SOW - Doc B6 - Full Set - Control Asbuilts R1 - 2017 (AutoCAD).pdf

PDF 6 MB Posted

Attached to
Replace Fire Alarm Control Panel - Naval Station Everett, WA
Solicitation number
N4425526P7000
Issued by

About this file

This document is an as-built set of control drawing documents for a mechanical and control systems upgrade project at Naval Station Everett, Washington, specifically focusing on Building 1950. The project, completed by NCS Corporation for Doyon Logistics Services in October 2014, involved an industrial controls systems upgrade with a comprehensive retrofit of HVAC, heating water, and chilled water systems.

The documentation details extensive control system modifications including multiple air handling units (AHU-1, AHU-2, AHU-3, AHU-4), variable air volume (VAV) terminal units, exhaust fans, unit heaters, and hydronic systems. Key components include Distech Controls ECB series controllers, BACnet networking, variable frequency drives (VFDs), temperature and occupancy sensors, and integration of existing equipment. The project appears focused on improving energy efficiency, system monitoring, and environmental control across different building zones such as the gymnasium, kitchen, mechanical rooms, natatorium, and various administrative spaces, with precise wiring and control logic documented for each system.

View the file

Other files

File Type Posted
SOW - Doc A9 - Contractor QC Report.pdf PDF
SOW - Doc A8 - DBIDS- Acceptable ID Documents.pdf PDF
SOW - Doc A3 - Activity Hazard Analysis - COE 2016 R2.pdf PDF
SOW - Doc A4 - Submittal - Transmittal Form - 2015 R2.pdf PDF
SOW - DOC B14 - E-18 Fire Alarm - Elevator Control - 1996 (PDF Only).pdf PDF
SOW - DOC B15 - Commons Architectural Drawings.pdf PDF
SOW - Doc D2 - D40 FIRE ALARM.docx DOCX document
SOW - Doc A11 - Monthly Waste Report - 2010-10.pdf PDF
SOW - DOC B9 - M-10R1 Mech Equipment Room 1st Floor Plan - 2017 (PDF Only).pdf PDF
SOW - Doc A10 - Contractor Production Report - 2017.pdf PDF
SOW - DOC B12 - P-07 2nd Floor Plan South - Plumbing - 1996 (AutoCAD).pdf PDF
SOW - Doc B7 - FX102 Building 1950 Monaco FARS Final Design (PDF Only).pdf PDF
SOW - DOC B16 - Natatorium Architectural Drawings.pdf PDF
SOW - Doc B3 - E-20R3 Panel Schedules - 2009 (AutoCAD).pdf PDF
SOW - DOC B13 - P-09 Kitchen Plan - Second Floor Plumbing - 1996 (PDF Only).pdf PDF
SOW - Doc D4 - Electronic Operation and Maintenance Support Info.docx DOCX document
SOW - DOC B10 - P-10 Kitchen Equipment Piping Diagrams - 1996 (PDF Only).pdf PDF
SOW - Doc A6 - SECNAV 5512_1 April 2025.pdf PDF
SOW - Doc B8 - Fire Alarm Shop Drawings - Commons and Pool Combined (AutoCAD).pdf PDF
SOW - Doc A7 - NSE - REAL ID - Identification and Citizenship Requirement.pdf PDF
SOW - Doc B4 - E-21R5 Panel Schedules - 2015 (AutoCAD).pdf PDF
SOW - Doc A5 - Time Impact Analysis.pdf PDF
SOW - Doc B5 - E-19R2 One-line Diagram - 2008 (AutoCAD).pdf PDF
SOW - Doc B2 - M-01.01R2 Schedules Pool Addition - 2017 (AutoCAD).pdf PDF
SOW - Doc A12 - eCMS Section - UFGS 01 31 23.13 20.pdf PDF
SOW - Doc A1 - Pre Proposal Inquiry Form.pdf PDF
SOW - Doc B1 - M-02R1 Mech Equipment Schedules Commons - 2017 (PDF Only).pdf PDF
SOW - Doc D3 - D50 ELECTRICAL.docx DOCX document
SOW - Doc A2 - Request For Information Form.pdf PDF
SOW - DOC B11 - P-01 Plumbing Schedules - Plans and Details - 1996 (PDF Only).pdf PDF
SOW - Doc D1 - C30 INTERIOR FINISHES.docx DOCX document
SOW - Replace Fire Alarm Control Panel B1950.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N C

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

C O

V E

R

COVER

CONTROL DRAWINGS

FOR

BUILDING 1950

SMART ENERGY NAVAL STATION

EVERETT, WA

SUBMITTED BY:

NCS CORPORATION

11110 25th AVE EAST, SUITE A

TACOMA, WA 98445

(253) 539-4600 / FAX (253) 584-6980

AS-BUILT

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

IN

D

E X

INDEX

FY-13 ENERGY PROJECT:

SMART ENERGY INSTALLATION AOR WIDE

NAVAL STATION EVERETT, WA

CONTROL DRAWING INDEX

B1950

28. EF-11 THROUGH EF-14 WIRING

29. UH-1 FIELD WIRING

30. EF-7 & UH-2 FIELD WRING

31. EF-8 & UH-3 FIELD WIRING

32. DDCP-01 PANEL WIRING

33. DDCP-02A PANEL WIRING

34. DDCP-02B PANEL WIRING

35. DDCP-03 PANEL WIRING

36. DDCP-04 PANEL WIRING

37. DDCP-05 PANEL WIRING

38. DDCP-06 PANEL WIRING

39. DDCP-07A PANEL WIRING

40. DDCP-07B PANEL WIRING

41. DDCP-08 PANEL WIRING

42. DDCP-09 PANEL WIRING

43. CV/VV VAV FIELD WIRING

44. FP VAV FIELD WIRING

45. VV VAV-112 FIELD WIRING

46. VV VAV-133 FIELD WIRING

47. CV VAV-138 FIELD WIRING

48. FP VAV-202A FIELD WIRING

49. VV VAV-228 FIELD WIRING

50. VV VAV-232 FIELD WIRING

51. AHU-1 (POOL PAK) FIELD WIRING

52. NATATORIUM FP VAV (AHU-2) CONTROLLER WIRING

53. NATATORIUM FP VAV (AHU-2) FIELD WIRING

54. NATATORIUM HEATING WATER SYSTEM

55. LEGENDS AND ABBREVIATIONS

56. BOILER CP WIRING DETAIL

01. SITE PLAN

02. MATERIALS LIST & DEVICE ID's

03. VALVE SCHEDULE

04. COMMUNICATIONS

05. SC CONTROLLER

06. POINTS LIST

07. SEQUENCE PART 1

08. SEQUENCE PART 2

09. SEQUENCE PART 3

10. B1950 1ST FLOOR NORTH

11. B1950 1ST FLOOR SOUTH

12. B1950 NATATORIUM

13. B1950 2ND FLOOR NORTH

14. B1950 2ND FLOOR SOUTH

15. B1950 MECHANICAL ROOMS

16. AHU-1 FIELD WIRING

17. AHU-2 FIELD WIRING

18. AHU-3 FIELD WIRING

19. AHU-3 VFD FIELD WIRING

20. AHU-4 FIELD WIRING

21. AHU-1, 2 & 4 MOTOR WIRING

22. HOT & CHILLED WATER SYSTEM

23. PUMP MOTOR FIELD WIRING

24. DUCT HEAT COILS 2 THROUGH 7 FIELD WIRING

25. DUCT HEAT COILS 1, 8 THROUGH 11 FIELD WIRING

26. EF-1 THROUGH EF-6 WIRING

27. EF-9 AND EF-10 WIRING

PIER D

PIER E

LAYDOWN

PARKING

PARKING

PARKING

PARKING

PARKING

PERRY AVE

18TH

S

TMAHAN AVE

W R

E N

W A

Y

F L

E T

C H

E R

W A

Y

SPRUANCE BLVD

TH

A

TC

H E R S

T

TR

U

X

TU

N S

T.

TAYLO

R

ST

NIMITZ AVE

W A

D S

W O

R T

H S

T

21302132

22002202

23102320

SUBST1

PIER A

PIER B

FLE

TC

H E R W

A Y

M

ARIN

E V

IE

W D

R

NORTH W

HARF

S O

U T

H W

H A

R F

LOT A

LOT F

LOT D

LOT C

PARKING

LOT B

LOT E

MAIN GATE

MARINA

BRIDGE

21062108

AREA

PARKING

LOT G

NAVAL STATION EVERETT

FY-13 ENERGY PROJECT

SMART ENERGY INSTALLATION AOR WIDE

PACKAGE 6, BUILDINGS 1950

SHIELDS PARK

NORTH GATE

MARKER BUOY

LAYDOWN AREAS

HENRY BLAKE

120' X 10' FLOATING DOCK

R A M

P

P O

T T

E R

S T

BLUE SHARK

PIER C

GRID NORTH

TRUE N

O

RTH

41.8025°

1801, 1802 UNDER 1803

LOT I

LOT J

LOT K

A

B

6 LANES, 43" WIDE

INSIDE LENGTH 1211'6"

HELO

W

REN W

AY

STOP

STOP STOP

ONLY ONLY

STOP

STOP

STOP

ONLY

S T

O P

S T

O P

S T

O P

S T

O P

STO

P

S T

O P

B

S

IT

E

P L

A N

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

-1

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

N C

S E

N G

IN

E

E R

M

W

R E

V

IS

IO

N

S

IS

S

U E

D A

T E

JO

B

N U

M B

E R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

D D

C C

O N

T R

A C

T O

R

D R

A W

IN

G

T

IT

L E

SHEET NO.

P R

O

JE

C T

N C

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

B1950

A S

-B U

IL

T

-9

-2

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-2

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

M A

T E

R

IA

L S

L

IS

T

D E

V

IC

E I D

's

02 R1

MATERIALS LIST DEVICE ID's

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

V A

L V

E S

C H

E D

U L

E

VALVE SCHEDULE

*NOTE: FOR TCV-7 THROUGH TCV-16 AND TCV-22 THROUGH TCV-26 THE VALVE ACTUATOR WAS THE ONLY PART REPLACED

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-2

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

C O

M M

U N

IC

A

T

IO

N D

IA

G

R A

M

04 R1

COMMUNICATION DIAGRAM

SWITCH

DDCP-02

RS 940G ICS NETWORK

BUILDING SWITCH

AHU-2/AHU-4

IP CONNECTION TO ICS NETWORK

SC-01

SUPERVISORY CONTROLLER

(JACE)

DDCP-01

AHU-1

VAV's (18)

DDCP-07

DDCP-04

HWS/CWS

BACnet Network #10

BACnet Network #11

DDCP-09

DDCP-06

VAV-NAT

(AHU-2 POOL PAK)

DDCP-08

CHILLER

VAV's (12)

DDCP-03

AHU-3

VAV's (5)

DDCP-05

BOILER#1 BOILER#2 HWP-1

VFD

HWP-2

VFD

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

S C

C O

N T

R O

L L

E R

GND

NEUT

LINE

UPS OUTPUT

STATUS

CONTACTS

LINE

INPUT

LINE INPUT

STATUS

CONTACTS

UPS

PORTECTED

ED OUTPUT

RESET

OFF

P O

W E

R

UPS

GRN

WHT

BLK

TO SC

UPS BATTERY

CONTACTS

120 VAC LINE

INPUT

TO SC

AC POWER

CONTACTS

IN

P

U T

P W

R

P O

W E

R S

U P

P L

Y

U S

E C

O P

P E

R C

O N

D U

C T

O R

S O

N L

Y

IN

P

U T

:9

-2

V a c

-6

H z

INPUT POWER

FROM

POWER CONTROL

CENTER

D

IS

T E

C H

C O

N T

R O

L S

C O

M C

A R

D

(C O

M

BB+

BB-

UPS AC

GND

UPS BATT

GND

DOOR TMP

GND

LAN 1

LAN 2

C O

M C

A R

D

C

O M

O P

T

IO

N A

L

O P

T

IO

N A

L

U S

B

U S

B

RS-485 POWER

S + -

B B

P S

P S

AC POWER CONTACTS

BACnet Network # 10

UPS BATTERY CONTACTS

DOOR SWITCH

SUPERVISORY CONTROLLER (JACE)

(SC)-1

POWER CONTROL

CENTER

RIB-PSMN2C2RB10

RS 940G ICS NETWORK

BUILDING SWITCH

PORT 5

PORT 6

PORT 1

PORT 4

PORT 3

PORT 2

CAT5

FIBER

TO B2114

CIRCUIT BREAKER

PANEL P4 30

E C

-B O

S -7

A X

PORT 7

PORT 8

P

I

U

Q

E

E

N

I

L

HSP-121BT1RU

REQUIRES SERVICE

NORMAL

LIGHT OFF-

LIGHT ON-

47-63 HZ

15 AMPS MAX

MAX

120 VAC

GND

NEUT

AC

GND

NEUT

AC

POWER CONDITIONER

5 AMP

PC

F

TO SC

INPUT

POWER

120 VAC LINE

INPUT

CIRCUIT BREAKER

PANEL X1 11

BACnet Network # 11

LOCATED IN ROOM 124

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-2

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

P O

IN

T

S L

IS

T

06 R1

POINTS LIST

NOTE: MOST AHU-1N POINTS ARE MONITERED THROUGH MODBUS ONLY

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-2

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

S E

Q U

E N

C E

O F

O P

E R

A T

IO

N

S P

A R

T

GENERAL DESCRIPTION:

EACH AIR HANDLING UNIT SERVES ZONE HEATING COILS. AHU SYSTEMS

CONSIST OF MINIMUM OUTDOOR AIR DAMPER, OUTDOOR/RETURN/EXHAUST AIR DAMPERS,

FILTER, HOT WATER HEATING COIL, SUPPLY FAN, AND RETURN FAN.

AHU-1 SERVES GYMNASIUM

(HC-1), WEIGHT ROOM (HC-2, -3), AND MULTI-PURPOSE RM (HC-4).

AHU-2 SERVES

RACQUETBALL CTS. (HC-5, -7), MULTI-PURPOSE RM. (HC-6), LOCKER ROOMS (HC-8, -9),

GYM CORRIDOR (HC-10), AND LAUNDRY (HC-11).

THE FOLLOWING SEQUENCE DESCRIPTION IS TYPICAL FOR BOTH AIR HANDLING UNITS,EXCEPT

WHERE SPECIFICALLY NOTED.

WHEN AHU SUPPLY FAN IS OFF RESPECTIVE CONTROL DEVICES ARE POSITIONED AS FOLLOWS:

-RETURN FAN IS OFF.

-MINIMUM AND MAXIMUM OUTDOOR AIR AND EXHAUST AIR DAMPERS POSITION ARE CLOSED.

-RETURN DAMPER IS OPEN.

-HEATING COIL CONTROL VALVE POSITIONS CLOSED (NO FLOW THROUGH COIL).

-TOILET/LOCKER ROOM EXHAUST FAN EF-5 IS OFF (INTERLOCK WITH AHU-2 ONLY).

RETURN FANS RF-1 (AHU-1) AND RF-2 (AHU-2) ARE INTERLOCKED THROUGH DDC SOFTWARE

TO OPERATE WHEN RESPECTIVE AHU SUPPLY FAN RUNS.

SYSTEM START-STOP:

AHU FAN SYSTEMS ARE STARTED AND STOPPED IN ACCORDANCE WITH SEVEN DAY TIME

PROGRAM AND INDOOR/OUTDOOR TEMPERATURE COMPARISON SCHEME, IN ORDER TO

ESTABLISH OCCUPIED TEMPERATURE SETPOINT AT THE TIME OF SCHEDULED OCCUPANCY.

SYSTEM OPERATES IN ONE OF THREE MODES; NIGHT UNOCCUPIED, DAY WARM-UP, OR DAY

OCCUPIED.

DAY OCCUPIED MODE SCHEDULE IS TO BE INITIALLY PROGRAMMED AS FOLLOWS:

MON THROUGH FRI – 0530 TO 2230

SAT – 0700 TO 2330

SUN – 0700 TO 2330

NIGHT UNOCCUPIED CYCLE:

SUPPLY AND RETURN FANS ARE OFF, DAMPERS AND VALVES POSITION AS STATED ABOVE. IF

ANY ZONE TEMPERATURE DROPS BELOW 55F AHU SYSTEM STARTS AND OPERATES SIMILAR

TO DAY WARM-UP MODE DESCRIBED BELOW. SYSTEM SHUTS OFF WHEN THE LOWEST ZONE

TEMPERATURE RISES ABOVE 58F.

DAY WARM-UP CYCLE:

MORNING WARM-UP MODE IS INITIATED FROM SEVEN DAY TIME PROGRAM AND

INDOOR/OUTDOOR TEMPERATURE COMPARISON SCHEME, IN ORDER TO ESTABLISH

OCCUPIED HEATING TEMPERATURE SETPOINT AT TIME OF SCHEDULED OCCUPANCY. AHU

FAN SYSTEM OPERATES CONTINUOUSLY WITH MIN/MAX OUTDOOR AND EXHAUST AIR

DAMPERS CLOSED, RETURN AIR DAMPER OPEN, AND EF-5 OFF (AHU-2 ONLY). HEATING COIL

CONTROL VALVE MODULATES TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT. SUPPLY

AIR SETPOINT IS RESET FROM COLDEST ZONE TEMPERATURE IN ACCORDANCE WITH THE

FOLLOWING SCHEDULE. RESET SCHEDULE VALUES ARE ADJUSTABLE.

ZONE TEMPERATURE = 68F TO 74F

SUPPLY AIR SETPOINT = 70F TO 60F

AIR HANDLING UNIT OPERATES IN DAY WARM-UP MODE UNTIL ALL ZONES HAVE REACHED 68F

OR SYSTEM SWITCHES TO DAY OCCUPIED MODE.

DAY OCCUPIED CYCLE:

AHU SUPPLY FAN OPERATES CONTINUOUSLY. MINIMUM OUTDOOR AIR DAMPER OPENS

FULLY. HEATING COIL CONTROL VALVE AND MAXIMUM OUTDOOR, RETURN, AND EXHAUST AIR

DAMPERS ARE CONTROLLED IN SEQUENCE TO MAINTAIN SUPPLY AIR TEMPERATURE

SETPOINT. SUPPLY AIR TEMPERATURE SETPOINT IS RESET FROM ZONE DEMANDING THE

MOST HEATING OR COOLING. RESET SCHEDULE IS ADJUSTABLE AND IS INITIALLY SET-UP AS FOLLOWS:

ZONE TEMPERATURE = 68F TO 74F

SUPPLY AIR TEMPERATURE = 70F TO 60F

VFD SPEEDS:

WHEN CO2 IS LESS THEN 1000 PPM THE VFD'S WILL OPERATE AT LOW SPEED

WHEN CO2 IS GREATER THEN 1000 PPM VFD'S WILL OPERATE AT HIGH SPEED. ALSO OSA/EXH

DAMPERS WILL OPEN AND AN ALARM WILL BE GENERATED.

CO2 WILL NOT OVERRIDE A TEMPERATURE LOW LIMIT. VFD SPEEDS SET BY TAB AGENT.

SAFETIES:

LOW LIMIT THERMOSTAT SHUTS DOWN AHU FAN SYSTEM AND CLOSES OSA/EXH DAMPERS WHEN

SUPPLY AIR TEMPERATURE DROPS BELOW LOW LIMIT THERMOSTAT SETPOINT,

INITALLY SET FOR 40F (ADJUSTABLE 35-45F). LOW LIMIT THERMOSTAT REQUIRES MANUAL RESETTING

IN ORDER TO RE-START AHU FAN SYSTEM.

UPON ACTIVATION OF DUCT MOUNTED SMOKE DETECTOR(S) (FURNISHED AND INSTALLED BY

DIVISION 16 CONTRACTOR) SUPPLY AND RETURN FAN WILL SHUT DOWN AND DAMPERS WILL CLOSE.

ALARM MONITORING:

THE FOLLOWING POINTS LISTED BELOW ARE MONITORED FOR ALARMING AT THE HOST

OPERATORS TERMINAL

- SUPPLY AIR TEMPERATURE (LOW LIMIT ALARM < 45F AND HIGH LIMIT ALARM > 120F)

- SUPPLY FAN MOTOR RUN STATUS (FAILURE ALARM)

- FILTER STATUS (DIRTY ALARM)

- RETURN FAN MOTOR RUN STATUS (FAILURE ALARM)

- CARBON DIOXIDE LEVELS ( HIGH LIMIT ALARM)

GENERAL DESCRIPTION:

AIR HANDLING UNIT SERVES KITCHEN AREAS. AHU SYSTEMS CONSIST OF OUTDOOR AIR

DAMPER, FILTER, HOT WATER HEATING COIL AND BOOSTER PUMP, AND SUPPLY FAN.

SYSTEM START-STOP:

AHU FAN SYSTEM IS STARTED AND STOPPED MANUALLY BY KITCHEN STAFF THROUGH

INTERLOCK WITH KITCHEN HOOD CONTROL PANEL.

WHEN KITCHEN SYSTEM IS SHUT OFF CONTROL DEVICES AND EQUIPMENT ARE POSITIONED

AS FOLLOWS:

- EF-1 AND EF-2 HOOD FANS ARE OFF (KITCHEN HOOD CONTROL PANEL FUNCTION).

- EF-3 IS OFF.

- AHU-4 OUTDOOR AIR DAMPER POSITIONS CLOSED.

- AHU-4 FAN IS SHUT OFF THROUGH END SWITCH OF OUTDOOR AIR DAMPER ACTUATOR.

- HEATING COIL CONTROL VALVE REMAINS UNDER CONTROL.

- HEATING COIL CIRCULATING PUMP CP-3 REMAINS UNDER CONTROL.

- TERMINAL UNITS VV116B AND VV232 MINIMUM AIRFLOW VOLUME CONTROL (WHEN

AHU-3 IS OPERATING).

WHEN KITCHEN SYSTEM IS TURNED ON CONTROL DEVICES AND EQUIPMENT ARE POSITIONED

AS FOLLOWS:

- EF-1 AND EF -2 HOOD FANS ARE ON (KITCHEN HOOD CONTROL PANEL FUNCTION).

- EF-3 IS ON.

- AHU-4 OUTDOOR AIR DAMPER POSITIONS OPEN.

- AHU-4 FAN IS STARTED THROUGH END SWITCH OF OUTDOOR AIR DAMPER ACTUATOR.

- TERMINAL UNITS VV116B AND VV232 MAXIMUM AIRFLOW VOLUME CONTROL (WHEN

AHU-3 IS OPERATING).

DISCHARGE TEMPERATURE CONTROL:

HEATING COIL CONTROL VALVE AND CIRCULATING PUMP CP-3 OPERATE TO MAINTAIN AHU

DISCHARGE AIR TEMPERATURE SETPOINT. UPON DROP IN DISCHARGE TEMPERATURE BELOW

SETPOINT CIRCULATING PUMP STARTS AND CONTROL VALVE MODULATES. DISCHARGE

TEMPERATURE SETPOINT IS MANUALLY ADJUSTED BY KITCHEN STAFF THROUGH WALL

MOUNTED POTENTIOMETER, SETPOINT RANGE IS 50 – 70F.

TERMINAL UNIT CONTROL:

VV116B, SERVING KITCHEN: TERMINAL UNIT PRIMARY AIR DAMPER MODULATES TO MAINTAIN

MINIMUM AND MAXIMUM AIRFLOW VOLUME SETPOINTS. VV232, SERVING PREP KITCHEN:

TERMINAL UNIT PRIMARY AIR DAMPER MODULATES TO MAINTAIN MINIMUM AND MAXIMUM

AIRFLOW VOLUME SETPOINTS, TERMINAL UNIT HEATING COIL CONTROL VALVE MODULATES

TO MAINTAIN HEATING SETPOINT, INITIALLY SET FOR 68F. AIRFLOW VOLUME SETPOINTS ARE

SWITCHED BETWEEN MINIMUM AND MAXIMUM VALUES IN ACCORDANCE WITH KITCHEN

SYSTEM OPERATION.

SAFETIES:

LOW LIMIT THERMOSTAT SHUTS DOWN AHU FAN SYSTEM WHEN HEATING COIL LEAVING AIR

TEMERATURE DROPS BELOW LOW LIMIT THERMOSTAT SETPOINT, INITIALLY SET FOR 35F

(ADJUSTABLE 35-45F). LOW LIMIT THERMOSTAT REQUIRES MANUAL RESETTING IN ORDER TO

RE-START AHU FAN SYSTEM.

WHEN SUPPLY AIR TEMPERATURE DROPS BELOW 35F HEATING COIL CIRCULATING PUMP,

CP-3 STARTS AND RUNS CONTINUOUSLY UNTIL ENTERING AIR TEMPERATURE RISES ABOVE

40F. PUMP OPERATES IN THIS MODE REGARDLESS OF AHU-4 FAN OPERATION.

UPON ACTIVATION OF DUCT MOUNTED SMOKE DETECTOR(S), SUPPLY FAN IS SHUT DOWN

AND OSA DAMPER CLOSES.

ALARM MONITORING:

THE FOLLOWING POINTS LISTED BELOW ARE MONITORED FOR ALARMING AT HOST

OPERATORS TERMINAL

- SUPPLY AIR TEMPERATURE (LOW LIMIT ALARM < 35F) VIA INTERNAL HARDWARE FREEZE STAT SWITCH

- DISCHARGE AIR TEMPERATURE (LOW LIMIT ALARM < 40F AND HIGH LIMIT ALARM > 85F)

- SUPPLY FAN MOTOR RUN STATUS (FAILURE ALARM)

- FILTER STATUS (DIRTY ALARM)

- CIRCULATING PUMP CP-3 MOTOR RUN STATUS (FAILURE ALARM)

- HOOD EXHAUST FAN EF-1 MOTOR RUN STATUS (FAILURE ALARM)

- HOOD EXHAUST FAN EF-2 MOTOR RUN STATUS (FAILURE ALARM)

- HOOD EXHAUST FAN EF-3 MOTOR RUN STATUS (FAILURE ALARM)

AIR HANDLING UNITS AHU-1 AND AHU-2 AIR HANDLING UNIT AHU-4

SEQUENCE OF OPERATIONS PART 1

THE DDC SYSTEM MONITORS SPACE TEMPERATURE, SUPPLY AIR TEMPERATURE, RETURN AIR

TEMPERATURE, AND MIXED AIR TEMPERATURE. UPON A CALL FOR OCCUPIED THE DAMPERS WILL OPEN TO MIN POSITION. FAN WILL THEN COME. AHU-2N CONTROLS TO SPACE TEMPERATURE AND IF SPACE TEMP FALLS BELOW ROOM SETPOINT OF 68F THE HEATING VALVE WILL OPEN. THERE IS A COOLING DEADBAND OF 6F. IF TEMPERATURE RISES ABOVE ROOM SETPOINT THE HEATING VALVE WILL CLOSE. ECON MODE CAN BE ENABLED IF SPACE TEMP RISES ABOVE THE COOLING DEADBAND.

ALONG WITH OAT BEING LESS THEN RETURN AIR BY 3F OR MORE.

SAFETIES:

LOW LIMIT WILL OPEN HEATING VALVE 100% OPEN WHEN SUPPLY TEMPERATURE DROPS BELOW LOW

LIMIT THERMOSSTAT SETPOINT INITIALLY SET AT 35F. (ADJUSTABLE).

AIR HANDLING UNIT AHU-2N

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-2

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

S E

Q U

E N

C E

O F

O P

E R

A T

IO

N

S P

A R

T

SEQUENCE OF OPERATIONS PART 2

VV / VARIABLE VOLUME TERMINAL UNITS

VARIABLE VOLUME TERMINAL UNITS (VV) OPERATE IN NIGHT UNOCCUPIED AND DAY

OCCUPIED MODES IN CONJUNCTION WITH THE SCHEDULED OPERATION OF AHU-3 FAN

SYSTEM.

NIGHT UNOCCUPIED CYCLE:

VV TERMINAL UNIT PRIMARY AIR VALVE IS CLOSED.

DAY WARM-UP AND OCCUPIED CYCLES:

VV TERMINAL UNIT PRIMARY AIR VALVE MODULATES TO SATISFY ZONE HEATING AND

COOLING SETPOINTS, INITIALLY SET FOR 68F HEATING AND 72 COOLING (BOTH SETPOINTS

ARE OPERATOR ADJUSTABLE).

WHEN ZONE TEMPERATURE IS BETWEEN HEATING AND COOLING SETPOINTS – PRIMARY AIR

VALVE MODULATES TO MAINTAIN DEADBAND AIR FLOW VALUE.

WHEN ZONE TEMPERATURE IS LESS THAN OR EQUAL TO HEATING SETPOINT – PRIMARY AIR

VALVE MODULATES TO MAINTAIN HEATING AIR FLOW VALUE. TERMINAL UNIT

HEATING COIL CONTROL VALVE MODULATES OPEN TO SATISFY HEATING SETPOINT.

WHEN ZONE TEMPERATURE IS GREATER THAN OR EQUAL TO COOLING SETPOINT – PRIMARY

AIR VALVE MODULATES TO MAINTAIN MAXIMUM AIR FLOW VALUE AS NEEDED.

ALARM MONITORING:

THE FOLLOWING POINTS LISTED BELOW ARE MONITORED FOR ALARMING AT HOST

OPERATORS TERMINAL

- ZONE TEMPERATURE (OCCUPIED MODE ONLY; LOW LIMIT ALARM < 63F AND HIGH LIMIT

ALARM > 83F)

- PRIMARY AIR FLOW VOLUME (OCCUPIED MODE ONLY; ALARM +/- 25% DIFFERENCE

BETWEEN SETPOINT & ACTUAL)

FT / FAN TERMINAL UNITS

FAN TERMINAL UNITS OPERATE IN NIGHT UNOCCUPIED, DAY WARM-UP, AND DAY OCCUPIED

MODES IN CONJUNCTION WITH THE SCHEDULED OPERATION OF AHU-3 FAN SYSTEM.

NIGHT UNOCCUPIED CYCLE:

TERMINAL UNIT FAN OPERATES INTERMITTENTLY TO SATISFY ZONE NIGHT UNOCCUPIED

HEATING SETPOINT, INITIALLY SET FOR 55F (OPERATOR ADJUSTABLE). WHEN TERMINAL UNIT

FAN OPERATES – PRIMARY AIR VALVE REAMAINS CLOSED AND REHEAT COIL CONTROL VALVE

MODULATES TO SATISFY NIGHT UNOCCUPIED HEATING SETPOINT. TERMINAL UNIT OPERATES

IN THIS MODE UNITL ZONE TEMPERATURE IS ABOVE 58F (OPERATOR ADJUSTABLE).

DAY WARM UP AND OCCUPIED MODES:

FT TERMINAL UNIT REHEAT COIL CONTROL VALVE, FAN, AND PRIMARY AIR VALVE/DAMPER

OPERATE TO MAINTAIN ZONE DAY OCCUPIED HEATING AND COOLING SETPOINTS, INITIALLY

SET FOR 68F HEATING AND 72F COOLING (BOTH SETPOINTS ARE OPERATOR ADJUSTABLE).

WHEN ZONE TEMPERATURE IS BETWEEN HEATING AND COOLING SETPOINTS – PRIMARY AIR

VALVE MODULATES TO MAINTAIN DEADBAND AIR FLOW VALUE, TERMINAL FAN IS OFF AND

HEATING COIL CONTROL VALVE IS CLOSED.

WHEN ZONE TEMPERATURE IS LESS THAN OR EQUAL TO HEATING SETPOINT – PRIMARY AIR

VALVE MAINTIANS AUXILIRY (MINIMUM) AIR FLOW VALUE. TERMINAL UNIT FAN

STARTS AND HEATING COIL CONTROL VALVE MODULATES OPEN TO SATISFY HEATING

SETPOINT. FAN AND VALVE OPERATE IN SEQUENCE, FAN STARTS AND ON FURTHER DROP IN

TEMPERATURE VALVE MODULATES OPEN.

WHEN ZONE TEMPERATURE IS GREATER THAN OR EQUAL TO COOLING SETPOINT – PRIMARY

AIR VALVE MODULATES UP TO MAXIMUM AIR FLOW VALUE, TERMINAL FAN IS OFF AS NEEDED.

ALARM MONITORING:

THE FOLLOWING POINTS LISTED BELOW ARE MONITORED FOR ALARMING AT THE HOST

OPERATORS TERMINAL

- ZONE TEMPERATURE (LOW LIMIT ALARM < 50F / UNOCCUPIED, < 63F / OCCUPIED AND

HIGH LIMIT ALARM> 83F)

- PRIMARY AIR FLOW VOLUME (OCCUPIED MODE ONLY ALARM +/- 25% DIFFERENCE

BETWEEN SETPOINT & ACTUAL).

CV / CONSTANT VOLUME TERMINAL UNITS

CONSTANT VOLUME TERMINAL UNITS (CV) OPERATE IN NIGHT UNOCCUPIED AND DAY

OCCUPIED MODES IN CONJUNCTION WITH THE SCHEDULED OPERATION OF AHU-3 FAN

SYSTEM.

NIGHT UNOCCUPIED CYCLE:

CV TERMINAL UNIT PRIMARY AIR VALVE IS CLOSED.

DAY WARM-UP AND OCCUPIED CYCLES:

CV TERMINAL UNIT PRIMARY AIR VALVE MODULATES TO MAINTAIN AIRFLOW VOLUME

SETPOINT. TERMINAL UNIT HEATING COIL CONTROL VALVE MODULATES TO SATISFY ZONE

HEATING SETPOINT, INITIALLY SET FOR 68F (SETPOINT IS OPERATOR ADJUSTABLE).

ALARM MONITORING:

THE FOLOWING POINTS LISTED BELOW ARE MONITORED FOR ALARMING AT HOST

OPERATORS TERMINAL.

- ZONE TEMPERATURE (OCCUPIED MODE ONLY: LOW LIMIT ALARM < 63F AND HIGH LIMIT

ALARM > 83F)

- PRIMARY AIR FLOW VOLUME ( OCCUPIED MODE ONLY ALARM +/- 25% DIFFERENCE BETWEEN

SETPOINT AND ACTUAL

AIR HANDLING UNIT AHU-3

GENERAL DESCRIPTION:

AIR HANDLING UNIT SERVES FT/VV/CV ZONE TERMINAL UNITS. AHU SYSTEM CONSITS OF

MINIMUM OUTDOOR AIR DAMPER, OUTDOOR/RETURN/EXHAUST AIR DAMPERS, FILTER, HOT

WATER HEATING COIL, CHILLED WATER COOLING COIL, SUPPLY FAN, AND RETURN FAN.

SUPPLY AND RETURN FAN MOTORS OPERATE FROM VARIABLE FREQUENCY DRIVES.

WHEN AHU SUPPLY FAN IS OFF RESPECTIVE CONTROL DEVICES ARE POSITIONED AS

FOLLOWS:

- RETURN FAN IS OFF.

- MINIMUM AND MAXIMUM OUTDOOR AIR AND EXHAUST AIR DAMPERS POSITION CLOSED.

- RETURN AIR DAMPER POSITIONS OPEN.

- HEATING COIL CONTROL VALVE POSITIONS CLOSED (NO FLOW THROUGH COIL)

- COOLING COIL CONTROL VALVE POSITIONS CLOSED (NO FLOW THROUGH COIL)

RETURN FAN RF-3 IS INTERLOCKED THROUGH DDC SYSTEM SOFTWARE TO OPERATE WHEN

AHU-3 SUPPLY FAN RUNS.

SYSTEM START-STOP:

AHU FAN SYSTEM IS STARTED AND STOPPED IN ACCORDANCE WITH SEVEN DAY TIME

PROGRAM AND INDOOR/OUTDOOR TEMPERATURE COMPARISON SCHEME, IN ORDER TO

ESTABLISH OCCUPIED TEMPERATURE SETPOINT AT THE TIME OF SCHEDULED OCCUPANCY.

SYSTEM OPERATES IN ONE OF THREE MODES; NIGHT UNOCCUPIED, DAY WARM-UP, OR DAY

OCCUPIED.

DAY OCCUPIED MODE SCHEDULE IS TO BE INITIALLY PROGRAMMED AS FOLLOWS:

- MON THROUGH SUN = 0700 TO 2200

NIGHT UNOCCUPIED CYCLE:

AHU FAN SYSTEM IS OFF, DAMPERS AND VALVES POSITION AS STATED ABOVE. FAN

TERMINAL UNITS (FT) MAINTAIN RESPECTIVE ZONE NIGHT UNOCCUPIED SETPOINT.

WARM-UP CYCLE:

MORNING WARM-UP MODE IS INITIATED FROM SEVEN DAY TIME PROGRAM AND

INDOOR/OUTDOOR TEMPERATURE COMPARISON SCHEME, IN ORDER TO ESTABLISH

OCCUPIED HEATING TEMPERATURE SETPOINT AT TIME OF SCHEDULED OCCUPANCY. AHU

FAN SYSTEM OPERATES CONTINUOUSLY WITH MIN/MAX OUTDOOR AND EXHAUST AIR

DAMPERS CLOSED, RETURN AIR DAMPER OPEN. HEATING COIL CONTROL VALVE MODULATES

TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT.SUPPLY AIR SETPOINT IS RESET FROM

COLDEST ZONE TEMPERATURE IN ACCORDANCE WITH THE FOLLOWING SCHEDULE. RESET

SCHEDULE VALUES ARE ADJUSTABLE.

- ZONE TEMPERATURE = 65F TO 68F.

- SUPPLY AIR SETPOINT = 68F TO 60F

AIR HANDLING UNIT SYSTEM OPERATES IN DAY WARM-UP MODE UNTIL ALL ZONES ARE 68F.

ONCE ALL ZONES HAVE REACHED 68F SYSTEM SWITCHES TO DAY OCCUPIED MODE.

DAY OCCUPIED CYCLE:

AHU SUPPLY/RETURN FAN RUN CONTINUOUSLY. MINIMUM OUTDOOR AIR DAMPER OPENS FULLY.

HEATING COIL CONTROL VALVE, MAXIMUM OUTDOOR, RETURN, AND EXHAUST AIR DAMPERS,

AND COOLING COIL CONTROL VALVE ARE CONTROLLED IN SEQUENCE TO MAINTAIN SUPPLY

AIR TEMPERATURE SETPOINT. SUPPLY AIR TEMPERATURE SETPOINT IS RESET FROM COLDEST

ZONE TEMPERATURE IN ACCORDANCE WITH THE FOLLOWING SCHEDULE. RESET SCHEDULE

VALUES ARE ADJUSTABLE.

-- ZONE TEMPERATURE = 65F TO 68F

-- SUPPLY AIR SETPOINT = 68F TO 60F

ON SUPPLY AIR TEMPERATURE DROP BELOW SETPOINT HEATING VALVE MODULATES OPEN

WITH DAMPERS POSITIONED FOR MINIMUM OUTDOOR AIR (MAXIMUM OUTDOOR AIR DAMPERS

CLOSED). ON SUPPLY TEMPERATURE RISE ABOVE SETPOINT COOLING COIL VALVE

MODULATES OPEN AFTER DAMPERS HAVE MODULATED TO FULL OUTDOOR AIR (MAXIMUM

OUTDOOR AIR DAMPERS HAVE MODULATED TO FULLY OPEN). WHEN OUTDOOR AIR

TEMPERATURE RISES ABOVE 76F DAMPER REPOSITION TO MINIMUM OUTDOOR AIR (MAXIMUM

OUTDOOR AIR DAMPER CLOSED).

TEMPERATURE CONTROL OF DAMPERS IS OVERRIDEN BY SPACE CARBON DIOXIDE SENSORS

TO MAINTAIN ACCEPTABLE CO2 LEVELS WITHIN BUILDING BUT WILL NOT OVERRIDE THE LOW LIMIT.

DAMPERS MODULATE TO INCREASE OUTDOOR AIR INTRODUCTION AS CO2 LEVELS INCREASE

ABOVE 1200PPM. DAMPERS RESPOND TO THE HIGHER OF THE TWO SPACE CARBON DIOXIDE SENSORS.

SUPPLY DUCT STATIC PRESSURE CONTROL:

SUPPLY FAN MOTOR SPEED IS CONTROLLED, THROUGH VARIABLE FREQUENCY DRIVE (VFD),

TO MAINTAIN SUPPLY DUCT STATIC PRESSURE SETPOINT, INITIALLY SET FOR 1.50 INCH WC

(OPERATOR ADJUSTABLE 0 TO 2.0 INCHES WC). TWO DUCT STATIC PRESSURE SENSORS ARE

PROVIDED AND RETURN FAN OPERATES TO SATISFY THE HIGHER OF THE TWO SENSORS.

SPACE STATIC PRESSURE CONTROL:

RETURN FAN MOTOR SPEED IS CONTROLLED, THROUGH VARIABLE FREQUENCY DRIVE (VFD),

TO MAINTAIN SPACE STATIC PRESSURE SETPOINT, INITIALLY SET FOR +0.02 INCH WC

(OPERATOR ADJUSTABLE -0.15 TO +0.15 INCHES WC). TWO SPACE STATIC PRESSURE

SENSORS ARE PROVIDED AND RETURN FAN OPERATES TO SATISFY THE HIGHER OF THE TWO

SENSORS.

SAFETIES:

LOW LIMIT THERMOSTAT SHUTS DOWN AHU FAN SYSTEM AND CLOSES OSA/EXH DAMPERS

WHEN HEATING COIL LEAVING AIR TEMPERATURE DROPS BELOW LOW LIMIT THERMOSTAT

STEPOINT, INITIALLY SET FOR 35F (ADJUSTABLE 35-45F). LOW LIMIT THERMOSTAT REQUIRES MANUAL RESETTING IN ORDER TO

RE-START AHU FAN SYSTEM.

UPON ACTIVATION OF DUCT MOUNTED SMOKE DETECTOR(S), SUPPLY FAN AND RETURN FAN IS SHUT DOWN.

SUPPLY FAN IS SHUTDOWN WHEN SUPPLY DUCT STATIC PRESSURE EXCEED

OVERPRESSURE SETPOINT, INITIALLY SET FOR 4.0 WC (ADJUSTABLE 1.4 – 5.5 INCHES WC). DUCT

STATIC HIGH LIMIT PRESSURE SWITCH REQUIRES MANUAL RESETTING IN ORDER TO RE-

START AHU FAN SYSTEM.

ALARM MONITORING:

THE FOLLOWING POINTS LISTED BELOW MONITORED FOR ALARMING AT HOST OPERATOR’S TERMINAL.

- SUPPLY AIR TEMPERATURE (LOW LIMIT ALARM < 40F AND HIGH LIMIT ALARM > 80F OCCUPIED MODE).

- SUPPLY FAN MOTOR VFD STATUS (FAILURE ALARM)

- RETURN FAN MOTOR VFD STATUS (FAILURE ALARM)

- FILTER STATUS (DIRTY ALARM)

- SUPPLY AIR DUCT STATIC PRESSURE #1 (LOW LIMIT ALARM < +.75 INCHES WC AND HIGH LIMIT ALARM > +2.5 INCHES WC)

- SUPPLY AIR DUCT STAIC PRESSURE #2 (LOW LIMIT ALARM < +.75 INCHES WC AND HIGH LIMIT ALARM > +2.5 INCHES WC)

- SPACE STATIC PRESSURE #1 (LOW LIMIT ALARM < -0.10’’WC AND HIGH LIMIT ALARM > + 0.10’’ WC).

- SPACE STATIC PRESSURE #1 (LOW LIMIT ALARM < -0.10’’WC AND HIGH LIMIT ALARM > +0.10’’ WC).

- SPACE STATIC PRESSURE #2 (LOW LIMIT ALARM < -0.10’’WC AND HIGH LIMIT ALARM > + 0.10’’ WC).

- FOOD COURT SPACE CO2 LEVEL (HIGH LIMIT ALARM > 1200PPM)

- BANQUET FACILITY SPACE CO2 LEVEL (HIGH LIMIT ALARM > 1200PPM)

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-2

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

S E

Q U

E N

C E

O F

O P

E R

A T

IO

N

S P

A R

T

SEQUENCE OF OPERATIONS PART 3

HEATING WATER SYSTEM

GENERAL DESCRIPTION:

HEATING WATER SYSTEM CONSISTS OF HEATING WATER CIRCULATION PUMPS HWP-1 AND

HWP-2, BOILERS B-1 AND B-2, AND BOILER SYSTEM CONTROL PANEL. HEATING WATER

SYSTEM IS INTERLOCKED THROUGH SOFTWARE TO OPERATE IN CONJUNCTION WITH AIR

HANDLING UNITS SCHEDULED NIGHT, WARM-UP, AND DAY MODES. INDIVIDUAL BOILER

CONTROL IS FROM INTEGRAL CONTROLS WITHIN EACH BOILER AND ON / OFF STAGING OF

BOILERS IS FROM DDCP-04 CONTROL PANEL. HWPS ARE TO RUN A MINIMUM OF 10 MIN AFTER

LAST BOILER IS SHUT-OFF. REFER TO OPERATING INSTRUCTIONS FURNISHED WITH HEATING

WATER SYSTEM CONTROL PANEL FOR COMPLETE SEQUENCE OF OPERATION DESCRIPTION OF

BOILERS AND PANEL.

UNOCCUPIED:

LEAD PUMP IS OFF AND BOILERS ARE DE-ACTIVATED. WHEN ANY FAN TERMINAL UNIT ZONE

(FT) OR AIR HANDLING UNIT (AHU-1, 2, 3, 4) REQUIRES HOT WATER HEATING TO MAINTAIN

NIGHT UNOCCUPIED TEMPERATURE SETPOINT, HEATING WATER SYSTEM IS ACTIVATED.

ONCE ACTIVATED, HEATING WATER SYSTEM OPERATES FOR A MINIMUM 15 MINUTES OR

UNTIL DEMAND FOR HOT WATER HEATING NO LONGER EXISTS.

WARM-UP:

LEAD PUMP OPERATES CONTINUOUSLY AND SYSTEM PANEL CONTROL OF BOILERS IS

ACTIVATED WHEN OUTDOOR AIR TEMPERATURE IS BELOW 65F. LEAD PUMP IS OFF AND

SYSTEM PANEL CONTROL OF BOILERS IS DEACTIVATED WHEN OUTDOOR AIR TEMPERATURE

IS ABOVE 68F.

OCCUPIED:

LEAD PUMP OPERATES CONTINUOUSLY AND SYSTEM PANEL CONTROL OF BOILERS IS

ACTIVATED WHEN OUTDOOR AIR TEMPERATURE IS BELOW 65F. LEAD PUMP IS OFF AND

SYSTEM PANEL CONTROL OF BOILERS IS DEACTIVATED WHEN OUTDOOR AIR TEMPERATURE

IS ABOVE 68F.

CIRCULATING PUMPS:

HEATING WATER SYSTEM CIRCULATING PUMPS OPERATE IN A LEAD STANDBY WITH

ALTERNATION CONFIGURATION. LEAD PUMP SELECTION IS AUTOMATICALLY ALTERNATED

BETWEEN PUMPS TO EQUAL OUT RUNTIME. ALTERNATION OCCURS WEEKLY. IN THE EVENT

OF A LEAD PUMP FAILURE – THE STANDBY PUMP IS STARTED. VFD PROOF SWITCH ON EACH CIRCULATON PUMP, INDICATES RESPECTIVE PUMPS OPERATION. CIRCULATING PUMPS ARE PROGRAMMED WITH

MINIMUM ON AND OFF TIMES TO PREVENT SHORT CYCLING.

CIRCULATING PUMP VFD SPEED CONTROLLED BY HWS CONTROLLER BASED ON SYSTEM

DIFFERENTIAL PRESSURE. 14 PSI SETPOINT (ADJUSTABLE)

SYSTEM PANEL CONTROL OF BOILERS:

HEATING WATER SYSTEM CONTROL PANEL PROVIDES ON / OFF STAGING OF BOILERS IN

SEQUENCE TO MAINTAIN BOILER LOAD. BOILER LOAD IS DETERMINED BY BUILDINGS

CONTROLLERS BASED ON THE CALL FOR HEAT FROM THE VAV'S AND AHU'S. HEATING

WATER SETPOINTS ARE INTERANL TO BOILERS AND ARE RESET BASED ON A 0-10VDC SIGNAL

HOT WATER SUPPLY TEMPERATURE SETPOINT IS RESET FROM OUTSIDE AIR TEMPERATURE

IN ACCORDANCE WITH THE FOLLOWING RESET SCHEDULE. (VALUES ARE ADJUSTABLE)

- OUTSIDE AIR TEMPERATURE = 20F TO 65F

- HOT WATER SUPPLY SETPOINT = 190F to 140F

ALARM MONITORING:

THE FOLLOWING POINTS LISTED BELOW ARE MONITORED FOR ALARMING AT HOST

OPERATORS TERMINAL

- HEATING WATER PUMP HWP-1 STATUS (FAILURE ALARM)

- HEATING WATER PUMP HWP-2 STATUS (FAILURE ALARM)

- HEATING WATER SUPPLY TEMPERATURE (LOW LIMIT ALARM AFTER 30 MIN OF

ONE BOILER BEING ON AND TEMP IS 140F AND HIGH LIMIT ALARM WHEN TEMP OF 200F)

CHILLED WATER SYSTEM

GENERAL DESCRIPTION:

CHILLED WATER SYSTEM CONSISTS OF CHILLER CHLR-1 WITH INTEGRAL CHILLED WATER

CIRCULATING PUMP, CHWP-1. CHILLED WATER SYSTEM IS INTERLOCKED THROUGH SOFTWARE

TO OPERATE IN CONJUNCTION WITH AIR HANDLING UNITS SCHEDULED NIGHT, WARMUP, AND

DAY MODES.

UNOCCUPIED:

CHILLED WATER SYSTEM IS DEACTIVATED, PUMP IS OFF AND CHILLER DISABLED.

WARMUP:

CHILLED WATER SYSTEM IS DEACTIVATED, PUMP IS OFF AND CHILLER DISABLED.

OCCUPIED:

CHILLED WATER SYSTEM IS ACTIVATED WHEN OUTDOOR AIR TEMPERATURE IS ABOVE 60F,

AND AT LEAST (1) ROOM SENSOR IS ABOVE 78 DEG. F. (ADJUSTABLE)

WHEN CHILLER IS ENABLED, INTERNAL CONTROLS START PUMP AND VERIFY FLOW VIA INTERNAL

FLOW SWITCH ALLOWING CHILLER TO RUN.

INTEGRAL CAPACITY CONTROL OF CHILLER OPERATE TO MAINTAIN CHILLED WATER SUPPLY

TEMPERATURE SETPOINT AS SET THROUGH CHILLER CONTROLS . ON SCHEDULED SHUTDOWN

OF CHILLED WATER SYSTEM, EITHER FROM AHU TIME SCHEDULES OR OUTDOOR TEMPERATURE

DROP BELOW 58F, CHILLER IS DISABLED AND AFTER 5 MINUTE TIME DELAY PUMP IS SHUT OFF.

ALARM MONITORING:

THE FOLLOWING POINTS LISTED BELOW ARE MONITORED FOR ALARMING AT HOST

OPERATORS TERMINAL.

- CHILLED WATER PUMP CHWP-1 STATUS (FAILURE ALARM)

- CHILLED WATER SUPPLY TEMPERATURE (LOW LIMIT ALARM 10F < SETPOINT AND HIGH

LIMIT ALARM 10F > SETPOINT)

EQUIPMENT ROOM EXHAUST FANS:

EF-7 SERVING KITCHEN CONDENSING UNITS EQUIPMENT ROOM 300:

EXHAUST FAN AND ASSOCIATED INTAKE/EXHAUST DAMPERS OPERATE TO MAINTAIN

EQUIPMENT ROOM SPACE TEMPERATURE SETPOINT OF 80F. ON RISE IN SPACE

TEMPERATURE ABOVE SETPOINT INTAKE AND EXHAUST DAMPERS OPEN, EXHAUST FAN IS

STARTED THROUGH END SWITCH OF EXHAUST DAMPER ACTUATOR. FAN OPERATES WITH

DAMPERS OPEN UNTIL SPACE TEMPERATURE DROPS 5F BELOW SETPOINT. DAMPERS CLOSE

AND EXHAUST FAN IS STOPPED THROUGH END-SWITCH OF EXHAUST DAMPER ACTUATOR.

EF-8 SERVING MEZZANINE MECHANICAL EQUIPMENT ROOM:

EXHAUST FAN AND ASSOCIATED INTAKE/EXHAUST DAMPERS OPERATE TO MAINTAIN

EQUIPMENT ROOM SPACE TEMPERATURE SETPOINT OF 80F. ON RISE IN SPACE

TEMPERATURE ABOVE SETPOINT INTAKE DAMPER OPENS IF SPACE TEMPERATURE RISES 5F

ABOVE SETPOINT EXHAUST DAMPER OPENS AND EXHAUST FAN IS STARTED THOUGH END

SWITCH OF THE EXHAUST DAMPER ACTUATOR. FAN OPERATES WITH DAMPERS OPEN UNTIL

SPACE TEMPERATURE DROPS BELOW SETPOINT. EXHAUST DAMPER CLOSES AND EXHAUST

FAN IS STOPPED THROUGH END SWITCH OF EXHAUST DAMPER ACTUATOR. INTAKE DAMPER

REMAINS OPEN AND CLOSES WHEN SPACE TEMPERATURE DROPS 5F BELOW SETPOINT.

EF-9 SERVING MECHANICAL EQUIPMENT ROOM 123:

EXHAUST FAN OPERATES TO MAINTAIN EQUIPMENT ROOM SPACE TEMPERATURE SETPOINT OF

80F. ON RISE IN SPACE TEMPERATURE ABOVE SETPOINT EXHAUST FAN IS STARTED. FAN

OPERATES UNTIL SPACE TEMPERATURE DROPS 5F BELOW SETPOINT.

EF-10 SERVING ELECTRICAL EQUIPMENT ROOM 124:

EXHAUST FAN AND ASSOCIATED INTAKE/EXHAUST DAMPERS OPERATE TO MAINTIAN

EQUIPMENT ROOM SPACE TEMPERATURE SETPOINT OF 80F. ON RISE IN SPACE

TEMPERATURE ABOVE SETPOINT INTAKE AND EXHAUST DAMPERS OPEN, EXHAUST FAN IS

STARTED THROUGH END SWITCH OF EXHAUST FAN DAMPER ACTUATOR. FAN OPERATES

WITH DAMPERS OPEN UNTIL SPACE TEMPERATURE DROPS 5F BELOW SETPOINT. DAMPERS

CLOSE AND EXHAUST FAN IS STOPPED THROUGH END SWITCH OF EXHAUST DAMPER

ACTUATOR.

EF-14 SERVING ELEVATOR EQUIPMENT ROOM 229:

EXHAUST FAN AND ASSOCIATED INTAKE/EXHAUST DAMPERS OPERATE TO MAINTAIN

EQUIPMENT ROOM SPACE TEMPERATURE SETPOINT OF 80F. ON RISE IN SPACE

TEMPERATURE ABOVE SETPOINT INTAKE AND EXHAUST DAMPERS OPEN, EXHAUST FAN IS

STARTED THROUGH END SWITCH OF EXHAUST DAMPER ACTUATOR. FAN OPERATES WITH

DAMPERS OPEN UNTIL SPACE TEMPERATURE DROPS 5F BELOW SETPOINT. DAMPERS CLOSE

AND EXHAUST FAN IS STOPPED THROUGH END SWITCH OF EXHAUST DAMPER ACTUATOR.

ALARM MONITORING:

THE FOLLOWING POINTS LISTED BELOW ARE MONITORED FOR ALARMING AT HOST

OPERATOR’S TERMINAL.

- EF-7 SPACE TEMPERATURE (LOW LIMIT ALARM < 38F AND HIGH LIMIT ALARM > 90F)

- EF-8 SPACE TEMPERATURE (LOW LIMIT ALARM < 38F AND HIGH LIMIT ALARM > 90F)

- EF-9 SPACE TEMPERATURE (LOW LIMIT ALARM < 38F AND HIGH LIMIT ALARM > 90F)

- EF-10 SPACE TEMPERATURE (LOW LIMIT ALARM < 38F AND HIGH LIMIT ALARM > 90F)

- EF-14 SPACE TEMPERATURE (LOW LIMIT ALARM < 38F AND HIGH LIMIT ALARM > 90F)

EXHAUST FAN CONTROL AND MONITORING:

EXHAUST FANS (EF-4, 5, 6) ARE INTERLOCKED, THROUGH DDC SYSTEM SOFTWARE. TO

OPERATE WITH AHU FAN SYSTEMS SCHEDULE. FANS ARE OFF DURING NIGHT UNOCCUPIED

AND DAY WARM-UP CYCLES. FANS OPERATE CONTINUOUSLY DURING DAY OCCUPIED CYCLE.

- EF-4 SERVING KITCHEN AREA, IS INTERLOCKED TO OPERATE WITH AHU-4.

- EF-5 SERVING LOCKER ROOMS IS INTERLOCKED TO OPERATE WITH AHU-2.

- EF-6 SERVING TOILET ROOMS, IS INTERLOCKED TO OPERATE WITH AHU-1, -2, -3.

EF-5 AND EF-6 ARE STARTED AND STOPPED FROM RESPECTIVE EXHAUST DAMPER

ACTUATOR END SWITCH, DAMPER IS OPENED AND CLOSED BY SIGNAL FROM DDC SYSTEM.

DRYER EXHAUST FANS EF-11, -12, -13 ARE INTERLOCKED TO OPERATE FROM LAUNDRY ROOM

CLOTHES DRYERS. OPERATIONAL STATUS IS MONITORED FOR ALARMING.

ALARM MONITORING:

THE FOLLOWING POINTS LISTED BELOW ARE MONITORED FOR ALARMING AT HOST

OPERATORS TERMINAL.

- EXHAUST FAN EF-4 MOTOR RUN STATUS (FAILURE ALARM)

- EXHAUST FAN EF-5 MOTOR RUN STATUS (FAILURE ALARM)

- EXHAUST FAN EF-6 MOTOR RUN STATUS (FAILURE ALARM)

- EXHAUST FAN EF-11 MOTOR RUN STATUS (HIGH CURRENT LOAD ALARM)

- EXHAUST FAN EF-12 MOTOR RUN STATUS (HIGH CURRENT LOAD ALARM)

- EXHAUST FAN EF-13 MOTOR RUN STATUS (HIGH CURRENT LOAD ALARM)

DOMESTIC WATER RECIRCULATION PUMPS CP-1 AND CP-2

DOMESTIC WATER RECIRCULATION PUMPS OPERATE IN CONJUNCTION WITH AHU SYSTEM

OCCUPANCY SCHEDULES. PUMPS OPERATE CONTINUOUSLY DURING DAY OCCUPIED MODE

AND ARE OFF DURING NIGHT UNOCCUPIED AND DAY WARM UP MODES. PUMP CP-1 SERVES

DOMESTIC WATER HEATER WH-1 AND PUMP CP-2 SERVES KITCHEN WATER HEATER WH-2.

UNIT HEATERS UH-1, UH-2, AND UH-3

UNIT HEATERS OPERATE IN CONJUNCTION WITH AHU SYSTEM OCCUPANCY SCHEDULES. UNIT

HEATERS OPERATE TO MAINTAIN DAY OCCUPIED HEATING SETPOINT OF 60F AND NIGHT

UNOCCUPIED HEATING SETPOINT OF 50F. WHEN SPACE TEMPERATURE DROPS BELOW

HEATING SETPOINT UNIT HEATER FAN STARTS AND HEATING WATER CONTROL VALVE OPENS

IN SEQUENCE. UH-1 SERVES VALVE ROOM 166, UH-2 SERVES MECHANICAL ROOM 216 AND UH-

3 SERVES MECHANICAL ROOM 216.

FIN TUBE RADIATION CONTROL

FTU-1 IS CONTROLLED FROM FT202A TERMINAL UNIT AS FIRST STAGE OF HEAT. FTU-2 IS

CONTROLLED FROM SPACE TEMPERATURE SENSOR IN LOBBY 100 TO MAINTAIN SETPOINT

OF 68F.

ELEVATOR PIT METHANE DETECTION

METHANE MONITORING PANEL, LOCATED IN ELEVATOR EQUIPMENT ROOM 229, MONITORS

METHANE GAS LEVEL THROUGH SENSOR WALL MOUNTED AT BOTTOM OF ELEVATOR SHAFT

#2. AN ALARM IS GENERATED TO THE HOST OPERATORS TERMINAL IN THE EVENT METHANE

GAS LEVELS EXCEED ALARM LIMIT SETPOINTS, INITIALLY SET FOR 30%LEL AND 50% LEL.

POOL HEATING WATER SYSTEM

GENERAL DESCRIPTION:

HEATING WATER SYSTEM CONSISTS OF HEATING WATER CIRCULATION PUMPS SCP-1 AND

SCP-2, BOILERS B-1 AND B-2, AND BOILER SYSTEM CONTROL PANEL. HEATING WATER

SYSTEM IS INTERLOCKED THROUGH SOFTWARE TO OPERATE IN CONJUNCTION WITH AIR

HANDLING UNITS (POOL PACK AHU-1N) SCHEDULED NIGHT, WARM-UP, AND DAY MODES.

INDIVIDUAL BOILER CONTROL IS FROM INTEGRAL CONTROLS WITHIN EACH BOILER AND

ON / OFF STAGING OF BOILERS IS FROM DDCP-07 CONTROL PANEL. SCPS ARE TO RUN A

MINIMUM OF 10 MIN AFTER LAST BOILER IS SHUT-OFF. REFER TO OPERATING INSTRUCTIONS

FURNISHED WITH HEATING WATER SYSTEM CONTROL PANEL FOR COMPLETE SEQUENCE

OF OPERATION DESCRIPTION OF BOILERS AND PANEL.

UNOCCUPIED:

LEAD PUMP IS OFF AND BOILERS ARE DE-ACTIVATED. WHEN ANY FAN TERMINAL UNIT ZONE

(FT) OR AIR HANDLING UNIT (AHU-3, AHU-4) REQUIRES HOT WATER HEATING TO MAINTAIN

NIGHT UNOCCUPIED TEMPERATURE SETPOINT, HEATING WATER SYSTEM IS ACTIVATED.

ONCE ACTIVATED, HEATING WATER SYSTEM OPERATES FOR A MINIMUM 15 MINUTES OR

UNTIL DEMAND FOR HOT WATER HEATING NO LONGER EXISTS.

SCP-1 AND SCP-2 SPEEDS ARE CONTROLLING TO A HOT WATER DIFFERENTIAL PRESSURE

SETPOINT OF 10 PSI

WARM-UP:

LEAD PUMP OPERATES CONTINUOUSLY AND SYSTEM PANEL CONTROL OF BOILERS IS

ACTIVATED WHEN OUTDOOR AIR TEMPERATURE IS BELOW 66F. LEAD PUMP IS OFF AND

SYSTEM PANEL CONTROL OF BOILERS IS DEACTIVATED WHEN OUTDOOR AIR TEMPERATURE

IS ABOVE 68F.

OCCUPIED:

LEAD PUMP OPERATES CONTINUOUSLY AND SYSTEM PANEL CONTROL OF BOILERS IS

ACTIVATED WHEN OUTDOOR AIR TEMPERATURE IS BELOW 66F. LEAD PUMP IS OFF AND

SYSTEM PANEL CONTROL OF BOILERS IS DEACTIVATED WHEN OUTDOOR AIR TEMPERATURE

IS ABOVE 68F.

CIRCULATING PUMPS:

HEATING WATER SYSTEM CIRCULATING PUMPS OPERATE IN A LEAD STANDBY WITH

ALTERNATION CONFIGURATION. LEAD PUMP SELECTION IS AUTOMATICALLY ALTERNATED

BETWEEN PUMPS TO EQUAL OUT RUNTIME. ALTERNATION OCCURS WEEKLY. IN THE EVENT

OF A LEAD PUMP FAILURE – THE STANDBY PUMP IS STARTED. CURRENT SENSING SWITCH,

ON EACH CIRCULATON PUMP, INDICATES RESPECTIVE PUMPS OPERATION. CIRCULATING

PUMPS ARE PROGRAMMED WITH MINIMUM ON AND OFF TIMES TO PREVENT SHORT CYCLING.

SYSTEM PANEL CONTROL OF BOILERS:

HEATING WATER SYSTEM CONTROL PANEL PROVIDES ON / OFF STAGING OF BOILERS IN

SEQUENCE TO MAINTAIN BOILER LOAD. BOILER LOAD IS DETERMINED BY BUILDINGS

CONTROLLERS BASED ON THE CALL FOR HEAT FROM THE AHU-1N. HEATING WATER

SETPOINTS ARE INTERANL TO BOILERS AND ARE RESET BASED ON A 0-10VDC SIGNAL

HOT WATER SUPPLY TEMPERATURE SETPOINT IS RESET FROM OUTSIDE AIR TEMPERATURE

IN ACCORDANCE WITH THE FOLLOWING RESET SCHEDULE. (VALUES ARE ADJUSTABLE)

- OUTSIDE AIR TEMPERATURE = 20F TO 65F

- HOT WATER SUPPLY SETPOINT = 190F to 140F

ALARM MONITORING:

THE FOLLOWING POINTS LISTED BELOW ARE MONITORED FOR ALARMING AT HOST

OPERATORS TERMINAL

- HEATING WATER PUMP SCP-1 ALARM STATUS (FAILURE ALARM)

- HEATING WATER PUMP SCP-2 ALARM STATUS (FAILURE ALARM)

- HEATING WATER BOILER #1 ALARM STATUS (FAILURE ALARM)

- HEATING WATER BOILER #2 ALARM STATUS (FAILURE ALARM)

- HEATING WATER SUPPLY TEMPERATURE (LOW LIMIT ALARM AFTER 30 MIN OF

ONE BOILER BEING ON AND TEMP IS 140F AND HIGH LIMIT ALARM WHEN TEMP OF 200F)

POOL PAK AHU-1N

THE DDC INTERFACE IS JUST MONITORING THESE POINTS OVER MODBUS. AHU-1N IS

CONTROLLING TO RUN 24/7. THE FOLLOWING EF UNITS ARE TIED IN WITH THE POOL PAK

AHU-1N:

- EF-5N IS HARDWIRED TO RUN WHEN THE AHU-1N IS RUNNING

- EF-4N TIED TO AN OPERATES FROM INLINE SENSOR

- EF-3N TIED TO AN OPERATES FROM INLINE SENSOR

- EF-2N IS ENABLED WITH THE DDC AND RUNS WITH THE AHU-1N

- EF-1N IS ENABLED WITH THE DDC AND RUNS WITH THE AHU-1N

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

F

IR

S T

F L

O O

R N

O R

T H

UH-1

CP-1

T

T

T

T

T

HC-10

HC-11

CH-1

CH-2

HC8

HC9

HC10

HC1

DDCP-06

ABOVE CEILING

= CLOUDED AREAS REPRESENT CHANGES UNDER THIS CONTRACT.

MOVIE THEATER

T0 DDCP-06

DDCP-09

HC-8

HC-9

T

T

EF-5N

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

F

IR

S T

F L

O O

R S

O U

T H

MASSAGE

STORAGE

T

T

T

T

T

T

T

T

T

C

TT

T

T

T

T

T

T

T

T TT

T

T

VAV-134

VAV-130

VAV-138

VAV-112

VAV-116A

VAV-116B

VAV-130

VV-126

VAV-125

VAV-121

VAV-133

VAV-134

VAV-131

VAV-100D

VAV-100B

VAV-100C

VAV-100A

J

J

J-BOX UP TO

MECH MEZZ

J-BOX FROM

2ND FLOOR

DDCP-04

TR7

TR9

TR8

UP TO VAV'S

ON SECOND FLOOR

CO2 SENSOR

TO DDCP-03

FTU-2

KITCHEN HOOD

CONTROL PANEL

TO DDCP-03

= CLOUDED AREAS REPRESENT CHANGES UNDER THIS CONTRACT.

SC

NS

MOVIE THEATER

B-2

B-1

NETWORK

SWITCH

POWER SUPPLIED TO SC

FROM PANEL P4 CIRCUIT 30

TO NETWORK SWITCH

FROM PANEL X1 CIRCUIT 11

POWER FOR SC AND NETWORK SWITCH

1 2

T

C H

W P

-1

H W

P -1

H W

P -2

SF-9

EF-10

EF-14

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

F

IR

S T

F L

O O

R N

A T

A T

O R

IU

M

B1950 NORTH

ELECT RM 114

MECH RM 113

STORAGE

FAMILY LOCKER

MATCH LINE

DDCP-07

= CLOUDED AREAS REPRESENT CHANGES UNDER THIS CONTRACT.

AHU-1

POOL PAK UNIT

AHU-2N

T H

EXISTING CONDUIT TO

ELECT ROOM E124

SCP-1

SCP-2

(FAN POWERED)

VAV

UH-1N

EF-1N

(ROOFTOP)

EF-3N

EF-4N

EF-2N

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

S E

C O

N D

F L

O O

R N

O R

T H

STAIR AND LANDING ARE

HC-1

HC-2 HC-3 HC-4

T

T T

HC-4

HC-2 HC-3 DDCP-05

EF-11

EF-12

EF-13

DOWN TO DDCP-06

IN LAUNDRY 154

EXISTING

MOD-51 MOD-61

EF-5

EF-6

= CLOUDED AREAS REPRESENT CHANGES UNDER THIS CONTRACT.

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

S E

C O

N D

F L

O O

R S

O U

T H

DN

FOOD COURT BELOW

T

T

T

T

T

T C

T

T

TT

T T

T

T

T

T

T

T

T

T

VAV-202A

VAV-202B

VAV-200B

VAV-204

VAV-104B

VAV-226A

VAV-220B

VAV-200A

VAV-220A

VAV-104B

VAV-226DVAV-226C

VAV-226B VAV-226E

VAV-226F

VAV-232

VAV-228

VAV-200C

FTU

-1

J J-BOX DOWN TO

1ST FLOOR

TR12

SENSORS LOCATED ON

1ST FLOOR BELOW

HC-5 HC-6

HC-7

HC-5

DUCT

HC-6

DUCT

HC-7

DUCT

DDCP-02

MCC-2

M

METHANE PANEL

TR-10

TR-11

CO2 SENSOR

TO DDCP-03

J

RISER JUNCTION BOX

UP FROM MECH 123

AND DOWN FROM

MEZZ MECH RM

AHU-2

AHU-4

UPPER MECHANICAL MEZZANINE ABOVE

SERVES AHU-1 & AHU-3 (DDCP-01 & 03)

REFER TO SHEET 15

= CLOUDED AREAS REPRESENT CHANGES UNDER THIS CONTRACT.

DDCP-08

RF-2

CP-3

EF-2

EF-1

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-2

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

M E

C H

A N

IC

A

L R

O O

M S

15 R1

AHU-1 & RF-1

RISER JUNCTION BOX

UP FROM MECH 123

AND DOWN FROM

MEZZ MECH RM

DDCP-01

DDCP-03

VFD

VFD

VFD VFD

SCP-2

SCP-1

HT

AHU-1

POOL PAK UNIT

D D

C P

-0

MECH RM 113

ELECT RM 114

B-1

B-2

NS

SC

DDCP-04

J-BOX UP TO

MECH MEZZ

J

J

T T

MECH ROOM 123

ELECT ROOM 124

EXISTING CONDUIT

TO ELECT 124

VFD

VFD

MECHANICAL UPPER MEZZANINE

MECHANICAL ROOM 113

MECHANICAL ROOM 123

NETWORK SWITCH

POWER SUPPLIED TO SC

FROM PANEL P4 CIRCUIT 30

TO NETWORK SWITCH

FROM PANEL X1 CIRCUIT 11

POWER FOR SC AND NETWORK SWITCH1

UH-3 EF-8

AHU-3

EF-7

OSA

DP

BUILDING OUTSIDE AIR

PRESSURE REFERENCE

UH-2

EF-10

EF-9

H W

P -1

H W

P -2

S F

-3 N

EF-4N

UH-1N

EF-1N

(ROOFTOP)

DP

HW DP

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

A H

U -1

F

IE

L D

W

IR

IN

G

C O

M

RELIEF

AIR

OSA

MIN

OSA SA

RA

DPS

AHU1

TS

TS

N O

FILTER

SF

AHU-1

RF

AHU-1

TERMINATE AT DDCP--01

U

I-

U

I-

C

O M

C

O M

U

I-

H

C O

M

C O

M

C O

M

P R

-0

U O

-2

H

H

C O

M

C O

M

U O

-1

U O

-1

C O

M

U I-

NC N0

RS

XX

ROOM SENSOR

LOCATED IN GYM

HWRHWR

HWSHWS

TCVTCV

MOD

MOD

MOD

MOD

LL

SMK

LINELINE

M1M2

EXISTING LOW LIMIT & SMOKE DETECTOR

SAFTIES ARE WIRED INTO THE VFD.

SP=1" WC

37,000 CFM

37,000 CFM

HC-1

SD

E

E

E

GMA126.1U

GCA161.1P

E = EXISTING

CLOUDED AREA IDENTIFIES NEW CONTROL DEVICES

NOTE: ALL WIRING IS EXISTING

REFER TO SHEET 21 FOR VFD WIRING

REFER TO SHEET 21

FOR VFD WIRING

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

A H

U -2

F

IE

L D

W

IR

IN

G

C O

M

RELIEF

AIR

OSA

MIN

OSA SA

RA

DPS

AHU2

TS

TS

N O

FILTER

SF

AHU-2

RF

AHU-2

TERMINATE AT DDCP--02

U

I-

U

I-

C

O M

C

O M

H

C O

M

C O

M

P R

-0

U O

-0

H

C O

M

U O

-0

C

O M

U

I-

NC N0

HWR

HWS

TCV

MOD

MOD

MOD

MOD

LL

SMK

LINELINE

M1M2

EXISTING LOW LIMIT & SMOKE DETECTOR

SAFTIES ARE WIRED INTO THE VFD.

SP=1" WC

10,300 CFM

14,500 CFM

SD

E

E

E

GCA121.1U

GCA161.1P

E = EXISTING

CLOUDED AREA IDENTIFIES NEW CONTROL DEVICES

NOTE: ALL WIRING IS EXISTING

REFER TO SHEET 21 FOR VFD WIRING

REFER TO SHEET 21

FOR VFD WIRING

GCA161.1U

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

A H

U -3

F

IE

L D

W

IR

IN

G

E = EXISTING

CLOUDED AREA IDENTIFIES NEW CONTROL DEVICES

NOTE: ALL WIRING IS EXISTING

C O

M

RELIEF

AIR

OSA

MIN

OSA

RA

DPS

AHU3

TS

TS

N O

FILTER

SF

AHU-3

RF

AHU-3

TERMINATE AT DDCP-03

TERMINATE AT DDCP-03

U

I-

C

O M

U I-

U I-

H

C O

M

C O

M

C O

M

C O

M

P R

-0

H

H

U O

-0

H

H

C

O M

C O

M

C O

M

U

I-

U O

-0

U O

-0

C

O M

U

I-

1 1

HWR CWR

HWS CWS

2 2

8 8

03 04

TCV TCV

MOD

MOD

MOD

MOD

LL

LINELINE

M1M2

EXISTING LOW LIMIT & SMOKE DETECTOR

SAFTIES ARE WIRED INTO THE MCC.

SP=1" WC

38,000 CFM

42,500 CFM

NC

85 GPM 85 GPM

C O

M C

O M

C O

M

C O

M

C O

M

C O

M

P W

R P

W R

P W

R

P W

R

P W

R

P W

R

DUCT STATIC

DUCT STATIC

SPACE STATIC SPACE STATIC

DPS

DPS

DPS DPS

CO2 CO2

33 33

31 32

O U

T O

U T

O U

T

O U

T

O U

T

O U

T

HI

HI

HI HI

LO

LO

LO LO

MOUNTED IN DDCP-03

MOUNTED IN DDCP-03

MOUNTED IN CP-3 MOUNTED IN CP-3

SERVICE TO 2ND FLOOR

PREP KITCHEN & DISHWASH

VAV UNITS

SERVICE TO ADMIN

GEAR ISSUE & BANQUET

FACILITY VA UNITS

SERVICE TO BAR/LOUNGE

MULTIPURPOSE ROOM

VAV UNITS

12 X 16 DUCT

30 X 60 DUCT

48 X 24 DUCT

EXISTING WALL BOX EXISTING WALL BOX

CARBON DIXOIDE CARBON DIXOIDE

BANQUET FACILITY 226 FOOD COURT 104

ATMOSPHERE

REFERENCE

ON ROOF

ATMOSPHERE

REFERENCE

ON ROOF

REFER TO SHEET

21 FOR VFD WIRING

REFER TO SHEET 21

FOR VFD WIRING

E

EE

E

E

E

E

GCA121.1U

GCA161.1P

SMK

SMK

SMK

U I-

C O

M

H

U I-

C O

M

H

U I-

C O

M

H

TERMINATE AT DDCP-03

U I-

C O

M

H

TERMINATE AT DDCP-03

GCA161.1U

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

A H

U -3

V F

D F

IE

L

D W

IR

IN

G

E = EXISTING

CLOUDED AREA IDENTIFIES NEW CONTROL DEVICES

NOTE: ALL WIRING IS EXISTING

L2/S

L2/S

L1/R

L1/R

L3/T

L3/T

94 94

EARTH

GROUND

EARTH

GROUND

T1/U

T1/U

T2/V

T2/V

T3/W

T3/W

95 95

EARTH

GROUND

EARTH

GROUND

VARIABLE FREQUENCY DRIVE VARIABLE FREQUENCY DRIVE

INPUT POWER INPUT POWER

-1

V

D C

S P

E E

D S

IG

N

A L

-1

V

D C

S P

E E

D S

IG

N

A L

IN

P

U T

C O

M M

O N

IN

P

U T

C O

M M

O N

R U

N S

IG

N

A L

R U

N S

IG

N

A L

4 43 3

T

T

T

T

T

T

AC MOTOR AC MOTOR

AHU-3 SF FAN VFD AHU-3 RF FAN VFD

C O

M

C O

M

U I-

U I-

C O

M

C O

M

U O

-0

U O

-0

C

O M

C O

M

P R

-0

P R

-0

27 2710 1028 2816 16

F A

U L

T C

O N

T A

C T

S

F A

U L

T C

O N

T A

C T

S

R-7 R-8SMK

SA

SMK

SA

SMK

SA

SMK

RA

PSH

LL

AHU-3 AHU-3 AHU-3 AHU-3 AHU-3 AHU-3

EXISTING SAFTIES EXISTING SAFTIES

EXIST EXIST

TERMINATIONS AT DDCP-03

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

A H

U -4

F

IE

L D

W

IR

IN

G

E = EXISTING

CLOUDED AREA IDENTIFIES NEW CONTROL DEVICES

NOTE: ALL WIRING IS EXISTING

C O

M

OSA

DPS

AHU4

TSTS

N O

FILTER

SF

AHU-4

TERMINATE AT DDCP-02

C O

M

C O

M

U I-

U I-

C O

M

P R

-0

H

P R

-0

C O

M

C O

M

U O

-3

C O

M

C O

M

U I-

U I-

NC N0

HWR

HWS

4-1

TCV

FR

MOD

LL

LINELINE

M1M2

EXISTING LOW LIMIT & SMOKE DETECTOR

SAFTIES ARE WIRED INTO THE MCC.

SP=1" WC

9,000 CFM

AHU-4 SA

CP-3

EF-1 EF-3 EF-2

KITCHEN HOOD

KITCHEN HOOD KITCHEN HOODKITCHEN HOOD

KITCHEN HOOD

AHU-4

ADJUST

SETPOINT

50 70

0-10K OHM POT

KITCHEN HOOD CONTROL PANEL

WALL MOUNTED SPA AT

S1

S3

X2

1A

3A

EXISTING MCC-2/C1

INTERFACE WIREWAY

AHU-4 START/STOP

EXISTING

E

E

E

E

GCA126.1U

SMK

TERMINATE AT DDCP-02B

C O

M

U I-

AHU-4

ADJUST

SETPOINT

50 70

0-10K OHM POT

E

C O

M

U I-

KITCHEN

HOOD

PANEL

S C

O R

P O

R A

T

IO

N

T H

A V

E E

A S

T

S U

IT

E

A T

A C

O M

A

W A

(2

-4

F

A X

-6

A S

-B U

IL

T

P R

O

JE

C T

SHEET NO.

D R

A W

IN

G

T

IT

L E

D D

C C

O N

T R

A C

T O

R

M E

C H

A N

IC

A

L C

O N

T R

A C

T O

R

JO

B

N U

M B

E R

D A

T E

IS

S

U E

R E

V

IS

IO

N

S

N C

S E

N G

IN

E

E R

M

W

D O

Y O

N L

O G

IS

T

IC

S

S E

R V

IC

E

S

W E

Y E

R H

A E

U S

E R

W A

Y S

O U

T H

F E

D E

R A

L W

A Y

W

A

(2

-5

-1

-9

-2

R M

-1

-6

I N

D U

S T

R

IA

L C

O N

T R

O L

S S

Y S

T E

M S

U P

G R

A D

E V

A R

IO

U

S B

U

IL

D

IN

G S

B

N

A V

A L

S T

A T

IO

N

E V

E R

E T

T

W A

A H

U -1

M O

T O

R W

IR

IN

G

E = EXISTING

CLOUDED AREA IDENTIFIES NEW CONTROL DEVICES

NOTE: ALL WIRING IS EXISTING

EXIST SC100-1

1/10A - 0/5 VDC

LOCATED IN STARTER

CT

X

C O

M

C O

M

P R

-0

U I-

P R

-0

T3

X2

1A

T1

3A

T2

SD LL

E…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .