SOW - Doc A9 - Contractor QC Report.pdf

PDF 235 KB Posted

Attached to
Replace Fire Alarm Control Panel - Naval Station Everett, WA
Solicitation number
N4425526P7000
Issued by

About this file

This document is a Contractor Quality Control Report template designed for tracking and documenting work performance, quality assurance, and compliance during a contract's execution. The form includes sections for preparatory, initial, and follow-up phases of work, with checkboxes and fields to record details such as whether specific work phases were performed, compliance with contract specifications, safety requirements (EM385-1-1), and any rework items identified.

The template provides space for the contractor's authorized Quality Control (QC) Manager to certify the report's accuracy, documenting equipment, materials, and work performed during the reporting period. It also includes a section for Government Quality Assurance Representatives to add remarks or exceptions, allowing for comprehensive documentation and oversight of contract work. The form is structured to capture detailed information about work activities, testing, personnel, and any issues that may arise during the contract's execution.

View the file

Other files

File Type Posted
SOW - Doc D3 - D50 ELECTRICAL.docx DOCX document
SOW - Doc D1 - C30 INTERIOR FINISHES.docx DOCX document
SOW - DOC B11 - P-01 Plumbing Schedules - Plans and Details - 1996 (PDF Only).pdf PDF
SOW - Doc B1 - M-02R1 Mech Equipment Schedules Commons - 2017 (PDF Only).pdf PDF
SOW - Doc A1 - Pre Proposal Inquiry Form.pdf PDF
SOW - Doc B2 - M-01.01R2 Schedules Pool Addition - 2017 (AutoCAD).pdf PDF
SOW - Doc A2 - Request For Information Form.pdf PDF
SOW - Doc A8 - DBIDS- Acceptable ID Documents.pdf PDF
SOW - Doc A12 - eCMS Section - UFGS 01 31 23.13 20.pdf PDF
SOW - Doc D4 - Electronic Operation and Maintenance Support Info.docx DOCX document
SOW - Doc B6 - Full Set - Control Asbuilts R1 - 2017 (AutoCAD).pdf PDF
SOW - Doc A6 - SECNAV 5512_1 April 2025.pdf PDF
SOW - DOC B16 - Natatorium Architectural Drawings.pdf PDF
SOW - Doc B3 - E-20R3 Panel Schedules - 2009 (AutoCAD).pdf PDF
SOW - DOC B12 - P-07 2nd Floor Plan South - Plumbing - 1996 (AutoCAD).pdf PDF
SOW - DOC B13 - P-09 Kitchen Plan - Second Floor Plumbing - 1996 (PDF Only).pdf PDF
SOW - DOC B10 - P-10 Kitchen Equipment Piping Diagrams - 1996 (PDF Only).pdf PDF
SOW - DOC B9 - M-10R1 Mech Equipment Room 1st Floor Plan - 2017 (PDF Only).pdf PDF
SOW - Doc A11 - Monthly Waste Report - 2010-10.pdf PDF
SOW - Doc A10 - Contractor Production Report - 2017.pdf PDF
SOW - Doc A3 - Activity Hazard Analysis - COE 2016 R2.pdf PDF
SOW - Doc D2 - D40 FIRE ALARM.docx DOCX document
SOW - DOC B15 - Commons Architectural Drawings.pdf PDF
SOW - Doc B8 - Fire Alarm Shop Drawings - Commons and Pool Combined (AutoCAD).pdf PDF
SOW - Doc B7 - FX102 Building 1950 Monaco FARS Final Design (PDF Only).pdf PDF
SOW - Doc B4 - E-21R5 Panel Schedules - 2015 (AutoCAD).pdf PDF
SOW - DOC B14 - E-18 Fire Alarm - Elevator Control - 1996 (PDF Only).pdf PDF
SOW - Doc A7 - NSE - REAL ID - Identification and Citizenship Requirement.pdf PDF
SOW - Doc B5 - E-19R2 One-line Diagram - 2008 (AutoCAD).pdf PDF
SOW - Doc A4 - Submittal - Transmittal Form - 2015 R2.pdf PDF
SOW - Doc A5 - Time Impact Analysis.pdf PDF
SOW - Replace Fire Alarm Control Panel B1950.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR QUALITY CONTROL REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

REPORT NO

PHASE CONTRACT NO CONTRACT TITLE

4296/2C (9/98)

WAS PREPARATORY PHASE WORK PREFORMED TODAY?

IF YES, FILL OUT AND ATTACH SUPPLEMENTAL PREPARATORY PHASE CHECKLIST.

PREPARATORY NOYES

Schedule Activity No Definable Feature of Work (DFOW) Index #

WAS INITIAL PHASE WORK PREFORMED TODAY?

IF YES, FILL OUT AND ATTACH SUPPLEMENTAL INITIAL PHASE CHECKLIST.

INITIAL YES NO

Schedule Activity No Definable Feature of Work (DFOW) Index #

WORK COMPLIES WITH CONTRACT AS APPROVED DURING INITIAL PHASE?

WORK COMPLIES WITH SAFETY REQUIREMENTS AND INSPECTION COMPLIES WITH EM385-1-1?

FOLLOW-UP NOYES

YES NO

Schedule Activity No

Description of Work, Testing Performed & By Whom, Definable Feature of Work, Specification Section, Location and List of Personnel Present

REWORK ITEMS IDENTIFIED TODAY (NOT CORRECTED BY CLOSE OF BUSINESS) REWORK ITEMS CORRECTED TODAY (FROM REWORK ITEMS LIST)

Schedule Activity No Description Schedule

Activity No Description

REMARKS (Also Explain Any Follow-Up Phase checklist Item From Above That Was Answered "NO"; Work Deficiency, Safety Deficiency.) Manuf. Rep On-Site, etc.

Schedule Activity No Description

On behalf of the contractor, I certify that this report is complete and correct and equipment and material used and work performed during this reporting period is in compliance with the contract drawings and specifications to the best of my knowledge except as noted in this report. AUTHORIZED QC MANAGER AT SITE DATE

GOVERNMENT QUALITY ASSURANCE REPORT DATE

QUALITY ASSURANCE REPRESENTATIVE'S REMARKS AND/OR EXCEPTIONS TO THE REPORT: FOR GOVERNMENT USE ONLY.

Schedule Activity No Description

DATEGOVERNMENT QUALITY ASSURANCE MANAGER

CONTRACTOR QUALITY CONTROL REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

REPORT NO

PHASE

CONTRACT NO

CONTRACT TITLE

4296/2C (9/98)

WAS PREPARATORY PHASE WORK PREFORMED TODAY?

IF YES, FILL OUT AND ATTACH SUPPLEMENTAL PREPARATORY PHASE CHECKLIST.

PREPARATORY

Schedule Activity No Critical Path Schedule Activity Number that pertains to the Definable Feature of Work that Preparatory Phase work was performed today; use one number per line.

Definable Feature of Work (DFOW) The Definable Feature of Work for which Preparatory Phase work was performed today.

Index #

WAS INITIAL PHASE WORK PREFORMED TODAY?

IF YES, FILL OUT AND ATTACH SUPPLEMENTAL INITIAL PHASE CHECKLIST.

INITIAL

Schedule Activity No Critical Path Schedule Activity Number that pertains to the Definable Feature of Work that Initial Phase work was performed today; use one number per line.

Definable Feature of Work (DFOW) The Definable Feature of Work for which Initial Phase work was performed today.

Index #

WORK COMPLIES WITH CONTRACT AS APPROVED DURING INITIAL PHASE?

WORK COMPLIES WITH SAFETY REQUIREMENTS AND INSPECTION COMPLIES WITH EM385-1-1?

FOLLOW-UP

Schedule Activity No Critical Path Schedule Activity Number that pertains the the Definable Feature of Work that Follow-up was performed today; use one number per line.

Description of Work, Testing Performed & By Whom, Definable Feature of Work, Specification Section, Location and List of Personnel Present The Definable Feature of Work and all other general facts that are associated with Follow Up oversight which was provided.

REWORK ITEMS IDENTIFIED TODAY (NOT CORRECTED BY CLOSE OF BUSINESS)

REWORK ITEMS CORRECTED TODAY (FROM REWORK ITEMS LIST)

Schedule Activity No Critical Path Schedule Activity Number that pertains to the Rework Item identified today; use one number per line.

Description Description of the Rework Item identified today.

Schedule Activity No Critical Path Schedule Activity Number that pertains to the Rework Item corrected today; use one number per line.

Description Description of the Rework Item corrected today.

REMARKS (Also Explain Any Follow-Up Phase checklist Item From Above That Was Answered "NO"; Work Deficiency, Safety Deficiency.) Manuf. Rep On-Site, etc.

Schedule Activity No Critical Path Schedule Activity Number that pertains to the Remarks; use one number per line.

Description Provide any pertinent information regarding discussions, direction provided, QC problem areas, deviations from QC Plan, construction deficiencies encountered, QC meetings held, as-built drawing updated, and any Follow-up Phase item from above that was answered NO.

On behalf of the contractor, I certify that this report is complete and correct and equipment and material used and work performed during this reporting period is in compliance with the contract drawings and specifications to the best of my knowledge except as noted in this report.

AUTHORIZED QC MANAGER AT SITE

DATE

GOVERNMENT QUALITY ASSURANCE REPORT

DATE

QUALITY ASSURANCE REPRESENTATIVE'S REMARKS AND/OR EXCEPTIONS TO THE REPORT: FOR GOVERNMENT USE ONLY.

Schedule Activity No Critical Path Method (CPM) Schedule Activity Number that pertains to the QA Remarks and/or exceptions; use one number per line.

Description FEAD/ROICC remarks and/or exceptions to the contents of this report.

DATE

GOVERNMENT QUALITY ASSURANCE MANAGER

8.0.1291.1.339988.308172

This is the date work was accomplished for this report; typically today's date.:
Shall be sequential to previous report.:
Construction Contract Number and Task Order (TO) Number, if any.:
Use Contract Title and Location.:
Button3:
Button4:
:
FEAD/ROICC remarks and/or exceptions to the contents of this report.:
DateTimeField1:
SignatureField1:
DateTimeField3:
SignatureField2: