N50054-15-R-0003_Amendment_0002 _Submarine_Preservation_ Conform_Document .pdf

PDF 457 KB Posted

Attached to
Submarine Preservation
Solicitation number
N50054-15-R-0003
Issued by

About this file

N50054-15-R-0003 Amendment 0002 Submarine Preservation Conform Document

View the file

Other files

File Type Posted
Submarine_Preservation_Revised_Q A.pdf PDF
N50054-15-R-0003_Amendment_0002 _Submarine_Preservation.pdf PDF
J25--Past_Performance_Assessment_Questionnaire_ REVISED .doc DOC document
N50054-15-R-0003_Amendment_0001 _Submarine_Preservation_ Conform_Document .pdf PDF
Questions_ _Answers_(Q A) _Submarine_Preservation.pdf PDF
N50054-15-R-0003_Amendment_0001 _Submarine_Preservation.pdf PDF
J15--Submarine_Maintenance_Standard_6350-081-001 _Inspect _Repair_Vibration_Damping.pdf PDF
J2--LWT_042-05.pdf PDF
J14--Submarine_Maintenance_Standard_6310-081-015 _Submarine_Preservation.pdf PDF
J10--LWT_042-88.pdf PDF
J1--CDRLs.PDF PDF
J22--991-11-001 _Scaffolding _provide_ SAMPLE .pdf PDF
J3--LWT_042-07.pdf PDF
Solicitation_N50054-15-R-0003 _Submarine_Preservation.pdf PDF
J25--Past_Performance_Assessment_Questionnaire.doc DOC document
J5--LWT_042-22.pdf PDF
J13--SWT_992-31.pdf PDF
J6--LWT_042-26.pdf PDF
J19--DD_Form_254 _DOD_Contract_Security_Classification_Specification.pdf PDF
J18--S9086-VD-STM-030_Naval_Ships_Technical_Manual_(NSTM)_Chapter_631 _Preservation_of_Ships_in_Service.pdf PDF
J7--LWT_042-27.pdf PDF
J8--LWT_042-28.pdf PDF
J11--LWT_042-89.pdf PDF
Solit-Exhibits_A-E--Submarine_Preservation.xls XLS spreadsheet
J16--Submarine_Maintenance_Standard_6350-081-006 _Inspect_and_Repair_Vibration_Damping.pdf PDF
J24--Past_Performance_Information_(PPI)_Form.docx DOCX document
J23--997-11-001 _Ship's_Docking_Report _Inspection_and_Services _provide_ SAMPLE .pdf PDF
J9--LWT_042-37.pdf PDF
J21--NSLC_User_Account_Request_Form _NSLC_AISC_Form-0001.pdf PDF
J20--Capacity_Evaluation_Form.xlsx XLSX spreadsheet
J12--SWT_077-001.pdf PDF
J4--LWT_042-11.pdf PDF
J17--MARMC_Code_970_Contractor_Scaffolding_Policy _Ser_970-33-12.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 01:00 PM local time 21 Jan 2015

X

A X B X C X D

EX

X

G F 83 - 90

91 - 105 X H 106 - 111 christian.r.smith@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-A3 1 111

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N50054 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

Block 8 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

CHRISTIAN R SMITH (757) 396-5041 X423

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 10

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

11 - 42

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

44 - 45 46 - 47

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 48 - 54 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 55 - 63 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

64 - 80

PART II - CONTRACT CLAUSES

MID-ATLANTIC REGIONAL MAINTENANCE CENTER

CODE 411,

NNSY, BLDG. 51, 2ND FLOOR

PORTSMOUTH VA 23705-0215 (757) 396-5041

(757) 396-1762FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

81 - 82

6. REQUISITION/PURCHASE NO.

N50054SUBPRES

5. DATE ISSUED

19 Dec 2014

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N50054-15-R-0003

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

CLIN

Number

UNDEFINED JOB

Base Year Effort

FFP

Reference Exhibit A for Base Year Effort FOB: Destination

PURCHASE REQUEST NUMBER: N50054SUBPRES

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

CLIN

100101

Reserved

FFP

For Navy Accounting Only

UNIT UNIT PRICE MAX AMOUNT

CLIN

100102

FFP

For Navy Accounting Only

UNIT UNIT PRICE MAX AMOUNT

CLIN

OPTION Option I - Second Year Effort

FFP

Reference Exhibit B for Option I - Second Year Effort

UNIT UNIT PRICE MAX AMOUNT

CLIN

100201

FFP

For Navy Accounting Only

UNIT UNIT PRICE MAX AMOUNT

CLIN

100202

FFP

For Navy Accounting Only

UNIT UNIT PRICE MAX AMOUNT

CLIN

OPTION Option II - Third Year Effort

FFP

Reference Exhibit C for Option II - Third Year Effort

UNIT UNIT PRICE MAX AMOUNT

CLIN

100301

FFP

For Navy Accounting Only

UNIT UNIT PRICE MAX AMOUNT

CLIN

100302

FFP

For Navy Accounting Only

UNIT UNIT PRICE MAX AMOUNT

CLIN

OPTION Option III - Fourth Year Effort

FFP

Reference Exhibit D for Option III - Fourth Year Effort

UNIT UNIT PRICE MAX AMOUNT

CLIN

100401

FFP

For Navy Accounting Only

UNIT UNIT PRICE MAX AMOUNT

CLIN

100402

FFP

For Navy Accounting Only

UNIT UNIT PRICE MAX AMOUNT

CLIN

OPTION Option IV - Fifth Year Effort

FFP

Reference Exhibit E for Option IV - Fifth Year Effort

UNIT UNIT PRICE MAX AMOUNT

CLIN

100501

FFP

For Navy Accounting Only

UNIT UNIT PRICE MAX AMOUNT

CLIN

100502

FFP

For Navy Accounting Only

CLAUSES INCORPORATED BY FULL TEXT

HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)

(a) As part of the negotiated fixed price or total estimated amount of this contact, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term “residual dollar amount” shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)

The entire contract is fixed price.

RMC B-2-0002 PROGRESS PAYMENT RATES

The progress payment rate for this contract is 90 percent for large business and 95 percent for small business.

TOTAL FOR ALL FIVE YEARS

Section C - Descriptions and Specifications

STATEMENT OF WORK (SOW)

C.1. SCOPE OF WORK

C.1.1. The contractor shall furnish the necessary management, material support services, labor, supplies, and equipment deemed necessary to perform depot/intermediate level preservation on Los Angeles, Virginia and Ohio Class submarines. Work may be performed at one or more of the following locations: Norfolk Naval Shipyard (NNSY) or Naval Station Norfolk.

a. Work shall be accomplished by personnel meeting at least the minimum qualifications set forth elsewhere herein and shall be provided onboard the submarine as required. Typical work performed during an availability, may include blasting, preservation, and surface preparation for complete or touch-up preservation for the internal and exterior tanks, bow structure, exterior and interior sail and/or turtleback, free floods, bow dome areas above the boot top, exterior hull, and non-skid removal and installation. Preservation work will include blasting and painting one hundred percent (100%) high solids and non-high solids coatings.

b. Additional work may include the cleaning of sanitary and other tanks, construction of scaffolding required to accomplish submarine preservation work, general shipboard cleaning, zinc replacement, and lead ballast removal and installation.

C.1.2. Critically coated surfaces and tanks require National Association of Corrosion Engineers (NACE) or NAVSEA Basic Paint Inspector (NBPI) certified inspectors, blasters, spray painters, plural component pump tenders and applicators, who have work experience in extremely confining spaces with structural abnormalities, equipment interferences and limited existing access openings. Inspectors and painters must be highly experienced working in extremely confining spaces with the application and inspections of ultra-high solid Optically Active Pigment (OAP) paints including single coat systems and non-high solid paints (e.g. Sherwin Williams Fast Clad ER, International Interline 783, Navy Polyamide Epoxy MIL-DTL-24441 paints ). All tanks require the preparation and application of 100% coverage without additional access cuts installed and special blasting and application equipment/nozzles are often required to achieve this requirement.

C.1.3. A Ship Specification Package (SSP) or Statement of Work (SOW) shall be issued with each task order and will include the details of the work requirements, deliverables, documentation, training, inspections, and applicable Government, department, and industry standards.

C.1.4. The production schedule requirements for the tanks are of utmost importance to the Navy and shall be adhered to. The use of project management, supervision and quality assurance personnel that are familiar with this type of preservation process is extremely important. At a minimum, contractors shall meet the minimum personnel qualification requirements outlined in paragraph C.2 PERSONNEL.

C.1.5. Due to U.S. Navy or other customer commitments and schedules, task orders may be issued as emergent requirements. The contractor may be required to respond to more than one requirement (simultaneous task orders for more than one submarine).

C.1.6. Specific tasks can include the following functions:

a. Interior tanks, exterior tanks, pressure hull, non-pressure hull, Vertical Launch System (VLS), Retractable Bow Plane (RBP), Torpedo Tube Recess, sonar dome, fairwater, turtleback, and miscellanies recess/free floods; and may include hull components and other mechanical linkages/surfaces that shall be protected during blasting and painting operations to prevent damage. The components may or may not be removed by the Government during the availability. These components will remain in place unless Government work requires their removal.

b. Sound Dampening/Special Hull Treatment (SHT) Tiles

1. Reference (e) and reference (f) provide guidance on the preparation and preservation of dampening tiles. Surfaces beneath exterior tiles and tiles inside tanks are considered critically coated. All exterior tiles and tiles inside tanks shall be installed over a surface prepared to Surface Preparation Standard (SSPC)-SP 10 and painted (avoid filling perforations). CRES fasteners (studs, nuts, washers) used to secure Type II vibration damping and acoustic tiles shall be left unpainted.

2. The government/contractor will remove any sound damping tiles found to be damaged. Tightly adherent paint within one inch of damping and acoustic tiles does not have to be removed if the paint is in good condition as determined by NACE or NBPI certified inspectors. Special precautions are required for protection of the sound damping tiles. Precautions include starting of blasting operations at the lowest pressure and working pressure up until paint is removed, while keeping the wand discharge constantly moving. Areas of paint failure within one inch of tiles may be power tool cleaned to bare metal (SSPC-SP 11). If the sound damping tiles weep, the weeping will be addressed on an individual basis with removal only as a last resort. Sound damping tiles will remain installed unless they are damaged. Damage to systems, components or other items, including sound dampening tiles, incurred through improper blast protection/carelessness by the contractor will be repaired by NNSY and/or Contractor at the contractor’s expense in accordance with DFAR Clause 252.217-7012.

3. NNSY is responsible for stud replacement and installation unless otherwise specified on individual task orders.

4. Reference (i) and reference (j) provide guidance on the preparation, installation and preservation in way of SHT. All contractor personnel shall be trained and certified per the guidance of paragraph 3 of Section V of the Special Hull Treatment (SHT) Uniform Industrial Process Instruction (UIPI). NNSY will provide the necessary training materials and video noted in paragraph 4 of Section V of the SHT UIPI for the contractor to perform this training. Upon award of task order, contractors shall provide their company specific training/lesson plan for review by NNSY C (255) for compliance with the SHT UIPI. Contractor shall provide a printed copy of qualification and training records to the COR for verification and record retention purposes.

Qualifications will be verified prior to the commencement of any work.

5. Special precautions are required for SHT work because of special hazards associated with SHT tile, mainly toxic metals (lead) and hazardous waste from paint chips. Whenever preparing tile surfaces where tile coverply will be disturbed, various levels of Personal Protective Equipment (PPE) will be required in accordance with Navy Occupational Safety and Health (NAVOSH) standards or Occupational Safety and Health Administration (OSHA) Maritime Standard 29 CFR 1915.1025, Lead. The contractor shall supply all Personal Protective Equipment (PPE) in accordance with the appropriate OSHA Standard list. Examples of typical equipment used include steel toed shoes, safety glasses, hard hats, ear plugs, fall protection, flashlights, chemlights and respiratory protection equipment. When respiratory protection is required the contractor shall furnish, train and fit-test the employee with a NIOSH approved respirator/face-piece, breathing air hoses, breathing air box/manifold and appropriate cartridges for the airborne hazard generated. Contractor personnel performing work under this contract shall complete OSHA Maritime Standard 29 CFR 1915.1025, Lead Training prior to reporting to work under any task order awarded under this contract. The contractor shall provide verification that each individual performing work under this contract is properly qualified and trained in accordance with NSI 009-74 and OSHA Standards.

a. Zinc Replacement includes the removal and installation of zinc anodes and continuity check.

b. Lead Ballast Removal and Installation. Lead ballast removal and installation typically includes the following: removal and reinstallation of sound dampening tiles, remove/retain lead bin canning plate, caning plates strongbacks and liners, remove lead ballast, cleaning of lead pigs, clean lead bin pockets, use of protective coverings/containments, surface preparation, preservation of lead bins, and reinstall lead. Contractor is responsible for lead cutting. Note: Contractor will provide all lead cutting equipment.

1. When lead is removed from lead bins, the structure shall be blasted to SSPC-SP 10 and preserved with an ultra-high solids paint, (even if the surrounding structure is being touch-up painted) prior to installing lead per reference (e).

c. When the contractor is responsible for staging, it will typically include all internal and external staging installation, modification, maintenance of and removal as requested. Staging may be required to support work being accomplished by the contractor and may be used to support NNSY at no additional cost to the Government.

d. Specific Preservation Requirements

1. The contractor will be required to provide all coatings, solvents and any other material required unless stated otherwise in the task order. The contractor will be required to provide samples of all paints (with copies of Material Safety Data Sheets (MSDS) and Certificate of Analysis (COA) or Certificate of Conformance (COC) with the receipt inspection test values) used in CRITICAL COATED areas to the government for receipt inspection prior to use as stated in the task order. The Government will perform the required testing for receipt inspection of all coatings as stated in the task order. Contractor shall only use QPL/QPD authorized paints that have received receipt inspection government approval. The Government is not responsible for paints failing receipt inspection and will be allowed to hold onto the samples until the issue is documented and adjudicated.

Contractor will provide copies of all laboratory reports from receipt inspections to the Government prior to application. The contractor will provide to the Government a report listing all paints and attributes of paints (e.g colors) utilized by the contractor by item. This is required to complete the docking report (PER SWT 997-00) and for entry into the Corrosion Control Information Management System (CCIMS).

2. The Government will perform an initial wash down of the hull, free floods, voids, and tanks upon opening. The contractor shall be responsible for additional cleaning to support blasting/ painting including fresh water pressure washing (2000 – 5000 PSI) of the surfaces to remove loose paint and salt deposits and other debris; clean to SSPC-SP 1 specification. Government inspection with contractor will be accomplished to determine pre-existing damage after contractor pressure washing is complete.

3. During work per this contract, the contractor will be required to re-preserve or touch-up paint of the tank/space, areas in way of staging, temporary services/interferences were located, access cuts, etc.

until the final acceptance of the tank or space by the project Government representative and Government Inspector(s). Government Inspection of this work is required. After the tank/area is turned over and accepted by the Government, any area disturbed by the Government will be touched-up by the Government. Tank Closure touch-ups will be completed by the Government (NNSY).

