venture Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Member of Joint Venture (Explain) Other(Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work (if more than one box is checked, explain in Box 8 which elements of performance fall into each category including percentages):

New Construction Renovation Repair Alteration Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

Firm-Fixed Price Cost/Time and Material Other (explain):

Complete Block 7 for Construction Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

ATTACHMENT C: CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

Design-Build RFP Development Designer of Record Engineering Services Full Plans & Specs

Other (explain):

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

10. Provide a detailed description of what work the entity identified in Box self-performed on this project:

11. Other Information

File details come from the government source that posted it. Updated .