- Bldg. AS518 Paint Booth Repairs
- Solicitation number
- N4008524R2728
About this file
This document appears to be a set of partial floor plans and details related to a federal contract opportunity. The key details are:
The contract opportunity is for repairs to Building AS518 Paint Booth at Camp Lejeune. The work involves modifications to the existing fire protection sprinkler system, including demolition and new piping and sprinkler heads. The system must comply with NFPA 13, NFPA 33, NFPA 101, and various UFC standards. The sprinklers protecting the exhaust system must be no more than 12 feet apart and have a minimum flow of 30 GPM at 15 PSI. The solicitation number is N4008524R2728 and the contract is being issued by the Department of the Navy Naval Facilities Engineering Command. Only Mechanical MACC Contractors listed on the General Requirements cover page may submit proposals for this project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23-0038 Existing Paint Booth Submittal.pdf | ||
| Amend 0004 230038.pdf | ||
| Amend 0003 230038.pdf | ||
| 23-0038 Amendment 0002.pdf | ||
| 230038 Transmittal Paint Booth.pdf | ||
| 60040515.pdf | ||
| 60040513.pdf | ||
| 23-0038 Upgrade AS518 Paint Booth to NESHAP Stds. Final Specifications 06-19-2024.pdf | ||
| Amend 0001 230038.pdf | ||
| 60040517.pdf | ||
| 60040516.pdf | ||
| 60040520.pdf | ||
| 23-0038 AS518 MOD Div. 21 Specification.pdf | ||
| 60040514.pdf | ||
| 23-0038 AS518 MOD Div. 21 Submittal Register.pdf | ||
| 60040518.pdf | ||
| 60040511A.pdf | ||
| 60040519.pdf | ||
| 60040521.pdf | ||
| 60040511.pdf | ||
| 60040512.pdf | ||
| N4008523B0038 Specs.pdf | ||
| Mech MACC RFP.pdf | ||
| N4008523B0038 Dwgs.pdf | ||
| 23-0038 APPD.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S S S
S S
S S
S S
S S
S
S S
S S
S
FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE
FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE
FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE
FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE
FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE
FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE
S S
S S
S
S S
S S
S
S S
S S
S
S S S
S
A
A
KEY NOTES FOR DETAIL 1 & 2:
1/4" = 1'-0"
0 4' 8'2'
PARTIAL FIRE PROTECTION FLOOR PLAN - DEMOLITION
PLAN NORTH
EXISTING SPRINKLER HEAD
DEMOLITION/NEW SPRINKLER HEAD
EXISTING SPRINKLER PIPEWORK
NEW SPRINKLER PIPEWORK EXTENSION
PIPE CONTINUES
POINT OF REMOVAL - DEMOLITION
POINT OF CONNECTION BETWEEN NEW
AND EXISTING CONSTRUCTION
PIPE RISES
PIPE DROPS
IN
RT
N
JE
NO
L.
T E
NA
040804
E NG
F
NI EER
OL
V
SEAL
S
A
SFORP
E H C
I
AL
OI N
OR L
T
E R
06-19-2024
KEY PLAN - BLDG AS518
LEGEND:
S
SEAL AND CAP EXISTING PIPING TO THE EXHAUST SYSTEM.
CONNECT TO EXISTING SUPPLY TO PROVIDE PROTECTION TO THE
RELOCATED EXHAUST SYSTEM.
WORK THIS AREA
LOCATION OF RISER
THE SYSTEM MODIFICATIONS SHALL COMPLY WITH THE FOLLOWING CODES
AND STANDARDS:
1. NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS -
2022 ED.
2. NFPA 33 STANDARD FOR SPRAY APPLICATION USING FLAMMABLE OR
COMBUSTIBLE MATERIALS - 2024 ED.
3. NFPA 101 LIFE SAFETY CODE - 2024 ED.
4. UFC 1-200-01 GENERAL BUILDING REQUIREMENTS, CHANGE 3 - 26
FEBRUARY 2024.
5. UFC 3-600-01 DESIGN: FIRE PROTECTION ENGINEERING FOR FACILITIES,
CHANGE 6 - 06 MAY 2021.
6. UFC 4-211-02 AIRCRAFT CORROSION CONTROL AND PAINT FACILITIES, 1
DECEMBER 2012.
GENERAL NOTES:
DESIGN CRITERIA:
1. FIELD VERIFY JOB CONDITIONS AND VERIFY MEASUREMENTS,
DISTANCES, ELEVATIONS, CLEARANCES, SIZES, ETC. THAT MAY AFFECT
THE SYSTEM INSTALLATION OR COMPLIANCE WITH NFPA 13, AND NOTIFY
THE CONTRACTING OFFICER PRIOR TO BEGINNING WORK.
2. ALL SPRINKLERS MUST BE DESIGNED FOR EXTRA HAZARD OCCUPANCY
UNLESS OTHERWISE INDICATED.
3. PIPE TO BE SCHEDULE 40 BLACK STEEL FOR PIPES 2" AND SMALLER; AND
PIPING LARGER THAN 2" MUST BE A MINIMUM OF SCHEDULE 10.
COORDINATE FINAL SPRINKLER PLACEMENT, PIPE ROUTING, AND
QUANTITY BETWEEN SPRINKLER AND GENERAL CONTRACTOR. PIPE
ROUTING SHOWN IS SUGGESTED. FINAL ROUTING MUST BE SHOWN
CONTRACTOR APPROVED THROUGH THE SHOP DRAWINGS.
4. BACKGROUND INFORMATION OF OTHER TRADES IS SHOWN FOR
COORDINATION PURPOSES ONLY. REFER TO THE TRADE DRAWINGS FOR
EXACT LOCATIONS, SIZES, AND QUANTITIES OF OTHER TRADES' WORK.
5. SPRINKLERS PROTECTING THE EXHAUST SYSTEM SHALL NOT BE
FARTHER THAN 12 FT APART AND SHALL HAVE A MINIMUM FLOW OF 30
GPM PER HEAD AT 15 PSI. THE EXHAUST SYSTEM SHALL REMAIN
FUNCTIONING DURING THE ACTIVATION OF THE FIRE ALARM SYSTEM.
6. THESE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND DO NOT SHOW
ALL DETAILS REQUIRED FOR THE COMPLETE SYSTEM. THEY SHOULD
HOWEVER BE FOLLOWED AS CLOSELY AS POSSIBLE IN THE GENERAL
ARRANGEMENT AND LOCATION OF EQUIPMENT.
7. SPRINKLERS NEAR A HEAT SOURCE (UNIT HEATER, DIFFUSER, STEAM
MAINS, SKYLIGHT, ETC) SHALL HAVE TEMPERATURE RATING IN
ACCORDANCE WITH NFPA 13.
8. ONLY ONE PIPE SHALL BE SUPPORTED FROM A SINGLE TRAPEZE
HANGER UNLESS OTHERWISE APPROVED IN WRITING BY A STRUCTURAL
ENGINEER. HANGERS WITH MORE THAN 150 POUNDS OF LOAD SHOULD
BE ATTACHED TO THE BAR JOIST AT A PANEL POINT.
S
1/4" = 1'-0"
0 4' 8'2'
PARTIAL FIRE PROTECTION FLOOR PLAN - RENOVATION
PLAN NORTH
NOT TO SCALE
EXISTING SPRINKLER RISER DETAIL
S
8” UNDERGROUND FIRE WATER SUPPLY
OS&Y W/TAMPER SWITCH
RPZ BACKFLOW PREVENTER
REDUCING 8” TO 6” TEE
BUTTERFLY CONTROL VALVE W/TAMPER SWITCH
ALARM CHECK VALVE W/DRAIN TO EXTERIOR
BALL CHECK VALVE TO FDC
WATER FLOW SWITCH
KEY NOTES FOR DETAIL 3:
File details come from the government source that posted it. Updated .