4. All tanks requiring blasting (SSPC-SP 6 and SSPC-SP 10) will include all surfaces to be prepared and preserved one-hundred percent (100%) (e.g. structural, framing, flasks, foundations, hangers, tank covers including main ballast tanks flood grates and appendages (welded, bolted, or removed as interference from the area) that are normally prepared and preserved). All removed appendages shall be identified/tagged and turned over to the contractor for prep/painting. Standard Work Items (SWIs) (commonly referred to as “042s”) or Engineering specifications (commonly referred to as “E-specs”) are equivalent to the Customer Contracted Team (CCT) MOA and are invoked in contracts for work contracted through MARMC. References (e), SWIs, Engineering specifications”) and reference (l) section 11 applies. Customer Contracted Team (CCT) is any maintenance organization (military, government activity or contractor) that is neither NNSY nor Ship’s Force (S/F).

5. NAVSEA Standard Item (NSI) 009-32, and reference (e) provide inspection criteria for each coat of the system applied. Paint failure defects are defined in paragraph 631-6.5 and Table 631-6-2 of Reference (l), NSI 009-32 and reference (e). For the purpose of this contract, cratering is not a hole in the coating.

Holes through the coating are pinholes, also known as holidays, as defined in paragraph 631-6-5 and Table 631-6-2 of Reference (l), NSI 009-32 and reference (e).

6. During surface preparation by blasting the contractor may be allowed to prepare inaccessible areas with power tools to SSPC-SP 11, as follows. The decision that an area is inaccessible and what the acceptable surface preparation shall be determined by a joint inspection and agreed to by the SUPERVISOR/Government prior to surface preparation. The degree of surface preparation required would be the maximum possible for that area in accordance with NSI 009-32 and reference (e). Inaccessible areas where the contractor is authorized to utilize power tools are to be documented on QA forms as “Inaccessible Areas” with a SUPERVISOR/Government signature included that area is inaccessible and what acceptable surface preparation is allowed.

7. Environmental controls will be maintained by the contractor as required in accordance with NSI 009-32 and reference (e). Copies of all Environmental OQE will be provided to the Government upon request.

e. The contractor will provide fire watches during any hot work producing operations. OSHA standards and/or the Safety and Health Divisions of the location of the work being performed shall determine if the work is a hot work operation.

f. Containment/Blast Protection

1. Each Task Order will identify whether the Government or the contractor will provide staging, containments, enclosures and aerial platforms required to perform the preservation work. If the contractor is tasked to provide the staging and containments for the outer hull, 100% of the blast grit must be contained and monitored for grit accumulation to prevent weight damage/personnel injury/collapse. No welding or stud welding will be allowed to the outer hull, pressure hull or pressure hull support structure or superstructure. The Government will stage the Outer hull radiation areas. If the contractor is to provide the staging it shall be installed, modified, maintained and removed in accordance with the requirements of reference (h) and 1915 of reference (k). If the Government provides the staging the contractor will not be allowed to tie contractor staging into the Government staging without prior approval of NNSY Staging Inspector. Contractor provided staging, containments, and enclosures around radiation areas will need to be offset as necessary to preclude entry into the radiation area by any personnel working aloft. The perimeter of radiation areas are clearly marked with magenta signs and rope by NNSY Code 105. The contractor provided staging will be used by the Government to perform inspections and any required repairs.

2. The contractor will be required to install, maintain and remove protection/protective covers in way of contamination producing operations. Government verification inspections shall be required prior to, during and after each of the contamination producing operation. The Government Representative shall be present at each contamination producing operation protection inspections. The post contamination producing operation inspection will require the contractor to remove “ALL CONTRACTOR CONTAMINATION PRODUCING OPERATION PROTECTION” and then reinstall the contamination producing operation protection prior to the next contamination producing operation evolution. Government may require the contractor to cover additional structure and piping that they identify as requiring protection.

C.2. PERSONNEL

C.2.1. The contractor shall be responsible for the employment of trained and technically qualified personnel to perform task orders. The contractor shall be responsible for assuring that all personnel meet security requirements at each location they will work. The contractor, upon request of the Government representative, shall produce the qualifications of an individual to substantiate qualifications to perform the task being worked. In addition, the contractor is responsible for employing and maintaining the personnel, organizational and administrative control necessary to ensure the performance meets or exceeds all contract specification requirements hereunder, reference (a) through reference (m) and as set forth in each individual task order.

C.2.2. The contractor shall ensure adequate resources are dedicated to comply with the standards, guidelines, and procedures as stated to satisfy the requirements of the task orders. The use of project management, engineers, on-site supervisors and quality assurance personnel that are familiar with this type of preservation process is required.

C.2.3. The contractor shall identify one lead, dedicated point of contact (POC) (i.e. Project Manager, On-

Site Supervisor) and an alternate POC who shall coordinate all aspects of the task order. This individual will be required to attend project team morning meetings to ensure a coordinated effort in accomplishment of work. A weekly review meeting (or on a schedule identified within each task order) will be required to evaluate the progress of blasting and painting and evaluate overall schedule progress.

C.2.4. Critically coated surfaces and tanks require certified quality assurance inspectors, blasters, spray painters, plural component pump tenders and applicators in accordance with NSI 009-32 and reference (e), who have work experience in extremely confining spaces with structural abnormalities and equipment interference.

C.2.5. Contractors performing blasting operations (abrasive and waterjetting) or paint/nonskid application shall be certified in accordance with NSI 009-32, reference (e), and The Society of Protective Coatings (SSPC) QP 1 Certification or NAVSEA-approved equivalent.

C.2.6. Minimum Personnel Qualifications Requirements

a. The contractor is required to provide key on-site personnel who meet at least the minimum levels of professional and technical experience outlined below. The specialized experience included, as a part of the required qualifications, shall have been obtained in the fields of endeavor indicated by the applicable labor categories listed below. Working knowledge may be obtained either by direct experience or by close working relationship with the area specified so that it would enable successful performance of tasks. If the ACO questions the qualifications or competence of any person under the contract, the burden of proof to sustain that the person is qualified shall be upon the contractor.

Project Manager:

Experience: The individual should have ten or more years in overseeing and managing preservation efforts on

U.S. Navy ships similar in scope to the statement of work using Naval Ship’s Technical Manual (NSTM) 631 and NSI 009-32 preservation standards and environmental practices.

Project Engineer:

Experience: The individual should have ten or more years of experience in dealing with preservation efforts onboard U.S. Navy ships and currently operating at the Journeyman level.

Quality Assurance Professional:

Experience: Coating inspectors shall have a minimum of two years of marine coatings related work experience. The individual should also be capable of implementing quality assurance plans, reading and recording data associated with marine coatings. Shall be fully qualified and certified in accordance with applicable requirements outlined in Section C.2.

Supervisor:

Experience: The individual should have a minimum of four years of experience with the application of marine coatings, including, but not limited to: set up, abrasive blasting, power tool cleaning, mixing and applying materials. Requires experience measuring and recording required data such as: ambient temperature and paint thickness. Requires experience in reading and interpreting blue prints, technical manuals and other technical data and in sequencing work appropriately to eliminate repeating work efforts. Shall be fully qualified and certified in accordance with applicable requirements outlined in Section C.2.

C.2.7. The contractor agrees that key personnel designated in the technical proposal will be available for contract performance and shall not be replaced during the first 120 days of the contract, unless such substitutions are necessitated by an individual’s sudden illness, death, or termination of employment. All proposed substitutes (no matter when they are proposed during the performance period) shall have qualifications that are equal to or higher than the qualifications of the person being replaced. If the Contracting Officer determines that suitable and timely replacement of personnel who have been reassigned, terminated or have otherwise become unavailable to perform under this contract is not reasonably forthcoming or that the resultant reduction of productive effort would impair the successful completion of the contract or the Task Order, the contract may be terminated by the Contracting Officer for default. Alternatively, at the Contracting Officer’s discretion, if the Contracting Officer finds the contractor to be at fault for the condition, they may equitably adjust (downward) the contract price to compensate the Government for any delay, loss or damage as a result of the contractor’s action.

C.3. ORGANIZATION

C.3.1. The Contractor must have an established, documented, implemented, and maintained Quality Management System as a means of ensuring the final product conforms to specified requirements of the Task Order.

In accordance with NSI 009-04, the Quality Management system shall, as a minimum, comply with the requirements of ANSI/ISO/ASQ Q9001-2008 and all additional contract requirements.

a. The contractor must have an organization with the experience and comprehensive understanding to apply management techniques, methods, and procedures required to efficiently complete the requirements of this solicitation.

b. The contractor shall work in accordance with this contract, and the written task orders issued by the Contracting Officer (CO). Should the contractor be instructed by an individual other than the Contracting Officer to perform work that it considers to be a change to this contract or the task order, the contractor shall not perform such work and immediately notify the Contracting Officer in accordance with the notification of changes clause, FAR 52.243-7.

C.3.2. Contractors performing blasting operations (abrasive and waterjetting) or paint/nonskid application shall be certified in accordance with The Society of Protective Coatings (SSPC) QP 1 Certification or NAVSEA-approved equivalent.

C.3.3. The contractor is required to provide all of their own equipment and supplies necessary for the performance of this contract. Should the Government provide any Government furnished property it will be stated clearly in each task order.

C.4. REFERENCES

C.4.1. In performing the requirements of this contract, the contractor shall comply with all the following references and attachments (Section J) to this solicitation.

a. The following Category I and II, NAVSEA STANDARD ITEMS (NSIs) may be viewed on the

Internet at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/standard.aspx and will apply to all task orders:

009-01 General Criteria; accomplish 07 Nov 2013

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide

29 Jul 2011

009-03 Toxic and Hazardous Substances; control 17 Jan 2013 009-04 Quality Management System; provide 07 Nov 2013 009-05 Temporary Accesses; provide 17 Jan 2013

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

10 Jun 2014

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;

accomplish

10 Jun 2014

009-09 Process Control Procedure (PCP); provide and accomplish 06 Jan 2014 009-10 Shipboard Asbestos-Containing Material (ACM); control 29 Jul 2011 009-20 Government Property; control 17 Jan 2013 009-23 Interferences; remove and install 17 Jan 2013 009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; 17 Jan 2013 accomplish 009-32 Cleaning and Painting Requirements; accomplish 07 Nov 2013

