This submittal register outlines 206 line items requiring submission for a construction contract to repair oil storage tanks at the Portsmouth Naval Shipyard in Maine. The contract involves pre-construction, design, construction, testing, certification, operation and maintenance, and closeout submissions. Required submissions include plans, schedules, safety documentation, training records, inspection and test reports, equipment details, warranties, record drawings and operational materials. Submissions are due prior to construction, during construction, and as part of contract closeout. The contractor must provide all labor, supervision, engineering, materials and equipment to complete repairs to the oil storage tanks in accordance with associated drawings and specifications.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| TITLE: | ST19-0831 Repair Oil Storage Tanks | SUBMITTAL REGISTER | ||||||||||||||||||
| JOB NAME: | ||||||||||||||||||||
| LOCATION: | PNSY-72 | |||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||||
| Line | Act-ivity # | Trans-mittal # | Specification Section | SD # | SD Description | Item Submitted | Paragraph # | Classi-fication: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth - Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 14 00.00 22 | 01 | Preconstruction Submittals | List of Contact Personnel | 1.5.1 | G | ||||||||||||||
| 2 | 01 20 00.00 22 | 01 | Preconstruction Submittals | Schedule of Prices | 1.3 | G | ||||||||||||||
| 3 | 01 30 00.00 22 | 01 | Preconstruction Submittals | NAVFAC Red Zone Checklist | 0 | G | ||||||||||||||
| 4 | 01 30 00.00 22 | 01 | Preconstruction Submittals | NAVFAC PWD ME Follow-on Services List | 1.8 | G | ||||||||||||||
| 5 | 01 31 23.13 20 | 01 | Preconstruction Submittals | List of Contractor's Personnel | 1.4.2 | G | ||||||||||||||
| 6 | 01 32 16.00 20 | 01 | Preconstruction Submittals | Construction Schedule | 1.2 | G | ||||||||||||||
| 7 | 01 32 16.00 20 | 01 | Preconstruction Submittals | Construction Schedule (3 Week) | 1.6 | G | ||||||||||||||
| 8 | 01 32 16.00 20 | 01 | Preconstruction Submittals | Construction Schedule (Outages) | 1.8 | G | ||||||||||||||
| 9 | 01 32 16.00 20 | 07 | Certificates | Monthly Updates | 1.4 | G | ||||||||||||||
| 10 | 01 33 00 | 01 | Preconstruction Submittals | Submittal Register | 1.5 | G | ||||||||||||||
| 11 | 01 33 10.05 20 | 01 | Preconstruction Submittals | Consolidated RFP Documents | 2.1 | G | ||||||||||||||
| 12 | 01 33 10.05 20 | 01 | Preconstruction Submittals | Submittal Register | 1.5.5 | G | ||||||||||||||
| 13 | 01 33 10.05 20 | 05 | Design Data | Design Drawings | 1.7 | G | ||||||||||||||
| 14 | 01 33 10.05 20 | 05 | Design Data | Specifications | 1.8 | G | ||||||||||||||
| 15 | 01 33 10.05 20 | 05 | Design Data | Design Analysis | 1.9 | G | ||||||||||||||
| 16 | 01 33 10.05 20 | 05 | Design Data | Design Submittals | 2.2 | G | ||||||||||||||
| 17 | 01 33 10.05 20 | 11 | Closeout Submittals | Record Documents | 0 | G | ||||||||||||||
| 18 | 01 33 10.05 20 | 11 | Closeout Submittals | DD Form 1354 | 0 | G | ||||||||||||||
| 19 | 01 35 26.00 22 | 01 | Preconstruction Submittals | Accident Prevention Plan (APP) | 1.7 | G | ||||||||||||||
| 20 | 01 35 26.00 22 | 06 | Test Reports | Monthly Exposure Reports | 1.4 | G | ||||||||||||||
| 21 | 01 35 26.00 22 | 06 | Test Reports | Notifications and Reports | 1.12 | G | ||||||||||||||
| 22 | 01 35 26.00 22 | 06 | Test Reports | Accident Reports | 1.12.2 | G | ||||||||||||||
| 23 | 01 35 26.00 22 | 06 | Test Reports | LHE Inspection Reports | 1.12.3 | G | ||||||||||||||
| 24 | 01 35 26.00 22 | 07 | Certificates | Crane Operators/Riggers | 1.6.1.5 | G | ||||||||||||||
| 25 | 01 35 26.00 22 | 07 | Certificates | Standard Lift Plan | 1.7.2.2 | G | ||||||||||||||
| 26 | 01 35 26.00 22 | 07 | Certificates | Critical Lift Plan | 1.7.2.3 | G | ||||||||||||||
| 27 | 01 35 26.00 22 | 07 | Certificates | Naval Architecture Analysis | 1.7.2.3 | G | ||||||||||||||
| 28 | 01 35 26.00 22 | 07 | Certificates | Activity Hazard Analysis (AHA) | 1.8 | G | ||||||||||||||
| 29 | 01 35 26.00 22 | 07 | Certificates | Confined Space Entry Permit | 1.9.1 | G | ||||||||||||||
| 30 | 01 35 26.00 22 | 07 | Certificates | Hot Work Permit | 1.9.1 | G | ||||||||||||||
| 31 | 01 35 26.00 22 | 07 | Certificates | Certificate of Compliance | 1.12.4 | G | ||||||||||||||
| 32 | 01 35 26.00 22 | 07 | Certificates | Third Party Certification of Barge-Mounted Mobile Cranes | 0 | G | ||||||||||||||
| 33 | 01 35 26.00 22 | 07 | Certificates | License Certificates | 1.14 | G | ||||||||||||||
| 34 | 01 35 26.00 22 | 07 | Certificates | Radiography Operation Planning Work Sheet | 1.14.1 | G | ||||||||||||||
| 35 | 01 45 00.10 22 | 01 | Preconstruction Submittals | QC Plan | 1.6 | G | ||||||||||||||
| 36 | 01 50 00.00 22 | 01 | Preconstruction Submittals | Construction site plan | 1.4 | G | ||||||||||||||
| 37 | 01 50 00.00 22 | 01 | Preconstruction Submittals | Traffic control plan | 3.3.1 | G | ||||||||||||||
| 38 | 01 50 00.00 22 | 06 | Test Reports | Backflow Preventer Tests | 2.2.5 | G | ||||||||||||||
| 39 | 01 50 00.00 22 | 07 | Certificates | Backflow Tester | 1.5.1 | G | ||||||||||||||
| 40 | 01 50 00.00 22 | 07 | Certificates | Backflow Preventers | 1.5 | G | ||||||||||||||
| 41 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Preconstruction Survey | 1.5.1 | G | ||||||||||||||
| 42 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Solid Waste Management Plan | 3.4 | G | ||||||||||||||
| 43 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Regulatory Notifications | 1.5.2 | G | ||||||||||||||
| 44 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Environmental Management Plan (EMP) | 3.1 | G | ||||||||||||||
| 45 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Dirt and Dust Control Plan | 3.14.1 | G | ||||||||||||||
| 46 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Contractor Hazardous Material Inventory Log | 3.6 | G | ||||||||||||||
| 47 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Storm Water Management/Erosion and Sedimentation Control Plan | 3.2.1 | G | ||||||||||||||
| 48 | 01 57 19.00 22 | 06 | Test Reports | Laboratory Analysis | 3.13.4.2 | G | ||||||||||||||
| 49 | 01 57 19.00 22 | 06 | Test Reports | Disposal Requirements | 3.15.2 | G | ||||||||||||||
| 50 | 01 57 19.00 22 | 06 | Test Reports | Erosion and Sediment Control Inspection Reports | 3.2.4 | G | ||||||||||||||
| 51 | 01 57 19.00 22 | 06 | Test Reports | Solid Waste Management Report | 3.4.1 | G | ||||||||||||||
| 52 | 01 57 19.00 22 | 11 | Closeout Submittals | Storm Water Management and Erosion Control Compliance Notebook | 3.2.1 | G | ||||||||||||||
| 53 | 01 57 19.00 22 | 11 | Closeout Submittals | Waste Determination Documentation | 3.5 | G | ||||||||||||||
| 54 | 01 57 19.00 22 | 11 | Closeout Submittals | Disposal Documentation for Hazardous and Regulated Waste | 3.13.4.4 | G | ||||||||||||||
| 55 | 01 57 19.00 22 | 11 | Closeout Submittals | Contractor 40 CFR Employee Training Records | 1.5.5 | G | ||||||||||||||
| 56 | 01 57 19.00 22 | 11 | Closeout Submittals | Solid Waste Management Report | 3.4.1 | G | ||||||||||||||
| 57 | 01 57 19.00 22 | 11 | Closeout Submittals | Contractor Hazardous Material Inventory Log | 3.6 | G | ||||||||||||||
| 58 | 01 57 19.00 22 | 11 | Closeout Submittals | Hazardous Waste/Debris Management | 3.13.4 | G | ||||||||||||||
| 59 | 01 57 19.00 22 | 11 | Closeout Submittals | Regulatory Notifications | 1.5.2 | G | ||||||||||||||
| 60 | 01 74 19.00 22 | 01 | Preconstruction Submittals | Waste Management Plan | 1.3 | G | ||||||||||||||
| 61 | 01 74 19.00 22 | 11 | Closeout Submittals | Records | 1.4 | G | ||||||||||||||
| 62 | 01 78 00.00 22 | 03 | Product Data | As-Built Record of Equipment and Materials | 1.3.2 | G | ||||||||||||||
| 63 | 01 78 00.00 22 | 03 | Product Data | Warranty Management Plan | 1.7.1 | G | ||||||||||||||
| 64 | 01 78 00.00 22 | 03 | Product Data | Warranty Tags | 1.7.4 | G | ||||||||||||||
| 65 | 01 78 00.00 22 | 03 | Product Data | Final Cleaning | 0 | G | ||||||||||||||
| 66 | 01 78 00.00 22 | 03 | Product Data | Spare Parts Data | 1.4 | G | ||||||||||||||
| 67 | 01 78 00.00 22 | 08 | Manufacturer’s Instructions | Preventative Maintenance | 1.5 | G | ||||||||||||||
| 68 | 01 78 00.00 22 | 08 | Manufacturer’s Instructions | Condition Monitoring (Predictive Testing) | 1.5 | G | ||||||||||||||
| 69 | 01 78 00.00 22 | 08 | Manufacturer’s Instructions | Inspection | 1.5 | G | ||||||||||||||
| 70 | 01 78 00.00 22 | 08 | Manufacturer’s Instructions | Instructions | 1.7.1 | G | ||||||||||||||
| 71 | 01 78 00.00 22 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 1.9 | G | ||||||||||||||
| 72 | 01 78 00.00 22 | 11 | Closeout Submittals | Record Drawings | 1.3.1 | G | ||||||||||||||
| 73 | 01 78 00.00 22 | 11 | Closeout Submittals | Certification of EPA Designated Items | 1.6 | G | ||||||||||||||
| 74 | 01 78 00.00 22 | 11 | Closeout Submittals | Certification of EPA Designated Items | 1.6 | G | ||||||||||||||
| 75 | 01 78 00.00 22 | 11 | Closeout Submittals | Red Zone Documents | 1.3.6 | G | ||||||||||||||
| 76 | 01 78 23 | 10 | Operation and Maintenance Data | O&M Database | 0 | G | ||||||||||||||
| 77 | 01 78 23 | 10 | Operation and Maintenance Data | Training Plan | 3.1.1 | G | ||||||||||||||
| 78 | 01 78 23 | 10 | Operation and Maintenance Data | Training Outline | 3.1.3 | G | ||||||||||||||
| 79 | 01 78 23 | 10 | Operation and Maintenance Data | Training Content | 3.1.2 | G | ||||||||||||||
| 80 | 01 78 23 | 11 | Closeout Submittals | Training Video Recording | 3.1.4 | G | ||||||||||||||
| 81 | 01 78 23 | 11 | Closeout Submittals | Validation of Training Completion | 3.1.6 | G | ||||||||||||||
| 82 | 01 78 24.00 22 | 11 | Closeout Submittals | eOMSI, Progress Submittal | 1.4.1 | G | ||||||||||||||
| 83 | 01 78 24.00 22 | 11 | Closeout Submittals | eOMSI, Prefinal Submittal | 1.4.2 | G | ||||||||||||||
| 84 | 01 78 24.00 22 | 11 | Closeout Submittals | eOMSI, Final Submittal | 1.4.3 | G | ||||||||||||||
| 85 | 02 82 00 | 03 | Product Data | Amended Water | 1.2.2 | G | ||||||||||||||
| 86 | 02 82 00 | 03 | Product Data | Safety Data Sheets (SDS) for All Materials | 1.3.9 | G | ||||||||||||||
| 87 | 02 82 00 | 03 | Product Data | Encapsulants | 2.1 | G | ||||||||||||||
| 88 | 02 82 00 | 03 | Product Data | Respirators | 3.1.2.1 | G | ||||||||||||||
| 89 | 02 82 00 | 03 | Product Data | Local Exhaust Equipment | 3.1.7 | G | ||||||||||||||
| 90 | 02 82 00 | 03 | Product Data | Pressure Differential Automatic Recording Instrument | 3.1.7 | G | ||||||||||||||
| 91 | 02 82 00 | 03 | Product Data | Vacuums | 3.1.8 | G | ||||||||||||||
| 92 | 02 82 00 | 03 | Product Data | Glovebags | 0 | G | ||||||||||||||
| 93 | 02 82 00 | 06 | Test Reports | Air Sampling Results | 1.5.5 | G | ||||||||||||||
| 94 | 02 82 00 | 06 | Test Reports | Pressure Differential Recordings for Local Exhaust System | 1.5.6 | G | ||||||||||||||
| 95 | 02 82 00 | 06 | Test Reports | Clearance Sampling | 3.2.14.5 | G | ||||||||||||||
| 96 | 02 82 00 | 06 | Test Reports | Asbestos Disposal Quantity Report | 3.3.3.2 | G | ||||||||||||||
| 97 | 02 82 00 | 07 | Certificates | Employee Training | 1.3.4 | G | ||||||||||||||
| 98 | 02 82 00 | 07 | Certificates | Notifications | 1.3.5 | G | ||||||||||||||
| 99 | 02 82 00 | 07 | Certificates | Respiratory Protection Program | 1.3.7 | G | ||||||||||||||
| 100 | 02 82 00 | 07 | Certificates | Asbestos Hazard Abatement Plan | 1.3.10 | G | ||||||||||||||
| 101 | 02 82 00 | 07 | Certificates | Testing Laboratory | 1.3.11 | G | ||||||||||||||
| 102 | 02 82 00 | 07 | Certificates | Landfill Approval | 1.3.12 | G | ||||||||||||||
| 103 | 02 82 00 | 07 | Certificates | Delivery Tickets | 1.3.12 | G | ||||||||||||||
| 104 | 02 82 00 | 07 | Certificates | Waste Shipment Records | 1.3.12 | G | ||||||||||||||
| 105 | 02 82 00 | 07 | Certificates | Transporter Certification | 1.3.13 | G | ||||||||||||||
| 106 | 02 82 00 | 07 | Certificates | Medical Certification | 1.3.14 | G | ||||||||||||||
| 107 | 02 82 00 | 07 | Certificates | Private Qualified Person Documentation | 1.5.1 | G | ||||||||||||||
| 108 | 02 82 00 | 07 | Certificates | Competent Person | 1.5.2 | G | ||||||||||||||
| 109 | 02 82 00 | 07 | Certificates | Worker's License | 1.5.3 | G | ||||||||||||||
| 110 | 02 82 00 | 07 | Certificates | Contractor's License | 1.5.4 | G | ||||||||||||||
| 111 | 02 82 00 | 07 | Certificates | Federal, State or Local Citations on Previous Projects | 1.5.8 | G | ||||||||||||||
| 112 | 02 82 00 | 07 | Certificates | Encapsulants | 2.1 | G | ||||||||||||||
| 113 | 02 82 00 | 07 | Certificates | Equipment Used to Contain Airborne Asbestos Fibers | 3.1 | G | ||||||||||||||
| 114 | 02 82 00 | 07 | Certificates | Water Filtration Equipment | 3.1.3.3 | G | ||||||||||||||
| 115 | 02 82 00 | 07 | Certificates | Vacuums | 3.1.8 | G | ||||||||||||||
| 116 | 02 82 00 | 07 | Certificates | Ventilation Systems | 3.1.8 | G | ||||||||||||||
| 117 | 02 82 00 | 11 | Closeout Submittals | Permits | 0 | G | ||||||||||||||
| 118 | 02 82 00 | 11 | Closeout Submittals | Notifications | 1.3.5 | G | ||||||||||||||
| 119 | 02 82 00 | 11 | Closeout Submittals | Respirator Program Records | 1.3.7.1 | G | ||||||||||||||
| 120 | 02 82 00 | 11 | Closeout Submittals | Protective Clothing Decontamination Quality Control Records | 1.5.7 | G | ||||||||||||||
| 121 | 02 82 00 | 11 | Closeout Submittals | Rental Equipment | 1.7.1 | G | ||||||||||||||
| 122 | 02 83 00 | 01 | Preconstruction Submittals | Competent Person | 1.5.1.1 | G | ||||||||||||||
| 123 | 02 83 00 | 01 | Preconstruction Submittals | Training Certification | 1.5.1.2 | G | ||||||||||||||
| 124 | 02 83 00 | 01 | Preconstruction Submittals | Occupational and Environmental Assessment Data Report | 1.5.2.3 | G | ||||||||||||||
| 125 | 02 83 00 | 01 | Preconstruction Submittals | Medical Examinations | 1.5.2.4 | G | ||||||||||||||
| 126 | 02 83 00 | 01 | Preconstruction Submittals | Lead, Cadmium, Chromium Waste Management Plan | 1.5.2.8 | G | ||||||||||||||
| 127 | 02 83 00 | 01 | Preconstruction Submittals | Licenses, Permits and Notifications | 1.5.4 | G | ||||||||||||||
| 128 | 02 83 00 | 01 | Preconstruction Submittals | Occupant Protection Plan | 1.5.5 | G | ||||||||||||||
| 129 | 02 83 00 | 01 | Preconstruction Submittals | Lead, Cadmium, Chromium Compliance Plan | 1.5.2.2 | G | ||||||||||||||
| 130 | 02 83 00 | 01 | Preconstruction Submittals | Lead, Cadmium, Chromium Compliance Plan | 3.1.1.6 | G | ||||||||||||||
| 131 | 02 83 00 | 01 | Preconstruction Submittals | Initial Sample Results | 3.4.1.1 | G | ||||||||||||||
| 132 | 02 83 00 | 01 | Preconstruction Submittals | Written Evidence of TSD Approval | 3.5.2.1 | G | ||||||||||||||
| 133 | 02 83 00 | 03 | Product Data | Respirators | 1.6.1 | G | ||||||||||||||
| 134 | 02 83 00 | 03 | Product Data | Vacuum Filters | 1.6.4 | G | ||||||||||||||
| 135 | 02 83 00 | 03 | Product Data | Negative Air Pressure System | 1.6.7 | G | ||||||||||||||
| 136 | 02 83 00 | 03 | Product Data | Materials and Equipment | 2.1 | G | ||||||||||||||
| 137 | 02 83 00 | 03 | Product Data | Expendable Supplies | 2.1.1 | G | ||||||||||||||
| 138 | 02 83 00 | 03 | Product Data | Local Exhaust Equipment | 3.1.1.5 | G | ||||||||||||||
| 139 | 02 83 00 | 03 | Product Data | Pressure Differential Automatic Recording Instrument | 3.1.1.5 | G | ||||||||||||||
| 140 | 02 83 00 | 03 | Product Data | Pressure Differential Log | 3.1.1.6 | G | ||||||||||||||
| 141 | 02 83 00 | 06 | Test Reports | Sampling and Analysis | 1.3.3 | G | ||||||||||||||
| 142 | 02 83 00 | 06 | Test Reports | Occupational and Environmental Assessment Data Report | 1.5.2.3 | G | ||||||||||||||
| 143 | 02 83 00 | 06 | Test Reports | Sampling Results | 1.5.2.3 | G | ||||||||||||||
| 144 | 02 83 00 | 06 | Test Reports | Pressure Differential Recordings For Local Exhaust System | 1.5.3 | G | ||||||||||||||
| 145 | 02 83 00 | 07 | Certificates | Testing Laboratory | 1.5.1.3 | G | ||||||||||||||
| 146 | 02 83 00 | 07 | Certificates | Third Party Consultant Qualifications | 1.5.1.4 | G | ||||||||||||||
| 147 | 02 83 00 | 07 | Certificates | Occupant Notification | 3.1.1.1 | G | ||||||||||||||
| 148 | 02 83 00 | 07 | Certificates | Notification of the Commencement of [LBP] Hazard Abatement | 3.1.1.1 | G | ||||||||||||||
| 149 | 02 83 00 | 07 | Certificates | Clearance Certification | 3.5.1.1 | G | ||||||||||||||
| 150 | 02 83 00 | 11 | Closeout Submittals | Hazardous Waste Manifest | 3.5.2.1 | G | ||||||||||||||
| 151 | 02 83 00 | 11 | Closeout Submittals | Turn-In Documents or Weight Tickets | 3.5.2.1 | G | ||||||||||||||
| 152 | 32 01 19 | 03 | Product Data | Manufacturer's Recommendations | 3.1.2.3 | G | ||||||||||||||
| 153 | 32 01 19 | 03 | Product Data | Equipment | 3.1 | |||||||||||||||
| 154 | 32 01 19 | 04 | Samples | Materials | 1.4.1 | G | ||||||||||||||
| 155 | 32 01 19 | 06 | Test Reports | Certified Copies of the Test Reports | 0 | G | ||||||||||||||
| 156 | 33 01 50.60 | 03 | Product Data | Cleaning Agents | 2.1.1 | |||||||||||||||
| 157 | 33 01 50.60 | 03 | Product Data | Abrasive for Blasting | 2.1.2.1 | |||||||||||||||
| 158 | 33 01 50.60 | 03 | Product Data | Gasoline-Oil-Resisting Rubber Gloves and Boots | 2.2 | |||||||||||||||
| 159 | 33 01 50.60 | 03 | Product Data | Cotton Coveralls and Hard Hat | 2.2 | |||||||||||||||
| 160 | 33 01 50.60 | 03 | Product Data | Respiratory Protective Equipment | 2.2 | |||||||||||||||
| 161 | 33 01 50.60 | 03 | Product Data | Disinfectant | 2.2 | |||||||||||||||
| 162 | 33 01 50.60 | 06 | Test Reports | Blasting Abrasive | 1.5.11.1 | |||||||||||||||
| 163 | 33 01 50.60 | 06 | Test Reports | Tank Contents | 1.5.11.1 | |||||||||||||||
| 164 | 33 01 50.60 | 06 | Test Reports | Cleaning Test Panel Results | 1.5.11.1 | |||||||||||||||
| 165 | 33 01 50.60 | 06 | Test Reports | Monitoring Results | 1.5.11.2 | G | ||||||||||||||
| 166 | 33 01 50.60 | 07 | Certificates | Qualifications of Marine Chemist | 1.5.10.1 | |||||||||||||||
| 167 | 33 01 50.60 | 07 | Certificates | Qualifications of Certified Industrial Hygienist (CIH) | 1.5.10.2 | |||||||||||||||
| 168 | 33 01 50.60 | 07 | Certificates | Testing Laboratory | 1.5.10.3 | |||||||||||||||
| 169 | 33 01 50.60 | 07 | Certificates | Safety Plan | 1.5.10.4 | |||||||||||||||
| 170 | 33 01 50.60 | 07 | Certificates | Training Certification | 1.5.10.4 | |||||||||||||||
| 171 | 33 01 50.60 | 07 | Certificates | Work Plan | 1.5.10.5 | |||||||||||||||
| 172 | 33 01 50.60 | 07 | Certificates | Hazardous Waste Disposal Plan | 1.5.10.6 | |||||||||||||||
| 173 | 33 01 50.60 | 07 | Certificates | Tank Certification of Safety | 1.5.10.7 | |||||||||||||||
| 174 | 33 01 50.60 | 07 | Certificates | Exhaust | 1.7.1 | |||||||||||||||
| 175 | 33 01 50.60 | 07 | Certificates | Exhaust | 1.7.1 | |||||||||||||||
| 176 | 33 01 50.60 | 07 | Certificates | Respiratory Protective Equipment | 2.2 | |||||||||||||||
| 177 | 33 01 50.60 | 07 | Certificates | Breathing-Air Supply Source | 2.2 | |||||||||||||||
| 178 | 33 01 50.60 | 07 | Certificates | Combustible Gas Indicator | 2.2 | |||||||||||||||
| 179 | 33 01 50.60 | 07 | Certificates | Oxygen Meter | 2.2 | |||||||||||||||
| 180 | 33 01 50.60 | 07 | Certificates | Velometers | 2.2 | |||||||||||||||
| 181 | 33 01 50.60 | 07 | Certificates | Lighting | 2.2 | |||||||||||||||
| 182 | 33 01 50.60 | 07 | Certificates | First Aid Kit | 2.2 | |||||||||||||||
| 183 | 33 01 50.60 | 08 | Manufacturer’s Instructions | Cleaning Agents | 2.1.1 | |||||||||||||||
| 184 | 33 01 50.60 | 11 | Closeout Submittals | Safety Permits | 1.5.3 | |||||||||||||||
| 185 | 33 52 80 | 03 | Product Data | External Pipe Coating | 2.1.1 | |||||||||||||||
| 186 | 33 52 80 | 03 | Product Data | Field-Applied External Pipe Coating | 3.2.1 | |||||||||||||||
| 187 | 33 52 80 | 06 | Test Reports | Qualification Testing | 2.2.1 | |||||||||||||||
| 188 | 33 52 80 | 06 | Test Reports | Qualification Testing | 2.2.1 | |||||||||||||||
| 189 | 33 52 80 | 06 | Test Reports | Inspection Report Forms | 2.2.3.2 | |||||||||||||||
| 190 | 33 52 80 | 06 | Test Reports | Inspection Report Forms | 3.4.2.2 | |||||||||||||||
| 191 | 33 52 80 | 06 | Test Reports | Daily Inspection Reports | 2.2.3.3 | |||||||||||||||
| 192 | 33 52 80 | 06 | Test Reports | Daily Inspection Reports | 3.4.2.3 | |||||||||||||||
| 193 | 33 52 80 | 07 | Certificates | Contract Errors, Omissions, and Other Discrepancies | 1.4.1 | |||||||||||||||
| 194 | 33 52 80 | 07 | Certificates | Corrective Action Procedures | 1.4.2.1 | |||||||||||||||
| 195 | 33 52 80 | 07 | Certificates | Coating Work Plan | 1.4.3 | |||||||||||||||
| 196 | 33 52 80 | 07 | Certificates | Qualifications of Certified Industrial Hygienist (CIH) | 1.4.4.1 | |||||||||||||||
| 197 | 33 52 80 | 07 | Certificates | Qualifications of Pipe Coating Shop | 1.4.4.8 | |||||||||||||||
| 198 | 33 52 80 | 07 | Certificates | Qualifications of Certified Protective Coatings Specialist (PCS) | 1.4.4.2 | |||||||||||||||
| 199 | 33 52 80 | 07 | Certificates | Qualifications of Coating Inspection Company for Field Coating | 1.4.4.3 | |||||||||||||||
| 200 | 33 52 80 | 07 | Certificates | Qualifications of Coating Inspector for Field Coating | 1.4.4.4 | |||||||||||||||
| 201 | 33 52 80 | 07 | Certificates | Qualifications Of Individuals Performing Abrasive Blasting for Field Coating | 1.4.4.5 | |||||||||||||||
| 202 | 33 52 80 | 07 | Certificates | Qualifications of Individuals Performing Coating Application for Field Coating | 1.4.4.6 | |||||||||||||||
| 203 | 33 52 80 | 07 | Certificates | Qualifications of Individuals Performing Coating Application for Field Coating | 1.4.4.6 | |||||||||||||||
| 204 | 33 52 80 | 07 | Certificates | Qualifications of Individuals Operating Plural Component Equipment (Pump Tenders) for Field Coating | 1.4.4.7 | |||||||||||||||
| 205 | 33 52 80 | 07 | Certificates | Qualifications of Coating Contractors | 1.4.4.9 | |||||||||||||||
| 206 | 33 52 80 | 11 | Closeout Submittals | Inspection Logbook | 3.4.2.4 |