SOW - DOC B9 - M-10R1 Mech Equipment Room 1st Floor Plan - 2017 (PDF Only).pdf
PDF 2 MB Posted
- Solicitation number
- N4425526P7000
About this file
This document is an "As Built" mechanical engineering drawing for a mechanical equipment room (Room 123), specifically detailing HVAC and gas-related infrastructure. The technical schematic includes multiple detailed views showing gas vent lines, boiler control systems, temperature sensors, gas regulators, and piping configurations for what appears to be a mechanical room with complex venting and equipment installations. Specific components noted include a 6" Bosch water heater, CPVC piping, combustion air connections, gas vents (both existing and new), and variable frequency drives (VFD-1, VFD-2). The drawing is marked as sheet M10R, prepared by a western division engineering firm, with a project number 80061 and drawing number 8416334, and includes construction notes and a mechanical legend to provide additional context and guidance for the installed systems.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
replaced Boch control board for room venting changes
6 CPVC
CPVC
Removed from scpope
6" Boch Water Heater CPVC 4 combustion air
BP
BP
Temperature Sensors
Gas Regulators Typical 2
(E)Gas Vent
(N) 1" Gas Vent
AS BUILT
CHLR-1
R
VFD-1,VFD-2