Attachment C - Construction Design Exp.docx

DOCX document 14 KB Posted

Attached to
Design-Build (DB)/Design-Bid-Build (DBB), Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) - Maine
Solicitation number
N4008521R1217
Issued by

About this file

This document contains an attachment and federal contract opportunity related to construction and design services. The attachment provides a project data sheet template to collect details on relevant past performance examples, including the firm name, location and type of work performed, award and completion dates, contract value, description of project and self-performed work. The federal contract opportunity is a solicitation for an indefinite delivery, indefinite quantity multiple award construction contract supporting the Naval Facilities Engineering Command Mid-Atlantic area of responsibility. The contract will encompass new construction, demolition, repair, alteration and renovation projects including administrative, industrial and medical facilities. Work may involve lead or asbestos abatement, explosive facilities and areas outside the primary area of responsibility.

View the file

Other files

File Type Posted
AMENDMENT 0004.pdf PDF
Amendment 0003 Attachment F_Rev1- Price Proposal Form - 1660646_ST19-0831 Repair Oil Storage Tanks.pdf PDF
Amendment 0003 SV Sign-in 21R1217.pdf PDF
Amendment 0003 PPI Attachment 95 - B72 Fuel Oil Water Seperator Asbuilt.pdf PDF
Amendment 0003 PPI Attachment 80B - PNSY A-102_PNSY-Kittery_IntExt-UT_InspectionRpt_2018-signed.pdf PDF
Amendment 0003 SOW_REV2 9-17-21 - 1660646_ST19-0831 Repair Oil Storage Tanks.pdf PDF
AMENDMENT 0003.pdf PDF
Amendment 0003 PPI Attachment 125 - B72 Repair Fuel Oil Storage Tanks.pdf PDF
Amendment 0003 PPI Attachment 80 - PNSY A-101_PNSY-Kittery_IntExt-UT_InspectionRpt_2018.pdf PDF
Amendment 0003 PPI Attachment 79B - A-102-BLDG72 - 2020 Inspection.pdf PDF
Amendment 0003 PPI Attachment 79 - A-101-BLDG72 - 2020 Inspection.pdf PDF
Amendment 0002 - PPI Attachment Q50 - Attachment 3.1 - Updated Coating Spec 09 97 13.27.pdf PDF
AMENDMENT 0002.pdf PDF
Amendment 0002 - PPI Attachment Q46 - Haz Material Survey Report-Final - Credere - 6-22-21.pdf PDF
Amendment 0002 - Attachment 4 - Submittal Register - Rev2.xls XLS spreadsheet
Amendment 0002 - PPI Attachment Q8 - Fuel Oil One-Line Drawing.pdf PDF
Amendment 0002 - PPI Attachment Q7 - Fuel Oil Skid Drawing.pdf PDF
Amendment 0001 - 5500 DBIDS Form.docx DOCX document
Amendment 0001 - Attachment 4 - Submittal Register - Rev1.xls XLS spreadsheet
AMENDMENT 0001.pdf PDF
Amendment 0001 - secnav 5512-1.pdf PDF
Amendment 0001 - Attachment 3 - Technical Specifications Rev2.pdf PDF
Amendment 0001 - Acceptable Forms of ID.docx DOCX document
Attachment D - SOW With OPTONS - ST19-0831 Repair Oil Storage Tanks.pdf PDF
Attachment 1 - Price Proposal Form.pdf PDF
Attachment 5 - Drawings.pdf PDF
Attachment 2 -DIV1 Specs.pdf PDF
Attachment 4 - Submittal Register - 1660646.xls XLS spreadsheet
Attachment B - Past Performance Questionnaire.docx DOCX document
Attachment 3 - Technical Specifications Rev1.pdf PDF
Attachment A - Pre-Proposal Inquiry Log.doc DOC document
N4008521R1217.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

|_| DESIGN #1 |_| DESIGN #2 |_| DESIGN #3 |_| DESIGN #4 |_| DESIGN #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| RFP Development |_| Designer of Record |_| Engineering Services |_| Full Plans & Specs

|_| Other (explain):

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

11. Other Information: