Amendment 0002 - PPI Attachment Q50 - Attachment 3.1 - Updated Coating Spec 09 97 13.27.pdf
PDF 182 KB Posted
- Solicitation number
- N4008521R1217
About this file
This solicitation is for an indefinite delivery, indefinite quantity multiple award construction contract to support the Public Works Department in Maine. Under this contract, multiple contractors will be selected to complete a wide range of design-build and design-bid-build construction projects for the Naval Facilities Engineering Command Mid-Atlantic area of responsibility, including new construction, demolition, repair, renovation, and alteration of buildings, infrastructure, and systems. Project types may include administrative, industrial, maintenance, warehouse, communications, personnel support, recreational, lodging, medical, training, and range facilities. Lead and asbestos abatement may also be required. Contractors will be responsible for all associated labor, supervision, engineering, design, materials, equipment, transportation, and other services to complete individual task orders issued under this contract. Work may include projects in explosive facilities and other areas under the responsibility of NAVFAC Mid-Atlantic as needed.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
At t achment 3. 1
SECTI ON 09 97 13. 27
EXTERI OR COATI NG OF STEEL STRUCTURES
10/16
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM C920 ( 2018) St andar d Speci f i cat i on f or El ast omer i c Joi nt Seal ant s
ASTM D1200 ( 2010; R 2014) Vi scosi t y by For d Vi scosi t y Cup
ASTM D1640/ D1640M ( 2014) St andar d Test Met hods f or Dr yi ng, Cur i ng, or Fi l m For mat i on of Or gani c Coatings
ASTM D3276 ( 2015; E 2016) St andar d Gui de f or Pai nt i ng I nspect or s ( Met al Subst r at es)
ASTM D3925 ( 2002; R 2015) Sampl i ng Li qui d Pai nt s and Rel at ed Pi gment ed Coat i ngs
ASTM D4285 ( 1983; R 2012) I ndi cat i ng Oi l or Wat er i n Compr essed Ai r
ASTM D7127 ( 2017) St andar d Test Met hod f or Measur ement of Sur f ace Roughness of Abr asi ve Bl ast Cl eaned Met al Sur f aces usi ng a Por t abl e St y l us I nst r ument
ASTM E11 ( 2016) St andar d Speci f i cat i on f or Woven Wi r e Test Si eve Cl ot h and Test Si eves
I NTERNATI ONAL ORGANI ZATI ON FOR STANDARDI ZATI ON ( I SO)
I SO 9001 ( 2008; Cor r 1 2009) Qual i t y Management Syst ems- Requi r ement s
SOCI ETY FOR PROTECTI VE COATI NGS ( SSPC)
SSPC 7/ NACE No. 4 ( 2007; E 2004) Br ush- Of f Bl ast Cl eani ng
SSPC AB 2 ( 2015; E 2016) Cl eanl i ness of Recycl ed Fer r ous Met al l i c Abr asi ve
SSPC AB 3 ( 2003; E 2004) Fer r ous Met al l i c Abr asi ve
SSPC Gui de 12 ( 1998; E 2004) Gui de f or I l l umi nat i on of
SECTI ON 09 97 13. 27 Page 1
I ndust r i al Pai nt i ng Pr oj ect s
SSPC Gui de 6 ( 2015) Gui de f or Cont ai ni ng Sur f ace Pr epar at i on Debr i s Gener at ed Dur i ng Pai nt Removal Oper at i ons
SSPC PA 1 ( 2016) Shop, Fi el d, and Mai nt enance Coat i ng of Met al s
SSPC PA 2 ( 2015; E 2017) Pr ocedur e f or Det er mi ni ng Conf or mance t o Dr y Coat i ng Thi ckness Requirements
SSPC QP 1 ( 2012; E 2012) St andar d Pr ocedur e f or Eval uat i ng Pai nt i ng Cont r act or s ( Fi el d Appl i cat i on t o Compl ex I ndust r i al Structures)
SSPC QP 5 ( 2012) St andar d Pr ocedur e f or Eval uat i ng t he Qual i f i cat i ons of Coat i ng and Li ni ng I nspect i on Compani es
SSPC QS 1 ( 2015) St andar d Pr ocedur e f or Eval uat i ng a Cont r act or ' s Advanced Qual i t y Management System
SSPC SP 1 ( 2015) Sol vent Cl eani ng
SSPC SP 10/ NACE No. 2 ( 2007) Near - Whi t e Bl ast Cl eani ng
SSPC SP COM ( 2016; E 2017) Sur f ace Pr epar at i on Comment ar y f or St eel and Concr et e Substrates
SSPC VI S 1 ( 2002; E 2004) Gui de and Ref er ence Phot ogr aphs f or St eel Sur f aces Pr epar ed by Dr y Abr asi ve Bl ast Cl eani ng
U. S. DEPARTMENT OF DEFENSE ( DOD)
MIL-A-22262 ( 1993; Rev B; Am 2 1996) Abr asi ve Bl ast i ng Medi a Shi p Hul l Bl ast Cl eani ng
MIL-DTL-24441 ( 2009; Rev D) Pai nt , Epoxy- Pol yami de, Gener al Speci f i cat i on f or
MIL-DTL-24441/19 ( 2009; Rev C) Pai nt , Epoxy- Pol yami de, Zi nc Pr i mer , For mul a 159, Type I I I
MIL-DTL-24441/31 ( 2009; Rev B) Pai nt , Epoxy- Pol yami de, Whi t e, For mul a 152, Type I V
MIL-PRF-85285 ( 2012; Rev E; Not i ce 1 2016) Coat i ng:
Pol yur et hane Ai r cr af t and Suppor t Equi pment
MIL-STD-161 ( 2005; Rev G; Not i ce 1 2010) I dent i f i cat i on Met hods f or Bul k Pet r ol eum Pr oduct s Syst ems I ncl udi ng Hydr ocar bon Mi ssi l e Fuel s
SECTI ON 09 97 13. 27 Page 2
U. S. GENERAL SERVI CES ADMI NI STRATI ON ( GSA)
FED-STD-595 ( Rev C; Not i ce 1) Col or s Used i n Gover nment Pr ocur ement
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
29 CFR 1910. 1000 Ai r Cont ami nant s
29 CFR 1910. 134 Respi r at or y Pr ot ect i on
29 CFR 1926. 59 Hazar d Communi cat i on
1. 2 DEFINITIONS
Def i ni t i ons ar e pr ovi ded t hr oughout t hi s Sect i on, gener al l y i n t he par agr aph wher e used, and denot ed by capi t al l et t er s.
