N6247022R0002 Amend 0003.pdf

PDF 150 KB Posted

Attached to
P-91331, Phase 3 Family Housing Villaggio at Vicenza, Italy
Solicitation number
N6247022R0002
Issued by

About this file

This document is an amendment to a solicitation for construction services. The amendment extends the proposal due date to April 1st, 2022 and provides responses to pre-proposal inquiries. It revises several specifications and drawings related to hazardous materials, plumbing, electrical, and architectural plans. The opportunity is for Phase 3 Family Housing construction at Villaggio, Vicenza, Italy. The soliciting agency is the Department of the Navy Naval Facilities Engineering Command. The estimated value is over $15 million. Offerors are advised to prepare their proposals according to the revised solicitation documents.

View the file

Other files

File Type Posted
Revised Attachment E - Schedule B Price Proposal Form_16JUN2022.pdf PDF
N6247022R0002 Amend 0007.pdf PDF
Revised Attachment E - Schedule B Price Proposal Form_16JUN2022.pdf PDF
N6247022R0002 Amend 0007.pdf PDF
Revised Attachment E - Schedule B Price Proposal Form_14JUN2022.pdf PDF
N6247022R0002 Amend 0006.pdf PDF
Attachment Q - Anti-Mafia Self-Certification Form for Contracts between 150000 and 5382000.pdf PDF
Attachment R - Anti-Mafia Self-Certification Form for Contracts greater than 5382000.pdf PDF
N6247022R0002 Amend 0005.pdf PDF
Attachment J - PSC Italian Revised Revised March 18 2022.pdf PDF
Attachment O - 1656273Amend0004 Revised Drawings .pdf PDF
N6247022R0002 Amend 0004.pdf PDF
Attachment P - Site Visit Attendance Log.pdf PDF
Attachment O - 1656273Amend0004 Revised Drawings.pdf PDF
Attachment J - PSC Italian Revised Revised March 24 2022.pdf PDF
Attachment N - 1656273Amend0004 Revised Specs.pdf PDF
Attachment E - Schedule B Price Proposal Form Revised March 24 2022.pdf PDF
ATTACHMENT M - 1656273Amend0003 Revised Drawings.pdf PDF
ATTACHMENT L - 1656273Amend0003 Revised Specs.pdf PDF
N6247022R0002 Amend 0002.pdf PDF
N6247022R0002 Amend 0001.pdf PDF
N6247022R0002.pdf PDF
Attachment H - 1656273dwg27of29.pdf PDF
Attachment D - Past Performance Questionnaire (PPQ).pdf PDF
Attachment H - 1656273dwg14of29.pdf PDF
Attachment H - 1656273dwg19of29.pdf PDF
Attachment H - 1656273dwg12of29.pdf PDF
Attachment H - 1656273dwg25of29.pdf PDF
Attachment H - 1656273dwg08of29.pdf PDF
Attachment H - 1656273dwg04of29.pdf PDF
Attachment H - 1656273dwg16of29.pdf PDF
Attachment K - DWG Index.pdf PDF
Attachment H - 1656273dwg28of29.pdf PDF
Attachment H - 1656273dwg18of29.pdf PDF
Attachment B - SEC-NAV_5512_1_11787 Form.pdf PDF
Attachment H - 1656273dwg17of29.pdf PDF
Attachment I - UXO Report.pdf PDF
Attachment H - 1656273dwg26of29.pdf PDF
Attachment H - 1656273dwg29of29.pdf PDF
Attachment H - 1656273dwg07of29.pdf PDF
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment H - 1656273dwg15of29.pdf PDF
Attachment H - 1656273dwg23of29.pdf PDF
Attachment E - Schedule B Price Proposal Form.pdf PDF
Attachment H - 1656273dwg20of29.pdf PDF
Attachment F - LRA Commercial Vehicle Inspection Procedures.pdf PDF
Attachment H - 1656273dwg13of29.pdf PDF
Attachment H - 1656273dwg11of29.pdf PDF
Attachment H - 1656273dwg06of29.pdf PDF
Attachment G - Specifications.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

MILCON PROJECT P-91331, PHASE 3 FAMILY HOUSING VILLAGIO AT VICENZA, ITALY

Please see Section SF 30 Block 14 Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Mar-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247022R0002

X 9B. DATED (SEE ITEM 11)

24-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Mar-2022

CODE

COMNAVFACSYSCOM ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247022R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

The purpose of this amendment is for the following items:

1. Extend proposal due date

2. Responses to Pre-Proposal Inquiries (PPIs)

3. Specification and Drawing Revisions

4. Provide Attachments

1. The proposal due date is extended from Friday, 18 March 2022 at 2:00 PM Norfolk, VA local time to Friday, 01

April 2022 at 2:00 PM Norfolk, VA local time.

2. Responses to PPIs 1 13 Factor 1, Corporate Experience. As per the basis of evaluation, subcontractor's projects may be given less weight than Offeror's projects. In the case one subcontractor's project is included in the corporate experience, it means that it is a key subcontractor directly engaged in the execution of the works, and consequently, directly impacting on the success of the performance with relation to its scope.

We respectfully ask to revise this criteria of evaluation and give to subcontractor's projects the same weight as the Offeror's projects.

The Government has given consideration to your question. The solicitation will remain unchanged.

Propose in accordance with the solicitation.

2 We respectfully request that a time extension of 20 business days be granted to this bid. The site visit took place on 25 February, which is about 4 weeks after the issue of this solicitation (24 January) and about two weeks only before submission (11 March). To attend it is not mandatory, but it gives information about the project and the existing conditions.

Real price calculations can take place only after the site visit.

See amendment detail above.

3 SPECIFICATIONS, Contractor's Facilities.

Please clarify which Facilities, such as offices and storages, will be made available to the Contractor within the site area and at which rates.

Refer to Sheet C-005 -

CONTRACTOR LAYDOWN

AND STAGING PLAN. No Government furnished temporary construction office or storage provided.

4 Since last two year, Italian market of constructions, as indeed the worldwide market, is subject to significant turbulences and it's almost impossible now to evaluate the risk of costs escalation and to have certainty on the availability and delivery schedules of the materials. The market conditions at the moment of the execution may be so different to compromise the capability of the Contractor to perform the works. The problem is so important that the Italian Government has issued regulatory adjustments, the latest of which is Decreto Legge 4/2022, published on the Gazzetta Ufficiale (the Official Journal) n.21 of 27 Jan 2022.

We respectfully ask which way Navfac intends to face and manage this issue (i.e.

by introducing a price escalation criteria).

Propose in accordance with the solicitation.

5 We plan to show the experience of a subcontractor that will perform critical aspects of the requirement, which volume of works will be in any case a secondary part of total volume of works. Is it allowable to submit subcontractor's experience which is less than the $15 Million threshold, and demonstrate the performed volume in relation to the volume of the scope of work for this requirement?

In addition to this point: as an example, if a key subcontractor is hired to perform trade Mechanical/ HVAC, can their experience focus only on this trade?

The Solicitation states under Factor 1, “a construction value equal to or exceeding $15,000,000 (or the equivalent foreign currency)” must be submitted in order to be considered a relevant project.

Propose in accordance with the solicitation.

3. Specification and Drawing Revisions

The following Specifications are revised:

SECTION 01 11 00 SUMMARY OF WORK

Delete the Submittal Register attached to the end of the section and replace with the Submittal Register accompanying this amendment.

SECTION 01 14 00 WORK RESTRICTIONS

Delete Section 01 14 00 in its entirety and insert new section 01 14 00 accompanying this amendment.

SECTION 01 33 00 SUBMITTAL PROCEDURES

Delete Section 01 33 00 in its entirety and insert new section 01 33 00 accompanying this amendment.

SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

Delete Section 01 35 26 in its entirety and insert new section 01 35 26 accompanying this amendment.

SECTION 01 45 00.00 20 QUALITY CONTROL

Delete Section 01 45 00.00 20 in its entirety and insert new section 01 45 00.00 20 accompanying this amendment.

SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

Delete Section 01 57 19 in its entirety and insert new section 01 57 19 accompanying this amendment.

SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Delete Section 01 74 19 in its entirety and insert new section 01 74 19 accompanying this amendment.

SECTION 01 78 00 CLOSEOUT SUBMITTALS

Delete Section 01 78 00 in its entirety and insert new section 01 78 00 accompanying this amendment.

SECTION 02 82 00 ASBESTOS REMEDIATION

Delete Section 02 82 00 in its entirety and insert new section 02 82 00 accompanying this amendment.

SECTION 08 71 00 DOOR HARDWARE ATTACHMENT

Delete Section 08 71 00 attachment in its entirety and insert new section 08 71 00 attachment accompanying this amendment.

SECTION 09 30 10 CERAMIC, QUARRY, AND GLASS TILING

Delete Section 09 30 10 in its entirety and insert new section 09 30 10 accompanying this amendment.

SECTION 10 28 13 TOILET ACCESSORIES

Delete Section 10 28 13 in its entirety and insert new section 10 28 13 accompanying this amendment.

SECTION 10 71 13.13 EXTERIOR SHUTTERS

Delete Section 10 71 13.13 in its entirety and insert new section 10 71 13.13 accompanying this amendment.

SECTION 11 24 23 FALL PROTECTION SYSTEM

Delete Section 11 24 23 in its entirety and insert new section 11 24 23 accompanying this amendment.

The following drawings are revised:

NAVFAC DWG NO. Title

14105716 (G-003) INDEX OF DRAWINGS VOLUME I / ELENCO DISEGNI VOLUME I

14105719 (G-006) INDEX OF DRAWINGS VOLUME III PART I / ELENCO DISEGNI VOLUME III

PARTE I

14105757 (H-001) HAZARDOUS MATERIALS GENERAL NOTES / NOTE GENERALI MATERIALI

PERICOLOSI

14105759 (H-102) EXISTING BUILDING 223 HAZARDOUS MATERIALS PLANS / PIANTA

MATERIALI PERICOLOSI EDIFICIO 223 ESISTENTE

14105760 (H-103) EXISTING BUILDING 234 HAZARDOUS MATERIALS PLANS / PIANTA

MATERIALI PERICOLOSI EDIFICIO 234 ESISTENTE

14105761 (H-104) EXISTING BUILDING 115 HAZARDOUS MATERIALS PLANS / PIANTA

MATERIALI PERICOLOSI EDIFICIO 115 ESISTENTE

14106221 (A-101) AP BUILDING 27100 GROUND FLOOR PLAN / AP EDIFICIO 27100 PIANTA

PIANO TERRA

14106236 (A-131) AP BUILDING 28200 GROUND FLOOR PLAN / AP EDIFICIO 28200 PIANTA

PIANO TERRA

14106267 (A-190) SUBSTATION PLANS, ELEVATIONS, SECTIONS AND SCHEDULE / PIANTE,

PROSPETTI, SEZIONI E ABACO SOTTOSTAZIONE

14106271 (A-204) AP BUILDING 27100 EXTERIOR ELEVATION WEST / AP EDIFICIO 27100

PROSPETTI OVEST

14106325 (A-431) 3BR TOWNHOUSE GROUND, FIRST AND SECOND FLOOR PLANS / 3BR

TOWNHOUSE PIANTE PIANO TERRA, PRIMO E SECONDO PIANO

14106369 (A-511) EXTERIOR STEEP SLOPE ROOF DETAILS / DETTAGLI DEL TETTO ESTERNO A

FORTE PENDENZA

14106371 (A-513) EXTERIOR STEEP SLOPE ROOF DETAILS / DETTAGLI DEL TETTO ESTERNO A

FORTE PENDENZA

14106372 (A-514) EXTERIOR STEEP SLOPE ROOF DETAILS / DETTAGLI DEL TETTO ESTERNO A

FORTE PENDENZA

14106373 (A-515) EXTERIOR STEEP SLOPE ROOF DETAILS / DETTAGLI DEL TETTO ESTERNO A

FORTE PENDENZA

14106382 (A-541) TOWNHOUSE EXTERIOR DETAILS / TOWNHOUSE DETTAGLI ESTERNO

14106393 (A-555) INTERNAL DETAIL JOINERY / DETTAGLI FALEGNAMERIA INTERNA

14107044 (A-563) INTERIOR DETAILS - SHOWERS / DETTAGLI INTERNI

14106403 (A-601) INTERIOR PARTITION SCHEDULE / ABACO PARTIZIONI INTERNE

14106416 (A-616) CEILING TYPES SCHEDULE / ELENCO TIPOLGIE CONTROSOFFITTO

14106420 (A-623) AP BUILDING 27100 CORE AND SHELL DOOR SCHEDULE / AP EDIFICIO 27100

ABACO STRUTTURE E FINITURE PORTE

14106421 (A624) AP BUILDING 27100 INTERIOR DOOR SCHEDULE / AP EDIFICIO 27100 ABACO

PORTE INTERNE

14106422 (A-625) AP BUILDING 27200 DOOR SCHEDULES / AP EDIFICIO 27200 ABACO TELAIO

PORTA

14106424 (A-627) AP BUILDING 28200 3BR ABA INTERIOR DOOR SCHEDULE / AP EDIFICIO

28200 3BR ABA ABACO PORTE INTERNE

14106425 (A-628) AP BUILDING 29100 5BR ABA INTERIOR DOOR SCHEDULE / EDIFICIO 29100

5BR ABA ABACO PORTE INTERNE

14106428 (A-653) TOWNHOUSE DOOR SCHEDULES / TOWNHOUSE ABACHI PORTE

4. Provide Attachments

• ATTACHMENT L - 1656273Amend0003 Revised Specs

• ATTACHMENT M - 1656273Amend0003 Revised Drawings

(End of Summary of Changes)