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

10 Jun 2014

009-59 Organotin Antifouling Materials; control 29 Jul 2011 009-61 Shipboard Use of Flurocarbons; control 17 Jan 2013 009-65 Polychlorinated Biphenyls (PCBs); control 29 Jul 2011 009-67 Integrated Total Ship Testing; manage 17 Jan 2013 009-69 Heavy Weather Plan; provide 07 Nov 2013

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

10 Jun 2014

009-74 Occupational, Safety and Health Requirements; accomplish 10 Jun 2014 009-79 Government Owned Material (GOM); status reporting 29 Jul 2011 009-81 Compartment Closeout; accomplish 17 Jan 2013

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

17 Jan 2013

009-97 Ship Building and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coatings Information; provide

17 Jan 2013

009-99 Ship Departure Report; provide 17 Jan 2013

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish

29 Jul 2011

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels;

accomplish

29 Jul 2011

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards;

accomplish

29 Jul 2011

b. The following Category I and II, NAVSEA STANDARD ITEMS (NSIs) may be viewed on the Internet at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/standard.aspx and will be invoked on individual task orders as needed:

009-12 Welding, Fabrication, and Inspection Requirements; accomplish 07 Nov 2013 009-13 Meters; repair and certify calibration 17 Jan 2013 009-14 Gages and Thermometers; repair and certify calibration 17 Jan 2013 009-19 Provisioning Technical Documentation (PTD); provide 29 Jul 2011 009-21 Logistics and Technical Data; provide 29 Jul 2011 009-25 Structural Boundary Test; accomplish 17 Jan 2013 009-26 Deck Covering Requirements; accomplish 17 Jan 2013 009-29 Asbestos-Free Pipe Hanger Liner Material; install 29 Jul 2004 009-37 General Procedures for Woodwork; accomplish 30 Jul 2010

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/Component; provide

19 Jul 2007

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

29 Jul 2011

009-41 Technical Manual Contract Requirement (TMCR) for a Topically Structured Technical Manual; provide

19 Jul 2007

009-42 Technical Manual Contract Requirement (TMCR) for Updating Technical Manuals; provide

19 Jul 2007

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

07 Nov 2013

009-63 Lubricating Oils and Hydraulic Fluid; analyze 29 Jul 2011 009-77 Cofferdam Requirements; accomplish 17 Jan 2013 009-83 Wire Rope Fitting Verification; provide 17 Jan 2013

009-84 Accountability of Temporary Fasteners; provide 17 Jan 2013

009-85 Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide

19 Jul 2007

009-87 Chemical Disinfection Procedures; accomplish 17 Jan 2013

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

29 Jul 2011

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;

accomplish

29 Jul 2011

009-90 Technical Representative; provide 07 Nov 2013 009-104 Vibration Testing and Analysis; accomplish 29 Jul 2011 009-106 Work Authorization Form Coordinator (WAFCOR); provide 06 Jan 2014 009-107 Piping System Cleanliness (Non-Nuclear); accomplish 17 Jan 2013

c. The following NNSY LOCAL WORK TEMPLATES (LWTs) will be invoked on task orders as needed and are provided as attachments in Section J of the solicitation:

042-05 General Requirements for Work on Submarines for Norfolk Naval Shipyard (NNSY) Depot Level Availabilities; accomplish (Attachment J2)

042-07 Nuclear Powered Ships/Nuclear Support Ships; special requirements (Attachment J3)

042-11 General Occupational Safety, Health and Environment (OSHE) Requirements for Work Within Norfolk Naval Shipyard; accomplish (PCP) (Attachment J4)

042-22 General Requirements for Work Within Norfolk Naval Shipyard (NNSY); accomplish (Attachment J5)

042-26 Security Requirements for Work Within Norfolk Naval Shipyard (NNSY); accomplish (Attachment J6)

042-27 Accountability of Man-hour and Material Reservation; accomplish (Attachment J7)

042-28 Special Requirements for Non-SUBSAFE Work on Submarines; accomplish (Attachment J8)

042-37 General Requirements for Work Within Naval Station Norfolk and Joint Expeditionary Base (JEB) Little Creek - Fort Story; accomplish (Attachment J9)

042-88 Painting Requirements for Submarines Within Norfolk Naval Shipyard (NNSY); accomplish (Attachment J10)

042-89 General Radiological Requirements for Nuclear Powered Submarines at Norfolk Naval Shipyard (NNSY); accomplish (Attachment J11)

d. The following STANDARD WORK TEMPLATES (SWTs) will be invoked on individual task orders as needed and are provided as attachments in Section J of the solicitation:

077-01 Hazardous Waste Produced on Naval Vessels; control (Attachment J12) 16 Jun 2014 992-31 Cleaning and Pumping; accomplish (Attachment J13) 16 Jun 2014

e. Submarine Maintenance Standard 6310-081-015, Submarine Preservation (Attachment J14)

f. Submarine Maintenance Standard 6350-081-001, Inspect; Repair Vibration Damping

(Attachment J15)

g. Submarine Maintenance Standard 6350-081-006, Inspect and Repair Vibration Damping

(Attachment J16)

h. MARMC Code 970 Contractor Scaffolding Policy, Ser 970-33-12, dated 25 July 2012

(Attachment J17)

i. S6360-AD-HBK-010, Technical Handbook for Special Hull Treatment Maintenance and

Repair for Submarines (Classified Document—To be provided at award)

j. Uniform Industrial Process Instruction (UIPI) 0131-454C, Special Hull Treatment, Installation

Procedure (Classified Document—To be provided at award)

k. Occupational Safety and Health Administration (OSHA) Maritime Standard 29 CFR Title 29, Parts 1910, 1915, 1917, 1918, and 1926 are available at https://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0.

l. S9086-VD-STM-030 Naval Ship’s Technical Manual (NSTM) Chapter 631, Preservation of

Ships in Service (Attachment J18)

m. The Society of Protective Coatings (SSPC), Surface Preparation Standards are available at http://www.sspc.org.

NOTE: The contractor shall comply with the latest revision of these documents in effect at solicitation closing and when each option year is invoked. Additionally, in the event that there is any conflict between the references, NSIs, LWTs, and SWTs take precedence over technical manuals, specifications, and other references. Also, when references incorporate other tiered references, they are to be followed.

C.5. POST AWARD SUBMISSION

After receipt of a task order award and prior to starting work onboard the vessel, the contractor must submit a Visit Authorization Letter (VAL) in accordance with SECNAV M-5510.30 (Dept. of the Navy, Personnel Security Program), and/or DOD 5220.22M (National Industrial Security Program Operating Manual), to the Commanding Officer of the ship via the Mid-Atlantic Regional Maintenance Center (MARMC) Security Officer.

NOTE: The contractor shall comply with the latest revision of these documents in effect at solicitation closing and when each option year is invoked.

C.6. GENERAL REQUIREMENTS

The following are applicable to the extent they apply to all repairs, modifications, testing and adjustments. Any cost to comply with these requirements shall be included in the price of the CLINs listed in Section B.

C.6.1. The Contractor shall:

a. Exercise sound judgment and expertise to assure the successful completion of all tasks placed hereunder.

b. Designate those persons authorized to accept/reject verbal orders by the Administrative

Contracting Officer (ACO).

c. Coordinate schedules in the work affected areas with the Ship’s Authorized Representative

(SAR), MARMC Maintenance Team (MT), Lead Maintenance Activity (LMA), and the Contracting Officer’s Representative (COR) during the performance period of the task order. Obtain a copy of the ship’s operation drills, etc. (prior to start of work) from the SAR, thus avoiding unnecessary delays. The work effort on task orders shall be coordinated at minimum on a daily basis with the SAR to allow for changing situations onboard ships, vessels and shore activities to minimize delays and disruptions.

d. Progressively forward all requests for changes in delivery schedules, funding requirements and scope of work in writing to the COR. These requests shall include specific details as to what changes are required and circumstances requiring such and shall be submitted to the COR for forwarding to the ACO prior to 85% of delivery availability being exceeded.

e. Not respond to new performance requirements until a task order or a modification has been signed or verbal authorization has been given by the ACO.

f. Not respond to any requests requiring deviations in technical performance as specified in the task order without obtaining prior approval of the ACO.

g. Be responsible for inspection of workspaces prior to manning to ensure spaces are available for work to avoid unnecessary delays in day to day work schedule. If unexpected conditions exist, contractor shall submit Condition Report prior to start of work in space to project management.

h. Comply with NSI 009-24 in regards to isolation, blanking and tagging equipment, systems, circuits, components, piping and valves. Also comply with LWT 042-28 if the work is being performed in Norfolk Naval Shipyard. Work Authorization Form (WAF) will be utilized and invoked in conjunction with NSI 009-24 when work is being accomplished in Norfolk Naval Shipyard. The web site for the WAF is:

http://www.submepp.navy.mil/.

i. When working at Naval Station Norfolk LTW 042-05, 042-37, and 042-07 are invoked.

j. When working at Norfolk Naval Shipyard (NNSY), LWT 042-05, 042-07, 042-11, 042-22, 042-26, and 042-28, are invoked.

k. Provide protection during contamination-producing operations and maintain cleanliness in accordance with NSI 009-06. Remove and properly dispose of all debris or trash resulting from cleaning, removal, installation or any other aspect of task performance.

l. Submit a written weekly report detailing the daily events and the progress made during the course of each day to the COR and SAR. Time and location for submission of the weekly report shall be agreed upon at the beginning of each task order and prior to the start of the work.

m. Except as otherwise provided in this contract, or task orders issued hereunder, the Contractor shall provide all material, labor services, equipment, supplies, power, accessories, facilities and such other supplies and services as necessary for accomplishing assigned tasks. The Contractor may request on a case-by-case basis to use ship's services that are available. A request for use of ship's services must be made jointly to the SAR, LMA, and COR. Written permission will be obtained from the Commanding Officer (CO) of the ship before actual use of any ship services. A request for ship's services may be turned down whether or not the requested service is available. Denial of a request for use of ship's services will not be a valid basis for any claim or request for compensation. Regardless of any request for ship’s services, ship’s services shall not be used for contractor life support systems (compressors for breathing air), lifting equipment or any other equipment wherein an unexpected disruption of services has a high potential for loss of life, injury or damage to the ship’s equipment.

n. Ensure that persons assigned to render services hereunder are at all times under the direction and control of the contractor and are not employees of the Government.

o. Notify the Government by Condition Report, of interferences that need to be removed. This notification should be submitted no later than five days prior to the interference removal need date. Removal of interferences will be kept to a minimum, and they will not be performed just as a convenience to the contractor.

The Government will determine if the interference should be removed. The Government will be responsible for all interference removal and re-installation.

p. Follow all applicable Federal, State, and Local Laws concerning safety, health, and welfare of personnel and equipment as well as other personnel and equipment within a close proximity of the ongoing work and participate in drills to exercise the capacity for compliance to applicable Federal, State, and Local Laws.

q. Obtain approval in accordance within the guidelines set forth in clause RMC C-2-0051, Utilization of Subcontracts and Government Permission Prior to Their Use, prior to subcontracting any portion of the effort required by specific task orders.

r. Contact the COR when problems are encountered after normal working hours. If the COR cannot be reached, the contractor shall contact the MARMC Duty Officer at 757-739-5324. The MARMC Duty Officer will contact the Contracting Officer.

s. The contractor will identify needed repairs incidental to work identified on the task order, and recommend corrective actions during the contract performance for those deficiencies discovered which are not covered by the work specifications. Needed repairs and corrective action reported will be submitted to the Government in the form of a Condition Found Report (CFR).

CFR’s, price and supporting data will be submitted via the Navy’s automated Maintenance Database (NMD) within five working days of identification of the requirement. As a minimum, the CFR will include the following:

i. Identify the contract and task order number, ship, and hull number

ii. Serialize by CFR number

iii. Identification of the applicable Work Item number

iv. Date requirement was discovered

v. Description of work requirement

vi. Specification location of work

vii. Recommendation for corrective action

viii. Recommendation for the appropriate/best time to accomplish the work (with or without schedule change). Provide supporting rational for the recommendation, such as price efficiencies, availability of the work force, availability of material, premium expenditures, etc.

ix. Price and time estimates, and the time frame for which it is valid. The estimates should include premium/acceleration price for the material, subcontractors, man-hours, rework, and any additional price to on-going work resulting from the inclusion of the CFR work requirement.

x. Identification of related changes, if any, to the internal milestones and the production and task order completion dates. If there are no changes, the CFR should state that.

t. Attend a project orientation brief that will discuss expected actions of all contractors working onboard in the event of casualty. Additionally, the Contractor will follow direction of the Government Project Team in the event of drills or actual emergencies. The orientation is required for each awarded task order. Submit a report to the COR listing all personnel who have attended the orientation. The report shall be submitted prior to personnel reporting to the work site.

u. Be required to have personnel attend a brief on radiological controls and a brief on SUBSAFE requirements at the beginning of the project. The brief normally lasts 2-4 hours in length.

v. Be required to obtain a copy of ship’s drills and evolutions prior to the start of work. Drills conducted by ships force and /or the government facility will require minimal participation of the contractor but may require a short delay in the production effort. The contractor will be required to muster his employees at a designated area and the coordination for such drills will be with the COR.

w. Anticipate the following delays and disruptions: 4 hour delay per month for ship’s force and/or Government facility drills. WAF processing is usually 2 days and is contingent on ship's force availability and action.

x. The work to be performed on this contract requires strict adherence and management of the production schedule. The government’s historical data reveals that the contractor should anticipate manning the project twenty-four hours a day and seven days a week. The contractor will be required to attend progress and scheduling meetings, which may occur on daily and/or weekly basis. The goal of these meetings would be to provide updates to schedule adherence and to discuss any issue that may impact the contractor’s schedule.

y. The topside of each submarine will have gangway brows (1 brows forward and 1 brows aft), temporary services lines, hoses and cabling, safety railing and toe boards and other interferences. Staging, enclosures and containments shall be installed to suit these conditions. Preservation work on the external hull, sail and topside will require sequencing of production efforts to work around these conditions.

z. Damage to systems, sound dampening tile, components or other items incurred through improper blast protection, painting of surfaces designated not to be painted or carelessness by the contractor will be repaired by the Government or contractor at the contractor’s expense. The Liability and Insurance Clause (Aug 2003), DFAR 252.217-7012, is in effect in this contract. The contractor shall bear the first $50,000.00 of loss or damage from each occurrence or incident. The Contracting Officer will determine the parameters of the occurrence or incident at the time of the event. Some factors such as: the process or action that caused the damage, the amount and areas where the damage occurred, and when the damage was discovered will be considered.

aa. The Government will provide securable lay down areas. The contractor shall provide all specific equipment dimensions to the Government project team no later than 5 days after Task Order award to allow for specific allocation of space. The project team will coordinate the laydown area with the contractor. Lay down areas are solely for material needed to support current work evolutions and are not intended for long term storage.

All materials shall be kept to a minimum. The lay down area shall not be used for conex boxes unless approved by the COR. All conex boxes are to be used for material/tooling storage only and not for use as administrative spaces.

Vehicles are not to be parked in any areas intended for material storage. Shipyard cleanliness will be maintained.

There will be no material stored around, between or on top of conex boxes. A source of electricity and phone service will be provided for conex boxes, but will…