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 05, Desi gn Dat a
Cont ai nment Syst em
SD- 06 Test Repor t s
Joi nt Seal ant Qual i f i cat i on Test Repor t s
Coat i ngs Qual i f i cat i on Test Repor t s
Met al l i c Abr asi ve Qual i f i cat i on Test Repor t s
Coat i ng Sampl e Test Repor t s
Abr asi ve Sampl e Test Repor t s
I nspect i on Repor t For ms
Dai l y I nspect i on Repor t s
Recycl ed Met al l i c Abr asi ve Fi el d Test Repor t s ( Dai l y and Weekl y)
SD- 07 Cer t i f i cat es
Cont r act Er r or s, Omi ssi ons, and Ot her Di scr epanci es
Cor r ect i ve Act i on Pr ocedur es
Coat i ng Wor k Pl an
Qual i f i cat i ons of Cer t i f i ed I ndust r i al Hygi eni st ( CI H)
SECTI ON 09 97 13. 27 Page 3
Qual i f i cat i ons Of I ndi v i dual s Per f or mi ng Abr asi ve Bl ast i ng
Qual i f i cat i ons of Cer t i f i ed Pr ot ect i ve Coat i ngs Speci al i s t ( PCS)
Qual i f i cat i ons of Coat i ng I nspect i on Company
Qual i f i cat i ons of QC Speci al i s t Coat i ng I nspect or
Qual i f i cat i ons of Test i ng Labor at or y f or Coat i ngs
Qual i f i cat i ons of Test i ng Labor at or y f or Abr asi ve
Qual i f i cat i ons of Coat i ng Cont r act or s
Joi nt Seal ant Mat er i al s
Coat i ng Mat er i al s
Coat i ng Syst em Component Compat i bi l i t y
Non- met al l i c Abr asi ve
Met al l i c Abr asi ve
SD- 08 Manuf act ur er ' s I nst r uct i ons
Joi nt Seal ant I nst r uct i ons
Coat i ng Syst em I nst r uct i ons
SD- 11 Cl oseout Submi t t al s
Di sposal of Used Abr asi ve
I nspect i on Logbook; G
1. 4 QUALI TY ASSURANCE
1. 4. 1 Cont r act Er r or s, Omi ssi ons, and Ot her Di scr epanci es
Submi t al l er r or s, omi ssi ons, and ot her di scr epanci es i n cont r act document s t he Cont r act i ng Of f i cer wi t hi n 30 days of cont r act awar d f or al l wor k cover ed i n t hi s Sect i on, ot her t han t he wor k t hat wi l l not be uncover ed unt i l a l at er dat e. Al l such di scr epanci es shal l be addr essed and r esol ved, and t he Coat i ng Wor k Pl an modi f i ed, pr i or t o begi nni ng t he I ni t i al and Fol l ow- Up phases of wor k. Di scr epanci es t hat become appar ent onl y af t er wor k i s uncover ed shal l be i dent i f i ed at t he ear l i est di scover abl e t i me and submi t t ed f or r esol ut i on. Schedul e t i me ( Fl oat ) shoul d be bui l t i nt o t he pr oj ect schedul e at t hose poi nt s wher e ol d wor k i s t o be uncover ed or wher e access i s not avai l abl e dur i ng t he f i r st 30 days af t er awar d, t o al l ow f or r esol ut i on of cont r act di scr epanci es.
1. 4. 2 Cor r ect i ve Act i on ( CA)
CA shal l be i ncl uded i n t he Qual i t y Cont r ol Pl an.
SECTI ON 09 97 13. 27 Page 4
1. 4. 2. 1 Cor r ect i ve Act i on Pr ocedur es
Devel op pr ocedur es f or det er mi ni ng t he r oot cause of each non- compl i ance, devel opi ng a pl an t o el i mi nat e t he r oot cause so t hat t he non- compl i ance does not r ecur , and f ol l owi ng up t o ensur e t hat t he r oot cause was el i mi nat ed. Devel op Cor r ect i ve Act i on Request ( CAR) f or ms f or i ni t i at i ng CA, and f or t r acki ng and document i ng each st ep.
1. 4. 2. 2 I mpl ement Cor r ect i ve Act i on
The Cont r act or shal l t ake act i on t o i dent i f y and el i mi nat e t he r oot cause of each non- compl i ance so as t o pr event r ecur r ence. These pr ocedur es shal l appl y t o non- compl i ance i n t he wor k, and t o non- compl i ance i n t he QC Syst em. Cor r ect i ve act i ons shal l be appr opr i at e t o t he ef f ect s of t he non- compl i ance encount er ed. Each CAR shal l be ser i al i zed, t r acked i n a Log t o compl et i on and accept ance by t he Cont r act i ng Of f i cer , and r et ai ned i n pr oj ect r ecor ds. The Cor r ect i ve Act i on Log, showi ng st at us of each CAR, shal l be submi t t ed t o t he Cont r act i ng Of f i cer mont hl y. A CAR may be i ni t i at ed by ei t her t he Cont r act or or t he Cont r act i ng Of f i cer . The Cont r act i ng Of f i cer must appr ove each CAR at t he r oot cause i dent i f i cat i on st age, t he pl an f or el i mi nat i on st age, and t he c l ose out st age af t er ver i f i cat i on t hat t he r oot cause has been el i mi nat ed.
1. 4. 3 Coat i ng Wor k Pl an
Thi s wor k pl an shal l be consi der ed as par t of t he Qual i t y Cont r ol Pl an.
Pr ovi de pr ocedur es f or r evi ewi ng cont r act document s i mmedi at el y af t er awar d t o i dent i f y er r or s, omi ssi ons, and di scr epanci es so t hat any such i ssues can be r esol ved pr i or t o pr oj ect pl anni ng and devel opment of det ai l ed pr ocedur es.
Pr ovi de pr ocedur es f or ver i f i cat i on of key pr ocesses dur i ng I ni t i al Phase t o ensur e t hat cont r act r equi r ement s can be met . Key pr ocesses shal l i ncl ude sur f ace pr epar at i on, coat i ng appl i cat i on and cur i ng, i nspect i on, and document at i on, and any ot her pr ocess t hat mi ght adver sel y i mpact or der l y pr ogr essi on of wor k.
Pr ovi de pr ocedur es f or al l phases of coat i ng oper at i ons, i ncl udi ng pl anned wor k, r ewor k, r epai r , i nspect i on, and document at i on. Addr ess mobi l i zat i on and set up, sur f ace pr epar at i on, coat i ng appl i cat i on, coat i ng i ni t i al cur e, t r acki ng and cor r ect i on of noncompl i ant wor k, and demobi l i zat i on.
Coor di nat e wor k pr ocesses wi t h heal t h and saf et y pl ans and conf i ned space ent r y pl ans. For each pr ocess, pr ovi de pr ocedur es t hat i ncl ude appr opr i at e wor k i nst r uct i ons, mat er i al and equi pment r equi r ement s, per sonnel qual i f i cat i ons, cont r ol s, and pr ocess ver i f i cat i on pr ocedur es. Pr ovi de pr ocedur es f or i nspect i ng wor k t o ver i f y and document compl i ance wi t h cont r act r equi r ement s, i ncl udi ng i nspect i on f or ms and checkl i st s, and accept ance and r ej ect i on cr i t er i a.
Pr ovi de pr ocedur es f or det er mi ni ng t he exi st i ng sur f ace pr of i l e under pai nt , and pr ocedur es f or ensur i ng t hat t he pr of i l e i s not i ncr eased beyond t he maxi mum pr of i l e speci f i ed her ei n.
Pr ovi de pr ocedur es f or cor r ect i ng noncompl i ant wor k. Det ai l ed pr ocedur es ar e r equi r ed i n advance t o avoi d del ays i n meet i ng over coat wi ndows as wel l as t o avoi d del ays i n pr oduct i on. Pr ovi de pr ocedur es f or r epai r i ng def ect s i n t he coat i ng f i l m, such as r uns, dr i ps, sags, hol i days, over spr ay, as wel l as how t o handl e cor r ect coat i ng t hi ckness noncompl i ance, any ot her
SECTI ON 09 97 13. 27 Page 5 ar eas of r epai r or r ewor k t hat mi ght be adver sel y af f ect ed by del ays i n pr epar i ng and appr ovi ng new pr ocedur es.
I f a pr ocedur e i s based on a pr oposed or appr oved r equest f or devi at i on, t he devi at i on shal l be r ef er enced. Changes t o pr ocedur es shal l be not ed by submi t t al number and dat e appr oved, c l ear l y del i neat i ng ol d r equi r ement s and new r equi r ement s, so t hat t he r ecor ds pr ovi de a cont i nuous l og of r equi r ement s and pr ocedur es.
1. 4. 4 Desi gn Dat a
1. 4. 4. 1 Cont ai nment Syst em
Submi t compl et e desi gn dr awi ngs and cal cul at i ons f or t he scaf f ol di ng and cont ai nment syst em, i ncl udi ng an anal ysi s of t he l oads whi ch wi l l be added t o t he st r uct ur e by t he cont ai nment syst em and wast e mat er i al s. A r egi st er ed engi neer shal l appr ove cal cul at i ons and scaf f ol d syst em desi gn.
1. 4. 5 Test Repor t s
1. 4. 5. 1 Joi nt Seal ant Qual i f i cat i on Test Repor t s
Submi t t est r esul t s f r om i ndependent l abor at or y of r epr esent at i ve sampl es of j oi nt seal ant mat er i al . Sampl es must have been t est ed wi t hi n t he l ast t hr ee year s. Submi t r esul t s as r equi r ed i n par agr aph QUALI TY ASSURANCE PROVI SI ONS of ASTM C920. Not e t hat t est i ng i n accor dance wi t h QUALI TY ASSURANCE PROVI SI ONS i s a pr e- qual i f i cat i on r equi r ement .
1. 4. 5. 2 Coat i ngs Qual i f i cat i on Test Repor t s
Submi t t est r esul t s f r om i ndependent l abor at or y of r epr esent at i ve sampl es of each coat i ng mat er i al . U. S. Depar t ment of Def ense l abor at or i es ar e consi der ed t o be i ndependent l abor at or i es f or pur poses of compl i ance wi t h " QUALI FI CATI ON I NSPECTI ON" r equi r ement s her ei n. Sampl es must have been t est ed wi t hi n t he l ast t hr ee year s. Submi t r esul t s f or epoxy mat er i al s as r equi r ed i n par agr aph QUALI FI CATI ON I NSPECTI ON of MIL-DTL-24441 , and as r evi sed by par agr aph COATI NG SYSTEM her ei n. Submi t r esul t s f or pol yur et hane mat er i al s as r equi r ed i n par agr aph QUALI FI CATI ON I NSPECTI ON of MIL-PRF-85285 , and as r evi sed by par agr aph COATI NG SYSTEM her ei n. Not e t hat r equi r ement f or QUALI FI CATI ON I NSPECTI ON i s a pr e- qual i f i cat i on r equi r ement , and i nvol ves t he same t est i ng r equi r ed f or l i s t i ng i n t he Qual i f i ed Pr oduct s Li st of t he r espect i ve mat er i al . See appr opr i at e Mi l i t ar y Speci f i cat i on f or speci f i c t est r equi r ement s.
1. 4. 5. 3 Met al l i c Abr asi ve Qual i f i cat i on Test Repor t s
Submi t r esul t s f or abr asi ve as r equi r ed i n par agr aph 4 REQUI REMENTS of SSPC AB 3. Submi t t est r esul t s f r om i ndependent l abor at or y of r epr esent at i ve sampl es of each abr asi ve t o be used on t he j obsi t e. Sampl es must have been t est ed wi t hi n t he l ast t hr ee year s. Not e t hat t hi s t est i ng i s f or t he pur pose of pr equal i f y i ng t he abr asi ve.
1. 4. 5. 4 Recycl ed Met al l i c Abr asi ve Fi el d Test Repor t s ( Dai l y and Weekl y)
Submi t t est r esul t s f r om i ndependent l abor at or y of dai l y and weekl y Qual i t y Cont r ol t est i ng r equi r ed by SSPC AB 2, as modi f i ed i n par agr aph ABRASI VE.
SECTI ON 09 97 13. 27 Page 6
1. 4. 6 Qualifications
1. 4. 6. 1 Qual i f i cat i ons of Cer t i f i ed I ndust r i al Hygi eni st ( CI H)
Submi t name, addr ess, t el ephone number , FAX number , and e- mai l addr ess of t he i ndependent t hi r d par t y CI H. Submi t document at i on t hat hygi eni st i s cer t i f i ed by t he Amer i can Boar d of I ndust r i al Hygi ene i n compr ehensi ve pr act i ce, i ncl udi ng cer t i f i cat i on number and dat e of cer t i f i cat i on/ r ecer t i f i cat i on. Pr ovi de evi dence of exper i ence wi t h hazar ds i nvol ved i n i ndust r i al coat i ng appl i cat i on wor k.
1. 4. 6. 2 Qual i f i cat i ons of Cer t i f i ed Pr ot ect i ve Coat i ngs Speci al i s t ( PCS)
Submi t name, addr ess, t el ephone number , FAX number , and e- mai l addr ess of t he i ndependent t hi r d par t y PCS. Submi t document at i on t hat speci al i s t i s cer t i f i ed by SSPC: The Soci et y f or Pr ot ect i ve Coat i ngs ( SSPC) as a PCS, i ncl udi ng cer t i f i cat i on number and dat e of cer t i f i cat i on/ r ecer t i f i cat i on.
I f t he PCS i s empl oyed by t he same coat i ng i nspect i on company t o whi ch t he coat i ng i nspect or i s empl oyed, t hi s does not v i ol at e t he i ndependent t hi r d- par t y r equi r ement s. The PCS shal l r emai n cer t i f i ed dur i ng t he ent i r e pr oj ect , and t he Cont r act i ng Of f i cer shal l be not i f i ed of any change i n cer t i f i cat i on st at us wi t hi n 10 days of t he change. The PCS shal l not be t he desi gnat ed coat i ng i nspect or .
1. 4. 6. 3 Qual i f i cat i ons of Coat i ng I nspect i on Company
Submi t document at i on t hat t he coat i ng i nspect i on company t hat wi l l be per f or mi ng al l coat i ng i nspect i on f unct i ons i s cer t i f i ed by SSPC t o t he r equi r ement s of SSPC QP 5 pr i or t o cont r act awar d, and shal l r emai n cer t i f i ed whi l e accompl i shi ng any coat i ng i nspect i on f unct i ons. The coat i ng i nspect i on company must r emai n so cer t i f i ed f or t he dur at i on of t he pr oj ect . I f a coat i ng i nspect i on company' s cer t i f i cat i on expi r es, t he f i r m wi l l not be al l owed t o per f or m any i nspect i on f unct i ons, and al l sur f ace pr epar at i on and coat i ng appl i cat i on wor k must st op, unt i l t he cer t i f i cat i on i s r ei ssued. Request s f or ext ensi on of t i me f or any del ay t o t he compl et i on of t he pr oj ect due t o an i nact i ve cer t i f i cat i on wi l l not be consi der ed and l i qui dat ed damages wi l l appl y. Not i f y t he Cont r act i ng Of f i cer of any change i n coat i ng i nspect i on company cer t i f i cat i on st at us.
1. 4. 6. 4 Qual i f i cat i ons of QC Speci al i s t Coat i ng I nspect or
Submi t document at i on t hat each coat i ng i nspect or i s empl oyed, and qual i f i ed to SSPC QP 5, Level I I I , by t he sel ect ed coat i ng i nspect i on company. Each i nspect or shal l r emai n empl oyed by t he coat i ng i nspect i on company whi l e per f or mi ng any coat i ng i nspect i on f unct i ons.
1. 4. 6. 5 Qual i f i cat i ons Of I ndi v i dual s Per f or mi ng Abr asi ve Bl ast i ng
Submi t name, addr ess, and t el ephone number of each per son t hat wi l l be per f or mi ng abr asi ve bl ast i ng. Submi t document at i on t hat each bl ast er i s qual i f i ed by SSPC t o t he SSPC C- 7 Dr y Abr asi ve Bl ast er Qual i f i cat i on Pr ogr am. Each bl ast er shal l r emai n qual i f i ed dur i ng t he ent i r e per i od of abr asi ve bl ast i ng, and t he Cont r act i ng Of f i cer shal l be not i f i ed of any change i n qual i f i cat i on st at us.
1. 4. 6. 6 Qual i f i cat i ons of Test i ng Labor at or y f or Coat i ngs
Submi t name, addr ess, t el ephone number , FAX number , and e- mai l addr ess of t he i ndependent t hi r d par t y l abor at or y sel ect ed t o per f or m t est i ng of
SECTI ON 09 97 13. 27 Page 7 coat i ng sampl es f or compl i ance wi t h speci f i cat i on r equi r ement s. Submi t document at i on t hat l abor at or y i s r egul ar l y engaged i n t est i ng of pai nt sampl es f or conf or mance wi t h speci f i cat i ons, and t hat per sons per f or mi ng anal yses ar e qual i f i ed.
1. 4. 6. 7 Qual i f i cat i ons of Test i ng Labor at or y f or Abr asi ve
Submi t name, addr ess, t el ephone number , FAX number , and e- mai l addr ess of t he i ndependent t hi r d par t y l abor at or y sel ect ed t o per f or m t est i ng of abr asi ve f or compl i ance wi t h speci f i cat i on r equi r ement s. Submi t document at i on t hat l abor at or y has exper i ence i n t est i ng sampl es of abr asi ve f or conf or mance wi t h speci f i cat i ons, and t hat per sons per f or mi ng anal yses ar e qual i f i ed.
1. 4. 6. 8 Qual i f i cat i ons of Coat i ng Cont r act or s
Al l Cont r act or s and Subcont r act or s t hat per f or m sur f ace pr epar at i on or coat i ng appl i cat i on shal l be cer t i f i ed t o ei t her I SO 9001 or SSPC QP 1 and SSPC QS 1 pr i or t o cont r act awar d, and shal l r emai n cer t i f i ed whi l e accompl i shi ng any sur f ace pr epar at i on or coat i ng appl i cat i on. The pai nt i ng Cont r act or s and pai nt i ng Subcont r act or s must r emai n so cer t i f i ed f or t he dur at i on of t he pr oj ect . I f a Cont r act or ' s or Subcont r act or ' s cer t i f i cat i on expi r es, t he f i r m wi l l not be al l owed t o per f or m any wor k unt i l t he cer t i f i cat i on i s r ei ssued. Request s f or ext ensi on of t i me f or any del ay t o t he compl et i on of t he pr oj ect due t o an i nact i ve cer t i f i cat i on wi l l not be consi der ed and l i qui dat ed damages wi l l appl y. Not i f y t he Cont r act i ng Of f i cer of any change i n Cont r act or cer t i f i cat i on st at us.
1. 4. 6. 9 Joi nt Seal ant Mat er i al s
Pr ovi de manuf act ur er ' s cer t i f i cat i on of conf or mance t o cont r act requirements.
1. 4. 6. 10 Coat i ng Mat er i al s
Pr ovi de manuf act ur er ' s cer t i f i cat i on of conf or mance t o cont r act requirements.
1. 4. 6. 11 Coat i ng Syst em Component Compat i bi l i t y
Pr ovi de cer t i f i cat i on f r om each manuf act ur er of component s of t he coat i ng syst em, epoxy pr i mer , epoxy i nt er medi at e, and pol yur et hane t opcoat , t hat t he suppl i ed coat i ng mat er i al i s sui t abl e f or use i n t he speci f i ed coat i ng syst em. Each manuf act ur er shal l i dent i f y t he speci f i c pr oduct s, i ncl udi ng manuf act ur er ' s name, whi ch t hei r pr oduct may be used wi t h. The cer t i f i cat i on shal l pr ovi de t he name of t he manuf act ur er t hat wi l l pr ovi de t echni cal suppor t f or t he ent i r e syst em. When al l coat i ng mat er i al s ar e manuf act ur ed by one manuf act ur er , t hi s cer t i f i cat i on i s not r equi r ed.
1. 4. 6. 12 Non- met al l i c Abr asi ve
Pr ovi de manuf act ur er ' s cer t i f i cat i on t hat t he mat er i al s ar e cur r ent l y appr oved by t he Naval Sea Syst ems Command and l i s t ed on t he Qual i f i ed Pr oduct s Li st s ( QPL) f or t he speci f i ed mat er i al s.
1. 4. 6. 13 Met al l i c Abr asi ve
Pr ovi de manuf act ur er ' s cer t i f i cat i on of conf or mance t o cont r act r equi r ement s and pr ovi de copi es of t est r esul t s.
SECTI ON 09 97 13. 27 Page 8
1. 4. 7 Pr ot ect i ve Coat i ng Speci al i s t ( PCS)
The PCS shal l be consi der ed a QC Speci al i s t and shal l r epor t t o t he QC Manager , as speci f i ed i n Sect i on 01 45 00. 00 20 QUALI TY CONTROL. The PCS shal l appr ove al l submi t t al s pr i or t o submi ssi on t o t he QC Manager f or appr oval or submi ssi on t o t he gover nment f or appr oval .
1. 4. 8 Pr e- Appl i cat i on Meet i ng
Af t er appr oval of submi t t al s but pr i or t o t he i ni t i at i on of coat i ng wor k, Cont r act or r epr esent at i ves, i ncl udi ng at a mi ni mum, pr oj ect super i nt endent and QC manager , pai nt f or eman, coat i ng i nspect or , and PCS shal l have a pr e- appl i cat i on coat i ng pr epar at or y meet i ng. Thi s meet i ng shal l be i n addi t i on t o t he pr e- const r uct i on conf er ence. Speci f i c i t ems addr essed shal l i ncl ude: cor r ect i ve act i on r equi r ement s and pr ocedur es, coat i ng wor k pl an, saf et y pl an, coor di nat i on wi t h ot her Sect i ons, i nspect i on st andar ds, i nspect i on r equi r ement s and t ool s, t est pr ocedur es, envi r onment al cont r ol syst em, saf et y pl an, and t est l ogs. Not i f y Cont r act i ng Of f i cer at l east t en days pr i or t o meet i ng.
1. 5 PRODUCT DATA
1. 5. 1 Joi nt Seal ant I nst r uct i ons
Submi t manuf act ur er ' s pr i nt ed i nst r uct i ons i ncl udi ng det ai l ed appl i cat i on pr ocedur es, mi ni mum and maxi mum appl i cat i on t emper at ur es, and cur i ng pr ocedur es. I nc l ude Saf et y Dat a Sheet s ( SDS) f or mat er i al s t o be used at t he j ob s i t e i n accor dance wi t h 29 CFR 1926. 59.
1. 5. 2 Coat i ng Syst em I nst r uct i ons
Submi t manuf act ur er ' s pr i nt ed i nst r uct i ons i ncl udi ng det ai l ed mi xi ng and appl i cat i on pr ocedur es, number and t ypes of coat s r equi r ed, mi ni mum and maxi mum appl i cat i on t emper at ur es, and cur i ng pr ocedur es. I ncl ude Saf et y Dat a Sheet s ( SDS) f or mat er i al s t o be used at t he j ob s i t e i n accor dance with 29 CFR 1926. 59.
1. 6 DELI VERY AND STORAGE
Shi p, st or e, and handl e mat er i al s i n accor dance wi t h SSPC PA 1, and as modi f i ed i n t hi s Sect i on. Mai nt ai n t emper at ur e i n st or age spaces bet ween 40 and 85 degr ees F, and ai r t emper at ur e mor e t han 5 degr ees F above t he dew- poi nt at al l t i mes. I nspect mat er i al s f or damage pr i or t o use and r et ur n non- compl i ant mat er i al s t o manuf act ur er . Remove mat er i al s wi t h expi r ed shel f l i f e f r om gover nment pr oper t y i mmedi at el y and not i f y t he Cont r act i ng Of f i cer .
I f mat er i al s ar e appr oachi ng shel f l i f e expi r at i on and an ext ensi on i s desi r ed, sampl es may be sent t o t he manuf act ur er , al ong wi t h compl et e r ecor ds of st or age condi t i ons, wi t h a r equest f or shel f l i f e ext ensi on. I f t he manuf act ur er f i nds t he sampl es and st or age dat a sui t abl e f or shel f l i f e ext ensi on, t he manuf act ur er may i ssue an ext ensi on, r ef er enci ng t he pr oduct eval uat i on and t he r evi ew of st or age r ecor ds. Pr oduct s may not be ext ended l onger t han al l owed i n t he pr oduct speci f i cat i on.
1. 7 COATI NG HAZARDS
Ensur e t hat empl oyees ar e t r ai ned i n al l aspect s of t he saf et y pl an.
SECTI ON 09 97 13. 27 Page 9
Speci f i ed coat i ngs may have pot ent i al heal t h hazar ds i f i ngest ed or i mpr oper l y handl ed. The coat i ng manuf act ur er ' s wr i t t en saf et y pr ecaut i ons shal l be f ol l owed t hr oughout mi xi ng, appl i cat i on, and cur i ng of t he coat i ngs. Dur i ng al l c l eani ng, c l eanup, sur f ace pr epar at i on, and pai nt appl i cat i on phases, ensur e t hat empl oyees ar e pr ot ect ed f r om t oxi c and hazar dous chemi cal agent s whi ch exceed concent r at i ons i n 29 CFR 1910. 1000.
Compl y wi t h r espi r at or y pr ot ect i on r equi r ement s i n 29 CFR 1910. 134. The CI H shal l appr ove wor k pr ocedur es and per sonal pr ot ect i ve equi pment .
1. 8 JOB SI TE REFERENCES
Make avai l abl e t o t he Cont r act i ng Of f i cer at l east one copy each of
ASTM D3276, ASTM D3925, ASTM D4285, ASTM D7127, SSPC SP COM, SSPC SP 1,
SSPC 7/ NACE No. 4, SSPC SP 10/ NACE No. 2, SSPC PA 1, SSPC PA 2, SSPC Gui de 6, SSPC VI S 1, SSPC QP 1, SSPC QS 1, and an SSPC Cer t i f i ed Cont r act or Eval uat i on For m at t he j ob s i t e.
PART 2 PRODUCTS
2. 1 JOI NT SEALANT
TT- S- 00230, Type I I , Cl ass B
2. 2 COATI NG SYSTEM
Al t er nat e syst ems or pr oduct s wi l l not be consi der ed. Al l pr i mer , i nt er medi at e coat and t opcoat mat er i al s shal l be suppl i ed by one suppl i er .
The ent i r e coat i ng syst em i s i nt ended t o be appl i ed i n t he f i el d.
Al t er nat i vel y, sur f ace pr epar at i on may be accompl i shed i n t he shop, f ol l owi ng al l t emper at ur e, humi di t y, and t est i ng r equi r ement s l i s t ed her ei n, f ol l owed by an appl i cat i on of a hol d- pr i mer . Remove al l shop- appl i ed pr i mer pr i or t o f i nal f i el d sur f ace pr epar at i on and coat i ng syst em appl i cat i on. Adj ust al l shop pr epar at i on t o avoi d conf l i c t s wi t h f i nal sur f ace pr epar at i on r equi r ement s.
The Mi l i t ar y speci f i cat i on epoxy and pol yur et hane pr oduct s speci f i ed i n t hi s Sect i on do not r equi r e appr oval f or l i s t i ng on t he QPL pr i or t o cont r act awar d, as i ndi cat ed i n par agr aph 3. 2 of MIL-DTL-24441 and par agr aph 3. 1 of MIL-PRF-85285 . Test i ng of pr oduct s by an i ndependent l abor at or y t o t he QUALI FI CATI ON I NSPECTI ON r equi r ement s of MIL-DTL-24441 and MIL-PRF-85285 pr i or t o cont r act awar d i s r equi r ed. See speci f i c submi t t al r equi r ement s i n par agr aph QUALI TY ASSURANCE.
2. 2. 1 Zi nc- Ri ch Epoxy Pr i mer Coat
Epoxy pol yami de, MIL-DTL-24441/19 ( For mul a 159, Type I I I ) .
2. 2. 2 Epoxy I nt er medi at e Coat
Epoxy pol yami de, MIL-DTL-24441/31 ( For mul a 152, Type I V, Whi t e ( Ti nt ed) ) .
Ti nt t o appr oxi mat el y FED-STD-595 col or number 27778 par chment usi ng pi gment di sper si ons pr epar ed f or epoxy pai nt t i nt i ng. Manuf act ur er shal l t i nt mat er i al and appr opr i at el y l abel . Al l ot her r equi r ement s of t hi s Mi l i t ar y Speci f i cat i on appl y.
2. 2. 3 Pol yur et hane Topcoat
Pol yur et hane coat i ng t opcoat of MIL-PRF-85285 , Type I I , Whi t e FED-STD-595 col or number 17925.
SECTI ON 09 97 13. 27 Page 10
Modi f y par agr aph 3. 6. 4 of MIL-PRF-85285 , Vi scosi t y and Pot Li f e, as f ol l ows:
The vi scosi t y of t he admi xed coat i ng, when t est ed i n accor dance wi t h ASTM D1200 t hr ough a No. 4 For d cup, shal l be as f ol l ows:
Ti me f r om mi x ( mi ni mum) Maxi mum t i me t hr ough a No. 4 For d cup
Initially 30 seconds
2 hour s 60 seconds
4 hour s No gel
Modi f y par agr aph 3. 7. 1 of MIL-PRF-85285 , Dr yi ng Ti me, as f ol l ows:
When appl i ed by spr ay t echni ques and when t est ed i n accor dance wi t h ASTM D1640/ D1640M, t he coat i ng shal l be set - t o- t ouch wi t hi n f our hour s and dr y- har d wi t hi n ei ght hour s ( see 4. 6 and t abl e I ) .
2. 3 COLOR I DENTI FI CATI ON OF FUEL HANDLI NG AND STORAGE FACI LI TI ES
Pi pi ng, condui t , and t ank i dent i f i cat i on shal l be i n accor dance wi t h MIL-STD-161 . Mar k di r ect i on of f l ui ds i n accor dance wi t h MIL-STD-161 . The NATO symbol f or JP- 8 i s F- 34.
2. 4 COATI NG SAMPLE COLLECTI ON AND SHI PPI NG KI T
Pr ovi de a k i t t hat cont ai ns one quar t can f or t he base of each coat i ng mat er i al , an appr opr i at el y s i zed can f or each act i vat or , di ppi ng cups f or each component t o be sampl ed, a shi ppi ng box s i zed f or t he sampl es t o t o be shi pped, and packi ng mat er i al . Mar k cans f or t he appr opr i at e component .
Pr ovi de shi ppi ng document s, i ncl udi ng ei t her pr e- pai d shi ppi ng or a shi pper number t hat can be used by t he QC Manager t o ar r ange pi ckup, addr essed t o t he appr oved coat i ng t est i ng l abor at or y.
2. 5 ABRASI VE SAMPLE COLLECTI ON AND SHI PPI NG KI T
Pr ovi de a k i t t hat cont ai ns one sui t abl e pl ast i c bag or cont ai ner f or each sampl e t o be col l ect ed. Mar k cont ai ner s f or t he appr opr i at e component .
Pr ovi de shi ppi ng document s, i ncl udi ng ei t her pr e- pai d shi ppi ng or a shi pper number t hat can be used by t he QC Manager t o ar r ange pi ckup, addr essed t o t he appr oved coat i ng t est i ng l abor at or y.
