J8--LWT_042-28.pdf

PDF 7 KB Posted

Attached to
Submarine Preservation Federal contract opportunity
Solicitation number
N50054-15-R-0003
Issued by
Department of the Navy Naval Sea Systems Command

About this file

J8--LWT 042-28

View the file

Other files for this federal contract opportunity

Other files attached to Submarine Preservation, newest first.
File Type Posted
N50054-15-R-0003_Amendment_0002 _Submarine_Preservation.pdf PDF
Submarine_Preservation_Revised_Q A.pdf PDF
N50054-15-R-0003_Amendment_0002 _Submarine_Preservation_ Conform_Document .pdf PDF
J25--Past_Performance_Assessment_Questionnaire_ REVISED .doc DOC document
N50054-15-R-0003_Amendment_0001 _Submarine_Preservation.pdf PDF
N50054-15-R-0003_Amendment_0001 _Submarine_Preservation_ Conform_Document .pdf PDF
Questions_ _Answers_(Q A) _Submarine_Preservation.pdf PDF
J1--CDRLs.PDF PDF
J22--991-11-001 _Scaffolding _provide_ SAMPLE .pdf PDF
Solicitation_N50054-15-R-0003 _Submarine_Preservation.pdf PDF
J3--LWT_042-07.pdf PDF
J25--Past_Performance_Assessment_Questionnaire.doc DOC document
J13--SWT_992-31.pdf PDF
J6--LWT_042-26.pdf PDF
J19--DD_Form_254 _DOD_Contract_Security_Classification_Specification.pdf PDF
J18--S9086-VD-STM-030_Naval_Ships_Technical_Manual_(NSTM)_Chapter_631 _Preservation_of_Ships_in_Service.pdf PDF
J4--LWT_042-11.pdf PDF
J21--NSLC_User_Account_Request_Form _NSLC_AISC_Form-0001.pdf PDF
J12--SWT_077-001.pdf PDF
J9--LWT_042-37.pdf PDF
J17--MARMC_Code_970_Contractor_Scaffolding_Policy _Ser_970-33-12.pdf PDF
J20--Capacity_Evaluation_Form.xlsx XLSX spreadsheet
J14--Submarine_Maintenance_Standard_6310-081-015 _Submarine_Preservation.pdf PDF
J10--LWT_042-88.pdf PDF
J5--LWT_042-22.pdf PDF
J11--LWT_042-89.pdf PDF
Solit-Exhibits_A-E--Submarine_Preservation.xls XLS spreadsheet
J23--997-11-001 _Ship's_Docking_Report _Inspection_and_Services _provide_ SAMPLE .pdf PDF
J24--Past_Performance_Information_(PPI)_Form.docx DOCX document
J2--LWT_042-05.pdf PDF
J15--Submarine_Maintenance_Standard_6350-081-001 _Inspect _Repair_Vibration_Damping.pdf PDF
J7--LWT_042-27.pdf PDF
J16--Submarine_Maintenance_Standard_6350-081-006 _Inspect_and_Repair_Vibration_Damping.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO: 042-28-0011 of 3

USS ALBANY (SSN-753) 042-28-001ITEM NO:

16-501COAR:

NONECMP:

BASSPLANNER:

SHIP:

PCN: NNSY-Q064

SCOPE

REFERENCES

1.

2.

1.2.1

1.3.1

Norfolk Naval Shipyard

Not Applicable

Location of Work:

Identification:

2.1

2.2

2.3

2.4

2.5

2.6

2.7

2.8

2.9

2.10

Standard Items

0924-LP-062-0010, Submarine Safety (SUBSAFE) Requirements Manual

NAVSEANOTE 5000, Identification of Activities Authorized to Perform

SUBSAFE Work

0905-LP-485-6010, Manual for the Control of Testing and Ships

Conditions

NAVSEA INSTRUCTION 5100.3, Mercury, Mercury Compounds, and Components

Containing Mercury or Mercury Compounds; Control of

S9510-AB-ATM-010/(U), Nuclear Powered Submarine Atmosphere Manual

NAVSEAINST 9210.18, Cleanliness Control and Detrimental Material

Control Requirements for Naval Nuclear Reactor Plant Equipment, Components and Piping Systems

NAVSEAINST 9210.36, Steam Plant Cleanliness Control

NAVSEA LTR SER 05M2/006 DTD 17 JAN 06, MIL-11018-M Welding Electrodes

Not Procured to the Supplemental Requirements Specified in The Tech

Pub 1688

T9074-AD-GIB-010/1688, Requirements for Fabrication, Welding, and

Inspection of Submarine Structure

Special Requirements for Non-SUBSAFE Work On Submarines; accomplish

1.1

1.2

1.3

Title:

ITEM NO: 042-28-0012 of 3

SHIP:

REQUIREMENTS3.

General statement on SUBSAFE: The Submarine Safety (SUBSAFE) program is a certification program implemented by 2.2 to prevent the loss of a submarine and its personnel. This is accomplished by strict work controls, material controls and testing to verify system integrity. Only those Contractors listed in 2.3 are certified to perform SUBSAFE work. Any unauthorized work has the potential to void the certification and cause the loss of the submarine and its personnel.

Accomplish the requirements of 2.4 to control hazardous evolutions and provide for the safety of workers and the ship during industrial evolutions.

This manual requires workers to have a basic knowledge of shipyard work control procedures, be able to recognize and initiate alarms, and be familiar with actions which they should take to evacuate the ship, assist in isolating flooding, fight fires, and report submerged safety draft marks.

All personnel performing work on a submarine must receive special training on the requirements resulting from paragraph 3.1 and 3.2. The

Contractor shall ensure that all personnel (including all subcontractors) assigned to perform any work on a submarine have received this training before work begins. Training will be conducted by the WIZM and those parties deemed necessary by the WIZM.

Submit one legible copy, in hard copy or approved transferrable media, of a report listing personnel trained to the SUPERVISOR. The list is due prior to the commencement of work aboard the vessels. Update the list as required to include new personnel.

A mercury exclusion program is required in accordance with the requirements of 2.5 for all Naval Warships, and there are additional mercury exclusion requirements for submarines promulgated in accordance with 2.6. No

In order to avoid any inadvertent work being performed on SUBSAFE components or systems, verbatim compliance to written instructions is required.

DO NOT perform any work or disturb any system or component without specific written instructions to do so. A copy of these written instructions must be maintained on the work site and be available for review by the SUPERVISOR.

SUBSAFE systems and components are not marked as SUBSAFE and therefore are not easily identified. For this reason SUBSAFE certified personnel will provide an on-site brief and walk-through of the work site with the

Contractor before work begins. This brief will include identification of SUBSAFE components/systems located in the area or which may be affected by the work the

Contractor is performing, and lessons learned from previous problems encountered while performing similar work. Briefs and walk-throughs will be conducted by the

Work Integration Zone Manager (WIZM) and those parties deemed necessary by the

WIZM.

USS ALBANY (SSN-753)

3.1.1

3.1.2

3.1

3.2

3.3

3.4

3.5

ITEM NO: 042-28-0013 of 3

SHIP:

NOTES

GOVERNMENT FURNISHED MATERIAL(GFM)

4.

5.

5.1

5.2

5.3 mercury bearing equipment is to be brought onboard nuclear submarine at any time.

Prohibited items include mercury thermometers, portable fluorescent lights, black lights (sometimes used for non-destructive testing) or any other item that contains mercury that could be accidentally released.

The use of nickel-cadmium fasteners is not permitted on any Naval ship, including submarines.

Any material that will or might come into contact with any steam-wetted surface must be qualified for use on nuclear powered ships in accordance with 2.7 and 2.8.

Use of MIL 110-18M welding electrodes per MIL-E-22200/1 shall be subject to the following:

None.

Specific welding applications utilizing MIL-110-18M welding electrodes shall be in accordance with 2.10.

In addition to the ordering data in MIL-E-22200/1, the Contractor shall invoke the supplemental Quality Control (QC) Inspections of Table 10.1, Note 8 of 2.10, and shall require written certification of same from the welding electrode manufacturer. The requirement for these additional QC Inspections was put forth by 2.9. Certification is required for each heat/lot of MIL 110-18M welding electrode used.

Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.8.2 to the SUPERVISOR.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

USS ALBANY (SSN-753)

3.8.2.1

3.8.1

3.8.2

3.6

3.7

3.8

4.1

File details come from the government source that posted it. Updated .