The Contractor's Monthly Project Waste Summary Report (CMPWSR) is a standardized form used by contractors at the Bremerton Naval Complex to track and report solid waste disposal activities for a specific project or delivery order. The form requires contractors to document waste materials by recording their Serial Number, Load Numbers, and total pounds, with options to indicate whether items were reused, recycled, or disposed. Contractors must submit the report by the fifth calendar day of the following month to the Contracting Officer, along with original Solid Waste Tracking Sheets (SWTS). The form is specifically for non-hazardous waste that does not contain PCBs or asbestos, and the data will be recorded by Code 106.33 and included in the Solid Waste Annual Report.

View the file

Other files

File Type Posted
SOW - Doc A9 - Contractor QC Report.pdf PDF
SOW - Doc A8 - DBIDS- Acceptable ID Documents.pdf PDF
SOW - Doc A3 - Activity Hazard Analysis - COE 2016 R2.pdf PDF
SOW - Doc A4 - Submittal - Transmittal Form - 2015 R2.pdf PDF
SOW - DOC B14 - E-18 Fire Alarm - Elevator Control - 1996 (PDF Only).pdf PDF
SOW - DOC B15 - Commons Architectural Drawings.pdf PDF
SOW - Doc D2 - D40 FIRE ALARM.docx DOCX document
SOW - DOC B9 - M-10R1 Mech Equipment Room 1st Floor Plan - 2017 (PDF Only).pdf PDF
SOW - Doc A10 - Contractor Production Report - 2017.pdf PDF
SOW - DOC B12 - P-07 2nd Floor Plan South - Plumbing - 1996 (AutoCAD).pdf PDF
SOW - Doc B7 - FX102 Building 1950 Monaco FARS Final Design (PDF Only).pdf PDF
SOW - DOC B16 - Natatorium Architectural Drawings.pdf PDF
SOW - Doc B3 - E-20R3 Panel Schedules - 2009 (AutoCAD).pdf PDF
SOW - DOC B13 - P-09 Kitchen Plan - Second Floor Plumbing - 1996 (PDF Only).pdf PDF
SOW - Doc D4 - Electronic Operation and Maintenance Support Info.docx DOCX document
SOW - DOC B10 - P-10 Kitchen Equipment Piping Diagrams - 1996 (PDF Only).pdf PDF
SOW - Doc B6 - Full Set - Control Asbuilts R1 - 2017 (AutoCAD).pdf PDF
SOW - Doc A6 - SECNAV 5512_1 April 2025.pdf PDF
SOW - Doc B8 - Fire Alarm Shop Drawings - Commons and Pool Combined (AutoCAD).pdf PDF
SOW - Doc A7 - NSE - REAL ID - Identification and Citizenship Requirement.pdf PDF
SOW - Doc B4 - E-21R5 Panel Schedules - 2015 (AutoCAD).pdf PDF
SOW - Doc A5 - Time Impact Analysis.pdf PDF
SOW - Doc B5 - E-19R2 One-line Diagram - 2008 (AutoCAD).pdf PDF
SOW - Doc B2 - M-01.01R2 Schedules Pool Addition - 2017 (AutoCAD).pdf PDF
SOW - Doc A12 - eCMS Section - UFGS 01 31 23.13 20.pdf PDF
SOW - Doc A1 - Pre Proposal Inquiry Form.pdf PDF
SOW - Doc B1 - M-02R1 Mech Equipment Schedules Commons - 2017 (PDF Only).pdf PDF
SOW - Doc D3 - D50 ELECTRICAL.docx DOCX document
SOW - Doc A2 - Request For Information Form.pdf PDF
SOW - DOC B11 - P-01 Plumbing Schedules - Plans and Details - 1996 (PDF Only).pdf PDF
SOW - Doc D1 - C30 INTERIOR FINISHES.docx DOCX document
SOW - Replace Fire Alarm Control Panel B1950.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR'S MONTHLY PROJECT WASTE SUMMARY REPORT (CMPWSR)

Ref: NAVSHIPYDPUGETINST P5090.11

CONTRACT NUMBER:

CONTRACT TITLE/DELIVERY ORDER:

CONTRACTOR:

GOVERNMENT POINT OF CONTACT’S NAME: PHONE:

REPORTING DATES: From / / To / /

¾ CHECK HERE IF NO WASTE ORIGINATED FROM YOUR PROJECT THIS MONTH

Discarded items were: (Refer to the SWTS, Section II. Check the applicable disposition box and enter the discarded items as described.)

