This document appears to be a set of partial floor plans and details related to a federal contract opportunity. The key details are:

The contract opportunity is for repairs to Building AS518 Paint Booth at Camp Lejeune. The work involves modifications to the existing fire protection sprinkler system, including demolition and new piping and sprinkler heads. The system must comply with NFPA 13, NFPA 33, NFPA 101, and various UFC standards. The sprinklers protecting the exhaust system must be no more than 12 feet apart and have a minimum flow of 30 GPM at 15 PSI. The solicitation number is N4008524R2728 and the contract is being issued by the Department of the Navy Naval Facilities Engineering Command. Only Mechanical MACC Contractors listed on the General Requirements cover page may submit proposals for this project.

View the file

Other files

File Type Posted
23-0038 Existing Paint Booth Submittal.pdf PDF
Amend 0004 230038.pdf PDF
Amend 0003 230038.pdf PDF
23-0038 Amendment 0002.pdf PDF
230038 Transmittal Paint Booth.pdf PDF
60040515.pdf PDF
60040513.pdf PDF
23-0038 Upgrade AS518 Paint Booth to NESHAP Stds. Final Specifications 06-19-2024.pdf PDF
Amend 0001 230038.pdf PDF
60040517.pdf PDF
60040516.pdf PDF
60040520.pdf PDF
23-0038 AS518 MOD Div. 21 Specification.pdf PDF
60040514.pdf PDF
23-0038 AS518 MOD Div. 21 Submittal Register.pdf PDF
60040518.pdf PDF
60040511A.pdf PDF
60040519.pdf PDF
60040521.pdf PDF
60040511.pdf PDF
60040512.pdf PDF
N4008523B0038 Specs.pdf PDF
Mech MACC RFP.pdf PDF
N4008523B0038 Dwgs.pdf PDF
23-0038 APPD.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S S S

S S

S S

S S

S S

S

S S

S S

S

FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE

FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE

FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE

FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE

FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE

FU_COLDFU_HOTFU_WASTEFU_TOTALFIXT_CODE

S S

S S

S

S S

S S

S

S S

S S

S

S S S

S

A

A

KEY NOTES FOR DETAIL 1 & 2:

1/4" = 1'-0"

0 4' 8'2'

PARTIAL FIRE PROTECTION FLOOR PLAN - DEMOLITION

PLAN NORTH

EXISTING SPRINKLER HEAD

DEMOLITION/NEW SPRINKLER HEAD

EXISTING SPRINKLER PIPEWORK

NEW SPRINKLER PIPEWORK EXTENSION

PIPE CONTINUES

POINT OF REMOVAL - DEMOLITION

POINT OF CONNECTION BETWEEN NEW

AND EXISTING CONSTRUCTION

PIPE RISES

PIPE DROPS

IN

RT

N

JE

NO

L.

T E

NA

040804

E NG

F

NI EER

OL

V

SEAL

S

A

SFORP

E H C

I

AL

OI N

OR L

T

E R

06-19-2024

KEY PLAN - BLDG AS518

LEGEND:

S

SEAL AND CAP EXISTING PIPING TO THE EXHAUST SYSTEM.

CONNECT TO EXISTING SUPPLY TO PROVIDE PROTECTION TO THE

RELOCATED EXHAUST SYSTEM.

WORK THIS AREA

LOCATION OF RISER

THE SYSTEM MODIFICATIONS SHALL COMPLY WITH THE FOLLOWING CODES

AND STANDARDS:

1. NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS -

2022 ED.

2. NFPA 33 STANDARD FOR SPRAY APPLICATION USING FLAMMABLE OR

COMBUSTIBLE MATERIALS - 2024 ED.

3. NFPA 101 LIFE SAFETY CODE - 2024 ED.

4. UFC 1-200-01 GENERAL BUILDING REQUIREMENTS, CHANGE 3 - 26

FEBRUARY 2024.

5. UFC 3-600-01 DESIGN: FIRE PROTECTION ENGINEERING FOR FACILITIES,

CHANGE 6 - 06 MAY 2021.

6. UFC 4-211-02 AIRCRAFT CORROSION CONTROL AND PAINT FACILITIES, 1

DECEMBER 2012.

GENERAL NOTES:

DESIGN CRITERIA:

1. FIELD VERIFY JOB CONDITIONS AND VERIFY MEASUREMENTS,

DISTANCES, ELEVATIONS, CLEARANCES, SIZES, ETC. THAT MAY AFFECT

THE SYSTEM INSTALLATION OR COMPLIANCE WITH NFPA 13, AND NOTIFY

THE CONTRACTING OFFICER PRIOR TO BEGINNING WORK.

2. ALL SPRINKLERS MUST BE DESIGNED FOR EXTRA HAZARD OCCUPANCY

UNLESS OTHERWISE INDICATED.

3. PIPE TO BE SCHEDULE 40 BLACK STEEL FOR PIPES 2" AND SMALLER; AND

PIPING LARGER THAN 2" MUST BE A MINIMUM OF SCHEDULE 10.

COORDINATE FINAL SPRINKLER PLACEMENT, PIPE ROUTING, AND

QUANTITY BETWEEN SPRINKLER AND GENERAL CONTRACTOR. PIPE

ROUTING SHOWN IS SUGGESTED. FINAL ROUTING MUST BE SHOWN

CONTRACTOR APPROVED THROUGH THE SHOP DRAWINGS.

4. BACKGROUND INFORMATION OF OTHER TRADES IS SHOWN FOR

COORDINATION PURPOSES ONLY. REFER TO THE TRADE DRAWINGS FOR

EXACT LOCATIONS, SIZES, AND QUANTITIES OF OTHER TRADES' WORK.

5. SPRINKLERS PROTECTING THE EXHAUST SYSTEM SHALL NOT BE

FARTHER THAN 12 FT APART AND SHALL HAVE A MINIMUM FLOW OF 30

GPM PER HEAD AT 15 PSI. THE EXHAUST SYSTEM SHALL REMAIN

FUNCTIONING DURING THE ACTIVATION OF THE FIRE ALARM SYSTEM.

6. THESE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND DO NOT SHOW

ALL DETAILS REQUIRED FOR THE COMPLETE SYSTEM. THEY SHOULD

HOWEVER BE FOLLOWED AS CLOSELY AS POSSIBLE IN THE GENERAL

ARRANGEMENT AND LOCATION OF EQUIPMENT.

7. SPRINKLERS NEAR A HEAT SOURCE (UNIT HEATER, DIFFUSER, STEAM

MAINS, SKYLIGHT, ETC) SHALL HAVE TEMPERATURE RATING IN

ACCORDANCE WITH NFPA 13.

8. ONLY ONE PIPE SHALL BE SUPPORTED FROM A SINGLE TRAPEZE

HANGER UNLESS OTHERWISE APPROVED IN WRITING BY A STRUCTURAL

ENGINEER. HANGERS WITH MORE THAN 150 POUNDS OF LOAD SHOULD

BE ATTACHED TO THE BAR JOIST AT A PANEL POINT.

S

1/4" = 1'-0"

0 4' 8'2'

PARTIAL FIRE PROTECTION FLOOR PLAN - RENOVATION

PLAN NORTH

NOT TO SCALE

EXISTING SPRINKLER RISER DETAIL

S

8” UNDERGROUND FIRE WATER SUPPLY

OS&Y W/TAMPER SWITCH

RPZ BACKFLOW PREVENTER

REDUCING 8” TO 6” TEE

BUTTERFLY CONTROL VALVE W/TAMPER SWITCH

ALARM CHECK VALVE W/DRAIN TO EXTERIOR

BALL CHECK VALVE TO FDC

WATER FLOW SWITCH

KEY NOTES FOR DETAIL 3:

File details come from the government source that posted it. Updated .