60040514.pdf
PDF 416 KB Posted
- Attached to
- Bldg. AS518 Paint Booth Repairs
- Solicitation number
- N4008524R2728
About this file
This document appears to be an addendum to construction drawings for a project titled "Bldg. AS518 Paint Booth Repairs". The key details are:
The scope of work involves removing and disposing of existing exhaust ductwork, protecting and returning the existing exhaust fan to the government, removing the existing filter chamber and exhaust plenum, and preparing the existing paint booth for attachment of a new filter chamber. The work is to be performed at Camp Lejeune in North Carolina.
The federal contract opportunity related to this work has the Solicitation Number N4008524R2728 and is only open to Mechanical MACC Contractors listed on the General Requirements cover page. The procuring agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(X) GUH5-1
(X)MAU1
44x44
2246 Yaupon Drive Wilmington, NC 28401
Phone: 910.791.4000 Fax: 910.791.5266 www.cbhfengineers.com NC# P-0506c Copyright 2024CBHF Engineers, PLLC
Engineers, PLLC 043801
TROY O. GRADY
SEAL
R
EENI GN
P R
OF E S S I ON
A
E
L
NO
RT H CAROL I NA
ADDENDUM: ADDED TWO SHEETS 06/19/24
REMOVE AND DISPOSE OF ALL EXHAUST DUCTWORK. EXISTING ROOF CURB TO REMAIN. INSTALL
WEATHER TIGHT CAP ON EXISTING CURB. SEE 2/M-501 FOR FURTHER INFORMATION.
REMOVE, PROTECT AND RETURN TO THE GOVERNMENT THE EXISTING EXHAUST FAN. TAKE PRECAUTIONS
TO AVOID DAMAGE TO EXISTING ITEMS TO REMAIN IN PLACE.
REMOVE THE EXISTING FILTER CHAMBER AND EXHAUST PLENUM. TAKE PRECAUTIONS TO AVOID DAMAGE TO EXISTING ITEMS TO REMAIN IN PLACE. PREPARE EXISTING PAINT BOOTH FOR ATTACHMENT OF NEW
FILTER CHAMBER.
DEMOLITION KEYED NOTES
1/4" = 1'-0" 0 4' 8'2'1 PARTIAL FLOOR PLAN
PLAN
NORTH
1/4" = 1'-0" 0 4' 8'2'1 PARTIAL FLOOR PLAN
PLAN
NORTH
WORK THIS AREA
NOT TO SCALE0 KEY PLAN
File details come from the government source that posted it. Updated .