SOW - Doc A10 - Contractor Production Report - 2017.pdf
PDF 174 KB Posted
- Solicitation number
- N4425526P7000
About this file
This appears to be a default Adobe PDF viewer error page that indicates the document cannot be fully viewed due to an outdated PDF reader. The page provides links to upgrade Adobe Reader and access support resources for resolving the viewing issue. No substantive contract, solicitation, or federal procurement information is present in this file.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
To view the full contents of this document, you need a later version of the PDF viewer. You can upgrade to the latest version of Adobe Reader from www.adobe.com/products/acrobat/readstep2.html
For further support, go to www.adobe.com/support/products/acrreader.html
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
TITLE AND LOCATION
CONTRACT NO
REPORT NO
4296/2C (9/98)
CONTRACTOR
SUPERINTENDENT
MAX TEMP (F)
AM WEATHER
PM WEATHER
MIN TEMP (F)
WORK PERFORMED TODAY
Schedule Activity No Critical Path Method (CPM) Schedule Activity Number of this work; one number per line.
WORK LOCATION AND DESCRIPTION
Work location and general description of work being done associated with this Schedule Activity No.
EMPLOYER
Contractor or Subcontractor name.
NUMBER
Number of employees doing this work.
TRADE
Construction trade doing this work.
HRS
Total hours spent this day doing this work.
WAS A JOB SAFETY MEETING HELD THIS DATE?
(If YES attach copy of the meeting minutes)
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report)
JOB
SAFETY
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed)
TOTAL WORK HOURS ON JOB
SITE.
THIS DATE, INCL CON'T SHEETS
CUMULATIVE TOTAL OF WORK
HOURS FROM PREVIOUS
REPORT
TOTAL WORK HOURS FROM
START OF CONSTRUCTION
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed actions.)
Schedule Activity No Critical Path Method (CPM) Activity Number that pertains to the safety issue being discussed; one number per line.
LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED
Description of all Safety Actions Taken Today or Safety Inspections Held.
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER) Schedule Activity No Critical Path Method (CPM) Schedule Activity Number that pertains to the equipment/material being received; one number per line.
Submittal # Submittal Number for equipment/material.
Description of Equipment/Material Received Description of Equipment Material Received, e.g., drywall.
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Schedule Activity No Critical Path Method (CPM) Schedule Activity Number that pertains to the Construction Equipment that is on the job site today; one number per line.
Owner Owner of Equipment that is on the job site today.
Description of Construction Equipment Used Today (incl Make and Model) Description of construction equipment on the job site today (include Make and Model).
Hours Used Enter total number of hours this equipment was used on site today.
Schedule Activity No Critical Path Method (CPM) Schedule Activity Number that pertains to the Remarks; one number per line.
REMARKS
Use to document discussions, instructions provided.
DATE
CONTRACTOR/SUPERINTENDENT
8.0.1291.1.339988.308172
| This is the date work was accomplished for this report; typically today's date.: |
| Shall be sequential to previous report.: |
| Use Contract Title and Location.: |
| Construction Contract Number and Task Order (TO) Number, if any.: |
| Prime Contractor's Name.: |
| Enter Superintendent's Name.: |
| High temperature during the work day.: |
| General description of morning (AM) weather conditions (sunny, cloudy, rain, etc.).: |
| General description of afternoon (PM) weather conditions (sunny, cloudy, rain, etc.).: |
| Low temperature during the work day.: |
| Button3: |
| Button4: |
| Use to document discussions, instructions provided.: |
| : |
| Total of all Hours Worked Today.: |
| Get this number from previous Production Report, Total Work Hours from "Start of Production" box.: |
| Add above totals.: |