SOW - Doc A10 - Contractor Production Report - 2017.pdf

PDF 174 KB Posted

Attached to
Replace Fire Alarm Control Panel - Naval Station Everett, WA
Solicitation number
N4425526P7000
Issued by

About this file

This appears to be a default Adobe PDF viewer error page that indicates the document cannot be fully viewed due to an outdated PDF reader. The page provides links to upgrade Adobe Reader and access support resources for resolving the viewing issue. No substantive contract, solicitation, or federal procurement information is present in this file.

View the file

Other files

File Type Posted
SOW - Doc D2 - D40 FIRE ALARM.docx DOCX document
SOW - DOC B15 - Commons Architectural Drawings.pdf PDF
SOW - Doc B8 - Fire Alarm Shop Drawings - Commons and Pool Combined (AutoCAD).pdf PDF
SOW - Doc B7 - FX102 Building 1950 Monaco FARS Final Design (PDF Only).pdf PDF
SOW - Doc B4 - E-21R5 Panel Schedules - 2015 (AutoCAD).pdf PDF
SOW - DOC B14 - E-18 Fire Alarm - Elevator Control - 1996 (PDF Only).pdf PDF
SOW - Doc A7 - NSE - REAL ID - Identification and Citizenship Requirement.pdf PDF
SOW - Doc B5 - E-19R2 One-line Diagram - 2008 (AutoCAD).pdf PDF
SOW - Doc A4 - Submittal - Transmittal Form - 2015 R2.pdf PDF
SOW - Doc A5 - Time Impact Analysis.pdf PDF
SOW - Doc D4 - Electronic Operation and Maintenance Support Info.docx DOCX document
SOW - Doc B6 - Full Set - Control Asbuilts R1 - 2017 (AutoCAD).pdf PDF
SOW - Doc A6 - SECNAV 5512_1 April 2025.pdf PDF
SOW - DOC B16 - Natatorium Architectural Drawings.pdf PDF
SOW - Doc B3 - E-20R3 Panel Schedules - 2009 (AutoCAD).pdf PDF
SOW - DOC B12 - P-07 2nd Floor Plan South - Plumbing - 1996 (AutoCAD).pdf PDF
SOW - DOC B13 - P-09 Kitchen Plan - Second Floor Plumbing - 1996 (PDF Only).pdf PDF
SOW - DOC B10 - P-10 Kitchen Equipment Piping Diagrams - 1996 (PDF Only).pdf PDF
SOW - Doc D3 - D50 ELECTRICAL.docx DOCX document
SOW - Doc D1 - C30 INTERIOR FINISHES.docx DOCX document
SOW - DOC B11 - P-01 Plumbing Schedules - Plans and Details - 1996 (PDF Only).pdf PDF
SOW - Doc B1 - M-02R1 Mech Equipment Schedules Commons - 2017 (PDF Only).pdf PDF
SOW - Doc A1 - Pre Proposal Inquiry Form.pdf PDF
SOW - Doc B2 - M-01.01R2 Schedules Pool Addition - 2017 (AutoCAD).pdf PDF
SOW - Doc A9 - Contractor QC Report.pdf PDF
SOW - Doc A2 - Request For Information Form.pdf PDF
SOW - Doc A8 - DBIDS- Acceptable ID Documents.pdf PDF
SOW - Doc A12 - eCMS Section - UFGS 01 31 23.13 20.pdf PDF
SOW - DOC B9 - M-10R1 Mech Equipment Room 1st Floor Plan - 2017 (PDF Only).pdf PDF
SOW - Doc A11 - Monthly Waste Report - 2010-10.pdf PDF
SOW - Doc A3 - Activity Hazard Analysis - COE 2016 R2.pdf PDF
SOW - Replace Fire Alarm Control Panel B1950.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

To view the full contents of this document, you need a later version of the PDF viewer. You can upgrade to the latest version of Adobe Reader from www.adobe.com/products/acrobat/readstep2.html

For further support, go to www.adobe.com/support/products/acrreader.html

CONTRACTOR PRODUCTION REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

TITLE AND LOCATION

CONTRACT NO

REPORT NO

4296/2C (9/98)

CONTRACTOR

SUPERINTENDENT

MAX TEMP (F)

AM WEATHER

PM WEATHER

MIN TEMP (F)

WORK PERFORMED TODAY

Schedule Activity No Critical Path Method (CPM) Schedule Activity Number of this work; one number per line.

WORK LOCATION AND DESCRIPTION

Work location and general description of work being done associated with this Schedule Activity No.

EMPLOYER

Contractor or Subcontractor name.

NUMBER

Number of employees doing this work.

TRADE

Construction trade doing this work.

HRS

Total hours spent this day doing this work.

WAS A JOB SAFETY MEETING HELD THIS DATE?

(If YES attach copy of the meeting minutes)

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES attach copy of completed OSHA report)

JOB

SAFETY

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/HAZMAT WORK DONE?

(If YES attach statement or checklist showing inspection performed)

TOTAL WORK HOURS ON JOB

SITE.

THIS DATE, INCL CON'T SHEETS

CUMULATIVE TOTAL OF WORK

HOURS FROM PREVIOUS

REPORT

TOTAL WORK HOURS FROM

START OF CONSTRUCTION

WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?

(If YES attach description of incident and proposed actions.)

Schedule Activity No Critical Path Method (CPM) Activity Number that pertains to the safety issue being discussed; one number per line.

LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED

Description of all Safety Actions Taken Today or Safety Inspections Held.

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER) Schedule Activity No Critical Path Method (CPM) Schedule Activity Number that pertains to the equipment/material being received; one number per line.

Submittal # Submittal Number for equipment/material.

Description of Equipment/Material Received Description of Equipment Material Received, e.g., drywall.

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.

Schedule Activity No Critical Path Method (CPM) Schedule Activity Number that pertains to the Construction Equipment that is on the job site today; one number per line.

Owner Owner of Equipment that is on the job site today.

Description of Construction Equipment Used Today (incl Make and Model) Description of construction equipment on the job site today (include Make and Model).

Hours Used Enter total number of hours this equipment was used on site today.

Schedule Activity No Critical Path Method (CPM) Schedule Activity Number that pertains to the Remarks; one number per line.

REMARKS

Use to document discussions, instructions provided.

DATE

CONTRACTOR/SUPERINTENDENT

8.0.1291.1.339988.308172

This is the date work was accomplished for this report; typically today's date.:
Shall be sequential to previous report.:
Use Contract Title and Location.:
Construction Contract Number and Task Order (TO) Number, if any.:
Prime Contractor's Name.:
Enter Superintendent's Name.:
High temperature during the work day.:
General description of morning (AM) weather conditions (sunny, cloudy, rain, etc.).:
General description of afternoon (PM) weather conditions (sunny, cloudy, rain, etc.).:
Low temperature during the work day.:
Button3:
Button4:
Use to document discussions, instructions provided.:
:
Total of all Hours Worked Today.:
Get this number from previous Production Report, Total Work Hours from "Start of Production" box.:
Add above totals.:
CheckBox1: 0
DateTimeField1:
SignatureField1:

File details come from the government source that posted it. Updated .