SOW - Doc A3 - Activity Hazard Analysis - COE 2016 R2.pdf

PDF 41 KB Posted

Attached to
Replace Fire Alarm Control Panel - Naval Station Everett, WA
Solicitation number
N4425526P7000
Issued by

About this file

This document is an Activity Hazard Analysis (AHA) template from the U.S. Army Corps of Engineers (EM385-1-1 standard, dated 30NOV14). The form provides a systematic risk assessment framework for identifying and mitigating workplace safety hazards. It includes a Risk Assessment Code (RAC) matrix that evaluates potential hazards based on two key dimensions: probability of occurrence (ranging from Frequent to Unlikely) and severity of potential consequences (from Catastrophic to Negligible). The template requires detailed documentation of work steps, specific anticipated hazards, control measures, and risk levels, with provisions for periodic review and mandatory employee sign-off before beginning work. Each section of the multi-page document provides spaces to comprehensively document safety protocols, equipment usage, training requirements, and inspection needs for a specific work activity.

View the file

Other files

File Type Posted
SOW - Doc D2 - D40 FIRE ALARM.docx DOCX document
SOW - DOC B15 - Commons Architectural Drawings.pdf PDF
SOW - Doc B8 - Fire Alarm Shop Drawings - Commons and Pool Combined (AutoCAD).pdf PDF
SOW - Doc B7 - FX102 Building 1950 Monaco FARS Final Design (PDF Only).pdf PDF
SOW - Doc B4 - E-21R5 Panel Schedules - 2015 (AutoCAD).pdf PDF
SOW - DOC B14 - E-18 Fire Alarm - Elevator Control - 1996 (PDF Only).pdf PDF
SOW - Doc A7 - NSE - REAL ID - Identification and Citizenship Requirement.pdf PDF
SOW - Doc B5 - E-19R2 One-line Diagram - 2008 (AutoCAD).pdf PDF
SOW - Doc A4 - Submittal - Transmittal Form - 2015 R2.pdf PDF
SOW - Doc A5 - Time Impact Analysis.pdf PDF
SOW - Doc D4 - Electronic Operation and Maintenance Support Info.docx DOCX document
SOW - Doc B6 - Full Set - Control Asbuilts R1 - 2017 (AutoCAD).pdf PDF
SOW - Doc A6 - SECNAV 5512_1 April 2025.pdf PDF
SOW - DOC B16 - Natatorium Architectural Drawings.pdf PDF
SOW - Doc B3 - E-20R3 Panel Schedules - 2009 (AutoCAD).pdf PDF
SOW - DOC B12 - P-07 2nd Floor Plan South - Plumbing - 1996 (AutoCAD).pdf PDF
SOW - DOC B13 - P-09 Kitchen Plan - Second Floor Plumbing - 1996 (PDF Only).pdf PDF
SOW - DOC B10 - P-10 Kitchen Equipment Piping Diagrams - 1996 (PDF Only).pdf PDF
SOW - Doc D3 - D50 ELECTRICAL.docx DOCX document
SOW - Doc D1 - C30 INTERIOR FINISHES.docx DOCX document
SOW - DOC B11 - P-01 Plumbing Schedules - Plans and Details - 1996 (PDF Only).pdf PDF
SOW - Doc B1 - M-02R1 Mech Equipment Schedules Commons - 2017 (PDF Only).pdf PDF
SOW - Doc A1 - Pre Proposal Inquiry Form.pdf PDF
SOW - Doc B2 - M-01.01R2 Schedules Pool Addition - 2017 (AutoCAD).pdf PDF
SOW - Doc A9 - Contractor QC Report.pdf PDF
SOW - Doc A2 - Request For Information Form.pdf PDF
SOW - Doc A8 - DBIDS- Acceptable ID Documents.pdf PDF
SOW - Doc A12 - eCMS Section - UFGS 01 31 23.13 20.pdf PDF
SOW - DOC B9 - M-10R1 Mech Equipment Room 1st Floor Plan - 2017 (PDF Only).pdf PDF
SOW - Doc A11 - Monthly Waste Report - 2010-10.pdf PDF
SOW - Doc A10 - Contractor Production Report - 2017.pdf PDF
SOW - Replace Fire Alarm Control Panel B1950.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EM385-1-1 (30NOV14) UFGS 103526 11/15

Activity Hazard Analysis (AHA)

Frequent Likely Occasional Seldom Unlikely

Catastrophic E E H H M

E H H M L

H M M L L

M L L L L

Signature: Step 1: Review each Hazard with identified safety

"Controls". Determine RAC (see above).

Annotate the overall highest RAC at the top of the AHA

Notes: (Field Notes, Review Comments, etc)

Controls RAC

AHA Signature Log #

Overall Risk Assessment Code (RAC) (Use highest code )

Critical

Marginal

Superintendant Signature

Project Location

Severity

Contract Number Probability

Risk Assessment Code (RAC) Matrix

Negligible

Activity/Work Task

Specific Anticipated HazardsJob Steps (Work Sequences)

L = Low Risk

RAC CHART

Probability: Likelihood the activity will cause a

Mishap (Near Miss, Incident, or Accident).

Identify as Frequent, Likely, Occasional, Seldom or Unlikely

E = Extremely High Risk

H = High Risk

M= Moderate Risk

Severity: The outcome if a mishap occurred.

Identify as Catastrophic, Critical, Marginal, or

Negligible

Step 2: Identify the RAC (probability vs. severity) as E, H, M, or L for each "Hazard" on AHA.

Subcontractor Foreman Name:

Date Prepared

SSHO Signature

ET/GDA Reviewed by (Name)

QC Manager Signature

Specific Anticipated Hazards Controls RAC Job Steps (Work Sequences)

UFGS 013526 11/15 1.9 Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work sequences; specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented.

UFGS 013526 1.9.1 Review the AHA list periodically (at least monthly) at supervisory safety meetings, update when procedures, scheduling or hazards change.

UFGS 013526 1.9.2 Each employee performing work...must review the AHA and sign a signature log for that AHA prior to starting work. The SSHO must maintain a signature log on site for every

AHA

Equipment to be used Training Requirements & Competent or Qualified

Personnel Name(s) Inspection Requirements

ActivityWork Task:
AHA Signature Log:
Project Location:
Contract Number:
Date Prepared:
SSHO Signature:
Superintendant Signature:
QC Manager Signature:
Subcontractor Forman Name:
Signature:
QA Reviewed by NameTitle:
Notes Field Notes Review Comments etc:
Job Steps Work SequencesRow1:
RACRow1:
Job Steps Work SequencesRow1_2:
Specific Anticipated HazardsRow1:
ControlsRow1:
RACRow1_2:
Equipment to be usedRow1:
Training Requirements Competent or Qualified Personnel NamesRow1:
Inspection RequirementsRow1:
Anticipated Hazards:
Controls:

File details come from the government source that posted it. Updated .