23-0038 AS518 MOD Div. 21 Specification.pdf

PDF 37 KB Posted

Attached to
Bldg. AS518 Paint Booth Repairs
Solicitation number
N4008524R2728
Issued by

About this file

This document is a specification section for upgrading the AS518 paint booth to NESHAP standards, including modifications to the existing automatic wet pipe fire extinguishing sprinkler system.

The key details are:

  • Scope of work includes installing new piping, upright and pendent sprinkler heads, and escutcheons to accommodate the relocation of the exhaust system for the paint booth in AS518.
  • Sprinklers must comply with NFPA 13 and 33 standards, with a minimum flow of 30 gpm per head at 15 psi for the exhaust system.
  • Contractor must submit shop drawings, product data, test reports, and certifications for the sprinkler system installation.
  • The sprinkler system installer must have 3 years of relevant experience and NICET Level III certification.
  • The Fire Protection Engineer will inspect the installation and witness the preliminary and final acceptance testing.

The related federal contract opportunity is a solicitation for repairs to Building AS518's paint booth, to be performed by a Mechanical MACC Contractor under the Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
23-0038 Existing Paint Booth Submittal.pdf PDF
Amend 0004 230038.pdf PDF
Amend 0003 230038.pdf PDF
23-0038 Amendment 0002.pdf PDF
230038 Transmittal Paint Booth.pdf PDF
60040515.pdf PDF
60040513.pdf PDF
23-0038 Upgrade AS518 Paint Booth to NESHAP Stds. Final Specifications 06-19-2024.pdf PDF
Amend 0001 230038.pdf PDF
60040517.pdf PDF
60040516.pdf PDF
60040520.pdf PDF
60040514.pdf PDF
23-0038 AS518 MOD Div. 21 Submittal Register.pdf PDF
60040518.pdf PDF
60040511A.pdf PDF
60040519.pdf PDF
60040521A.pdf PDF
60040521.pdf PDF
60040511.pdf PDF
60040512.pdf PDF
N4008523B0038 Specs.pdf PDF
Mech MACC RFP.pdf PDF
N4008523B0038 Dwgs.pdf PDF
23-0038 APPD.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Upgr ade AS518 Pai nt Boot ht o NESHAP St andar ds 05200014

SECTI ON 21 13 13. 00 20

WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON

04/ 08

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

FM GLOBAL ( FM)

FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de ht t p: / / www. appr oval gui de. com/

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 13 ( 2019; TI A 16- 1; TI A 16- 2; TI A 16- 3 2019;

Er r at a 17- 1; Er r at a 17- 2) St andar d f or t he I nst al l at i on of Spr i nkl er Syst ems

UNDERWRI TERS LABORATORI ES ( UL)

UL Fi r e Pr ot Di r ( Cur r ent ) Fi r e Pr ot ect i on Equi pment Di r ect or y

1. 2 SYSTEM DESCRI PTI ON

Modi f y t he exi st i ng aut omat i c wet pi pe f i r e ext i ngui shi ng spr i nkl er syst ems t o accommodat e t he r el ocat i on of t he exhaust syst em f or t he pai nt boot h i n AS518.

1. 3 SPRI NKLER SYSTEM DESI GN

Except as modi f i ed her ei n, scope of wor k i s i nst al l at i on of t he new pi pi ng, upr i ght and pendent spr i nkl er heads, and escut cheons desi gn aut omat i c wet pi pe f i r e ext i ngui shi ng spr i nkl er syst ems i n accor dance wi t h t he r equi r ed and advi sor y pr ovi s i ons of NFPA 13 NFPA 33 , i ncl udi ng al l r ecommendat i ons and advi sor y por t i ons, whi ch shal l be consi der ed mandat or y; t hi s i ncl udes advi sor y pr ovi s i ons l i s t ed i n t he appendi ces of such st andar d( s) , as t hough t he wor d " shal l " had been subst i t ut ed f or t he wor d " shoul d" wher ever i t appear s. Hydr aul i c cal cul at i ons shal l assume a15 psi pr essur e l oss f or t he backf l ow pr event er assembl y. Locat e spr i nkl er s i n a consi st ent pat t er n wi t h cei l i ng gr i d, l i ght s, and ai r suppl y di f f user s. Pr ovi de spr i nkl er s and pi pi ng syst em l ayout . Al l Devi ces and equi pment f or f i r e pr ot ect i on ser vi ce shal l be UL Fi r e Pr ot Di r l i s t ed or FM APP GUI DE appr oved f or use i n wet pi pe spr i nkl er syst ems.

1. 3. 1 Locat i on of Spr i nkl er s

The spaci ng of spr i nkl er s shal l not exceed t hat per mi t t ed by NFPA 13 f or ext r a hazar d occupancy. Addi t i onal l y, spr i nkl er s pr ot ect i ng t he exhaust syst em shal l not be f ar t her t han 12 f eet apar t t o ensur e adequat e cover age.

SECTI ON 21 13 13. 00 20 Page 1

1. 3. 2 Densi t y of Appl i cat i on of Wat er

Si ze t he pi pe t o pr ovi de t he speci f i ed densi t y when t he syst em i s di schar gi ng t he speci f i ed t ot al maxi mum r equi r ed f l ow. Appl i cat i on t o hor i zont al sur f aces bel ow t he spr i nkl er s shal l be 0. 30 gpm per sq f t f or Ext r a Hazar d Occupanci es. Fur t her mor e, spr i nkl er s pr ot ect i ng t he exhaust syst em shal l have a mi ni mum f l ow of 30 gpm per head at 15 psi . The exhaust syst em shal l r emai n f unct i oni ng dur i ng t he act i vat i on of t he f i r e al ar m syst em t o ensur e cont i nuous vent i l at i on.

1. 3. 3 Out si de Hose Al l owances

Hydr aul i c cal cul at i ons shal l i ncl ude a hose al l owance of 500 gpm f or out si de hose st r eams

1. 4 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 02 Shop Dr awi ngs

Shop Dr awi ngs

Pr epar e 24 by 36 i nch det ai l wor ki ng dr awi ngs of spr i nkl er s and pi pi ng. Fl oor pl ans shal l be dr awn t o a scal e not l ess t han 1/ 8" = 1' - 0" . Show dat a essent i al f or pr oper i nst al l at i on of each syst em. Show det ai l s, pl an v i ew, el evat i ons and sect i ons of t he syst ems suppl y and pi pi ng. Show pi pi ng schemat i c of syst ems suppl y, devi ces, val ves, pi pe and f i t t i ngs. Pr ovi de t hr ee copi es of t he Spr i nkl er Syst em Shop Dr awi ngs, no l at er t han 21 days pr i or t o t he st ar t of spr i nkl er syst em i nst al l at i on.

SD- 03 Pr oduct Dat a

Pi pe Fi t t i ngs Spr i nkl er s Pi pe hanger s and suppor t s Mechani cal coupl i ngs

Annot at e descr i pt i ve dat a t o show t he speci f i c model , t ype, and si ze of each i t em. Cat al og cut s shal l al so i ndi cat e UL Li st i ng/ FM Appr oval and count r y of manuf act ur e.

SD- 06 Test Repor t s

Request t o schedul e Pr el i mi nar y Test s;

Pr el i mi nar y Test Repor t

Pr ovi de Thr ee copi es of t he compl et ed Pr el i mi nar y Test Repor t , no l at er t han 7 days af t er t he compl et i on of t he Pr el i mi nar y Test s.

SECTI ON 21 13 13. 00 20 Page 2

The Pr el i mi nar y Test s Repor t shal l i ncl ude bot h t he Cont r act or ' s Mat er i al and Test Cer t i f i cat e f or Under gr ound Pi pi ng and t he Cont r act or ' s Mat er i al and Test Cer t i f i cat e f or Abovegr ound Pi pi ng. Al l i t ems i n t he Pr el i mi nar y Test s Repor t shal l be s i gned by t he Fi r e Pr ot ect i on Engi neer

Request t o schedul e Fi nal Accept ance Test

Fi nal Accept ance Test Repor t

Pr ovi de Thr ee copi es of t he compl et ed Fi nal Accept ance Test s Repor t s, no l at er t han 7 days af t er t he compl et i on of t he Fi nal Accept ance Test s. Al l i t ems i n t he Fi nal Accept ance Repor t shal l be s i gned by t he Fi r e Pr ot ect i on Engi neer .

SD- 07 Cer t i f i cat es

I nspect i on by Fi r e Pr ot ect i on Engi neer

Concur r ent wi t h t he Fi nal Accept ance Test Repor t , cer t i f i cat i on by t he Fi r e Pr ot ect i on Engi neer t hat t he spr i nkl er syst em i s i nst al l ed i n accor dance wi t h t he cont r act r equi r ement s, i ncl udi ng si gned appr oval of t he Fi nal Accept ance Test Repor t s.

Spr i nkl er Syst em I nst al l er

Submi t dat a showi ng t he Spr i nkl er Syst em I nst al l er has successf ul l y i nst al l ed syst ems of t he same t ype and desi gn as speci f i ed her ei n, Dat a shal l i ncl ude names and l ocat i ons of at l east t wo i nst al l at i ons wher e t he Cont r act or , or t he subcont r act or r ef er r ed t o above, has i nst al l ed such syst ems. I ndi cat e t ype and desi gn of each syst em and cer t i f y t hat each syst em has per f or med sat i sf act or i l y i n t he manner i nt ended f or not l ess t han 18 mont hs. Pr ovi de NI CET cer t i f i cat i on of t he syst em t echni c i an.

1. 5 QUALI FI CATI ONS

1. 5. 1 Spr i nkl er Syst em I nst al l er

The Spr i nkl er Syst em I nst al l er shal l be r egul ar l y engaged i n t he i nst al l at i on of t he t ype and compl exi t y of syst em speci f i ed i n t he Cont r act document s, and shal l have ser ved i n a s i mi l ar capaci t y f or at l east t hr ee syst ems t hat have per f or med i n t he manner i nt ended f or a per i od of not l ess t han 6 mont hs. I nst al l at i on dr awi ngs, shop dr awi ngs and as- bui l t dr awi ngs shal l be pr epar ed, by or under t he super vi s i on of , an syst em t echni c i an who i s exper i enced wi t h t he t ypes of wor ks speci f i ed her ei n, and i s cur r ent l y cer t i f i ed by t he Nat i onal I nst i t ut e f or Cer t i f i cat i on i n Engi neer i ng Technol ogi es ( NI CET) as an engi neer i ng t echni c i an wi t h mi ni mum Level I I I cer t i f i cat i on i n Aut omat i c Spr i nkl er Syst em pr ogr am.

1. 6 QUALI TY ASSURANCE

1. 6. 1 Mat er i al and Equi pment Qual i f i cat i ons

Pr ovi de mat er i al s and equi pment t hat ar e st andar d pr oduct s of manuf act ur er s r egul ar l y engaged i n t he manuf act ur e of such pr oduct s, whi ch ar e of a s i mi l ar mat er i al , desi gn and wor kmanshi p. St andar d pr oduct s shal l have been i n sat i sf act or y commer ci al or i ndust r i al use f or 2 year s

SECTI ON 21 13 13. 00 20 Page 3 pr i or t o bi d openi ng. The 2- year use shal l i ncl ude appl i cat i ons of equi pment and mat er i al s under s i mi l ar c i r cumst ances and of s i mi l ar s i ze.

The pr oduct shal l have been f or sal e on t he commer ci al mar ket t hr ough adver t i sement s, manuf act ur er s ' cat al ogs, or br ochur es dur i ng t he 2 year per i od.

1. 7 ACCESSI BI LI TY

I nst al l al l wor k so t hat par t s r equi r i ng per i odi c i nspect i on, oper at i on, mai nt enance, and r epai r ar e r eadi l y accessi bl e.

1. 8 DELI VERY, STORAGE AND HANDLI NG

Al l equi pment del i ver ed and pl aced i n st or age shal l be housed i n a manner t o pr ecl ude any damage f r om t he weat her , humi di t y and t emper at ur e var i at i ons, di r t and dust , or ot her cont ami nant s.

PART 2 PRODUCTS

2. 1 ABOVEGROUND PI PI NG COMPONENTS

Al l component s of t he abovegr ound pi pi ng shal l f ul l y compl y wi t h t he r equi r ement s and r ecommended pr act i ces of NFPA 13 and t hi s speci f i cat i on sect i on. Abovegr ound pi pi ng shal l be st eel .

2. 1. 1 St eel Pi pe

Pi pe shal l be bl ack st eel . St eel pi pi ng shal l be Schedul e 40 f or s i zes 2 i nches and smal l er and Schedul e 10 f or s i zes l ar ger t han 2 i nches.

Fi t t i ngsi nt o whi ch spr i nkl er s, spr i nkl er r i ser ni ppl es, or dr op ni ppl es ar e t hr eaded shal l be wel ded, t hr eaded, or gr ooved- end t ype. Pl ai n- end f i t t i ngs wi t h mechani cal coupl i ngs, f i t t i ngs t hat use st eel gr i ppi ng devi ces t o bi t e i nt o t he pi pe and segment ed wel ded f i t t i ngs shal l not be per mi t t ed. Rubber gasket ed gr ooved- end pi pe and f i t t i ngs wi t h mechani cal coupl i ngs shal l be per mi t t ed i n pi pe si zes 1. 5 i nches and l ar ger .

Fi t t i ngs, mechani cal coupl i ngs, and r ubber gasket s shal l be suppl i ed by t he same manuf act ur er . St eel pi pi ng wi t h wal l t hi ckness l ess t han Schedul e 30 shal l not be t hr eaded. Si de out l et t ees usi ng r ubber gasket ed f i t t i ngs shal l not be per mi t t ed. Spr i nkl er pi pe and f i t t i ngs shal l be met al .

2. 1. 2 Gr ooved Mechani cal Joi nt s and Fi t t i ngs

Gr ooved coupl i ngs, f i t t i ngs and gr oovi ng t ool s shal l be pr oduct s of t he same manuf act ur er .

2. 1. 3 Spr i nkl er Heads

Pr ovi de nomi nal 0. 50 i nch or i f i ce spr i nkl er s. Spr i nkl er s wi t h i nt er nal O- r i ngs shal l not be used. Spr i nkl er s shal l be used i n accor dance wi t h t hei r l i s t ed cover age l i mi t at i ons. Pr ovi de Upr i ght and Pendent st andar d r esponse spr i nkl er s. Spr i nkl er s shal l have a whi t e pol yest er f i ni sh.

Temper at ur e c l assi f i cat i on shal l be or di nar y. Spr i nkl er s i n hi gh heat ar eas i ncl udi ng i n c l ose pr oxi mi t y t o uni t heat er s shal l have t emper at ur e c l assi f i cat i on i n accor dance wi t h NFPA 13. Cei l i ng pl at es shal l not be mor e t han 0. 5 i nch deep. Cei l i ng cups shal l not be per mi t t ed.

SECTI ON 21 13 13. 00 20 Page 4

2. 1. 4 Pi pe Suppor t s

Pr ovi de Pi pe hanger s and suppor t s and i n accor dance wi t h NFPA 13.

2. 2 St eel Pi pe

Pi pe shal l be bl ack st eel . St eel pi pi ng shal l be Schedul e 40 f or s i zes l ess t han 2 i nches or l ar ger . Fi t t i ngs i nt o whi ch spr i nkl er s, spr i nkl er r i ser ni ppl es, or dr op ni ppl es ar e t hr eaded shal l be wel ded, t hr eaded, or gr ooved- end t ype. Pl ai n- end f i t t i ngs wi t h mechani cal coupl i ngs, f i t t i ngs t hat use st eel gr i ppi ng devi ces t o bi t e i nt o t he pi pe and segment ed wel ded f i t t i ngs shal l not be per mi t t ed. Rubber gasket ed gr ooved- end pi pe and f i t t i ngs wi t h mechani cal coupl i ngs shal l be per mi t t ed i n pi pe si zes 1. 5 i nches and l ar ger . Fi t t i ngs, mechani cal coupl i ngs, and r ubber gasket s shal l be suppl i ed by t he same manuf act ur er . St eel pi pi ng wi t h wal l t hi ckness l ess t han Schedul e 30 shal l not be t hr eaded.

2. 3 Fl exi bl e Spr i nkl er Hose

The use of f l exi bl e spr i nkl er hose i s not per mi ssi bl e.

2. 4 Pi pe Suppor t s

Pr ovi de Pi pe hanger s and suppor t s i n accor dance wi t h NFPA 13. 2. 5

ACCESSORI ES

2. 5. 1 Spr i nkl er Cabi net

Add ext r a spr i nkl er s t o exi st i ng spr i nkl er cabi net , i ncl udi ng a r epr esent at i ve sampl e of pendent t ype spr i nkl er s and spr i nkl er wr ench adj acent t o each al ar m val ve. The number and t ypes of ext r a spr i nkl er s shal l be as speci f i ed i n NFPA 13.

2. 5. 2 Pi pe Escut cheon

Pr ovi de spl i t hi nge met al pl at es f or pi pi ng ent er i ng wal l s, f l oor s, and cei l i ngs i n exposed spaces. Pr ovi de pol i shed st ai nl ess st eel pl at es or chr omi um- pl at ed f i ni sh on copper al l oy pl at es i n f i ni shed spaces. Pr ovi de pai nt f i ni sh on met al pl at es i n unf i ni shed spaces.

PART 3 EXECUTI ON

3. 1 I NSPECTI ON BY FI RE PROTECTI ON ENGI NEER

The Fi r e Pr ot ect i on Engi neer shal l i nspect t he spr i nkl er syst em per i odi cal l y dur i ng t he i nst al l at i on t o assur e t he spr i nkl er syst em i s bei ng pr ovi ded and i nst al l ed i n accor dance wi t h t he cont r act r equi r ement s and t he appr oved spr i nkl er syst em submi t t al . The Fi r e Pr ot ect i on Engi neer shal l at t end t he f i nal t est s, and shal l s i gn t he t est r esul t s. Af t er t he pr ogr ess of wor k t est i ng has been compl et ed, t he Fi r e Pr ot ect i on Engi neer , shal l cer t i f y i n wr i t i ng t he syst em i s r eady f or t he f i nal i nspect i ons and t est s. Thi s r epor t shal l document any di scr epanci es f ound and what act i ons wi l l be t aken t o cor r ect . Any di scr epancy not ed dur i ng t he per i odi c s i t e v i s i t s or t he pr ogr ess of wor k t est i ng shal l be br ought t o t he at t ent i on of t he Cont r act i ng Of f i cer i n wr i t i ng, no l at er t han t hr ee wor ki ng days af t er t he di scr epancy i s di scover ed.

SECTI ON 21 13 13. 00 20 Page 5

3. 2 ABOVEGROUND PI PI NG I NSTALLATI ON

The met hods of f abr i cat i on and i nst al l at i on of t he abovegr ound pi pi ng shal l f ul l y compl y wi t h t he r equi r ement s and r ecommended pr act i ces of NFPA 13 and t hi s speci f i cat i on sect i on.

3. 3 PENDENT SPRI NKLERS

Wher e spr i nkl er s ar e i nst al l ed bel ow suspended or dr opped cei l i ngs, dr op ni ppl es shal l be cut such t hat spr i nkl er cei l i ng pl at es or escut cheons ar e of a uni f or m dept h t hr oughout t he f i ni shed space. The out l et of t he r educi ng coupl i ng shal l not ext end mor e t han 1 i nch bel ow t he under si de of t he cei l i ng. Pendent spr i nkl er s i n suspended cei l i ngs shal l be a mi ni mum of 6 i nches f r om cei l i ng.

Pi pe Joi nt s

Pi pe j oi nt s shal l conf or m t o NFPA 13, except as modi f i ed her ei n. Wel ded j oi nt s wi l l be per mi t t ed, onl y i f wel di ng oper at i ons ar e per f or med as r equi r ed by NFPA 13 at t he Cont r act or ' s f abr i cat i on shop, not at t he pr oj ect const r uct i on s i t e. Fl anged j oi nt s shal l be pr ovi ded wher e i ndi cat ed or r equi r ed by NFPA 13. Gr ooved pi pe and f i t t i ngs shal l be pr epar ed i n accor dance wi t h t he manuf act ur er ' s l at est publ i shed speci f i cat i on accor di ng t o pi pe mat er i al , wal l t hi ckness and si ze.

Gr ooved coupl i ngs, f i t t i ngs and gr oovi ng t ool s shal l be pr oduct s of t he same manuf act ur er . The di amet er of gr ooves made i n t he f i el d shal l be measur ed usi ng t he met hod speci f i cal l y appr oved by t he coupl i ng manuf act ur er f or t he i nt ended appl i cat i on. Gr oove wi dt h and di mensi on of gr oove f r om end of pi pe shal l be measur ed and r ecor ded f or each change i n gr oovi ng t ool set up t o ver i f y compl i ance wi t h coupl i ng manuf act ur er ' s t ol er ances. [ A r epr esent at i ve of t he gr ooved coupl i ngs and f i t t i ngs manuf act ur er shal l conduct at l east one onsi t e i nspect i on of t he pi pi ng i nst al l at i on t o ensur e t he met hod of i nst al l at i on i s i n accor dance wi t h t he manuf act ur er ' s r equi r ement s and r ecommended pr act i ces.

Reducer s

Reduct i ons i n pi pe si zes shal l be made wi t h one- pi ece t aper ed r educi ng f i t t i ngs. Bushi ngs ar e pr ohi bi t ed. Pi pe Penet r at i ons

3. 4 PRELI MI NARY TESTS

The syst em, i ncl udi ng t he under gr ound wat er mai ns, and t he abovegr ound pi pi ng and syst em component s, shal l be t est ed t o assur e t hat equi pment and component s f unct i on as i nt ended. The under gr ound and abovegr ound i nt er i or pi pi ng syst ems and at t ached appur t enances subj ect ed t o syst em wor ki ng pr essur e shal l be t est ed i n accor dance wi t h NFPA 13. Submi t r equest t o schedul e Pr el i mi nar y Test s, no l at er t han 14 days pr i or t o t he pr oposed st ar t of t he t est s. Upon compl et i on of speci f i ed t est s, t he Cont r act or shal l submi t f or appr oval a Pr el i mi nar y Test Repor t .

3. 4. 1 Hydr ost at i c Test i ng

Abovegr ound pi pi ng shal l be hydr ost at i cal l y t est ed i n accor dance wi t h

NFPA 13.

3. 5 FI NAL ACCEPTANCE TEST

Fi nal Accept ance Test shal l begi n onl y when t he Pr el i mi nar y Test Repor t has been appr oved. Submi t r equest t o schedul e Fi nal Accept ance Test , no

SECTI ON 21 13 13. 00 20 Page 6 l at er t han 14 days pr i or t o t he pr oposed st ar t of t he t est s. Not i f i cat i on shal l i ncl ude a copy of t he Cont r act or ' s Mat er i al & Test Cer t i f i cat es.

The Base Fi r e Pr ot ect i on Engi neer shal l conduct t he Fi nal Accept ance Test .

The Cont r act or shal l submi t t he Fi nal Accept ance Test Repor t as speci f i ed i n t he Submi t t al s par agr aph.

An exper i enced t echni c i an r egul ar l y empl oyed by t he syst em i nst al l er shal l be pr esent dur i ng t he i nspect i on. The Fi r e Pr ot ect i on Engi neer shal l at t end t he f i nal i nspect i ons and t est s. At t hi s i nspect i on, r epeat any or al l of t he r equi r ed t est s as di r ect ed. Cor r ect def ect s i n wor k pr ovi ded by t he Cont r act or , and make addi t i onal t est s unt i l t he syst ems compl y wi t h cont r act r equi r ement s.

- - End of Sect i on - -