SWTS

SERIAL #

LOAD

NUMBERS

POUNDS

See * footnotes below

Example: ROI2002-

Asphalt Reused Recycled Disposed 234567 4-7 10,457

1. Reused Recycled Disposed

2. Reused Recycled Disposed

3. Reused Recycled Disposed

4. Reused Recycled Disposed

5. Reused Recycled Disposed

6. Reused Recycled Disposed

7. Reused Recycled Disposed

8. Reused Recycled Disposed

9. Reused Recycled Disposed

10. Reused Recycled Disposed

11. Reused Recycled Disposed

12. Reused Recycled Disposed

13. Reused Recycled Disposed

14. Reused Recycled Disposed

15. Reused Recycled Disposed

* For waste soil where no scales are available at place of delivery, calculate 2600 pounds per cubic yard removed.

** For common trash which has been collected by a disposal transporter and combined with others' trash in the truck, estimate 250 pounds per cubic yard. Base your estimate on how many cubic yards were removed, NOT the size of the box.

FINAL REPORT:

¾ CHECK HERE IF YOUR PROJECT/DELIVERY ORDER IS COMPLETE AND THIS IS THE LAST REPORT

NOTE: The SOLID WASTE TRACKING SHEET (SWTS), PSNS 5090/114, describes each load removed from the Bremerton Naval Complex by the Contractor or subsequent Sub-Contractors, and is used as a custody sheet to track all discarded items which have been designated by the Government as not Hazardous and do not contain PCBs or Asbestos. This report is a monthly summary of the SWTSs for this project.

(SEE REVERSE SIDE FOR INSTRUCTIONS)

PSNS 5090/113 (Rev. 07-02) (Front)

X kyle.bringedahl Typewritten Text SOW - Document A7

CONTRACTOR’S MONTHLY PROJECT WASTE SUMMARY REPORT (CMPWSR)

INSTRUCTIONS

DO NOT USE THIS FORM AS A SUMMARY FOR

HAZARDOUS WASTE OR WASTE CONTAINING PCBs OR ASBESTOS

CONTRACTOR:

a. Complete and accumulate all Solid Waste Tracking Sheets (SWTSs) each month for the duration of the project. At the end of each calendar month, compile requested data from the SWTS and complete the Contractor’s Monthly Project Waste Summary Report in the manner shown in the shaded example. Note that the reporting unit is “POUNDS.” If no waste originated from the project this month, or if this is the last report for the project, check the applicable boxes.

b. Submit the report no later than the fifth calendar day of the following month, along with all SWTS originals referenced in the report, to the Contracting Officer. If no waste transport activity has occurred during the month, check the applicable box and submit the report reflecting negative activity for that time period.

c. When a project ends in mid-month, submit the Contractor’s Monthly Project Waste Summary Report reflecting only the work activity which occurred from the first calendar day of that month to the project’s completion. Check the applicable box reflecting last report. Submit the final report, along with all SWTS originals referenced in the report, to the Contracting Officer prior to project close-out.

GOVERNMENT CONTRACT POINT OF CONTACT:

a. Forward a copy of the Contractor’s Monthly Project Waste Summary Report to Code 106.33, Solid Waste Program Manager, on a monthly basis.

b. Maintain all SWTSs in the permanent project file or, at the agency’s discretion, submit the SWTSs along with the Contractor’s Monthly Project Waste Summary Report to Code 106.33, Solid Waste Program Manager, each month.

CODE 106.33:

a. Record all data submitted on the Contractor’s Monthly Project Waste Summary Report.

b. Include this information in the Solid Waste Annual Report.

PSNS 5090/113 (Rev. 07-02) (Back) kyle.bringedahl Typewritten Text SOW - Document A7

Text1:
Text2:
Text3:
Text4:
Text5:
Text10:
Text11:
Text13:
Text12:
Text14:
Text15:
Text6:
Text7:
Text8:
Text9:
Text16:
Text17:
Text18:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24:
Text25:
Text26:
Text27:
Text28:
Text32:
Text36:
Text40:
Text44:
Text48:
Text52:
Text56:
Text60:
Text64:
Text68:
Text29:
Text30:
Text31:
Text34:
Text38:
Text42:
Text46:
Text50:
Text54:
Text58:
Text62:
Text66:
Text70:
Text33:
Text35:
Text37:
Text39:
Text41:
Text43:
Text45:
Text47:
Text49:
Text51:
Text53:
Text55:
Text57:
Text59:
Text61:
Text63:
Text65:
Text67:
Text69:
Text71:
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box1: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box42: Off
Check Box43: Off
Check Box44: Off
Check Box45: Off
Check Box46: Off
Check Box47: Off
Fill Out: You can fill out this form on-line.
Print:
Clear:

File details come from the government source that posted it. Updated .