About this file

This document contains a price proposal form for a construction contract opportunity with the Department of the Navy Naval Facilities Engineering Command. The solicitation seeks indefinite delivery, indefinite quantity multiple award construction contracts for public works projects in Maine, including new construction, demolition, repair, renovation of buildings, infrastructure and systems. Work may include hazardous material abatement and work in explosive facilities. The base contract line item involves repair of two bulk storage tanks, including hazardous material removal, insulation removal, coating and finish replacement, component replacement, and signage installation. The contract also includes four optional line items for a fuel pump skid, fuel/water separator, fill station, and logo addition. Offerors must provide fixed prices for each line item and their combination. Pricing terms are firm-fixed and non-adjustable. The base period of performance is 215 days from award, with optional items extendable. Award is to multiple awardees.

View the file

Other files

File Type Posted
AMENDMENT 0004.pdf PDF
Amendment 0003 Attachment F_Rev1- Price Proposal Form - 1660646_ST19-0831 Repair Oil Storage Tanks.pdf PDF
Amendment 0003 SV Sign-in 21R1217.pdf PDF
Amendment 0003 PPI Attachment 95 - B72 Fuel Oil Water Seperator Asbuilt.pdf PDF
Amendment 0003 PPI Attachment 80B - PNSY A-102_PNSY-Kittery_IntExt-UT_InspectionRpt_2018-signed.pdf PDF
Amendment 0003 SOW_REV2 9-17-21 - 1660646_ST19-0831 Repair Oil Storage Tanks.pdf PDF
AMENDMENT 0003.pdf PDF
Amendment 0003 PPI Attachment 125 - B72 Repair Fuel Oil Storage Tanks.pdf PDF
Amendment 0003 PPI Attachment 80 - PNSY A-101_PNSY-Kittery_IntExt-UT_InspectionRpt_2018.pdf PDF
Amendment 0003 PPI Attachment 79B - A-102-BLDG72 - 2020 Inspection.pdf PDF
Amendment 0003 PPI Attachment 79 - A-101-BLDG72 - 2020 Inspection.pdf PDF
Amendment 0002 - PPI Attachment Q50 - Attachment 3.1 - Updated Coating Spec 09 97 13.27.pdf PDF
AMENDMENT 0002.pdf PDF
Amendment 0002 - PPI Attachment Q46 - Haz Material Survey Report-Final - Credere - 6-22-21.pdf PDF
Amendment 0002 - Attachment 4 - Submittal Register - Rev2.xls XLS spreadsheet
Amendment 0002 - PPI Attachment Q8 - Fuel Oil One-Line Drawing.pdf PDF
Amendment 0002 - PPI Attachment Q7 - Fuel Oil Skid Drawing.pdf PDF
Amendment 0001 - 5500 DBIDS Form.docx DOCX document
Amendment 0001 - Attachment 4 - Submittal Register - Rev1.xls XLS spreadsheet
AMENDMENT 0001.pdf PDF
Amendment 0001 - secnav 5512-1.pdf PDF
Amendment 0001 - Attachment 3 - Technical Specifications Rev2.pdf PDF
Amendment 0001 - Acceptable Forms of ID.docx DOCX document
Attachment D - SOW With OPTONS - ST19-0831 Repair Oil Storage Tanks.pdf PDF
Attachment 5 - Drawings.pdf PDF
Attachment C - Construction Design Exp.docx DOCX document
Attachment 2 -DIV1 Specs.pdf PDF
Attachment 4 - Submittal Register - 1660646.xls XLS spreadsheet
Attachment B - Past Performance Questionnaire.docx DOCX document
Attachment 3 - Technical Specifications Rev1.pdf PDF
Attachment A - Pre-Proposal Inquiry Log.doc DOC document
N4008521R1217.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE PROPOSAL FORM – ATTACHMENT F

PART 1 GENERAL

1.1 CONTRACT LINE ITEM NUMBERS

1.1.1 General Notes

1. This contract will be awarded as one lump sum with unit prices required for specifically selected work.

2. See Scope of Work for detailed item descriptions.

CLIN 0001 – BASE PRICE: CLIN 0001 will consist of a repair of the bulk storage tanks (A-101 and A-102) located at B72, including: hazardous material removal; removing insulation; removing and replacing the coatings and finish; repairing two stairs; repairing tank chime; replacing all tank components; repairing and restoring fuel tank containment; and install NFPA required stickers. CLIN 001 shall be the total amount for the Base Price complete and in accordance with the drawings and specifications.

CLIN 0001AA – Insulation Removal: Price for hazardous material removal and removing insulation, complete and in accordance with the drawings and specifications, but excluding work described in CLIN(s) 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0002, 0003, 0004 and 0005.

PRICE FOR ITEM 0001AA:

CLIN 0001AB – Abrasive Blasting: Price for removing the existing tank coatings and finish complete and in accordance with the drawings and specifications, but excluding work described in CLIN(s) 0001AA, 0001AC, 0001AD, 0001AE, 0001AF, 0002, 0003, 0004 and 0005.

PRICE FOR ITEM 0001AB:

CLIN 0001AC – Fuel Tank Coating: Price for replacing the coatings and finish and repairing two stairs complete and in accordance with the drawings and specifications, but excluding work described in CLIN(s) 0001AA, 0001AB, 0001AD, 0001AE, 0001AF, 0002, 0003, 0004 and 0005.

PRICE FOR ITEM 0001AC:

CLIN 0001AD – Fuel Tank Chime Repair: Price for repairing tank chime complete and in accordance with the drawings and specifications, but excluding work described in CLIN(s) 0001AA, 0001AB, 0001AC, 0001AE, 0001AF, 0002, 0003, 0004 and 0005.

PRICE FOR ITEM 0001AD:

CLIN 0001AE – Fuel Tank Components: Price for replacing all tank components and installing NFPA required stickers complete and in accordance with the drawings and specifications, but excluding work described in CLIN(s)

0001AA, 0001AB, 0001AC, 0001AD, 0001AF, 0002, 0003, 0004 and 0005

PRICE FOR ITEM 0001AE:

CLIN 0001AF – Concrete/Containment Repair: Price for hazardous material removal and removing insulation complete and in accordance with the drawings and specifications, but excluding work described in CLIN(s)

0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0002, 0003, 0004 and 0005

PRICE FOR ITEM 0001AF:

TOTAL PRICE FOR CLIN 0001: $

CLIN 0002 - OPTION 1, Fuel Oil Pump Skid: CLIN 0002 shall be the total amount for Option 2, Fuel Oil Pump

Skid, complete and in accordance with the drawings and specifications, but excluding work described in CLIN(s)

0001, 0003, 0004 and 0005.

TOTAL PRICE FOR CLIN 0002: $

CLIN 0003 - OPTION 2, Fuel Oil Water Separator: CLIN 0003 shall be the total amount for Option 3, Fuel Oil

Water Separator, complete and in accordance with the drawings and specifications, but excluding work described in

CLIN(s) 0001, 0002, 0004 and 0005.

TOTAL PRICE FOR CLIN 0003: $

CLIN 0004 – OPTION 3, Fuel Oil Fill Station: CLIN 0004 shall be the total amount for Option 4, Fuel Oil Fill

Station, complete and in accordance with the drawings and specifications, but excluding work described in CLIN(s)

0001, 0002, 0003, and 0005.

TOTAL PRICE FOR CLIN 0004: $

CLIN 0005 – OPTION 4, NAVFAC Logo: CLIN 0005 shall be the total amount for Option 5, NAVFAC Logo, complete and in accordance with the drawings and specifications, but excluding work described in CLIN(s) 0001, 0002, 0003, and 0004.

TOTAL PRICE FOR CLIN 0005: $

GRAND TOTAL PRICE FOR ALL CLINs 0001 THROUGH 0005: $

1.2 CONTRACT LINE ITEM NOTES

a. Submit offers using this Price Proposal Form and these Contract Line Item Notes.

b. Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for the options

(CLINs 0002 through 0005) to the total price for CLIN 0001. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s).

c. For CLINs 0002 through 0005, enter unit price and extended total in spaces provided. If there is a difference between the unit price and the extended total, the unit price will be held to be the intended price and the total recomputed accordingly. If an offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

d. A firm-fixed proposed price is required for all CLINs. No provision is made for economic price adjustment.

e. The Government reserves the unilateral right to award CLIN 0002 to the Contractor at the proposed price within One Hundred (100) calendar days after contract award. If awarded the period of performance will be increased by ninety (90) additional calendar days

f. The Government reserves the unilateral right to award CLIN 0003 to the Contractor at the proposed price within One Hundred (100) calendar days after contract award. If awarded the period of performance will be increased by sixty (60) additional calendar days

g. The Government reserves the unilateral right to award CLIN 0004 to the Contractor at the proposed price within One Hundred (100) calendar days after contract award. If awarded the period of performance will be increased by sixty (60) additional calendar days

h. The Government reserves the unilateral right to award CLIN 0005 to the Contractor at the proposed price within One Hundred (100) calendar days after contract award. If awarded the period of performance will be not be increased.

i. The performance period for the work required by base price (CLIN 0001) shall be two-hundred and fifteen

(215) Days from the date of award (this date includes 15 days for submission and approval of required bonds and insurance). If any or all option items are exercised, the contract completion date remains the same as that of the base price (CLIN 0001), as the work required by these options can be performed concurrent to the base work.

j. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

k. If any of the CLINs 0002-0005 are exercised, additional bonding and consent of surety is required.

Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all CLINs.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Document --