J23--997-11-001 _Ship's_Docking_Report _Inspection_and_Services _provide_ SAMPLE .pdf
PDF 730 KB Posted
- Attached to
- Submarine Preservation
- Solicitation number
- N50054-15-R-0003
About this file
J23--997-11-001 Ship's Docking Report Inspection and Services provide SAMPLE
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO: 997−11−001
PRELIMINARY SPECIFICATION
USS (SSN− ) 997−11−001ITEM NO:
COAR:
NONECMP:
PLANNER:
SHIP:
PCN: NNSY−
DRYDOCK REQUIRED
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
Norfolk Naval Shipyard Dry Dock Number
Not Applicable
Location of Work:
Identification:
2.1
2.2
2.3
2.4
2.5
2.6
NAVSEA FORM 9997−1, Docking Report
NAVSEA FORM 9997−2, Docking Report
NAVSEA FORM 9997−3, Docking Report
NAVSEA FORM 9997−4, Docking Report
NAVSEA FORM 9997−5, Docking Report
− Rev J, SSN Submarine Docking Drawing
Ship’s Docking Report, Inspection and Services; provide
Record required data and submit in hard copy or approved transferrable media of applicable NAVSEA Forms 2.1 through 2.5 to Norfolk Naval Shipyard (NNSY)
Work Integration Zone Manager (WIZM) via the SUPERVISOR at least 10 days prior to undocking, providing a record of any changes of ship’s configuration, such as major weight alterations, cathodic or anodic protection installation, major hull or shell renewals and repairs, and underwater hull and tank preservation.
Identify paints, including MIL−SPEC, manufacturer, manufacture date, batch number, sequence, method of preparation, number of coats, and indicate whether touchup or complete repainting was accomplished to ship’s
1.1
1.2
1.3
Title:
3.1.1
3.1
SHIP:
DRYDOCK REQUIRED
(V)(G) "CERTIFY COMPLETION OF DRYDOCK RELATED WORK"
Maintain watertight integrity of the ship in drydock to a level four feet above the maximum waterborne draft. Provide temporary access closure plates and fasteners prior to removing plates, cutting access openings, or removing sea chest inlet/outlet equipment. Closure plates shall be available within a 4 hour time frame or as designated by the WIZM for emergency sealing of temporary openings. Seal access openings with closure plates when conditions warrant and at the end of each shift not immediately followed by another shift engaged in drydock work. Remove temporary closures when no longer required.
Prior to undocking, certify that Contractor responsible drydock work, including welding on interior surfaces of the underwater hull and Quality
Assurance requirements, is complete.
bottom, boot topping, rudders, struts, tanks, and shafts. When touchup or limited repairs are made, include a diagram or a grid description of the area.
Submit a list of sea valves worked. This list should include sea valves worked onboard ship and sea valves sent to a shop for repairs. List each item by number from ship’s docking plan, 2.6, or by space in which valve is located. Also give a brief description of type of valve, valve number and the service if work was accomplished by the Contractor.
Submit data for all repairs performed to the ship’s cathodic protection system including anode and reference cell replacement. Include the following information relating to the ship’s cathodic protection system as well;
Description of anodes (electric or alloy) on docking, name of primary and actual
Contractor performing work, first test data taken on docking including voltage and amperage, minimum and maximum at test of system, any repairs required to bring cathodic protection into specification after repairs.
Submit report of any rudder repairs and modifications, including associated journal dimensions and bearing clearances if work was accomplished by the Contractor.
When an area of hull plating removal makes temporary closure impractical, secure each vulnerable compartment in order to minimize potential damage. To the extent permitted by the scope and urgency of work, underwater hull operations shall be scheduled to maintain positive ship stability and maximum hull watertight integrity in the event of flooding.
Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.3 to the WIZM via the
USS (SSN− )
3.1.2
3.1.3
3.1.4
3.2.1
3.3.1
3.2
3.3
SHIP:
DRYDOCK REQUIRED
NOTES
GOVERNMENT FURNISHED MATERIAL(GFM)
4.
5.
5.1
5.2
5.3
(V)(G) "WATERTIGHT INTEGRITY INSPECTION"
The WIZM will deliver a copy of the docking report (with required attachments) in 3.1 to Norfolk Naval Shipyard Code 253.
SUPERVISOR.
Accomplish a watertight integrity inspection of all Contractor work affecting watertightness of the hull and hull penetrations below the water level in company with Ship’s force and the WIZM.
Verify drydock is clear of work related equipment.
Install tank/void manhole covers prior to undocking; remove covers when ship is pierside to support ship’s work.
Copies each to the following address:
NNSY Code 253
Attn: Supervisor, Code 253
Building 33, Norfolk Naval Shipyard
Tel: (757) 396−7391
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
USS (SSN− )
3.3.2
3.3.3
3.3.4
4.1.1
4.1
DOCKING REPORT
NAVSEA 9997/1 (REV. 11-80)
0116-LF-099-9701 (Page 1 of 4) REPORT NAVSEA 9997-1
FROM:
DATE:
TO:
COMMANDING OFFICER, U.S.S.
PLACE DOCKED DATE DOCKED DATE UNDOCKED
POSITION NUMBER THIS DOCKING
DIST. S.R.P. TO AFTMOST KEEL BLOCK
DOCKING PLAN NUMBER
PLAN NUMBERS FOR ZINCS OR CATHODIC PROTECTION REASON FOR DOCKING
SHAFTS SHAFT DIAMETER
DESIGN CLEARANCE
MAXIMUM ALLOWANCE CLEARANCE READING TAKEN BY
BEARING
CLEARANCES WHEN
DOCKED
STERN TUBE INTERMEDIATE STRUT MAIN STRUT SERIAL
NO.
NO. BL.
PROPELLERS
FORWARD AFT FORWARD AFT FORWARD AFT
NO 1 OR STBD OUTBD
INBD. DIA.
NO 2 OR STBD OUTBD
PITCH
NO 3 OR STBD OUTBD
OUTBD. DIA.
NO 4 OR STBD OUTBD
BEARING MATERIAL
MATERIAL
INB’D OUTB’D
CONDITION OF SHAFTING AND MATERIAL
INB’D PLAN NO. AND REVISION
OUTB’D
RUDDER AND DIVING PLANES
POST DIAMETER
PORT
IN.
STARBOARD
CENTERLINE
BEARING CLEARANCE
CENTERLINE
SONAR REMOVED THIS DOCKING
DOME TYPE
SERIAL
SONAR EXISTING AT UNDOCKING
DOME TYPE
WORK DONE – INCLUDE PAINTING
0116-LF-099-9701 (Page 2 of 4) REPORT NAVSEA 9997-1
COATING APPLICATIONS ACCOMPLISHED THIS DOCKING
PRESERVATION DATA: Identify surface preparation method as either “100% blast,” “brushblast,” “hydroblast,” “mechanical-clean,” “hand-clean,” “detergent-wash,” “ solvent-wash,” or water-wash only.” Identify paints used by Navy formula number or commercial designation in proper sequence and number of coats. Indicate whether 100% recoating, touch-up and overall topcoating, or spot touch-up only is accomplished, by placing and “X” in the appropriate space. Identify tanks by name and frame numbers.
MATERIAL IDENTIFICATION DATA: Identify all pretreatment primers, anticorrosive coatings, and antifouling coatings used in shipbottom painting.
SHIPBOTTOM PRESERVATION DATA
LOCATION
METHOD
OF
PREPARATION
PAIN APPLICATION
PAINTS USED
100%
RECOAT
TOUCH-UP
AND
OVERALL
COAT
SPOT
TOUCH-
UP
ONLY
BOOT TOPPING
BOTTOM
RUDDERS AND STRUTS
SHAFTING
OTHERS
MATERIAL IDENTIFICATION OF SHIPBOTTOM PAINTS USED
PAINT MANUFACTURER DATE MANUFACTURED BATCH NO.
0116-LF-099-9701 (Page 3 of 4) REPORT NAVSEA 9997-1
TANK PRESERVATION DATA TANK PRESERVATION
TANK NAME
AND
LOCATION
METHOD
OF
PREPARATION
PAINT APPLICATION TANK NAME
AND
LOCATION
METHOD
OF
PREPARATION
PAINT APPLICATION
PAINTS
USED
0%
R E
C O
A T
TO
U
C H
-U P
A N
D
O V
E R
A
LL
C
AT
S P
O T
TO
U
C H
U
P O
LY
PAINTS
USED
0%
R E
C O
A T
TO
U
C H
-U P
A
E R
A
LL
C
AT
O T
TO
U
C H
U
P O
LY
SIGNATURE
SIGNATURE NAME, CLASS AND NUMBER OF SHIP
0116-LF-099-9701 (Page 4 of 4) REPORT NAVSEA 9997-1
REMARKS (Continue on separate sheet, if necessary)
INSTRUCTIONS
GENERAL:
1. From: Enter reporting activity.
2. Date: Enter date of report.
3. Place Docked: Naval Shipyard, station, industrial activity drydock number.
4. Docking Date: Enter date ship drydocked.
5. Undocking Date: Enter date ship is undocked.
6. Position No.: Enter position number employed when ship is drydocked.
7. Dist.: S.R.P. to aftmost keel block: Enter distance from Stern
Reference Point.
8. Docking Plan No.: List docking plan number and revision employed to drydock the ship.
9. Plan Numbers for Zinc or Cathodic Protection: Indicate applicable plan number for installation.
10. Reason for Docking: State major reason for drydocking, i.e., propeller repairs, sonar dome and hoist replacement, hull damage, regular overhaul, etc.
SHAFTS:
1. Enter shaft diameter, design clearance and maximum allowed clearance from information provided by ship, manufacturers instructions and Naval Ships Technical Manual.
2. Bearing Clearances: Enter existing bearing clearances determined upon docking for stern tubes, intermediate struts and main struts as applicable.
3. Readings Taken By: Enter name of supervisor taking readings and ship number.
4. Bearing Material: Enter appropriate symbol for type of bearing material in each box.
W – Wood PP – Phenolic Plastic R – Rubber O – Other (specify type)
5. Inspect shafting covering for completeness and adherence.
Inspect exposed metal surfaces of all outboard shafting. Report condition, i.e., good condition, cracks, scored, corroded, etc.
PROPELLERS: Enter propeller data for each propeller as determined by examination of hub stamping.
List the propeller material as follows:
M – Manganese Bronze N – Nickel Aluminum Bronze
A – Manganese Nickel Aluminum Bronze S – Stainless Steel P – Special (If special materials other than above are used, note under remarks) RUDDER AND DIVING PLANE DATA: Enter Post Diameter and bearing Clearance for each rudder and diving plane as determined by measurement at time of docking. Take such rudder bearing clearances as are practicable without unshipping the rudder. Use R for rudder and D for diving planes. Use F and A to designate forward and aft where necessary. Divide port and starboard columns where necessary.
Check rudder nut lock.
SONAR: report dome type and serial number. The serial appears on the skirt and in the shipping orders.
REMARKS: Note when extensive repair or replacement of plates, seams, rivets, etc., is accomplished, including data concerning locations, actions and description of conditions which necessitated actions. Include any other information considered desirable for reference purposes, such as special block heights or other departures from docking plan. Attach additional sheets if required.
SUPPLEMENTARY FORMS:
1. Propellers: Submit a supplementary form NAVSEA 9997/2
PROPELLER REPORT and/or NAVSEA 9997/3 PROPELLER REPORT – DETACHABLE BLADE DATA, ONLY if repairs are accomplished or, propellers or blades are replaced.
2. Shafts, Bearings, Fairwaters, Ropeguards and Stern Tube Seals: Submit supplementary form NAVSEA 9997/4, ONLY when repairs or replacements are made or when corrosion or wear is extensive or severe.
a. The sketch should be modified by crossing out excess bearings for systems with fewer bearings than sketched.
b. Use one form sheet for each line of shafting.
c. Clearance readings; identification of material; condition of material; and work accomplished on Bearings, Fairwaters, Ropeguards, Journals, Shaft Covering, Packing, and Stern.
Tube Seals should be indicated in each applicable box provided for the recording of the condition and work accomplished by entering the proper symbols. If the symbol “O” (Other) is used to indicate information, an Arabic number may be used, such as “2”, to refer to an explanatory footnote “2”.
3. Wooden Hull Data: Submit supplementary form NAVSEA 9997/5 for all wood-hulled Naval vessels and service craft, ONLY if major structural repairs are required.
PROPELLER
NAVSEA 9997/2 (11-77) (FORMERLY NAVSHIPS 9070/2) S/N 0116-LF-099-9705 NAVSEA RPT. 9997-2
SUBMITTED BY ALL SHIPYARDS AND STATIONS FOR ALL CLASSES OF SHIPS WHEN REPAIRS/REPLACEMENT ARE MADE DOCKING DATE
PROPELLERS, SHAFT LOCATON
CENTER
OUTBOARD NO. 1 INBOARD NO. 2 INBOARD NO. 3 OUTBOARD NO. 4
A
F
U
NUMBER OF BLADES
SERIAL NO.
Drawing no.
TYPE MATERIAL
CONDITION*
R E
P L A
C
NUMBER OF BLADES
Drawing no.
CONDITION*
*Detailed report when necessary on condition and repairs to be entered on reverse side of this sheet, supplemented with sketches and photographs.
(USE NAVSEA 9997/3 FOR DETACHABLE BLADE PROPELLERS)
SOLID PROPELLER (HUB) DATA DETACHABLE
NUMBER
DRAWING
NUMBER
SHIP
SUITABILITY
SHAFT
SUITABILITY
DIAMETER PITCH MANUFACTURER CONTRACT OR
JOB NO.
WEIGHT
SUBMIT PITCH MEASUREMENTS FOR PROPELLERS WHERE INFORMATION IS MISSING OR REQUESTED:
SKETCH OF DAMAGE OR LOCATION OF CAVITATION PITTING (IF ANY)
SHAFT NO. CHECK
1. TYPICAL BLADE. ALL ALIKE
2. ONLY ONE BLADE NO.
3. SUCTION BACK
4. PRESSURE FACE
5. HUB
3. SUCTION BACK
4. PRESSURE FACE
3. SUCTION BACK
4. PRESSURE FACE
3. SUCTION BACK
4. PRESSURE FACE
5. HUB
TRAILING
EDGE
LEADING
EDGE
TRAILING
EDGE
LEADING
TRAILING
EDGE
LEADING
EDGE
TRAILING
EDGE
LEADING
EDGE
TRAILING
EDGE
LEADING
EDGE
Serial No. Serial No. Serial No. Serial No.
SIGNATURE REPORTING ACTIVITY NAME, CLASS AND NUMBER OR VESSEL
PROPELLER DETACHABLE BLADE
NAVSEA 9997/3 (11-77)(FRONT) (FORMERLY NAVSHIPS 9070/3) S/N 0116-LF-099-9710 NAVSEA RPT. 9997-3
SUPPLEMENTARY SHEET (A), DOCKING REPORT, PROPELLERS, BLADES OF DETACHABLE BLADE PROPELLERS. REPORTING ACTIVITY
NOTES
1. LIST BLADE DATA ON REVERSE SIDE.
2. DETAILED REPORT WHEN NECESSARY ON CONDITION AND REPAIRS TO BE ENTERED IN REMARKS COLUMN ON REVERSE SIDE
OF THIS SHEET. SUPPLEMENTED AS NECESSARY WITH SKETCHES AND PHOTOGRAPHS.
u.s.s.
SHAFT
STARBOARD PORT
CENTER OUTBOARD NO. 1 INBOARD NO. 2 INBOARD NO. 3 OUTBOARD NO. 4
BLADE NO.
AS
FOUND
SERIAL NO. 1
CONDITION 2
REPAIRS 2
REPLACED
NAVSEA 9997/3 (11-77)(REVERSE) DETACHABLE BLADE DATA
DRAWING
NO.
SHIP
SUITABILITY
SHAFT
SUITABILITY
DIAMETER
MANUFACTURER
CONTRACT OR
JOB ORDER
WEIGHT
REMARKS
NAVSEA RPT. 9997-4
WOODEN HULL DATA (SEE REVERSE SIDE FOR INSTRUCTIONS) NAVSEA RPT. 9997-5
NAVSEA 9997/5 (11-77) (FRONT) (FORMERLY NAVSHIPS 9070/5)
S/N0116-LF-099-9720
TO: Commander, Naval Ship Systems Command, Department of Navy, Washington, D.C. 20362
PART A GENERAL INFORMATION
SHIPYARD WHERE CONSTRUCTED AND LOCATION:
DATE: / / FILE NUMBER:
DATE COMPLETION: / / REPORT IS FOR
NEW CONSTRUCTION REPAIR
PART C REPAIR ONLY
YARD DOING REPAIR WORK:
PART B PRESERVATON DETAILS
WERE ALL BOLT HOLES, END GRAIN, AND FAIRED SURFACES GIVEN A
THOROUGH APPLICATION OF PRESERVATIVES DURING CONSTRUCTION? YES NO
WOOD HULL REPAIR COST:
NOTE: NEW CONSTRUCTION – COMPLETE ITEMS A THRU G ONLY
REPAIR – COMPLETE ITEMS H THRU J AND APPLICABLE ITEMS A THRU G.
STATUS OF CRAFT
ACTIVE INACTIVE
MEMBER OR COMPONENT
A B C D E F G REPAIR IF INACTIVE – STORAGE WAS
COVERED UNCOVERED H I J
W O
O D
S P
E C
IE
L
M
IN
A T
E S
E R
V A
T
IV
B
U S
H
A K
C U
U M
E S
S U
U B
L E
P L A
N K
IN
G
C
M E
T
M
R
IN
E B
O R
C
Y
M
C H
AREA OF SERVICE OR STORAGE
TEMPERATE TROPICAL
EVIDENCE OF INSECT DAMAGE
YES - EXPLAIN NO
“NAILSICKNESS” REPLACEMENT
YES NO IF YES, NAME
FASTENER MATERIAL
WOOD SPECIES
1. APRON DECAY WAS IN
STEM AREA
MIDSHIP AREA
TRANSOM AREA
BILGE AREA
BEAM-SHELF AREA
2. BULHEADS
3. BULWARK STANCHIONS
4. BUTT BLOCKS
5. CHIME
6. CLAMP
7. COAMINGS EVIDENT CAUSE OF DECAY
FRESH WATER LEAKAGE
POOR VENTILATION
8. COVERING BOARD (PLANKSHEER)
9. DECK
10. DEADWOOD CHECK CORRECTIVE ACTION TAKEN
BETTER VENTILATION
BETTER DRAINAGE
RESERVATIVE USED
DURABLE SPECIES INSTALLED
TIGHTENED DECK SEAMS AND JOINTS
11 DECK BEAMS
12. FENDER
13. FILLER BLOCKS
14. FLOOR TIMBERS
15. FRAMES
16. GARBOARD CAULKING REPLACEMENT
BELOW w/l LIN FT
ABOVE w/L LIN FT
DECK w/L LIN FT
17. HORN TIMBER
18. KEEL
19. KEELSONS
20. PLANKING. INNER
21. PLANKING. OUTER
22. PLYWOOD – PLANKING
23. PLYWOOD – ALL OTHER UNPAINTED AREAS
BILGE BEAM SHELF 24. SHAFT LOG
25. SHEATHING (DIAGONAL. INNER) PRESERVATIVE APPLIED TO UNPAINTED
AREAS
YES NO
26. SHELF
27. SKEG NOTE: UNDER REMARKS EXPLAIN ALL
INSECT DAMAGE. DESCRIBE ANY COSTLY
MECHANICAL FAILURES WHICH
APPARENTLY ARE RECURRING FOR A
SPECIFIC TYPE OF CRAFT.
28. STEM
29. STERN POST
30. STRAKE – SHEAR
31. STRINGERS
32. WORM SHEATHING
REMARKS – NOTE GENERAL LOCATION OF FIBERGLASS & FLOATION MATERIAL. INCLUDE ALL ADDITIONAL PERTAIMENT DATA – ATTACH ADDITIONAL SHEET(S) WHEN NECESSARY.
SIGNATURE – COGNIZANT INSPECTOR: NAME, CLASS AND NUMBER OF CRAFT
NAVSEA 9997/5 (11-77)(REVERSE)
GENERAL INSTRUCTIONS
The Cognizant Inspector will complete and sign this report. Panned or typewritten reports are acceptable. Use of abbreviations listed in key will facilitate completion. Other abbreviations may be used if explained or in common usage.
PART A. Omit shipyard location and completion date for craft under repair.
PART S. This portion of the report records preservation measures incorporated during craft’s construction or repair. USE KEY ABBREVIATIONS FOR COLUMNS A AND C.
Col. A. Name wood species of which members or component is made.
Col. B. Check (X) if member or component is laminated, and check (XX) if individual laminations pressure treated.
Col. C. Name preservative used for preserving member or component.
Col&. D. E & F. Check method used to apply preservative.
Col. G. Check (x) if double planking cement (MIL-C-16245) was used beneath, between or upon the member or component. Check (xx) if synthetic rubber used.
Cols. H. I & J. Applicable only to repairs. Check cause(s) of removal of member or component. Check Columns A thru G to indicate materials used for replacement.
PART C. Complete for repaired ships and boats only.
KEY ABBREVIATIONS
WOOD SPECIES (Column A)
A – Ash CY – Cypress M - Mahogany RO - Red Oak SP - Southern Pine
CE - Cedar DF - Douglas Fir L – Larch WO - White Oak S – Spruce T - Teak
PRESERVATIVES (Column C)
ACA - Chemonite (Ammonical-Copper-Arsenite) CZC - Chromated-Zinc-Chloride
ACC - Celcure (Acid-Cupric-Chromate) CCZC - Copperized-Chromated-Zinc-Chloride
B - Boliden Salt E - Erdalith
CN - Copper Naphthenate P - Pentachlorophenol
T - Tanalith (Wolman Salts)
| J20--997-11-001, Ship's Docking Report, Inspection and Services; provide [SAMPLE] |
| J20--997-11-001, Ship's Docking Report, Inspection and Services; provide |
| 9997-1 |
| INSTRUCTIONS |
| 9997-2 |
| 9997-3 |
| 9997-4 |
| 9997-5 |
File details come from the government source that posted it. Updated .