2. 6 TEST KI TS
2. 6. 1 Test Ki t f or Measur i ng Chl or i de, Sul f at e and Ni t r at e I ons on St eel and Coat ed Sur f aces
Pr ovi de t est k i t s cal l ed CHLOR* TEST CSN Sal t s, as manuf act ur ed by CHLOR* RI D I nt er nat i onal I nc. of Chandl er , Ar i zona ( www.chlor-rid.com ) or equal . An " equal " t est k i t shal l meet t he f ol l owi ng r equi r ement s:
SECTI ON 09 97 13. 27 Page 11
a. Ki t cont ai ns al l mat er i al s, suppl i es, t ool s and i nst r uct i ons f or f i el d t est i ng and on- s i t e quant i t at i ve eval uat i on of chl or i de, sul f at e and ni t r at e i ons;
b. Ki t ext r act sol ut i on i s aci di c, f act or y pr e- measur ed, pr e- packaged, and of uni f or m concent r at i on;
c. Ki t component s and sol ut i ons ar e mer cur y f r ee and envi r onment al l y friendly;
d. Ki t cont ai ns new mat er i al s and sol ut i ons f or each t est ext r act i on;
e. Ext r act i on t est cont ai ner ( vessel , s l eeve, cel l . et c. ) cr eat es a seal ed, encapsul at ed envi r onment dur i ng sal t i on ext r act i on;
f . Test ext r act cont ai ner i s sui t abl e f or t est i ng t he f ol l owi ng st eel sur f aces: hor i zont al ( up/ down conf i gur at i on) , ver t i cal , f l at , cur ved, smoot h, pi t t ed, and r ough;
g. Al l sal t i on concent r at i ons ar e di r ect l y measur ed i n mi cr ogr ams per squar e cent i met er .
2. 6. 2 Test Ki t f or I dent i f y i ng Ami ne Bl ush on Epoxy Sur f aces
Af t er coat i ng and/ or pr i mer has har dened and pr i or t o appl y i ng t he next coat , t est f or unr eact ed ami nes usi ng t he AMI NE BLUSH CHECK, manuf act ur ed by El comet er , Rochest er Hi l l s , Mi chi gan, or equal . To be consi der ed f or appr oval as an " equal " t est k i t i t shal l meet t he f ol l owi ng r equi r ement s:
a. Be a compl et el y sel f - cont ai ned f i el d t est k i t wi t h al l mat er i al s , suppl i es, t ool s and i nst r uct i ons t o per f or m t est s and i ndi cat e t he pr esence of unr eact ed ami nes;
b. Use an i dent i f i abl e, consi st ent , uni f or m, pr e- packaged, f act or y pr e- measur ed i ndi cat i ng sol ut i on;
c. Ki t cont ai ns no mer cur y or l ead and i s envi r onment al l y f r i endl y;
d. Ki t cont ai ns a sol ut i on of an unr eact ed ami ne f or t he pur pose of " sel f checki ng" t he i ndi cat or sol ut i on;
2. 7 ABRASIVE
The r ef er enced abr asi ve speci f i cat i ons have maxi mum l i mi t s f or sol ubl e sal t s cont ami nat i on, however , t hi s maxi mum l evel of cont ami nat i on does not guar ant ee t hat cont ami nat i on wi l l not be t r ansf er r ed t o t he st eel sur f ace dur i ng abr asi ve bl ast i ng. Ot her f act or s such as on- si t e handl i ng and r ecycl i ng can al l ow cont ami nat i on of abr asi ve. Cont r act or s ar e caut i oned t o ver i f y t hat t he chosen abr asi ve, al ong wi t h wor k and st or age pr ocesses, al l ow t he f i nal sur f ace c l eanl i ness r equi r ement s t o be achi eved.
Successf ul t est i ng of chl or i des i n abr asi ve does not negat e t he f i nal accept ance t est i ng of st eel sur f aces.
2. 7. 1 Non- met al l i c Abr asi ve
Conf or m t o MIL-A-22262 , Type I ( I nor gani c mat er i al s) . Abr asi ve shal l be appr oved by t he Naval Sea Syst ems Command and l i s t ed on t he appr opr i at e Qual i f i ed Pr oduct s Li st ( QPL) f or t he speci f i ed mat er i al s. Use sampl i ng
SECTI ON 09 97 13. 27 Page 12 pr ocedur es and t est i ng f r equenci es as pr escr i bed i n MIL-A-22262 . Use abr asi ve t hat i s speci f i cal l y sel ect ed and gr aded t o pr ovi de a shar p, angul ar pr of i l e t o t he speci f i ed dept h. Do not use ungr aded abr asi ve.
Make adj ust ment s t o pr ocesses or abr asi ve gr adat i on t o achi eve speci f i ed sur f ace pr of i l e. Recycl ed non- met al l i c abr asi ve shal l meet al l r equi r ement s of t he speci f i cat i on each t i me t hat i t i s pl aced i n t he bl ast pot.
2. 7. 2 Met al l i c Abr asi ve
2. 7. 2. 1 New and Remanuf act ur ed St eel Gr i t
Conf or m t o t he chemi cal and physi cal pr oper t i es of SSPC AB 3 Cl ass 1 ( St eel ) onl y. Cl ass 2 ( I r on) abr asi ve shal l not be used.
To devel op a sui t abl e wor k mi x f r om new st eel abr asi ve, a mi ni mum of 200 - 400 r ecycl es i s r equi r ed, t her ef or e, i t i s advant ageous f or a Cont r act or t o use r emanuf act ur ed st eel gr i t or gr i t r ecl ai med f r om a pr evi ous pr oj ect .
Such gr i t shal l be consi der ed t o conf or m i f i t can be t r aced t o new gr i t conf or mi ng t o SSPC AB 3 Cl ass 1 and i t meet s al l c l eanl i ness r equi r ement s of SSPC AB 3 Cl ass 1 when br ought t o t he cur r ent j obsi t e. Submi t one r epr esent at i ve sampl e of t hi s wor k mi x t o t he l abor at or y f or t est i ng, al ong wi t h sampl es of new mat er i al . Accept ance and use of t hi s wor k mi x shal l not be used t o j ust i f y any devi at i on f r om sur f ace pr epar at i on requirements.
2. 7. 2. 2 Recycl ed St eel Gr i t
Conf or m t o t he chemi cal and physi cal pr oper t i es of SSPC AB 2
2. 8 WHI TE ALUMI NUM OXI DE NON- SKI D GRI T
Si ze #60, dust f r ee ( washed and dr y) , mi ni mum 99 per cent pur e, havi ng t he f ol l owi ng s i eve anal ysi s when t est ed i n accor dance wi t h ASTM E11 usi ng a
2. 2 poundsample:
Si eve # Per cent Ret ai ned
40 0
50 15-40
60 60-85
PART 3 EXECUTI ON
Per f or m al l wor k, r ewor k, and r epai r i n accor dance wi t h appr oved pr ocedur es i n t he Coat i ng Wor k Pl an.
3. 1 REMOVAL OF COATI NGS CONTAI NI NG HAZARDOUS MATERI ALS
Coat i ngs cont ai ni ng hazar dous mat er i al s and i dent i f i ed f or di st ur bance dur i ng sur f ace pr epar at i on, i ncl udi ng r emoval , shal l be handl ed i n accor dance wi t h Sect i on 02 83 00 LEAD REMEDI ATI ON. Coor di nat e sur f ace pr epar at i on r equi r ement s f r om Sect i on 02 83 00 LEAD REMEDI ATI ON wi t h t hi s Section.
SECTI ON 09 97 13. 27 Page 13
3. 2 COATI NG AND ABRASI VE SAMPLE COLLECTI ON AND TESTI NG
Sampl e and t est mat er i al s del i ver ed t o t he j obsi t e. Not i f y Cont r act i ng Of f i cer t hr ee days i n advance of sampl i ng. The QC Manager and ei t her t he PCS or coat i ng i nspect or shal l wi t ness al l sampl i ng.
3. 2. 1 Coat i ng Sampl e Col l ect i on
Pr ovi de a sampl e col l ect i on k i t as r equi r ed i n par agr aph COATI NG SAMPLE COLLECTI ON AND SHI PPI NG KI T. Fr om each l ot , obt ai n a one quar t sampl e of each base mat er i al , and pr opor t i onal sampl es of each act i vat or based on mi x r at i o, by r andom sel ect i on f r om seal ed cont ai ner s i n accor dance wi t h ASTM D3925. Pr i or t o sampl i ng, mi x cont ent s of each seal ed cont ai ner t o ensur e uni f or mi t y. As an al t er nat i ve t o col l ect i ng smal l sampl es f r om ki t s, ent i r e k i t s may be r andoml y sel ect ed and shi pped t o l abor at or y, obser vi ng al l r equi r ement s f or wi t nessi ng and t r aceabi l i t y . For pur poses of qual i t y conf or mance i nspect i on, a l ot i s def i ned as t hat quant i t y of mat er i al s f r om a s i ngl e, uni f or m bat ch pr oduced and of f er ed f or del i ver y at one t i me. A bat ch i s def i ned as t hat quant i t y of mat er i al pr ocessed by t he manuf act ur er at one t i me and i dent i f i ed by number on t he l abel . I dent i f y sampl es by desi gnat ed name, speci f i cat i on number , bat ch number , pr oj ect cont r act number , sampl e dat e, i nt ended use, and quant i t y i nvol ved. The QC manager wi l l t ake possessi on of t he packaged sampl es, cont act t he shi ppi ng company t o ar r ange f or pi ckup, and r el i nqui sh t he sampl es onl y t o t he shi ppi ng r epr esent at i ve f or shi pment t o t he appr oved l abor at or y f or t est i ng as r equi r ed by t he par agr aph COATI NG SAMPLE TEST REPORTS.
3. 2. 2 Abr asi ve Sampl e Col l ect i on
Pr ovi de a sampl e col l ect i on k i t as r equi r ed i n par agr aph ABRASI VE SAMPLE COLLECTI ON AND SHI PPI NG KI T. For pur poses of qual i t y conf or mance i nspect i on, a l ot shal l consi st of al l abr asi ve mat er i al s of t he same t ype f r om a s i ngl e, uni f or m bat ch pr oduced and of f er ed f or del i ver y at one t i me. Obt ai n sampl es of each abr asi ve l ot usi ng t he sampl i ng t echni ques and schedul e of MIL-A-22262 . The addi t i on of any subst ance t o a bat ch shal l const i t ut e a new l ot . I dent i f y sampl es by desi gnat ed name, speci f i cat i on number , l ot number , pr oj ect cont r act number , sampl e dat e, i nt ended use, and quant i t y i nvol ved. The QC manager wi l l t ake possessi on of t he packaged sampl es, cont act t he shi ppi ng company t o ar r ange f or pi ckup, and r el i nqui sh t he sampl es onl y t o t he shi ppi ng r epr esent at i ve f or shi pment t o t he appr oved l abor at or y f or t est i ng as r equi r ed by t he par agr aph ABRASI VE SAMPLE TEST REPORTS.
3. 2. 3 Coat i ng Sampl e Test Repor t s
Submi t t est r esul t s f or each l ot of coat i ng mat er i al del i ver ed t o t he j obsi t e. Test sampl es of pr i mer , i nt er medi at e, and t opcoat mat er i al s f or compl i ance wi t h r equi r ement s of Tabl e I . Rej ect ent i r e l ot r epr esent ed by sampl es t hat f ai l one or mor e t est s, sel ect new l ot s, and t est sampl es.
3. 2. 4 Abr asi ve Sampl e Test Repor t s
Submi t t est r esul t s f or each l ot of abr asi ve del i ver ed t o t he j obsi t e.
Test sampl es of met al l i c abr asi ve t o t he r equi r ement s of par agr aph REQUI REMENTS of SSPC AB 3, except par agr aph 4. 1. 5 DURABI LI TY. Test sampl es of non- met al l i c abr asi ve as r equi r ed i n par agr aph QUALI TY CONFORMANCE I NSPECTI ON of MIL-A-22262 . Rej ect ent i r e l ot r epr esent ed by sampl es t hat f ai l one or mor e t est s, sel ect new l ot s, and t est sampl es.
SECTI ON 09 97 13. 27 Page 14
3. 3 SURFACES TO BE COATED
Coat ext er i or sur f aces of t ank i ncl udi ng st eel r oof , shel l , l egs, st ai r , r ai l i ng, and ot her ext er i or appur t enances.
3. 4 LIGHTING
Pr ovi de l i ght i ng f or al l wor k ar eas as pr escr i bed i n SSPC Gui de 12.
3. 5 ENVI RONMENTAL CONDI TI ONS
3. 5. 1 Containment
Desi gn and pr ovi de a cont ai nment syst em f or t he capt ur e, cont ai nment , col l ect i on, st or age and di sposal of t he wast e mat er i al s gener at ed by t he wor k under t hi s Sect i on, t o meet t he r equi r ement s of SSPC Gui de 6, Cl ass 2.
Vapor concent r at i ons shal l be kept at or bel ow 10 per cent of Lower Expl osi ve Li mi t ( LEL) at al l t i mes. Cont ai nment may be desi gned as f i xed cont ai nment f or compl et e st r uct ur e or por t abl e cont ai nment f or sect i ons of st r uct ur e, however , cont ai nment shal l r emai n i n any one pl ace f r om begi nni ng of abr asi ve bl ast i ng t hr ough i ni t i al cur e of coat i ng. Wast e mat er i al s cover ed by t hi s par agr aph shal l not i ncl ude any mat er i al or r esi due f r om r emoval of coat i ngs cont ai ni ng l ead, chr omi um, cadmi um, PCB, or any ot her hazar dous mat er i al .
I t i s t he Cont r act or s r esponsi bi l i t y t o i nsur e t he f easi bi l i t y and wor kabi l i t y of t he cont ai nment syst em. The Cont r act or shal l per f or m hi s oper at i ons and wor k schedul e i n a manner as t o mi ni mi ze l eakage of t he cont ai nment syst em. The cont ai nment syst em shal l be pr oper l y mai nt ai ned and shal l not devi at e f r om t he appr oved dr awi ngs. I f t he cont ai nment syst em f ai l s t o f unct i on sat i sf act or i l y , t he Cont r act or shal l suspend al l oper at i ons, except t hose r equi r ed t o mi ni mi ze adver se i mpact on t he envi r onment or gover nment pr oper t y. Oper at i ons shal l not r esume unt i l modi f i cat i ons have been made t o cor r ect t he cause of t he f ai l ur e.
3. 5. 2 Aut omat ed Moni t or i ng Requi r ement s
Pr ovi de cont i nuous moni t or i ng of t emper at ur e, r el at i ve humi di t y, and dew poi nt dat a at per t i nent poi nt s on t he st r uct ur e, dur i ng sur f ace pr epar at i on, coat i ng appl i cat i on, and i ni t i al cur e. Locat e sensor s t o pr ovi de per t i nent dat a f or t he sur f ace pr epar at i on and coat appl i cat i on bei ng per f or med. Moni t or any heat i ng, cool i ng, or dehumi di f i cat i on equi pment used. Make dat a avai l abl e t o t he Cont r act i ng Of f i cer t hr ough I nt er net access. Pr ovi de moni t or i ng equi pment t o per f or m as f ol l ows:
a. Dat a i s col l ect ed i n t he f i el d uni t i n one mi nut e i ncr ement s, and avai l abl e f or downl oad ( on- si t e) i n a st andar d f or mat . Cont r act or shal l col l ect t hi s dat a and make avai l abl e t o t he Cont r act i ng Of f i cer ;
b. Moni t or i ng equi pment shal l have backup power such t hat dat a col l ect i on and t r ansmi ssi on t o web ser ver wi l l be uni nt er r upt ed dur i ng t he ent i r e per i od of t he dehumi di f i cat i on r equi r ement ;
c. Moni t or i ng equi pment shal l have capabi l i t y t o measur e sur f ace t emper at ur es at a mi ni mum of f our l ocat i ons anywher e on a 150 f oot di amet er by 50 f oot hi gh t ank;
d. Moni t or i ng equi pment shal l have capabi l i t y t o measur e i nt er i or and ext er i or dr y bul b t emper at ur e ( DB) , r el at i ve humi di t y ( RH) , and
SECTI ON 09 97 13. 27 Page 15 dewpoi nt t emper at ur e ( DP) ;
e. Dat a shal l be avai l abl e cont i nuousl y t hr ough secur e I nt er net connect i on, usi ng wi del y avai l abl e web br owser s;
f . I nt er net accessi bl e dat a shal l be col l ect ed and st or ed i n maxi mum 15 mi nut e i ncr ement s, and l ag t i me bet ween dat a col l ect i on and onl i ne avai l abi l i t y shal l be no gr eat er t han 70 mi nut es;
g. I nt er net accessi bl e dat a shal l be avai l abl e f or v i ewi ng onl i ne i n t abul ar f or mat , and gr aphi cal f or mat usi ng sel ect ed dat a;
h. I nt er net accessi bl e dat a shal l be avai l abl e f or downl oad i n user - def i ned segment s, or ent i r e pr oj ect t o dat e, i n a st andar d f or mat usabl e by Mi cr osof t Excel and ot her spr eadsheet pr ogr ams.
i . I nt er net - based cont r ol s shal l pr ovi de al er t s t o pr e- desi gnat ed par t i es t hr ough emai l messagi ng;
j . I nt er net - based cont r ol s shal l moni t or dat a upl oads f r om f i el d uni t and i ssue al er t i f dat a not i ni t i at ed wi t hi n 60 mi nut es of l ast upl oad;
k. I nt er net - based cont r ol s shal l moni t or oper at i on of DH equi pment and i ssues al er t when power r emai ns of f f or mor e t han 15 seconds, or i f pr e- det er mi ned t emper at ur e, RH, or DP condi t i ons ar e exceeded;
The r equi r ement s l i s t ed her e wer e devel oped ar ound t he Munt er s Exact ai r e Moni t or i ng Syst em, as t hi s was t he onl y moni t or i ng syst em havi ng I nt er net connect i v i t y known t o be commer ci al l y avai l abl e. Ther e i s no r equi r ement f or connect i v i t y of t he moni t or i ng syst em t o cont r ol t he DH equi pment , t her ef or e, any combi nat i on of equi pment havi ng t he r equi r ed f unct i onal i t y wi l l be accept ed.
3. 6 SURFACE PREPARATI ON
3. 6. 1 Abr asi ve Bl ast i ng Equi pment
Use abr asi ve bl ast i ng equi pment of convent i onal ai r , f or ce- f eed, or pr essur e t ype. Mai nt ai n a mi ni mum pr essur e of 95 psi g at nozzl e. Conf i r m t hat ai r suppl y f or abr asi ve bl ast i ng i s f r ee of oi l and moi st ur e when t est ed i n accor dance wi t h ASTM D4285. Test ai r qual i t y at each st ar t up, but i n no case l ess of t en t han ever y f i ve oper at i ng hour s.
3. 6. 2 Oper at i onal Eval uat i on of Abr asi ve
Test abr asi ve f or sal t cont ami nat i on and oi l cont ami nat i on as r equi r ed by t he appr opr i at e abr asi ve speci f i cat i on dai l y at st ar t up and ever y f i ve oper at i ng hour s t her eaf t er .
3. 6. 3 Sur f ace St andar d
I nspect sur f aces t o be coat ed, and sel ect pl at e wi t h s i mi l ar pr oper t i es and sur f ace char act er i st i cs f or use as a sur f ace st andar d. Bl ast c l ean one or more 1 f oot squar e st eel panel s as speci f i ed i n par agr aph SURFACE PREPARATI ON. Recor d bl ast nozzl e t ype and si ze, ai r pr essur e at nozzl e and compr essor , di st ance of nozzl e f r om panel , and angl e of bl ast t o est abl i sh pr ocedur es f or bl ast c l eani ng. Measur e sur f ace pr of i l e i n accor dance wi t h ASTM D7127. When t he sur f ace st andar d compl i es wi t h al l speci f i ed r equi r ement s, seal wi t h a c l ear coat pr ot ect ant . Use t he sur f ace st andar d
SECTI ON 09 97 13. 27 Page 16 f or compar i son t o abr asi ve bl ast ed sur f aces t hr oughout t he cour se of wor k.
3. 6. 4 Pr e- Pr epar at i on Test i ng f or Sur f ace Cont ami nat i on
Per f or m t est i ng, abr asi ve bl ast i ng, and t est i ng i n t he pr escr i bed or der .
3. 6. 4. 1 Pr e- Pr epar at i on Test i ng f or Oi l and Gr ease Cont ami nat i on
I nspect al l sur f aces f or oi l and/ or gr ease cont ami nat i on usi ng t wo or mor e of t he f ol l owi ng i nspect i on t echni ques: 1) Vi sual i nspect i on, 2) WATER BREAK TEST, 3) CLOTH RUB TEST. Rej ect oi l and/ or gr ease cont ami nat ed sur f aces, c l ean usi ng a wat er based pH neut r al degr easer i n accor dance wi t h SSPC SP 1, and r echeck f or cont ami nat i on unt i l sur f aces ar e f r ee of oi l and grease.
WATER BREAK TEST - Spr ay at omi zed mi st of di st i l l ed wat er ont o sur f ace, and obser ve f or wat er beadi ng. I f wat er " wet s" sur f ace r at her t han beadi ng up, sur f ace can be consi der ed f r ee of oi l or gr ease cont ami nat i on. Beadi ng of wat er ( wat er f or ms dr opl et s) i s evi dence of oi l or gr ease cont ami nat i on.
CLOTH RUB TEST - Rub a c l ean, whi t e, l i nt f r ee, cot t on c l ot h ont o sur f ace and obser ve f or di scol or at i on. To conf i r m oi l or gr ease cont ami nat i on i n l i ght l y st ai ned ar eas, a non- st ai ni ng sol vent may be used t o ai d i n oi l or gr ease ext r act i on. Any v i s i bl e di scol or at i on i s evi dence of oi l or gr ease contamination.
3. 6. 4. 2 Pr e- Pr epar at i on Test i ng f or Sol ubl e Sal t s Cont ami nat i on
Test sur f aces f or sol ubl e sal t s, and wash as r equi r ed, pr i or t o abr asi ve bl ast i ng. Sol ubl e sal t t est i ng i s al so r equi r ed i n par agr aph PRE- APPLI CATI ON TESTI NG FOR SOLUBLE SALTS CONTAMI NATI ON as a f i nal accept ance t est of pr epar ed sur f aces af t er abr asi ve bl ast i ng, and successf ul compl et i on of t hi s phase does not negat e t hat r equi r ement . Thi s phase i s r ecommended si nce pr e- pr epar at i on t est i ng and washi ng ar e gener al l y mor e advant ageous t han at t empt i ng t o r emove sol ubl e sal t cont ami nat i on af t er abr asi ve bl ast i ng. Ef f ect i ve r emoval of sol ubl e sal t s wi l l r equi r e r emoval of any bar r i er t o t he st eel sur f ace, i ncl udi ng r ust .
Thi s pr ocedur e may necessi t at e combi nat i ons of wet abr asi ve bl ast i ng, hi gh pr essur e wat er r i nsi ng, and cl eani ng usi ng a sol ut i on of wat er washi ng and sol ubl e sal t s r emover . The sol ubl e sal t s r emover shal l be aci di c, bi odegr adabl e, nont oxi c, noncor r osi ve, and af t er appl i cat i on, wi l l not i nt er f er e wi t h pr i mer adhesi on. Del ays bet ween t est i ng and pr epar at i on, or t est i ng and coat i ng appl i cat i on, may al l ow f or t he f or mat i on of new cont ami nat i on. Use pot abl e wat er , or pot abl e wat er modi f i ed wi t h sol ubl e sal t r emover , f or al l washi ng or wet abr asi ve bl ast i ng.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .