About this file

This is a request for proposal for an indefinite delivery/indefinite quantity multiple award construction contract for the Public Works Department Maine area of responsibility. The solicitation seeks proposals for design-build and design-bid-build construction projects including new construction, demolition, repair, renovation, and facility maintenance. Work may include administrative, industrial, maintenance, warehouse, communications, personnel support, recreational, lodging, medical, training, and road facilities. Selected contractors will be responsible for labor, supervision, engineering, design, materials, equipment, tools, parts, supplies, and transportation for individual task order projects. The contract has a one-year base period and four one-year options with a total estimated value of $249 million. Task order projects are estimated between $500,000 to $5 million but may be lower or higher. Proposals are due by August 31, 2021. The solicitation is an 8(a) set-aside for firms located in Maine or within a 350-mile radius of Kittery, Maine. The Naval Facilities Engineering Command Mid-Atlantic will administer the contract in support of the Public Works Department Maine area of responsibility.

View the file

Other files

File Type Posted
AMENDMENT 0004.pdf PDF
Amendment 0003 Attachment F_Rev1- Price Proposal Form - 1660646_ST19-0831 Repair Oil Storage Tanks.pdf PDF
Amendment 0003 SV Sign-in 21R1217.pdf PDF
Amendment 0003 PPI Attachment 95 - B72 Fuel Oil Water Seperator Asbuilt.pdf PDF
Amendment 0003 PPI Attachment 80B - PNSY A-102_PNSY-Kittery_IntExt-UT_InspectionRpt_2018-signed.pdf PDF
Amendment 0003 SOW_REV2 9-17-21 - 1660646_ST19-0831 Repair Oil Storage Tanks.pdf PDF
AMENDMENT 0003.pdf PDF
Amendment 0003 PPI Attachment 125 - B72 Repair Fuel Oil Storage Tanks.pdf PDF
Amendment 0003 PPI Attachment 80 - PNSY A-101_PNSY-Kittery_IntExt-UT_InspectionRpt_2018.pdf PDF
Amendment 0003 PPI Attachment 79B - A-102-BLDG72 - 2020 Inspection.pdf PDF
Amendment 0003 PPI Attachment 79 - A-101-BLDG72 - 2020 Inspection.pdf PDF
Amendment 0002 - PPI Attachment Q50 - Attachment 3.1 - Updated Coating Spec 09 97 13.27.pdf PDF
AMENDMENT 0002.pdf PDF
Amendment 0002 - PPI Attachment Q46 - Haz Material Survey Report-Final - Credere - 6-22-21.pdf PDF
Amendment 0002 - Attachment 4 - Submittal Register - Rev2.xls XLS spreadsheet
Amendment 0002 - PPI Attachment Q8 - Fuel Oil One-Line Drawing.pdf PDF
Amendment 0002 - PPI Attachment Q7 - Fuel Oil Skid Drawing.pdf PDF
Amendment 0001 - 5500 DBIDS Form.docx DOCX document
Amendment 0001 - Attachment 4 - Submittal Register - Rev1.xls XLS spreadsheet
AMENDMENT 0001.pdf PDF
Amendment 0001 - secnav 5512-1.pdf PDF
Amendment 0001 - Attachment 3 - Technical Specifications Rev2.pdf PDF
Amendment 0001 - Acceptable Forms of ID.docx DOCX document
Attachment D - SOW With OPTONS - ST19-0831 Repair Oil Storage Tanks.pdf PDF
Attachment 1 - Price Proposal Form.pdf PDF
Attachment 5 - Drawings.pdf PDF
Attachment C - Construction Design Exp.docx DOCX document
Attachment 2 -DIV1 Specs.pdf PDF
Attachment 4 - Submittal Register - 1660646.xls XLS spreadsheet
Attachment B - Past Performance Questionnaire.docx DOCX document
Attachment 3 - Technical Specifications Rev1.pdf PDF
Attachment A - Pre-Proposal Inquiry Log.doc DOC document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN-BUILD (DB) /DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ), MULTIPLE AWARD CONSTRUCTION

CONTRACT (MACC) FOR PUBLIC WORKS DEPARTMENT (PWD) MAINE

This procurement is solicited as an 8(a) set-aside.

OFFERORS MUST BE 8(a) FIRMS SERVICED BY THE SBA, MAINE DISTRICT OFFICE IN THE STATE OF MAINE OR WITHIN A 350-MILE RADIUS OF KITTERY, MAINE, 03854. OFFERORS ARE REQUIRED TO SUBMIT THEIR CERTIFICATE OF EXISTENCE/CERTIFICATE OF AUTHORITY OR THE BONAFIDE OFFICE APPROVAL LETTER WITH THEIR PROPOSAL SUBMISSION WITH REFERENCE TO SBA REQUIREMENT NUMBER

SI1615324761M. (INSERT AS AN ATTACHMENT TO THE TECHNICAL PROPOSAL).

** All correspondence regarding this solicitation shall be directed via email to Brittany Cristelli at brittany.n.cristelli.civ@us.navy.mil **

BRITTANY N. CRISTELLI 757-341-1978

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

02-Aug-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211.10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________31 Aug 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

N4008521R1217 59

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N4008521R1217

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

PWD MAINE MACC

FFP

DESIGN-BUILD/DESIGN-BID-BUILD, INDEFINITE DELIVERY,

INDEFINITE QUANTITY, MULTIPLE AWARD CONSTRUCTION

CONTRACT FOR PUBLIC WORKS DEPARTMENT MAINE

FOB: Destination

NET AMT

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

Section 00 21 16 - Instructions to Proposers

INSTRUCTIONS TO OFFERORS

TABLE OF CONTENTS

1. GENERAL

1.1 NOTICE TO OFFERORS

1.2 GENERAL OVERVIEW OF PROCUREMENT PROCESS

1.3 GENERAL OVERVIEW OF CONTRACT

2. GENERAL OVERVIEW OF THE SEED PROJECT

3. BASIS FOR AWARD

4. EVALUATION FACTORS FOR AWARD

5. PROPOSAL REQUIREMENTS

5.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT

5.2 PROPOSAL SUBMISSION INSTRUCTIONS

5.3 PRE-PROPOSAL INQUIRIES (PPIS)

5.4 CONTRACT OPPORTUNITIES (SAM.GOV)

5.5 INCORPORATION OF TECHNICAL PROPOSALS

6. ATTACHMENTS:

ATTACHMENT A – PRE-PROPOSAL INQUIRY (PPI) LOG

ATTACHMENT B – PAST PERFORMANCE QUESTIONNAIRE

ATTACHMENT C – CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA SHEET

1. GENERAL

1.1 NOTICE TO OFFERORS

THIS SOLICITATION IS BEING ISSUED AS AN 8(A) SET-ASIDE IN ACCORDANCE WITH 13 CFR §

124.507. THE NAICS CODE FOR THIS PROCUREMENT IS 236220 AND THE SIZE STANDARD IS $39.5M.

OFFERORS MUST BE 8(a) FIRMS SERVICED BY THE SBA, MAINE DISTRICT OFFICE IN THE STATE OF MAINE OR WITHIN A 350-MILE RADIUS OF KITTERY, MAINE, 03854. OFFERORS ARE REQUIRED TO

SUBMIT THEIR CERTIFICATE OF EXISTENCE/CERTIFICATE OF AUTHORITY OR THE BONAFIDE

OFFICE APPROVAL LETTER WITH THEIR PROPOSAL SUBMISSION WITH REFERENCE TO SBA

REQUIREMENT NUMBER SI1615324761M.

1.2 GENERAL OVERVIEW OF PROCUREMENT PROCESS

This solicitation is formatted as a Request for Proposal (RFP) in accordance with the requirements designated by sections of the FAR 15.203. This method permits evaluation of proposals based on price competition, technical merit and other factors; permits impartial and comprehensive evaluation of offerors' proposals; permits discussions if necessary; and ensures selection of the source(s) whose performance provides the best value to the Government.

This acquisition will be solicited as a competitively negotiated procurement as an 8(a) set-aside.

The Government reserves the right to reject any or all proposals at any time prior to award; to negotiate with any or all offerors; to award the contracts to other than the offeror submitting the lowest total price; to award to other than the offeror submitting the highest technically rated proposal; and to award to the offeror submitting the proposal determined by the Government to be the most advantageous (best value) to the Government. OFFERORS ARE

ADVISED THAT AWARD MAY BE MADE WITHOUT DISCUSSION OR ANY CONTACT CONCERNING

THE PROPOSALS RECEIVED. Therefore, proposals should be submitted initially on the most favorable price and technical terms. Offerors should not assume that they will be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. However, the Government reserves the right to clarify certain aspects of proposals or conduct discussions providing an opportunity for the offeror to revise its proposal.

1.3 GENERAL OVERVIEW OF CONTRACT

This acquisition will result in the award of approximately five (5), Firm Fixed Price (FFP) Indefinite- Delivery/Indefinite Quantity (IDIQ), Design-Build and Design-Bid-Build Multiple Award Construction Contracts (MACCs) for the Public Works Department (PWD) Maine Area of Responsibility (AOR). Work may be required in other areas in the area of responsibility of NAVFAC Mid-Atlantic if deemed necessary. The Government intends to award no more than five (5) contracts resulting from this solicitation, unless the Government determines award to more than five (5) contracts to be in its best interests, to the responsible offerors whose proposals represent the best value after evaluation in accordance with the factors in the solicitation.

Construction projects to be performed under this MACC will require the ability to manage multiple task orders concurrently across the PWD Maine AOR. This MACC will encompass a wide range of DB and DBB construction projects that include, but are not limited to, new construction, demolition, repair, alteration, and renovation of buildings, systems and infrastructure. Types of facilities may include administrative, industrial, maintenance, warehouses, communications, personnel support, recreational, lodging, medical, training, ranges, and roads. Lead or asbestos abatement may be required in accomplishment of the work. The selected contractors will be responsible for all labor, supervision, engineering, design, materials, equipment, tools, parts, supplies, and transportation to perform all of the services described in the drawings and specifications provided for each individual project. Work in explosive facilities and/or sites may be required. Work associated with this MACC will be in support of the PWD Maine AOR managed by NAVFAC Mid-Atlantic. Work may be required in other areas in the area of responsibility of NAVFAC Mid-Atlantic if deemed necessary.

The completion date for the basic contract is one (1) year from the date of contract award with four (4) one- year option periods. The total five-year (base and four one-year options) estimated construction cost for all contracts is not to exceed $249,000,000.00 for the life of the contract. Projects for the MACC have an estimated construction cost between $500,000 and $5,000,000; however, smaller and larger dollar value projects may be considered at the discretion of the Contracting Officer. The Government guarantees an award amount of $5,000.00 to each successful offeror.

After award of the initial contracts and “seed” project, the successful IDIQ contractors will compete for task orders based on best value, using the tradeoff process or lowest price technically acceptable (to include lowest price). Only the successful IDIQ contractors will compete for task orders.

The intent of this contract is that all MACC Contractors participate in pre-proposal conferences and site-visits and submit proposals on each task order. Contract awardees will be expected to submit a proposal for all Task Order Requests for Proposal (RFP) received from the Government. However, in the event a MACC awardee is unable to submit a proposal on a particular RFP, the contractor is required to notify, in writing, the Contracting Officer who issued the RFP and the ACO for the basic contract within five (5) working days from receipt of the RFP. A MACC awardee can only elect to withdraw from submitting a proposal on three (3) task order RFPs during the course of each year of the contract (base plus four options). Additional withdrawal requests, in excess of three per year, may result in the Government choosing not to exercise remaining option terms.

Each task order will contain project specific evaluation factors that will vary depending on the unique requirements for each task order. Additionally, each task order will cite a specific completion date and associated liquidated damages.

Contractor Performance Information: Contractor’s performance will be evaluated using the respective contractor performance evaluation report entry system located on the website http://www.cpars.gov/. Prior to commencement of work the contractor is required to provide the government with the name, phone number and e-mail address of the “Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the government in the appropriate system. It is the contractor’s responsibility to keep this contact information current.

2. GENERAL OVERVIEW OF THE SEED PROJECT

The initial project (seed project) to be awarded as the first task order along with the basic contract will be Design- Bid-Build (DBB), ST 19-0831, Repair Oil Storage Tanks, B72, Portsmouth Naval Shipyard, Kittery, Maine. The anticipated scope of work will repair several deficiencies identified on the existing 60,000 gallon #2 fuel oil tanks.

Insulation that has known asbestos elements will be remediated and removed. The original coating is also assumed to have lead and will be remediated, cleaned, and recoated per current specifications. New isolation valves and piping will be installed as part of the repairs. There are no options associated with this project.

* Solicitation Section 01 00 00 will include the General Requirements for the seed project.

Pursuant to FAR 52.232-18, Availability of Funds, the Government's obligation under this solicitation, or any task order or contract that might result from the solicitation is entirely subject to, and contingent upon, the availability of appropriated funds. Should the Government be unable to award the seed project, the Government guarantees an award in the amount of $5,000.00 to each successful offeror upon award of the Multiple Award Construction Contracts. This minimum guarantee is over the full term of the contract, including option years. No legal liability on the part of the Government shall arise until funds are made available to the Contracting Officer and a task order or contract is awarded by the Contracting Officer. Any offeror proposing on this solicitation does so at its own cost and with the full knowledge that a task order for the seed project, might not result from this solicitation.

3. BASIS FOR AWARD

The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contracts; to negotiate with offerors in the competitive range; and to award the contracts to the offerors submitting the proposals determined to represent the best value—the proposals most advantageous to the Government, cost/price and other factors considered.

The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.

The relative order of importance of the non-price evaluation factors is the technical factors (Factors 1, 2, and 3) are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 4). When the proposal is evaluated as a whole, the technical factors and past performance evaluation/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are approximately equal to price.

3.5 Any proposal found to have a Deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the Deficiency is corrected through discussions. Proposals may be found to have either a Significant Weakness or multiple Weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified Weakness(s) and/or Significant Weaknesses and the associated risk to successful contract performance resulting from the Weakness(s) and/or Significant Weaknesses. This assessment must provide the rationale for proceeding to award without discussions.

4. EVALUATION FACTORS FOR AWARD

1. The solicitation requires the evaluation of price and the following non-price factors:

Factor 1 – Experience Factor 2 – Safety Factor 3 – Management Approach Factor 4 – Past Performance

The distinction between Experience and Past Performance is Experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past Performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

2. The relative order of importance of the non-price evaluation factors is the technical factors (Factors 1, 2, and 3) are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 4). When the proposal is evaluated as a whole, the technical factors and past performance evaluation/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are approximately equal to price.

The importance of price will increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-price proposal’s superiority to the Government. Award will be made to the responsible Offerors whose offers conform to the solicitation and represents the best value to the Government, price and non-price factors considered.

3. Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price

(1) Solicitation Submittal Requirements:

Price shall be submitted on the Price Proposal Form included in the solicitation and submitted in accordance with the instructions below. The offeror shall submit one (1) hard copy marked “Original", one (1) hard copy marked “Copy,” and one (1) CD-ROM electronic copy. All hard copies shall be in separate 3-ring binders (maximum 1.5 inches). In the event of a discrepancy between the electronic copy and the hard copies, the “original” hard copy shall govern.

All submissions shall including the following:

(i) Cover page with solicitation number, solicitation title, offeror name, address, phone number, fax number, DUNS, CAGE code, Point of Contact (POC), POC phone number, and POC email address;

(ii) Executed SF1442. Offeror shall insert its company name and address in Block #14, telephone number in Block #15, acknowledge all amendments in Block #19 (if applicable), name and title of person authorized to sign in Block #20A, signature in Block #20B and offer date in Block #20C of the SF1442. In addition, Offeror shall provide its DUNS Number, CAGE code, and Federal Tax ID number with its proposal:

(iii) All amendments acknowledged;

(iv) Completed Price Proposal Form for the Seed Project that includes all contract line item numbers (CLINs);

(v) Copy of Proof of “Active” status SAM registration and copy of Representation and Certifications.

Offeror shall ensure current registration on the SAM Website, www.sam.gov, including Annual Representations and

Certifications are complete and updated for this procurement. If a Representation or Certification required by Section 00600 of the RFP is not provided in SAM, include the representation or certification in your price proposal;

(vi) VETS-4212 current registration. Offeror shall ensure a current VETS-4212 report has been submitted to the Department of Labor (DOL) website, http://www.dol.gov/vets/vets4212.htm, if the Offeror is required to submit. An email confirmation of submission can be requested and received by the Offeror from the DOL website and submitted in the price proposal. If the Offeror is not required to submit a report to VETS-4212, include a brief statement and justification explaining why the Offeror is not required to submit a report. Visit the VETS-4212 website for details concerning if your company is required to submit a VETS-4212 report and to request an email confirmation of submission;

(vii) Bid bond (SF-24) in accordance with FAR Clause 52.228-1, Bid Guarantee. Offeror shall submit a bid bond (SF-24) in the amount of 20% of total project bid price for the seed project or $3M, whichever amount is less.

The bid bond shall be in the name of the offeror identified on the SF1442. In addition, the offeror shall provide a letter from its bonding company confirming that it has a single award bonding capacity of at least $10,000,000 and the ability to bond multiple projects. Bid Guarantee in accordance with FAR Clause 52.228-1;

(viii) Responsibility Determination Information (see below); and

(ix) Include an electronic, searchable PDF of the price proposal on one CD-ROM.

ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:

RESPONSIBILTY DETERMINATION INFORMATION – In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically FAR 9.104-1, General Standards. In a separate tab, the offeror shall provide the following information in the price proposal package:

(i) One (1) signed bank reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).

(ii) The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization.

Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.

(iii) Description of offeror’s facilities and equipment.

(iv) Other offeror’s work presently under contract.

(2) Basis of Evaluation: The Government will evaluate price based on the total price. Total price consists of the basic requirements, all option items (see attached Price Proposal Form of the solicitation), and any planned modifications. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section 00600 of the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

(i) Comparison of proposed prices received in response to the RFP.

(ii) Comparison of proposed prices with the IGCE.

(iii) Comparison of proposed prices with available historical information.

(iv) Comparison of market survey results.

(b) Non-price Factors:

Non-price binder: The offeror shall submit one (1) hard copy marked “Original", one (1) hard copy marked “Copy,” and one (1) CD-ROM electronic copy. All hard copies shall be in separate 3-ring binders (maximum 1.5 inches). In the event of a discrepancy between the electronic copy and the hard copies, the “original” hard copy shall govern.

All submissions shall including the following:

(i) Cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, CAGE Code, Point of Contact, Phone Number, and Email Address;

(ii) 8 ½ x 11 paper, 12-point font; and

(iii) Refer to individual factors for page limitations. Pages that exceed indicated page limitations shall not be evaluated.

(iv) Include an electronic, searchable PDF of the non-price proposal on one CD-ROM

Any price information within the technical proposal (non-price proposal) will not be considered. Likewise, any technical/non-price information within the price proposal will not be considered.

**The Government will not consider information submitted beyond the page limits set forth below.**

(1) Factor 1, Experience:

(i) Solicitation Submittal Requirements:

Construction Experience:

Offerors shall submit a minimum of three (3) up to a maximum of five (5) relevant construction projects as the prime contractor that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the projects proposed for this MACC.

For purposes of this evaluation, a relevant project is further defined as follows:

Size: A final construction cost of $150,000 or greater. At least one (1) relevant project must have a final construction cost of $1,000,000 or greater.

Scope/Complexity: New building construction, renovation, alteration and/or repair projects.

Additionally, in addition to meeting the above Size and Scope/Complexity, all submitted relevant projects shall demonstrate the following characteristics:

a) Experience as the prime contractor on submitted projects. The Government will not consider experience of proposed subcontractors. The prime contractor’s experience as a subcontractor may be considered only if the offeror clearly demonstrates that its role in the project met the above relevancy requirements.

b) Experience with both new construction (at least 1 one relevant project) and renovation (at least one relevant project). This experience may be shown in the same relevant project or different relevant projects.

c) Experience with design-build (at least 1 relevant project).

Note: Projects submitted that only include horizontal or civil site work will not be considered.

Projects submitted for the Offeror shall have been completed within the past five (5) years of the date of issuance of this RFP. If the contract completion date is not clearly identified, the Government may deem the project Not Relevant.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered; rather, Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate Construction and Design Experience, submit separate Project Data Sheets for construction and design or the Government may not consider the project. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider information submitted via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods) using the criteria identified above. In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. The Offeror shall provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. If the JV member has relevant experience, as defined above, as part of another JV entity, the JV member may submit that project as long as the JV member clearly demonstrates how its efforts on that project met the above requirements or the project may be considered Not Relevant. Offerors who fail to submit experience for all Joint Venture members may be rated lower. Offerors are still limited to a total of five (5) projects combined. For a JV, the offeror shall submit the signed JV agreement. For 8(a) Mentor-Protégé Joint Ventures, the offeror shall submit the signed and U.S. Small Business Administration (SBA) approved Mentor-Protégé agreement.

If an offeror has a project on which it worked as a JV, the offeror may submit that project but must clearly demonstrate how its efforts on that project met the above requirements or the project may be considered Not Relevant.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract or the Government may not consider the project.

Design Experience:

While the seed project is not design-build, design-build projects may be contemplated under this MACC. Therefore, the Offeror is required to address the design firm to be proposed on future projects.

Offerors shall clearly state the Architect-Engineer firm that is proposed to be utilized as the Designer of Record (DOR) for future task orders under this MACC. Provide the full name of the firm, address, DUNS number, and CAGE code. The designated firm will be required to be utilized as the DOR on future design-build task orders under the resulting MACC, unless a substitution is approved by the Contracting Officer for the proposed task order.

Offerors shall submit a minimum of three (3) up to a maximum of five (5) relevant projects performed by the designer of record (DOR) that best demonstrate the DOR’s experience in a diverse range of design tasks similar in size, scope, and complexity to the projects proposed for this MACC.

For purposes of this evaluation, a relevant design project is further defined as follows:

Size: A design project with a final construction cost of $150,000 or greater. At least (1) one relevant project must have a final construction cost of $1,000,000 or greater.

Scope/Complexity: New building construction, renovation, alteration and/or repair projects.

Additionally, in addition to meeting the above Size and Scope/Complexity, all submitted relevant design projects shall demonstrate the following characteristics:

a) Experience as the designer of record on submitted projects.

b) Experience with design of both new construction (at least 1 one relevant project) and renovation (at least one relevant project). This experience may be shown in the same relevant project or different relevant projects.

c) Experience with design-build (at least 1 relevant project).

Note: Projects submitted that only include horizontal or civil site work will not be considered.

Projects submitted shall have been completed within the past five (5) years of the date of issuance of this RFP. For design-build projects, the design portion of the contract shall have been completed within the past five (5) years of the date of issuance of this RFP. The design completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet (Attachment C) or the Government may deem the project Not Relevant.

A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered; rather, Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate Construction and Design Experience, submit separate Project Data Sheets for construction and design or the Government may not consider the project. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider information submitted via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. The Offeror shall provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

The Offeror may utilize experience of a design subcontractor as the Designer of Record in order to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor.

(ii) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review the first five projects submitted for construction and the first five projects submitted for design. Any projects submitted in excess of the five (5) for Construction Experience and five (5) for Design Experience will not be considered.

Relevant projects where the Offeror and the proposed design firm(s) have previously worked together may be considered more favorably than those that have not worked together.

Relevant projects that demonstrate design-build experience may be considered more favorably than those that do not have design-build experience.

Relevant projects that demonstrate experience with sustainable features may be considered more favorably than those that do not demonstrate experience with sustainable features.

Relevant projects that demonstrate the ability to perform multiple relevant projects simultaneously may be considered more favorably than those who do not have experience performing multiple simultaneous relevant projects.

(2) Factor 2, Safety:

(i) Solicitation Submittal Requirements:

The Offeror shall submit the following information: The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative, as described further below. For a partnership or joint venture, the Offeror shall submit separate DART rates and TCR for the specified five (5) CY for each contractor who is part of the partnership/joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.

NOTE: DART and TCR shall not be submitted for subcontractors

1. DART Rate: Submit five (5) previous complete calendar years’ [CY2016, CY2017, CY2018, CY2019, and CY2020] worth of data (not an overall average). If the Offeror has no DART rate, for any year, the Offeror must affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.

a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.

b. Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.

𝑫𝑨𝑹𝑻𝑹𝑨𝑻𝑬
NumberofDARTIncidentsx200,000

Total Number of Employee Labor Hours Worked

2. TCR Rate: Submit five (5) previous complete calendar years’ [CY2016, 2017, 2018, 2019, and 2020] worth of data (not an overall average). If the Offeror has no TCR rate, for any year, the Offeror must affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.

a. TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.

b. Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000, and then divide by the number of employee labor hours worked.

𝑻𝑪𝑹𝑹𝑨𝑻𝑬
NumberofTCRIncidentsx200,000

Total Number of Employee Labor Hours Worked

3. Technical Approach to Safety: Submit a narrative that addresses the following:

a Describe the Offeror’ s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describe the evaluation process used to select potential subcontractors.

c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page.

4. The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.

(ii) Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.

1. DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above Moderate Risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

a. Missing data without an explanation is considered a Deficiency.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) may indicate a strength.

c. An increasing DART rate trend may be considered a Weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate RIsk.

d. This chart correlates the DART rate to the level of risk:

Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99

Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0

2. TCR Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above Moderate Risk levels require the offeror to provide a detailed explanation that includes any corrective actions taken for improvement.

a. Missing data without an explanation is considered a Deficiency.

b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a strength.

c. An increasing TCR rate trend may be considered a Weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate Risk.

d. This chart correlates the TCR rate to the level of risk:

Risk TCR Rate Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49 Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99 Extremely High Risk Greater than 6.0

3. The Technical Approach to Safety Narrative. To determine the degree to which the Offeror:

a. Describes a viable SMS that addresses elements; such as Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describes a methodical process of evaluating subcontractor’s safety performance in their selection process.

c. Describes a logical management plan to hold themselves and their subcontractors accountable for adhering to the safety requirements of the contract.

d. The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page.

4. The Government reserves the right to review other available sources (public/Government internal) of information.

These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.

(3) Factor 3, Management Approach

(i) Solicitation Submittal Requirements:

Offeror shall submit a detailed narrative Management Plan describing how the offeror intends to successfully complete the work. The narrative plan shall not exceed five (5) pages single sided or 2.5 pages double sided, at a minimum, address the following:

Offeror’s strategy for successful execution of the work, managing multiple concurrent projects and managing the geographic coverage of the contract requirements.

Offeror’s plan for accomplishing the varied scope of work (Design-Build and Design-Bid-Build (fully designed)) for general construction projects.

The offeror shall provide the role, responsibilities, and contractual relationships between the various firms they will perform with under this contract. (see FAR Subpart 9.6). The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities.

Offeror’s plan for responding to proposed task orders that may have short response times or are solicited simultaneously.

The narrative will be evaluated to determine whether the offeror’s management approach will contribute to successful performance for this contract. Proposals providing greater detail and demonstrating a greater understanding of the requirements, as outlined above, may be rated higher. Failure to address all elements set out above will render the proposal Unacceptable.

(4) Factor 4 Past Performance:

(i) Solicitation Submittal Requirements:

The offeror shall submit the following information:

IF A COMPLETED CPARS EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH THE

PROPOSAL. IF THERE IS NOT A COMPLETED CPARS EVALUATION, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1, Experience. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment B), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Ms. Brittany Cristelli, via email at brittany.cristelli@navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.

IMPORTANT: It is the responsibility of the offeror to provide accurate points of contact for each identified contract and current telephone numbers and/or email addresses. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the offeror’s references or the references’ unwillingness to provide the information requested may affect the Government’s evaluation of this factor.

Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Experience. Offerors may also address any adverse past performance issues. Such explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.

Performance awards or additional information submitted will not be considered.

This evaluation focuses on how well the offeror performed on the projects submitted under Factor 1 Experience and past performance on other projects currently documented in known sources.

The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:

- A pattern of successful completion of tasks;

- A pattern of deliverables that are timely and of good quality;

- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and

- Recency of tasks performed that are identical to, similar to, or related to the task at hand

The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the offeror’s past performance will be used as a means of evaluating the offeror’s probability to successfully meet the requirements of the RFP.

This is the start of the file's text. The full file is on GovTribe.