Amendment 0003 PPI Attachment 125 - B72 Repair Fuel Oil Storage Tanks.pdf

PDF 408 KB Posted

Attached to
Design-Build (DB)/Design-Bid-Build (DBB), Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) - Maine
Solicitation number
N4008521R1217
Issued by

About this file

This document contains details regarding a federal solicitation for a multiple award construction contract. The solicitation seeks contractors to perform design-build and design-bid-build construction projects for the Public Works Department Maine under an indefinite delivery, indefinite quantity contract. Work will include new construction, demolition, repair, renovation and alteration of buildings, systems and infrastructure such as administrative facilities, industrial facilities, maintenance facilities, warehouses, communications facilities, personnel support facilities, recreational facilities, lodging facilities, medical facilities, training facilities, ranges and roads. Lead and asbestos abatement may be required. Selected contractors will be responsible for all labor, supervision, engineering, design, materials, equipment and transportation to complete individual task orders. Work may involve explosive facilities. All work will support the Public Works Department Maine area of responsibility managed by the Naval Facilities Engineering Command Mid-Atlantic. The period of performance is not specified.

View the file

Other files

File Type Posted
AMENDMENT 0004.pdf PDF
Amendment 0003 Attachment F_Rev1- Price Proposal Form - 1660646_ST19-0831 Repair Oil Storage Tanks.pdf PDF
Amendment 0003 SV Sign-in 21R1217.pdf PDF
Amendment 0003 PPI Attachment 95 - B72 Fuel Oil Water Seperator Asbuilt.pdf PDF
Amendment 0003 PPI Attachment 80B - PNSY A-102_PNSY-Kittery_IntExt-UT_InspectionRpt_2018-signed.pdf PDF
Amendment 0003 SOW_REV2 9-17-21 - 1660646_ST19-0831 Repair Oil Storage Tanks.pdf PDF
AMENDMENT 0003.pdf PDF
Amendment 0003 PPI Attachment 80 - PNSY A-101_PNSY-Kittery_IntExt-UT_InspectionRpt_2018.pdf PDF
Amendment 0003 PPI Attachment 79B - A-102-BLDG72 - 2020 Inspection.pdf PDF
Amendment 0003 PPI Attachment 79 - A-101-BLDG72 - 2020 Inspection.pdf PDF
Amendment 0002 - PPI Attachment Q50 - Attachment 3.1 - Updated Coating Spec 09 97 13.27.pdf PDF
AMENDMENT 0002.pdf PDF
Amendment 0002 - PPI Attachment Q46 - Haz Material Survey Report-Final - Credere - 6-22-21.pdf PDF
Amendment 0002 - Attachment 4 - Submittal Register - Rev2.xls XLS spreadsheet
Amendment 0002 - PPI Attachment Q8 - Fuel Oil One-Line Drawing.pdf PDF
Amendment 0002 - PPI Attachment Q7 - Fuel Oil Skid Drawing.pdf PDF
Amendment 0001 - 5500 DBIDS Form.docx DOCX document
Amendment 0001 - Attachment 4 - Submittal Register - Rev1.xls XLS spreadsheet
AMENDMENT 0001.pdf PDF
Amendment 0001 - secnav 5512-1.pdf PDF
Amendment 0001 - Attachment 3 - Technical Specifications Rev2.pdf PDF
Amendment 0001 - Acceptable Forms of ID.docx DOCX document
Attachment D - SOW With OPTONS - ST19-0831 Repair Oil Storage Tanks.pdf PDF
Attachment 1 - Price Proposal Form.pdf PDF
Attachment 5 - Drawings.pdf PDF
Attachment C - Construction Design Exp.docx DOCX document
Attachment 2 -DIV1 Specs.pdf PDF
Attachment 4 - Submittal Register - 1660646.xls XLS spreadsheet
Attachment B - Past Performance Questionnaire.docx DOCX document
Attachment 3 - Technical Specifications Rev1.pdf PDF
Attachment A - Pre-Proposal Inquiry Log.doc DOC document
N4008521R1217.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B72 Repair Fuel Oil Storage Tanks

PPI Attachment - Equipment list

EQUIP.

ID

EQUIPMENT

DESCRIPTION

MOTOR/INPUT NOTES

DB-2 HRSG-2 Duct Burner

42.5 mmbtu/hr (gas/oil)

Deltak Corp.

Dino 4LF-2219-SE Oil Firing:

Heat Input: 42.5 mmbtu/hr Max Firing: 1747 oF Turndown: 4 to 1 Pressure at burner: 150 psig

DG-1 &

Diesel/Generator 147.6 gph (Lf) Fuel Oil Day Tank / Pump Manufacturer: Phillips Pump Tank capacity: 500 gallons Pump: 15 gpm @ 150 psi FOC-1 Fuel Oil Return Cooler Young F-301-HY-2P 15 gpm CW

CTG-2 Combustion Turbine Generator #2

69.86 mmbtu/hr (gas/oil)

Solar Turbines Taurus 60 Gas Firing:

Gas Line pressure: 275 psig Heat Input: 69.86 mmbtu/hr (HHV)

Flow: 69,860 scfh or 3,050 lbs/hr

B-3 & B-4

Boiler #3, & 4 83.2 mmbtu/hr

(LF)

Nebraska Boiler Company

NS-E-61 SH (MR,ST)

Oil Firing:

Heat input: 83.2 mmbtu/hr Turndown: 8 to 1 Pressure @ burner: 150 psig Excess air @ MCR: 15% Flue gas rate @ MCR: 15% Atomizing steam pressure @ burner: 100 psig

FOP 1

& 2

Fuel Oil Pump 1, 20 HP - 480V/3ph/ 60Hz Motor Model R877, 4 in. Suction 3 in. discharge

File details come from the government source that posted it. Updated .