23-0038 Existing Paint Booth Submittal.pdf
PDF 20 MB Posted
- Attached to
- Bldg. AS518 Paint Booth Repairs
- Solicitation number
- N4008524R2728
About this file
This document is a submittal related to the federal contract opportunity for Bldg. AS518 Paint Booth Repairs. The contract opportunity is a solicitation issued by the Department of the Navy Naval Facilities Engineering Command, with Solicitation Number N4008524R2728. The scope of work involves repairs to an existing paint booth, and only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal. The document appears to contain information about the existing paint booth, but does not provide details on the specific products, services, or performance requirements for the repairs. No information is given about response dates, award dates, pricing terms, set asides, incumbents, or other salient contract details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0004 230038.pdf | ||
| Amend 0003 230038.pdf | ||
| 23-0038 Amendment 0002.pdf | ||
| 230038 Transmittal Paint Booth.pdf | ||
| 60040515.pdf | ||
| 60040513.pdf | ||
| 23-0038 Upgrade AS518 Paint Booth to NESHAP Stds. Final Specifications 06-19-2024.pdf | ||
| Amend 0001 230038.pdf | ||
| 60040517.pdf | ||
| 60040516.pdf | ||
| 60040520.pdf | ||
| 23-0038 AS518 MOD Div. 21 Specification.pdf | ||
| 60040514.pdf | ||
| 23-0038 AS518 MOD Div. 21 Submittal Register.pdf | ||
| 60040518.pdf | ||
| 60040511A.pdf | ||
| 60040519.pdf | ||
| 60040521A.pdf | ||
| 60040521.pdf | ||
| 60040511.pdf | ||
| 60040512.pdf | ||
| N4008523B0038 Specs.pdf | ||
| Mech MACC RFP.pdf | ||
| N4008523B0038 Dwgs.pdf | ||
| 23-0038 APPD.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R20210008 - - Camp Lejeune Camp Lejeune, North Carolina
SUBMITTAL PACKAGE
FROM: (Contractor)
NEW
SECTION
NO.
REV APPROVED INITIAL
1 C
1 C
1 C
1 C
1 C
1 C
1 C
1 C
2 C
3 B
3 A
SHT 0 - Iso View of Booth Isometric view of equipment
SHT 1 - Plan View
SPECIFICATION SECTION/
DRAWING NO.
DESCRIPTION OF MATERIAL
ROHNER INC 9/2/2021
JOB NUMBER: PROJECT NAME: SUBMITTAL:
R20210008 Paint booth AS518 – Marine Corps
Base, Camp Lejeune
RESUBMITAL
Equipment plan sht.
Isometric view of equipment
SHT 3.2 Iso View
BY COMPLETING THIS FORM. THE UNDERSIGNED CONTRACTOR CERTIFIES THAT THE EQUIPMENT COMPLIES WITH ALL
SPECIFICATIONS OF SUBJECT CONTRACT
DATE: (MM/DD/YYYY) TYPE OR PRINT NAME AND TITLE SIGNATURE
SHT M2 - Mechanical Specifications
Mechanical Specs.
Isometric view of equipment
SHT 3.1 - Titan Schematic Titan AMU Schematic Drawing
EQUIPMENT APPROVAL SUBMITTAL
DATE: (MM/DD/YYYY)TO: (Contracting officer)
SHT E1 - Electrical One Line Electrical One Line Drawing
SHT S1 - Structural Drawings Structural Drawings
SHT M1 - Duct & Mechanical Schedule
Ductwork & Mechanical details
Item Specification Packet Specification Sheets for job related materials
SHT S2 Structural Detail Structural Drawing Details
SHT 2 - Exploded Iso View
1 7/30/2021 A KH
1 7/30/2021 A KH
1 7/30/2021 A KH
1 7/30/2021 A KH
2 7/30/2021 A KH
2 7/30/2021 A KH
3 7/31/2021 A KH
1 8/6/2021 B KH
1 8/6/2021 B KH
3 8/6/2021 B KH
1 9/2/2021 C KH
1 9/2/2021 C KH
1 9/2/2021 C KH
1 9/2/2021 C KH
1 9/2/2021 C KH
2 9/2/2021 C KH
2 9/2/2021 C KH
INITIAL
(NUMBER TO CORRESPOND WITH APPLICABLE ITEM NUMBER ON REVERSE)
SECTION
E1 updated with correct AHU motor HP and stamped
Sheets 0, 1, 2, 3.2, S1, M1, M2 updated with new AMU
Sheets 0, 1, 2, 3.2, S1, M1, M2 updated with relocated exhaust fan
Re-stamped sheets S1, M1, M2
DATE REV.
COMMENTS
Page 2.7 Air Solenoid Valve updated to correct part number
Burner Firing Rate corrected on M2
Page 2.1a AMU updated
Page 2.2 Exhaust fan updated
Sheets 0,1,2,3.2,S1,S2,M1,M2 updated w/ new booth dimensions
Sheets 0,1,2,3.2,S1,S2,M1,M2 updated w/ relocated AMU and Duct
Sheets 0,1,2,3.2,S1,S2,M1,M2 updated w/ relocated Exhaust fan & Duct box
M1 and M2 re-stamped
S1 and S2 re-stamped
2.1a Titan AMU drawing updated
Sheet 3.1 Titan Schematic added
Updated SHT 1 Exhaust VFD HP to 7.5
M2 drawing updated; AHU S.P, motor HP, NEC FLA, Unit FLA and stamped
Section 1 Revisions:
A. 07-30-21 – 1. Sheets 0, 1, 2, 3.2, S1, M1, M2 updated with side discharge Titan AMU and new Duct layout with relocated exhaust fan. Re-stamped S1, M1, M2, Burner Firing Rate corrected on M2.
B. 08-06-21 –1. Sheet 1 updated Exhaust VFD hp. Sheet M2 updated S.P., Motor Hp, NEC FLA, Unit FLA and re-stamped.
C. 09-02-21 – 1. Sheets 0, 1, 2, 3.2, S1, S2, M1, M2 updated w/ relocated AMU and Duct layout, relocated exhaust fan and duct box. Re-stamped M1, M2, S1, S2. AMU and exhaust fan CFM changed from 24,000 to 22,000. Booth dimensions changed and reflected in all sheets mentioned above.
Drawing Index
Sheet 0 Iso View of Booth
Sheet 1 Booth Plan View
Sheet 2 Exploded Iso View of Booth
Sheet 3 N/A
Sheet 3.2 Iso View
Sheet 4 N/A
Sheet S0 N/A
Sheet S1 Structural Drawings
Sheet S2 Structural Detail
Sheet M1 Duct & Mechanical Layout
Sheet M2 Mechanical Specifications
Sheet M3 N/A
ISSUED DATE:
DRAWN BY:
CHECKED BY:
JOB NO:
DRAWING TITLE:
R O
H N
E R
M
C H
A N
I C A L
I N
C
D B A
R
O H
N E R
N
E
A N
D R
E S
N
D
S U
I T E
V A N
C O
U V E R
W
A
V O
I C E
F A X
W A
L I C
O H
N E M
I L H
O R
L I C
C A
W W
W R
O H
N E R
U
S A C
SHEET NO:
EQUIP. NO:
C 2007- 2014 ROHNER ALL RIGHTS
RESERVED.
THIS DOCUMENT AND THE IDEAS
EXPRESSED HEREIN ARE THE
EXCLUSIVE PROPERTY OF ROHNER
AND IS NOT TO BE REPRODUCED
IN ANY MANNER WITHOUT
THE EXPRESS WRITTEN
AUTHORIZATION OF ROHNER.
REV:
DESCRIPTION OF CHANGE(S):
R20210008
MCD-RLWP-24-10-40-FCP
KDK
09/02/2021
EXPLODED ISOMETRIC
ASSEMBLY DRAWING
- ISOMETRIC VIEW OF BOOTH
A
C U
S T O
M
I N
D U
S T R I A L
M
O D
I F I
C
O S S
D
R A F T
B O
O T H
F
R
M ar in e
Co rp s A ir
St at io n
N ew
R iv er , J ac ks on vi lle , N
C
A M
P
L E
J E
U N
E h bu ild in g is
AS
Ca m pb el l S t.
INITIAL RELEASE
21.1 - 09/02/2021
XXX
READ PRIOR TO SIGNING!
Rohner engineering specifications shown on this approval drawing may differ from the equipment quotation. Please review all specifications on this approval drawing and compare to your signed quotation or purchase order. By signing this approval drawing the purchaser accepts these specifications in lieu of the quotation specifications and releases the equipment to be manufactured as shown in this drawing. Any changes requested after release to production will result in an upcharge of 5% of the total contract amount plus all additional design, engineering and materials cost plus normal gross profit margin.
APPROVAL
APPROVED FOR CONSTRUCTION WITH
NO CHANGES REQUIRED.
NOT APPROVED FOR CONSTRUCTION,
REQUIRES NEW SUBMITTAL DRAWINGS.
GAS SUPPLY: NATURAL GAS PROPANE
POWER SUPPLY VOLTAGE REQUIRED:
208V 230V 460V
1 3
LIGHTING: 120V 277V
NOTE: EQUIPMENT REQUIRES A HIGH PRESSURE
STEPDOWN REGULATOR SUPPLIED BY OTHERS WITH
OUTPUT OF ½ PSI (14" W.C.) AT THE MIDPOINT OF THE
ADJUSTMENT WITHIN 10' OF EQUIPMENT. ½ PSI (14"
W.C.) MINIMUM IS REQUIRED TO ACHIEVE RATED UNIT
BTUH OUTPUT. REGULATOR SHOULD BE LOCATED NO
CLOSER THAN 2' AND NO FURTHER THAN 10' OF EQUIPMENT
CONNECTION POINT.
COMPANY DATE
AUTHORIZED SIGNATURE TITLE
DIMENSIONS/DETAILS WITH AN * DENOTE A DESIGN
CHANGE FROM CONTRACT
LEGEND
SHEET 0 - ISOMETRIC VIEW / LEGEND / APPROVAL STAMP
SHEET 1 - BOOTH PLAN VIEW
SHEET 2 - EXPLODED ISOMETRIC VIEW
SHEET S0 - STRUCTURAL CALCULATION
SHEET SE1 - STRUCTURAL DRAWING
SHEET M1 - DUCT & MECHANICAL LAYOUT
SHEET M2 - MECHANICAL SPECIFICATIONS
SHEET E1 - ELECTRICAL ONE LINE
ISSUED DATE:
DRAWN BY:
CHECKED BY:
JOB NO:
DRAWING TITLE:
R O
H N
C H
A N
I C A L
I N
C
D B A
R
O H
N E R
N
E
A N
D R
E S
S U
I T E
V A N
C O
U V E R
W
A
V O
I C E
F A X
W A
L I C
H
N E M
I L H
O R
L I C
C
W W
W R
O H
N E R
U
S A C
C 2007- 2014 ROHNER ALL RIGHTS
RESERVED.
THIS DOCUMENT AND THE IDEAS
EXPRESSED HEREIN ARE THE
EXCLUSIVE PROPERTY OF ROHNER
AND IS NOT TO BE REPRODUCED
IN ANY MANNER WITHOUT
R20210008
MCD-RLWP-24-10-40-FCP
KDK
09/02/2021
EXPLODED ISOMETRIC
ASSEMBLY DRAWING
EXPLODED ISO VIEW
OF BOOTH
A
C U
S T O
M
I N
D U
S T R I A L
M
O D
I F I
O S S
D
R A F T
B O
O
R
M ar in e
Co rp s A ir
St at io n
N ew
R iv er , J ac ks on vi lle , N
C
A M
P
L E
J E
U N
E h bu ild in g is
AS
Ca m pb el l S t.
INITIAL RELEASE
21.1 - 09/02/2021
XXX
FILTERED CEILING WITH CLASS I DIV II LIGHTS
FILTERED SUPPLY PLENUM
REAR WALL EXHAUST PLENUM
9'X9' PRODUCT DOOR TYP.
EXPLODED ISOMETRIC VIEW
ALL DUCT MECHANICAL AIR UNITS NOT SHOWN FOR CLARITY
PARTS LIST
DESCRIPTIONPART NUMBERQTYITEM
42" Diameter Tube Axial FanTBA-4211
Make up Air Unit TA-127-VRH-0112
24VDC power supply, 24 I/O PLC controller, PID temperature control relay with fuzzy logic and auto tuning & 5.7” QVGA color touch screen HMI. (1) 20 hp. Supply blower VFD and (1) 7.5 hp. exhaust fan VFD(s) with auto booth pressure control.
Compact PLC based control center
ISSUED DATE:
DRAWN BY:
CHECKED BY:
JOB NO:
DRAWING TITLE:
R O
H N
C H
A N
I C A L
I N
C
D B A
R
O H
N E R
N
E
A N
D R
E S
S U
I T E
V A N
C O
U V E R
W
A
V O
I C E
F A X
W A
L I C
H
N E M
I L H
O R
L I C
C
W W
W R
O H
N E R
U
S A C
C 2007- 2014 ROHNER ALL RIGHTS
RESERVED.
THIS DOCUMENT AND THE IDEAS
EXPRESSED HEREIN ARE THE
EXCLUSIVE PROPERTY OF ROHNER
AND IS NOT TO BE REPRODUCED
IN ANY MANNER WITHOUT
R20210008
MCD-RLWP-24-10-40-FCP
3.2
KDK
09/02/2021
EXPLODED
ISOMETRIC
ASSEMBLY
DRAWING
- DEVICE LOCATIONS
1. UNLESS OTHERWISE NOTED:
A. PANEL-TO-PANEL FASTENING TO USE 1/4-20X3/4" HEX BOLTS AND NUTS.
B. PANEL-TO-TUBE STEEL FASTENING TO USE 1/4-20x1", SELF-DRILLING SCREW.
C. PANEL-TO-RIB STRUCTURE FASTENING TO USE 1/4-20X3/4" HEX BOLTS AND
NUTS.
D. RIB STRUCTURE-TO RIB STRUCTURE FASTENING TO USE 5/8-11X1 1/2" HEX
BOLTS AND NUTS.
E. RIB ANCHOR-TO-CONCRETE FASTENING TO USE 1/2"X5 1/2" WEDGE ANCHORS,
(2) PER RIB ANCHOR (TO BE SUPPLIED BY INSTALLER).
F. PRODUCT DOOR HINGE-TO-TUBE STEEL FASTENING TO USE 1/4-20X1"
SELF-DRILLING SCREW.
GENERAL NOTES:
U
S T O
M
I N
D U
S T R I A L
M
O D
I F I
O S S
D
R A F T
B O
O
R
M ar in e
Co rp s A ir
St at io n
N ew
R iv er , J ac ks on vi lle , N
C
A M
P
L E
J E
U N
E h bu ild in g is
AS
Ca m pb el l S t.
INITIAL RELEASE
21.1 - 09/02/2021
XXX
EXHAUST FAN EF1
(3) COMPACT PLC BASED CONTROL CENTER
IS TIED TO THE AIR MAKE UP AIR UNIT
Section 2
A. 07-30-2021 – 1. Page 2.7 Air Solenoid Valve changed from ¾” to 1 ¼” connection, 2.1a Titan AMU drawing updated.
B. No changes C. 09-02-2021 – 1. Page 2.1a updated Titan AMU, 2.2 updated GH exhaust fan submittal.
Components:
2.1 AMU
2.1a AMU Drawing
2.2 Exhaust Fans
2.3 Light Study
2.3a Light Study – LED Strip – Cost Adder Alternate to 2.3
2.4 Exhaust Filters
2.5 Supply Filters
2.6 Caulking
2.7 Air Solenoid Valve
2.8 N/A
2.9 Door Switch
2.10 Manometer
2.11 N/A
2.12 N/A
2.13 N/A
2.14 N/A
2.15 N/A
2.16 N/A
2.17 N/A
2.18 N/A
2.19 N/A
2.20 N/A
2.21 N/A
Any Job Specific Components:
2.50 N/A
2.51 N/A
2.52 N/A
2.53 N/A
2.54 N/A
2.55 N/A
2.56 N/A
2.57 N/A
2.58 N/A
2.59 N/A
2.60 N/A
Performance Quantity 1
Volume (CFM) 22,000 Total External SP (in. wg) 0.5
Operating Power (hp) 5.2 Required Power (hp) 5.2
Fan RPM 1037 Max Fan RPM 1327
Elevation (ft) 26 Start-up Temp.(F) 70
Operating Temp.(F) 70
Fan Configuration Size 42
Arrangement 9 Level 3
Discharge Position Upblast Mounting Base Mount
Material Type Steel Spark Resistance None Impeller Material Aluminum
Equipment Weights Fan (LMD)(lb) 345
Motor/Drive (lb) 156 Accessories (lb) 85
Misc Fan Data Fan Eff. Index (FEI) 1.29
Outlet Velocity (ft/min) 2,233 Static Efficiency (%) 35
Tip Speed (ft/min) 11,407
Motor and Drives Motor Included
Size (hp) 7 1/2
RPM 1725
Enclosure TEFC V/C/P 460/60/3
Frame Size 213T Max Frame Size 215
Pulley Type Constant Drive Loss (%) 3.9
Drives Standard Drive Service Factor 1.5
NEC FLA* (Amps) 11
Model: TBI-CA-3H42-75 Tube Axial Belt Drive
Operating Performance
Sound Power by Octave Band Sound Data 62.5 125 250 500 1000 2000 4000 8000 LwA dBA
Inlet 106 100 95 93 88 84 80 77 95 83 *FLA - based on tables 150 or 148 of National Electrical Code 2002. Actual motor FLA may vary, for sizing thermal overload, consult factory.
LwA - A weighted sound power level, based on ANSI S1.4 dBA - A weighted sound pressure level, based on 11.5 dB attenuation per octave band at 5 ft- dBA levels are not licensed by AMCA International
08/30/2021Printed Date:
R20210008 - Exhaust FanJob:
TBI-22000-0.5-7.5Mark:
TBI-CA-3H42-75Model:
Generated by: kevinhsei@rohner-usa.comCAPS 4.36.1095 Page 1 of 3
Model: TBI-CA-3H42-75 Tube Axial Belt Drive
Standard Construction Features:
HOUSING: Continuously welded housing - Inlet and Outlet flanges with mounting holes - Adjustable motor base - Extended lube lines with grease fittings
BEARINGS, SHAFT AND PROPELLER: Heavy duty, self aligning pillow block bearings - Turned, precision ground and polished shaft - Airfoil blade design - Cast aluminum propeller
Selected Options & Accessories:
Motor PN - 304933, Baldor Motor Model Number - EM3710T NEMA Premium Efficient Motor - meets NEMA Table 12-12 Motor VFD Rated without Shaft Grounding Protection Motor with Class B or Greater Insulation Standard Drives Coating - Permatector, Concrete Gray-RAL 7023, Fan and Attached Accessories UL/cUL-705 - "Power Ventilators" Mounting Support - Universal Belt Guard Mounting Rails Unit Warranty: 1 Yr (Standard)
08/30/2021Printed Date:
R20210008 - Exhaust FanJob:
TBI-22000-0.5-7.5Mark:
Generated by: kevinhsei@rohner-usa.comCAPS 4.36.1095 Page 2 of 3
Bolt Circle Ø 44.25 Flange Hole Ø 0.56 Quantity 8
TOP VIEW
0.56 DIA. MOUNTING HOLES
TOP VIEW SHOWS FROM OUTLET END OF UNIT
A
IR
FL
O W
SIDE VIEW
37.25
MAX
17.38
50.00
51.25
42.50
45.75
30.00
Model: TBI-CA-3H42-75 Tube Axial Belt Drive
Notes: All dimensions shown are in units of in.
08/30/2021Printed Date:
R20210008 - Exhaust FanJob:
TBI-22000-0.5-7.5Mark:
Generated by: kevinhsei@rohner-usa.comCAPS 4.36.1095 Page 3 of 3
Section 3
A. 07-30-2021 – 1. Sheet 3.1 Titan Schematic added B. 08-06-2021 –1. Sheet E1 updated AHU motor HP
Electrical:
E1 One Line Drawing
3.1 Titan Schematic Submittal
3.2 N/A
3.3 N/A
3.4 N/A
3.5 N/A
File details come from the government source that posted it. Updated .