This solicitation is for the P-095 Pier 3 Recap project at Naval Station Norfolk in Virginia. The work includes demolishing the existing Pier 3 and constructing a new pier, as well as upgrading adjacent structures including CEP-176. The Navy seeks offers for a firm-fixed price design-bid-build contract. Proposals are due by November 16, 2021, with award anticipated in early 2022. The contractor will be responsible for design, permitting, construction, and one-year warranty for the pier recap work.
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008521R0219 P095 PIER 3 REPLACEMENT, NAVAL STATION NORFOLK, NORFOLK, VA
This amendment is issued to update instructions to offorers, incorporate responses to pre-proposal inquiries (PPI’s), revised draw ings and specifications, revised Attachment H-Price Proposal Form, and Pier 3 Contractor Laydow n Map.
See continuation pages.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 48
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Nov-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R0219
X 9B. DATED (SEE ITEM 11)
17-Sep-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Nov-2021
CODE
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008521R0219
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0006
The following revised Documents are hereby incorporated under this amendment and attached separately:
1614696Amend0006spc 1of1 Attachment H – Price Proposal Form Revised #3 Pier 3 Contractor Laydown Map
The following document is applicable to this amendment, but will be included under forthcoming amendment:
1614696Amend0006dwg 1of1
Section 00 21 16 - Instructions to Proposers
INSTRUCTIONS TO OFFERORS
2. BASIS FOR AWARD
F. EVALUATION FACTORS FOR AWARD
3. Basis of Evaluation and Submittal Requirements for Each Factor, (a) Price, (1) Solicitation Submittal Requirements is revised as follows:
Delete:
Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the 2019/2020 filing cycle;
Replace:
Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the 2020/2021 filing cycle;
Delete in entirety, Refer to PPI #289:
Factor 5 proposal and all corresponding Factor 5 Attachments E & F.
CONTINUATION SHEET
DOCUMENT 00 01 15 LIST OF DRAWINGS
1.2 CONTRACT DRAWINGS
The following NAVFAC Drawing Numbers are revised as of November 17, 2021. These revised drawings accompany this Amendment.
NAVFAC DWG NO. TITLE
12829047 CS203 – DRAINAGE PROFILES – SHEET 2 OF 2
12829069 CS603 – CIVIL SITE CONTROL TABLES – SHEET 3 OF 3
12829099 CX507 – ATFP DETAILS
12829157 SS161 – FENDER SYSTEM PLAN – AREA 161
12829158 SS162 – FENDER SYSTEM PLAN – AREA 162
12829159 SS163 – FENDER SYSTEM PLAN – AREA 163
12829165 SS301 – CEP-176 SECTIONS – SHEET 1 OF 2
12829166 SS302 – CEP-176 SECTIONS – SHEET 2 OF 2
12829171 SS401 – ENLARGED PARTIAL PLAN
12829173 SS501 – CEP-176 COMBI-WALL DETAILS
12829176 SS504 – CEP-102 COMBI-WALL DETAILS
On NAVFAC Dwg. No. 12828967 (G-125) PHASE 5: WORK LIMIT NOTES: After the last sentence add the following:
“PHASE 6 DREDGING WITHIN THE EXISTING PIER 3 FOOTPRINT MAY BE PERFORMED
CONCURRENTLY WITH THE PIER DEMOLITION. COORDINATE DREDGING AT THE FOOT OF THE
PIER WITH THE CEP-102 BULKHEAD CONSTRUCTION.
On NAVFAC Dwg. No. 12828969 (G-127) PHASE 7: WORK LIMIT NOTES: Delete the last sentence of NOTE 2 “LIMITED NOTICE TO PROCEED TO
PHASE 8 MAY BE PROVIDED UPON ACCEPTANCE OF PIER 3 PERMANENT SECURITY PERIMETER
AND SECURITY ENCLAVE ENTRANCE” and replace with “PHASE 8 MAY BEGIN CONCURRENT WITH
PHASE 7 WORK 1.D AND 1.E PROVIDED THAT WORK 1.B AND 1.C HAVE CONTRACTING OFFICER
ACCEPTANCE”.
On NAVFAC Dwg. No. 12829040 (CS109A) CIVIL SITE PLAN – AREA 109: Delete callout “M50 RATED HIGH SECURITY FENCE” and bubble designation C3/CX505 and replace with “SEE CX PLANS”.
On NAVFAC Dwg. No. 12829085 (CS109B) CIVIL SITE PLAN – AREA 109: Delete callout “M50 RATED HIGH SECURITY FENCE” and bubble designation C3/CX505 and replace with “SEE CX PLANS”.
On NAVFAC Dwg. No. 12829042 (CS111A) CIVIL SITE PLAN – AREA 111: Delete callout “HYDRODYNAMIC SEPARATOR” in its entirety.
On NAVFAC Dwg. No. 12829101 (CS111B) CIVIL SITE PLAN – AREA 111: Delete callout “HYDRODYNAMIC SEPARATOR” in its entirety.
On NAVFAC Dwg. No. 12829050 (CS502) DETAIL A1: Delete callout “8"Ø x 7'-6" LONG SCHEDULE 40 STEEL PIPE FILLED WITH CONCRETE.
PRIME AND PAINT SAFETY YELLOW.” and replace with “8"Ø x 7'-6" LONG SCHEDULE 40 GALVANIZED STEEL PIPE FILLED WITH CONCRETE. PROVIDE AND INSTALL SAFETY
YELLOW MANUFACTURED PLASTIC COVER W/ DOMED TOP.”.
On NAVFAC Dwg. No. 12829107 (S-002) CONCRETE NOTES: Add NOTE 17 to read as follows:
“17. AT CEP-176 AND CEP-102 STEEL PIPE/SHEET PILE COMBI-WALLS, PREPARE EXTERIOR STEEL SURFACES PRIOR TO PLACEMENT OF CAST-IN-PLACE CONCRETE FASCIA AND/OR CAST-IN-PLACE
CONCRETE FILL LOCATED BETWEEN THE PRECAST CONCRETE FASCIA PANEL AND STEEL COMBI-
WALL. SURFACE PREPARATION SHALL CONSIST OF CLEANING THE EXTERIOR FACE OF STEEL
PIPE/SHEET PILE COMBI-WALLS AT AREAS TO RECEIVE CONCRETE FASCIA IN ACCORDANCE
WITH SSPC-SP 2 “HAND TOOL CLEANING” TO REMOVE MARINE GROWTH. CLEANING SHALL BE
DONE NO MORE THAN 30 DAYS PRIOR TO PLACEMENT OF CONCRETE.”
On NAVFAC Dwg. No. 12829121 (SD301) NOTES: Delete NOTE 2 “PRECAST CONCRETE PILES AND CONCRETE JACKETS ARE IN POOR
CONDITION AND SUSCEPTIBLE TO BREAKING. CONTRACTOR SHALL ACCOUNT FOR PILE
CONDITION DURING REMOVAL. ALL PILES SHALL BE COMPLETELY EXTRACTED. FOR
ADDITIONAL INFORMATION, SEE FILE TITLED "1957 AS-BUILT.PDF" IN "REFERENCE
DOCUMENTS".” and replace with “PRECAST CONCRETE PILES AND CONCRETE JACKETS ARE IN POOR
CONDITION AND SUSCEPTIBLE TO BREAKING. CONTRACTOR SHALL ACCOUNT FOR PILE
CONDITION DURING REMOVAL. ALL PILES SHALL BE COMPLETELY EXTRACTED. FOR
ADDITIONAL INFORMATION SEE FILE TITLED “WATERFRONT EXPANSION1 – 1943.PDF” IN
“REFERENCE DOCUMENTS”.”
On NAVFAC Dwg. No. 12829170 (SS307) SECTION A1: At the top of CIP CONC RETAINING WALL BEYOND, delete callout “TOP OF CURB, EL +13.33 NAVD88” and replace with “TOP OF CURB, EL +14.50 NAVD88”.
SECTION C1: At the top of CIP CONC RETAINING WALL BEYOND, delete callout “TOP OF CURB, EL +13.33 NAVD88” and replace with “TOP OF CURB, EL +14.50 NAVD88”.
On NAVFAC Dwg. No. 12829184 (SS512) SECTION B4: At the top of CIP CONC RETAINING WALL, delete callout “EL +13.33” and replace with “EL +14.50”.
SECTION C1: Delete callout “4”Øx1” PLATE” and replace with “4”x4”x1” PLATE”.
On NAVFAC Dwg. No. 12829199 (SS528) CEP-176 PRECAST CONCRETE VAULT SCHEDULE: Delete schedule title “CEP-176 PRECAST CONCRETE VAULT SCHEDULE” and replace with “CEP-176 CAST-IN-PLACE CONCRETE VAULT SCHEDULE”.
On NAVFAC Dwg. No. 12829202 (SS531) DETAIL A2: Delete NOTE 2 “INSTALL ADDITIONAL 12 INCH CLEATS ALONG CURB ON CEP-176 AND PIER 3 AS SHOWN ON SHEETS SS201-SS203 TO TIE OFF COMPOSITE PANELS TO THE BERTH.” and replace with “INSTALL ADDITIONAL 12 INCH CLEATS ALONG CURB ON CEP-176, PIER 3, AND PIER 4 AS SHOWN ON SHEETS SS161-SS163 AND SS201-SS203 TO TIE OFF COMPOSITE PANELS TO THE
BERTH.”
On NAVFAC Dwg. No. 12829207 (SS536) SECTION A1: Delete callout “3/4”Ø x 5” LONG HEADED STUDS, TYP” and replace with “3/4”Ø x 6
3/16” LONG HEADED STUDS, TYP”.
SECTION A1: At the top of COMBI-WALL, delete callout “EL +3.67” in its entirety.
SECTION A1: At the top of COMBI-WALL, delete dimension “1’-0” ” in its entirety.
SECTION A1: Near the top of CIP CONC BULKHEAD PILE CAP, delete callout “EL +10.5 NAVD88” in its entirety.
DETAIL B4: Delete callout “3/4”Ø x 5” LONG HEADED STUD, TYP” and replace with “3/4”Ø x 6
3/16” LONG HEADED STUD, TYP”.
PLAN C2: Delete callout “3/4”Ø x 5” LONG HEADED STUDS, TYP” and replace with “3/4”Ø x 6
3/16” LONG HEADED STUDS, TYP”.
On NAVFAC Dwg. No. 12829213 (SS542) DETAIL A1: Delete callout “1 1/2"Ø HOLE FOR 1 3/8"Ø ADHESIVE ANCHOR BOLT (6 TOTAL)” and replace with “1 1/2"Ø HOLE FOR 1 3/8"Ø ANCHOR BOLT (6 TOTAL)”.
On NAVFAC Dwg. No. 12829214 (SS543) DETAIL B1: Delete callout “1"Ø ADHESIVE ANCHOR BOLT, TYP” and replace with “1"Ø ANCHOR
BOLT, TYP”.
On NAVFAC Dwg. No. 12829217 (SS547) DETAIL B4: Delete callout “8"Ø SCH 80 CONC FILLED PIPE BOLLARD, GALV” and replace with
“8"Ø SCH 80 CONC FILLED PIPE BOLLARD, GALV, PROVIDE & INSTALL SAFETY YELLOW
MANUFACTURED PLASTIC COVER W/ DOMED TOP”.
On NAVFAC Dwg No. 12829242 (MS001) GENERAL MECHANICAL NOTE 11C.: Revise to read as follows:
“C. PW – 316 STAINLESS STEEEL PIPE, HEAT TRACED AND INSULATED.”
GENERAL MECHANICAL NOTE 11G.: Revise to read as follows:
“G. SS/CHTABOVE PIER – 316 STAINLESS STEEL NO ADDITIONAL FINISH, NO
INSULATION.”
On NAVFAC Dwg No. 12829251 (MS124) WORK NOTES: Delete WORK NOTE 35“EXPANSION JOINT FOR SS-FM SEE DETAIL C1/MS502” in its entirety.
MECHANICAL DRAINAGE UTILITIES – AREA 104: Delete all callouts for Work Note 35.
On NAVFAC Dwg No. 12829270 (MS501) DETAIL A1: Delete callout “PROVIDE 316 STAINLESS STEEL PIPE STANDS TO SUPPORT PIPING ABOVE DECK (TYP. BOTH SIDES)” and replace with “PROVIDE 316 STAINLESS STEEL
ADJUSTABLE PIPE STANDS TO SUPPORT PIPING ABOVE DECK (TYP. BOTH SIDES).
ADJUSTABLE PIPE STANDS TO COMPLY WITH MSS-SP-58 TYPE 38. PROVIDE WITH BASE
AND ANCHOR BOLT TO DECK OR CONCRETE TRENCH COVER.”
DETAIL A3: Delete callout “PROVIDE 316 STAINLESS STEEL PIPE STANDS TO SUPPORT PIPING ABOVE DECK (TYP. BOTH SIDES)” and replace with “PROVIDE 316 STAINLESS STEEL ADJUSTABLE PIPE
STANDS TO SUPPORT PIPING ABOVE DECK (TYP. BOTH SIDES).
ADJUSTABLE PIPE STANDS TO COMPLY WITH MSS-SP-58 TYPE 38. PROVIDE WITH BASE
AND ANCHOR BOLT TO DECK OR CONCRETE TRENCH COVER.”
DETAIL A3: Add NOTE to read as follows:
“NOTE: SEE A1/PURE WATER P&ID SHEET 6 OF 6 SHEET AP807 FOR NUMBER AND
LOCATIONS OF FLANGES FOR THE PURE WATER UTILITY STATIONS.”
DETAIL B1: Delete callout “PROVIDE 316 STAINLESS STEEL PIPE STANDS TO SUPPORT PIPING ABOVE DECK (TYP. BOTH SIDES)” and replace with “PROVIDE 316 STAINLESS STEEL
ADJUSTABLE PIPE STANDS TO SUPPORT PIPING ABOVE DECK (TYP. BOTH SIDES).
ADJUSTABLE PIPE STANDS TO COMPLY WITH MSS-SP-58 TYPE 38. PROVIDE WITH BASE
AND ANCHOR BOLT TO DECK OR CONCRETE TRENCH COVER.”
DETAIL B3: Delete callout “PROVIDE 316 STAINLESS STEEL PIPE STANDS TO SUPPORT PIPING ABOVE DECK (TYP. BOTH SIDES)” and replace with “PROVIDE 316 STAINLESS STEEL
ADJUSTABLE PIPE STANDS TO SUPPORT PIPING ABOVE DECK (TYP. BOTH SIDES).
ADJUSTABLE PIPE STANDS TO COMPLY WITH MSS-SP-58 TYPE 38. PROVIDE WITH BASE
AND ANCHOR BOLT TO DECK OR CONCRETE TRENCH COVER.”
DETAIL D1: Delete callout “PROVIDE 316 STAINLESS STEEL PIPE STANDS TO SUPPORT PIPING ABOVE DECK (TYP. BOTH SIDES)” and replace with “PROVIDE 316 STAINLESS STEEL
ADJUSTABLE PIPE STANDS TO SUPPORT PIPING ABOVE DECK (TYP. BOTH SIDES).
ADJUSTABLE PIPE STANDS TO COMPLY WITH MSS-SP-58 TYPE 38. PROVIDE WITH BASE
AND ANCHOR BOLT TO DECK OR CONCRETE TRENCH COVER.”
DETAIL D3: Delete callout “PROVIDE 316 STAINLESS STEEL PIPE STANDS TO SUPPORT PIPING ABOVE DECK (TYP. BOTH SIDES)” and replace with “PROVIDE 316 STAINLESS STEEL
ADJUSTABLE PIPE STANDS TO SUPPORT PIPING ABOVE DECK (TYP. BOTH SIDES).
ADJUSTABLE PIPE STANDS TO COMPLY WITH MSS-SP-58 TYPE 38. PROVIDE WITH BASE
AND ANCHOR BOLT TO DECK OR CONCRETE TRENCH COVER.”
On NAVFAC Dwg No. 12829273 (MS504) DETAIL A1: Add NOTE to read as follows:
“NOTE: FOR MPCA, HPCA, AND PURE WATER THE GUIDES AND SUPPORTS ARE THE SAME
PRODUCT.”
On NAVFAC Dwg. No. 12829331 (EP403) PLAN 1: Delete all callouts for cable “LLL” and replace with cable callout “L2/L4”.
PLAN 2: Delete all callouts for cable “L” and replace with cable callout “L5”.
PLAN 3: Delete all callouts for cable “LL” and replace with cable callout “L4”.
On NAVFAC Dwg No. 12829451 (AP001) GENERAL PLUMBING NOTES: Add NOTE 10D. to read as follows:
“D. NITROGEN – 316 STAINLESS STEEL PIPING PER SPECIFICATION SECTION 40 05 13. NO
INSULATION.”
On NAVFAC Dwg No. 12829459 (AP111) ENLARGED PLAN A1: Delete callout “GOVERNMENT FURNISHED/GOVERNMENT INSTALLED NITROGEN TANKS AND SUPPORT SYSTEM” and replace with “GOVERNMENT
FURNISHED/CONTRACTOR INSTALLED NITROGEN TANKS AND SUPPORT SYSTEM”.
On NAVFAC Dwg No. 12829484 (AP503) DETAIL C4: Add NOTE to read as follows:
“NOTE: THIS DETAIL APPLIES TO THE GUARDHOUSE ONLY.”
DETAIL C4: Delete callouts “PIPE MATERIAL TRANSITION” and “PLASTIC TUBING (PEX
EQUIVALENT)”.
On NAVFAC Dwg No. 12829492 (AP603) MEDIUM PRESSURE AIR DRYERS/PURIFIERS SCHEDULE: Revise INLET FLOW (SCFM) column values from “366” to “763”.
MEDIUM PRESSURE AIR DRYERS/PURIFIERS SCHEDULE: Revise OUTLET FLOW (SCFM) column values from “305” to “634”.
MEDIUM PRESSURE AIR COMPRESSOR SCHEDULE: Revise STAGES column values from “SINGLE” to “TWO OR THREE”.
MEDIUM PRESSURE AIR COMPRESSOR SCHEDULE: Revise STANDARD CAPACITY (SCFM) column values from “816” to “763”.
On NAVFAC Dwg No. 12829493 (AP604) HIGH PRESSURE AIR DRYERS/PURIFIERS SCHEDULE: Revise NOTES column values from blank to “1,2”.
HIGH PRESSURE AIR DRYERS/PURIFIERS SCHEDULE: Add NOTE 2 to read as follows:
“2. WATER CONTENT SHALL BE 67 PPM MAXIMUM AND TOTAL VOLATILE
HYDROCARBONS SHALL BE 25 PPM MAXIMUM.”
On NAVFAC Dwg No. 12829495 (AP610) DIAGRAM A1: Add the following:
Provide unions on both sides of all the condensate drain devices including CS-1 thru CS-6, CD-1 & CD- 1, MCAD-1A, thru MCAD-4A, and MACD-1B thru MACD-4B.
On NAVFAC Dwg No. 12829496 (AP611) DIAGRAM B1: Add the following:
Provide unions on both sides of all the condensate drain devices including HPCD-1A/1B, HPCD-2A/2B, HPCD-3A/3B, HPCD-4A/4B, HPCD-5A/5B, and HPCD-6A/6B.
On NAVFAC Dwg No. 12829498 (AP613) WORK NOTES: Add KEYNOTE 42 to read as follows:
“42 ALL SOLENOID VALVES SHALL BE BALL VALVES WITH ELECTRONIC ACTUATORS.”
SCHEMATIC A1: Add the following keynote callout to one of the solenoid valves: “42 (TYP)”.
PROJECT TABLE OF CONTENTS
Section 22 15 19.19 20 NONLUBRICATED ROTARY SCREW AIR COMPRESSORS (100 HP AND LARGER) is added to the Table of Contents and accompanies this Amendment.
Delete Section 22 16 19.26 20 LARGE CENTRIFUGAL AIR COMPRESSORS (OVER 200 HP) in its entirety.
Delete Section 34 71 13.19 in its entirety and replace with Section “34 71 13.19 CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS dated November 17, 2021”. The revised section accompanies this Amendment.
SECTION 01 45 00.00 20 QUALITY CONTROL
1.5.4 QC Specialists Duties and Qualifications
In the second sub-paragraph, delete the first sentence and replace with “As a minimum, full time QC Specialists shall be appointed in each of the following disciplines: Civil/Structural (combined), Mechanical, and Electrical.”
SECTION 03 31 30 MARINE CONCRETE
2.7.1 Reinforcing Bars
Delete this Paragraph in its entirety and replace with the following:
“ACI 301 unless otherwise specified and shall meet the design yield strength and ductility requirements.
Deformed reinforcing bars meeting the requirements of ASTM A706/A706M, Grade 60 prefabricated and then coated in accordance with ASTM A767/A767M Class 1 galvanized after fabrication. ASTM A1094/A1094M Continuous Hot-Dip Galvanized Steel Bars for Concrete Reinforcement is an acceptable alternative to ASTM A767/A767M Class 1 galvanized for this project.”
SECTION 22 15 26.00 20 HIGH AND MEDIUM PRESSURE COMPRESSED AIR PIPING
2.2 MEDIUM PRESSURE AIR RECEIVERS
Delete this Paragraph in its entirety and replace with the following:
“2.2 MEDIUM PRESSURE AIR RECEIVERS
ASME BPVC SEC VIII D1, labeled and rated for 150 psig, equipped with required valves and trimmings, including gage and automatic drain valve and ASME BPVC SEC VIII D1 and ASME BPVC SEC IX pressure safety relief valve. Pressure as indicated. Sandblast exterior and interior to SSPC SP 10/NACE No. 2, near-white. Lining shall be a factory applied 8 mil minimum epoxy coating. Exterior finish shall be two coats of rust inhibitor primer and one coat epoxy enamel.”
2.5.2 Fittings, Size 2 Inches and Larger
Delete this Paragraph in its entirety and replace with the following:
“2.5.2 Fittings, Size 2 Inches and Larger ASME B16.9, carbon steel, butt welding, Schedule 40, or ASME B46.1, carbon steel welding neck flanges, Class 150, ASME B46.1, flanged fittings, carbon steel, Class 150, gaskets ASME B16.20, spiral wound metallic, Class 150, bolts ASTM A193/A193M, Grade B7, and nuts, ASTM A194/A194M, Grade
7. Butt welded joints shall be full penetration consumable insert or backing ring type. Provide with manual gear operator on valves 3” and larger and manual lever for valves 2-1/2” and smaller. Provide chain operator on valves located 6’-0” above finish floor or higher.”
2.5.6.4 Safety Valves
After this paragraph, add the following:
“2.5.6.5 Butterfly Valves Butterfly valves shall conform to MSS SP-67and are the wafer type for mounting between specified flanges. Ensure valves are rated for 150-psig shutoff and non-shock working pressure. Select bodies of cast ferrous metal conforming to ASTM A126, Class B, and to ASME B16.1 for body wall thickness.
Seats and seals are fabricated from resilient elastomer designed for field removal and replacement.”
2.5.12 Tetrafluoroethylene Tape
After this paragraph, add the following and renumber subsequent paragraphs accordingly.
“2.6 DRAIN PIPING FOR COMPRESS AIR SYSTEM
Drain piping after blowdown, filters, etc. shall be ASTM B88 Type K or M copper tubing. Solder metal shall conform to ASTM B32.”
2.7 BREATHING AIR MONITOR
Provide breathing air monitor to monitor CO, CO2, O2 and VOC concentrations of the high pressure compressed air. Connect to the high-pressure line after the filter unit of the compressor. System shall be rated to operate at 5000 psig. The monitor shall include the following features:
a. Switch box for wall mounting
b. Internal LCD display for indication of intake air (CO / CO2 / O2)
c. LCD main display for displaying moisture
d. LCD display for compressed air (CO / CO2 / O2 / VOC)
e. Display of measured values in ppm, %, mg/m3, PSI and °F
f. Pressure / Temperature compensation
g. Green Power LED / Red Alarm LED
h. Pressure reducer including throttle valve
i. Output signal for compressor shutdown
j. Flush function with selector switch (for separation of polluted air during the start of the compressor)
k. Integrated aerator unit
l. External test gas connection”
SECTION 31 62 13.20 PRECAST/PRESTRESSED CONCRETE PILES
2.1.4.3 Corrosion Inhibiting Admixture
After the final sentence, add the following:
“Corrosion inhibiting admixture is not required for the 12-inch square prestressed concrete pile at the Utility Service Building (USB).”
2.1.10 Epoxy Coating for Concrete Surface
After the final sentence, add the following:
“Epoxy coating is not required for the 12-inch square prestressed concrete pile at the Utility Service Building
(USB).”
SECTION 33 52 10 FUEL SYSTEMS PIPING
2.4.2 Steel Reinforced Flexible Pipe
Delete this Paragraph in its entirety and replace with the following:
“2.4.2 Double Wall Containment Piping Piping system shall be the factory fabricated, double-wall type that conforms to ASME B31.3 and NFPA
30. Product pipe shall be as indicated on the drawings and as specified herein. The exterior containment pipe shall be fiberglass reinforced plastic (FRP) that conforms to ASTM D5677 except as modified herein. Containment pipe shall be chemically compatible with the type of fuel to be handled, be non-corrosive, dielectric, non-biodegradable, and resistant to attack from microbial growth. Containment piping shall be capable of withstanding a minimum 5 psi air pressure. Containment piping and supports shall be designed to allow for drainage of liquids.
Containment piping shall allow for complete inspection of the product piping before the containment piping is sealed. Containment piping shall be evenly separated from the product piping with pipe supports that are designed based on pipe size, pipe and fuel weight, and operating conditions. Pipe supports shall be constructed of the same material as the product pipe FRP. Design supports so that no point loading occurs on the primary or exterior pipe. Supports shall be permanently attached to the product pipe either by tack welding or by an adhesive. Supports shall be designed and installed to allow for pipe movement of both the product piping and the exterior containment piping without causing damage to either.”
2.4.2.1 Steel Reinforced Flexible Pipe Fittings
Delete this Paragraph in its entirety.
SECTION 40 05 13 PIPELINES, PROCESS PIPING
2.7.3.2 Flanged Fittings
Delete this Paragraph in its entirety and replace with the following:
“2.7.3.2 Flanged Fittings Flanges and flanged fittings shall be Class 125, ASTM A240/A240M, TP316 stainless steel backing flanges with ASME B16.1 drilling. Flanges shall be complete with one-piece, molded HDPE stub ends.
Flanged connections shall have the same pressure rating as the pipe or greater. Bolting shall be stainless steel, ASTM A193/A193M, Grade B8 hex head bolts and ASTM A194/A194M, Grade 8 hex head nuts.
Bolts shall be provided with washers of the same material as the bolts. Gaskets shall be full-faced, maximum 1/8 inch thick, fabricated from nitrile in accordance with ASME B16.21.”
PRE-PROPOSAL INQUIRES
Additional PPI's that are not included under this Amendment may be addressed in subsequent Amendments.
PPI
Sec. Para. Draw # Question Response
121 N/A N/A SD101-
Please confirm that conex boxes, trailers, miscellaneous material, buoys, movable containers, etc located within the work areas will be removed by others prior the contractor starting.
The Government is working with tenants on relocation plan. Contractor should expect miscellaneous debris as well as +/- 300lf of concrete sheet pile that will require disposal
144 G-005 /
CD103
Drawing G-005 note 3 indicates all rubbish and debris shall be collected and removed from Government property and disposed of at a legal off-site landfill. Drawing CD103 Demolition Note 5 indicates to demolish all building, pavement and utilities in this area. Advise will the following existing above ground items at CEP-176 and CEP- 102 be removed from the site prior to the start of demolition including: moveable containers, steel pipe fabrications located at West corner of CEP-176, hose and pipe utilities above ground along length of existing bulkhead, steel buildings on skids, precast concrete elements throughout CEP- 176 acting as bumpers/curb stops, scaffold racks, etc.
The Government is working with tenants on relocation plan. Contractor should expect miscellaneous debris as well as +/- 300lf of concrete sheet pile that will require disposal
163 Please confirm that port operations will only be working 40 hrs/week. This will impact the contract cost and time.
Bid per RFP. Refer to Section 01 14 00, paragraph 1.4.5.
166 SD301 Note 2 refers to As-Built 1957 drawings.
These drawings are not in the reference drawing package. Please provide.
Refer to Amendment 0006;
Summary of changes.
219 33110
MS505/A
1/C1
WITH NO DESIGNATION PROVIDED FOR
THE TYPE OF "METAL" PIPE AT DETAILS A1
& C1, PLEASE CONFIRM THAT THE
PIPE/FITTINGS FOR THE DWC,SS & OWWO
IS TO BE DUCTILE IRON PIPE PER
SPECIFICATION 331100.
Provide 316 stainless steel piping for the metal piping for the DCW, OWWO & SS risers above the trenches.
220 33110
WE FIND NO SPECIFICATION FOR DIP
FLANGE ADAPTERS THAT WILL BE NEEDED
AT THE PIPE PENETRATIONS AT THE
TRENCH COVER. WILL WEDGE ACTION
GRIPPING TYPE FLANGE ADAPTERS BE
ACCEPTABLE?
Provide HDPE flange connections and standard 316 stainless steel pipe flanges for the risers. See PPI 219.
221 33110 0/400
WE FIND NO SPECIFICATION FOR THE 8"
POTABLE WATER STRAINER AT EACH
STATION. WILL ONE BE PROVIDED?
Strainer specification included in Section 40 05 13, Paragraph 2.11.3.
271 Form
In addition to the project size and coordination effort required between the Price and Non-Price proposals, we have received feedback from the subcontracting community that they will be unable to provide quotes on the project unless there is a change to the current bid date. We respectfully request a 4 week postponement to the current bid due date of November 16, 2021.
Refer to Amendment 0005, Summary of changes. Proposal due date extension
280 11 31 41
2.1.2 a. ASTM A252, Grade 36 Modified with the following:
(1) ASTM A6/A6M standard supplementary requirement: S5 (25 ft-lb min. at +10 degrees F).
Our plate mill vendors are stating they can only guarantee 15 ft-lb at +10 degrees F.
Is this acceptable?
Bid per RFP
281 12 31 41
2.1.2 a.
(3)
Spiral mills that commonly manufacture large-diameter pipe per AWWA C200 or ASTM A252 adhere to a radial tolerance, and repair procedures, per AWWA C200- 17 (an excerpt of this standard is attached).
From the attached AWWA C200 graph that is marked for the wall thickness on this project, ¼” is the allowable radial offset for ¾” nominal wall pipe and nearly 11/32” for 1” nominal wall pipe. Can the owner substitute industry-standard allowable radial offsets per AWWA C200- 17 in lieu of the 1/16” requirement in
Bid per RFP
Specification Section 2.1.2.a.3? **See Graph
282 40 05
2.11.5.1 Page 20
MS-601
MS-502
1. Are double sided or singled sided expansion joints required for the MPCA system?
2. Are externally pressurized bellows expansion joints with carbon steel body/connections and stainless steel bellows acceptable for the MPCA system?
3. Are weld end connections acceptable for MPCA expansion joints?
1. Provide double sided expansion joint for the MPCA system.
2. Externally pressured bellows expansion joints with 316 stainless steel body/connections and 316 stainless steel bellows are acceptable for the MPCA system.
3. Provide flanged connection on the MPCA expansion joints.
283 22 00
2.9.1 Page 21
AP-601
1. Are line reactors and DC chokes acceptable noise suppressors to prevent noise transmission over electric feed lines?
2. Is a booster system using electric VFDs and NSF rated Nylon Sensing lines be acceptable?
3. Are 3600 RPM motors be acceptable?
4. Will a Booster Control Panel with 108.5 FLA and 141.5 MOCP ratings be acceptable?
1. See Specification Section 26 29 23 Adjustable Speed Drive ASD Systems Under 600 Volts.
2. See Specification 22 00 00 Plumbing, General Purpose for the Water Booster pump which does indicate VFD's. There is no specific specification on the sensing lines.
3. This increase in electrical requirements is acceptable but the Contractor shall be responsible for all electrical changes (i.e. wiring, breakers, etc.) associated with the proposed equipment provided on the project.
284 23 64
2.9.m Page 16
AM-602
CCC
Schedule Note 3 and 4
What NEMA rating and material of construction is required for the single point power connection panel?
Provide NEMA 4X Stainless Steel single point power connection panel.
286 G-124 This sheet references a temporary security barrier, and corresponding note 1.D references a security perimeter. Please provide detail.
Security perimeter is the ATFP design for the project. A Temporary Security Barrier detail will be provided in an amendment. Limits are shown on the phasing drawings.
287 SS30
N/A SS302 Please provide details for the guardrail that is shown to be embedded on the top of the CIP retaining wall on the landside of CEP- 176.
Details for the referenced guardrail shall match Detail C1/SS512.
288 Attac hment D
Page 1 N/A Please confirm a CCAS form completed by a project owner in the past is acceptable in place of a CPARS form for Federal projects being referenced in Factor 1 - Corporate Experience.
Confirmed acceptable.
289 Pp. 8 and 18 of
P. 18 - Factor
5.1 / P.
8 - Price Proposa l Docume nt List
N/A The RFP requires Attachment F to be submitted in both the Price Proposal and the Non-Price Factors Proposal. Please confirm that Attachment F will only need to be submitted in the Price Proposal as Attachment F includes information only for the price proposal.
See Amendment 0006, Summary of Changes.
Revises 3. Basis of Evaluation and Submittal Requirements for Each Factor, (a) Price, (1) Solicitation Submittal Requirements. Removes "Factor 5 proposal and all corresponding Factor 5 Attachments E & F." The Small Business Factor 5 and associated attachments are to be submitted in the non-price proposal binder. Please note the Small Business Subcontracting Plan remains in the Price Proposal.
290 N/A N/A CS103 Call out for Conc REEFER pad references the AS Drawings for details, however, the AS drawings do not detail this pad. Please provide details including thickness and reinforcement layout.
Refer to detail B1/AS501 for exterior equipment pad thickness and reinforcing.
291 N/A N/A N/A Will jetting be permitted for the removal of existing pile?
Jetting may be utilized to assist with extraction of existing piles.
293 N/A N/A N/A Current deadline for questions is 11/4.
There is currently a large amount of unanswered critical questions outstanding and there will be time needed for any questions that are turned in on the deadline of 11/4. Current bid date is 11/16 via mail, requiring Contractors to close out the bids no later than 11/12 –providing little time for contractors, subcontractors, and suppliers to incorporate these potential changes in costs. Please provide an extension on the bid date for the impact of the Q/A time period on the bid date.
Refer to Amendment 0005, Summary of changes. Proposal due date extension
294 Specs 36 of
1.4 N/A Due to the limited space available near the
work sites, will an off-base site for laydown/storage area be allowed to transload precast structures, rebar, and equipment?
Bid per RFP. Refer to Summary of Changes, incorporated laydown map “Pier 3 Contractor Laydown Map”.
Height of the stored materials shall not exceed 12 feet in total height to allow for clear radar path between vessels berthed at pier 1/pier 2 and security trailer near building CEP64.
295 Sets 06/22 & 08/22
There are permanent roadway regulatory signs reflected in the Civil-ATFP plan set.
There are no permanent roadway regulatory signs reflected on the Civil-Site plans. Please confirm that the only permanent roadway regulatory signs are only those reflected in the Civil-ATFP plan set.
Bid per the RFP.
298 01 50
Set 01/22; G-
Sheet G-121 indicates "Temporary Construction Fencing" to be installed/constructed to encapsulate the work zone. Please verify that this fence is to meet specification 01 50 00; section
2.3.2. "Chain Link Panel Fencing". If not, please provide the details and/or specification pertaining to the materials & installation for this fencing requirement.
Correct, construction fencing will follow 01 50 00.
299 05 50
Plan Sheets
CS502 &
SS547
Specification 05 50 13; section 2.7 indicates that pipe bollards are to be galvanized. The detail on sheet CS502 (Pipe Bollard (buried)) indicates these to be primed & painted. Please clarify the finishes and/or treatments of all pipe bollards, both mounted and buried.
Refer to Amendment 0006;
Summary of changes.
300 N/A C3 SS501 The east corner of bulkhead CEP-176 has a return to existing bulkhead CEP-176.
Current details show this return as a cast in place concrete face instead of the precast section that is used on the north face.
Please provide further details and section views of this return including reinforcing steel layout.
Refer to Amendment 0006;
Summary of changes. See attached updated Detail C3/SS501. Precast concrete fascia panel at the eastern end of CEP-176 to include a return portion as shown. Details shown on Drawing SS536 remain applicable.
301 EP112
EP514
Drawing G-121 mentions “Electrical substations demolition and construction at existing Pier 4 and telecommunications services.”
Drawings ET103 through ET701 do not show any telecommunications work on Pier 4.
Drawing ED101 shows a Key Plan that includes areas 161, 162 and 163, but there are no electrical demolition drawings for these areas.
Drawings EP112 and EP514 show new PLC’s for four of the existing Substations on Pier 4.
Do drawings EP112 and EP514 show all the electrical work on Pier 4? Is there any telecommunications work on Pier 4?
No telecom work for Pier 4 is required.
No electrical demolition for Pier 4 is required.
The scope of electrical work for Pier 4 is limited to providing PLC's in four existing substations.
302 RFP
Part 1 page 11 of
(1) (i) We understand from the EPA Industry One-On-One that the Government will consider the expanding the Factor 1, Corporate Experience definition of relevancy to include the landside building, sitework and utilities scope. Please provide the opportunity for Offerors to demonstrate experience in landside scope elements, as these are critical scope and complexity items.
304 The typical combi-wall plans utilize a NZ26 profile for the intermediate sheet.
Please confirm a PZC 26 profile will be an acceptable alternative.
The layout currently provided in the drawings is based on an NZ26 intermediate steel sheet pile (SSP).
Alternate SSP profiles would be acceptable if they and the overall combi-wall system meet all structural and other contract requirements. If an alternate SSP profile is utilized, the Contractor shall provide updated layouts affected by this change for review and approval by the Contracting Officer.
305 SS501 &
SS536
Section A4 on SS501 show ¾” x 6 3/16” studs to be welded onto the combination wall. B4 on SS536 shows ¾” x 5” studs.
Please confirm which is correct.
Refer to Amendment 0006;
Summary of changes.
306 CN101
& SS301
CN101 shows the existing contours near the North Face wall (outboard) is at -11.0 to -15.0’ elevation. The new PC fascia panel is installed to a -22’ elevation.
Section A1 on SS301 shows the existing mudline to be below the -22.0’ elevation.
Please clarify which is correct.
Refer to Amendment 0006;
Summary of changes. The existing mudline will graphically be shown above the bottom of fascia at EL -22.00 NAVD88 with a note that indicates the elevation varies and to refer to the dredging plans for existing mudline elevation. Refer to revised Drawing
SS301.
307 CN101
& SS301
If elevation on CN101 is correct, please clarify if the contractor expected to excavate / dredge this 10’ of material prior to combination wall installation. The prewelded studs will be damaged, if driven through the mudline.
Where the existing mudline along the CEP-176 alignment is higher than -
22.00 NAVD88, it is anticipated that
select dredging will be required at these specific locations after installation of the new steel pipe/sheet pile combi-wall to facilitate construction of the concrete fascia.
308 CN101
& SS301
Please confirm the existing North Face bulkhead can handle being dredged to a - 23’ elevation.
The 1943 original as-built construction drawings for CEP-176 are poor quality and unable to be read. For reference, subsequent repair drawings from 1946 and 1982 appear to show the mudline adjacent to the existing bulkhead as -
10.0 Mean Low Water (MLW) and
sloping down to the dredge depth.
Repair drawings from 2000 and the hydrographic survey for this project show the existing mudline adjacent to the existing bulkhead at the western end of CEP-176 deeper at -20.0 MLW.
The difference between MLW and NAVD88 vertical datum can be found on G-005. Localized dredging associated with debris removal to facilitate installation of the conbi-walls will be allowed down to elevation -20.0 MLW with prior approval of the Contracting Officer.
309 CN101
& SS301
If excavation / dredge is allowed prior to installation of the combination wall on the North Face, please clarify if the contractor will be able to dispose of the material at Craney Island? This excavation quantity is near 10,000 CY.
Regardless of timing, the dredged material may be placed at CIDMMA
310 SS501&
SS536
A3 on SS501 states pipe pile cut-off is El.
+3.42’. A1 on SS536 states top of combi-wall is at El. +3.67’. Please clarify which is correct.
Refer to Amendment 0006;
Summary of changes.
311 SS501 From C3, please provide a detail on how the internal void filled with concrete between the combi-wall and the precast fascia terminates between Pipe Pile Bent 1 and the East End of CEP 176.
Refer to Amendment 0006; Summary of changes. See attached updated Detail C3/SS501. Precast concrete fascia panel at the eastern end of CEP-176 to include a return portion as shown.
Details shown on Drawing SS536 remain applicable.
312 SS501 From C1, please provide a detail on the transition of the fascia concrete from elevation -22’ to -6’ between Pipe Pile Bent 97 and 98. We cannot determine where that transition occurs.
Refer to Amendment 0006, Summary of changes. See revised drawing SS501. The overall depth of the precast concrete fascia panel at CEP-176 was established at -22.0 NAVD88 to adequately mount the heavy weather mooring FRP backer wall shown on Drawing SS551. Therefore, a bottom elevation of -22.0 NAVD88 is not needed at CEP-102 or underneath Pier
3. As such, the precast concrete fascia panel is intended to end at the northwest corner of CEP-176 near pipe pile #97. The bottom of the concrete fascia makes a transition from elevation -22.0 NAVD88 to elevation -6.0 NAVD88 at the alignment of the front face of pipe piles on the combi-wall running along the north face of CEP-
176. Contractor to form the south face of the fascia at the transition between elevation -22.0 to -6.0. For additional information, see C1/SS501 &
A4/SS501.
313 G-121 to G-128
The referenced drawings show a very limited amount of construction laydown area. This project will require additional storage and expanded construction limits to perform the work efficiently. Please consider expanding the limits of construction and storage.
Bid per RFP. Refer to Summary of Changes, incorporated laydown map “Pier 3 Contractor Laydown Map”.
Height of the stored materials shall not exceed 12 feet in total height to allow for clear radar path between vessels berthed at pier 1/pier 2 and security trailer near building CEP64.
314 CP301 Section A2 states to provide a 6” weld at each interlock below the pile cap soffit.
Please confirm that the pile cap is the concrete fascia and the contractor is required to weld the interlocks together at elevation -22.5’ for Sections 1 and 2 and elevation -6.0’ for Sections 3 & 4.
The "MINIMUM 6" LONG WELD AT
EACH SHEET PILE INTERLOCK"
provided for electrical continuity as shown on Detail A2/CP301 shall be located at the top of steel sheet piles (i.e. the cutoff elevation).
315 CP301 Can the continuity weld be performed at the top of sheets?
The "MINIMUM 6" LONG WELD AT
EACH SHEET PILE INTERLOCK"
provided for electrical continuity as shown on Detail A2/CP301 shall be located at the top of steel sheet piles (i.e. the cutoff elevation).
316 CP301 The elevations for these new anodes are installed at NAVD88 elevations -26.5’, - 32.5’, - 10.5’, - and -14.5’. Please confirm that the anode installations will have to be completed after dredging operations are completed in the related areas.
Confirmed that it is anticipated that cathodic protection anodes will be installed after dredging operations are completed at locations where the existing mudline is higher than the required anode installation elevation.
317 03 31
3.6.2 This paragraph states that cracks in
concrete shall be repaired and inspection and repairs shall be provided by the contractor at no cost to the Government. a) Is the engineer expecting the concrete to crack? b) If so, please provide a quantity for cracks to repair.
318 Note 2 G-127 Please define parameters of “Limited Notice to Proceed” as stated in referenced note.
Refer to Amendment 0006;
Summary of changes.
319 Note 2 SS539 How thick is the epoxy sealer that goes on top of the precast fender piles?
Epoxy sealer at the top of prestressed concrete fender piles, as identified in Note 4 on SS539, shall be applied to a Dry Film Thickness (DFT) of 14 mils.
Epoxy sealer shall be a standard manufactured product for use in this application.
321 Specif icatio n 03 31 30
Page 7 The utility trench walls of Pier 3 are 3' width in section. Advise if the utility trench walls for Pier 3 fall under the definition of "mass concrete" which reads "includes all concrete elements with a section thickness of 3 feet or more regardless of temperature". Advise if Mass concrete includes concrete greater than 3' section or greater than or equal to 3' section.
Bid per RFP. Per Specification Section
03 31 30 MARINE CONCRETE,
Paragraph 1.3.i, mass concrete includes concrete elements with a section thickness of 3 feet or more. Therefore, 3 feet is inclusive in the requirement.
322 G-122, G-123, CN101,
CN301
Note 2 on drawing G-122 states that the transition from phase 2 to phase 3 corresponds with the substantial completion of CEP-176 structural work where Phase 3 includes the allowable dredging. Please define more clearly what is considered structural completion of CEP-176. Does this include fascia panels?
Note: it appears the precast fascias are below existing mudline in some of the areas that would lead us to be believe some dredging is required before the fascias are set. Please clarify.
Substantial completion must include installation of the new steel pipe/sheet pile combi-wall, construction of concrete fascia, and construction of the CEP-176 relieving platform prior to full-depth dredging activities in the basin. Where the existing mudline along the CEP-176 alignment is higher than -22.00 NAVD88, it is anticipated that select dredging will be required at these specific locations after installation of the new combi-wall to facilitate construction of the concrete fascia.
324 Specif icatio n 03 31 30
Spec 03 31 30, 3.2.9, Specification 03 31 30 paragraph 3.2.9 for Pits and Trenches indicates to place bottoms and walls monolithically or provide waterstops and keys. The language is not clear as to which direction monolithically the slab or walls should be poured. Advise if waterstop is required at the construction joint between slab and wall longitudinally and /or at the construction joints transverse direction forming a continuous diaphragm in U-shape from top of wall through slab and to top of adjacent trench wall
A waterstop and keyway is required at the construction joint between the concrete relieving platform slab and the utility vault wall at CEP-176.
325 Specif icatio n 01 00.00 20 & Specif icatio n 03 30 00
Spec 03 30 00, 1.6.7.1, In Specification 01 45 00.00 20 the qualification for the Quality Control manager are listed in section 1.5.1.2, page
4. However, in specification 03 30 00, section 1.6.7.1, Page 11 there seems to be additional qualification requirements for the Quality control manager. Please clarify that it is intended that the quality control manager meets both sets of qualifications.
Bid per RFP
326 Specif icatio n 03 31 30
Spec Drawing S-002
Drawing S-002 under Concrete Notes number 12 indicates to provide swellable waterstops as shown on the drawings and the waterstop shall be extruded polyurethane or bentonite/butyl rubber.
No detail is provided for waterstop in pits and trenches. Clarify type of waterstop in pits and trenches and provide construction joint details for waterstop in pits and trenches between slabs and walls longitudinally and transverse.
A waterstop and keyway is required at the construction joint between the concrete relieving platform slab and the utility vault wall at CEP-176.
328 01 57
3.4.1 Please clarify Preconstruction Air Permits
and whether this pertains to contractor’s construction equipment or new permanent equipment to be installed on the project.
This specification section only refers to the permanent equipment that is part of the construction process. With regard to the contractor’s temporary construction equipment, if the equipment is portable in nature, permitting will not be required. Exceptions can be submitted and evaluated following construction award.
329 Set 11/22
SS542
Detail B1 - Corner Fender Plan shows plate washers on the padeye anchor bolts but Detail A1 calls for 1.375" diam adhesive anchor bolts. Please clarify.
Refer to Amendment 0006;
Summary of changes.
330 Set 11/22
SS543
Detail B1 - Fender Pile Support Assembly shows nuts and washers on the anchor bolts while calling for 1" diam adhesive anchor bolts. This conflict appears on many drawings in this plan set. Is it the Navy's intent to allow the Contractor to choose in these instances between casting anchor bolts in place or the drill and epoxy method? Please clarify.
Refer to Amendment 0006;
Summary of changes.
331 26 08
3.1 Please confirm that the contractor is not
required to perform load testing on the electrical distribution system.
Contractor shall engage the services of a qualified testing organization to provide inspection, testing, calibration, and adjustment of the electrical distribution system and generation equipment as specified by Section 26 08 00.
Contractor shall perform testing for equipment and systems as required by Sections not listed in 26 08 00.
332 SS529 &
SS530
C1 on SS529 states that the Anchor pockets must be @ 2’0” OC MAX. Same detail shows 14 pockets. Detail B1 on SS530 states to install 14 threaded hanger rods evenly spaced. The 2’ OC requirement would almost double the amount of hanger required. Please clarify which detail is correct.
The 2'-0" max spacing requirement for the threaded rod hangers referenced applies to all the precast concrete vaults included in the schedule on SS530.
333 N/A N/A MS503/
A1
WILL THE ELECTROFUSION FLEX
RESTRAINTS BE REQUIRED ON THE
6",8" & 10" HDPE GRAVITY SEWER
LINES?
Yes, that detail is for all of the HDPE piping.
334 21120
2.1.6.3 FX601,6
DRAWINGS FX601 & 602 SHOW A
THERMOSTATIC VALVE ON THE 8"
FIRE MAIN LOOP AND THE 4" RISERS
TO THE FIRE PROTECTION
STATIONS. SPECIFICATION
211200.2.1.6.3 DOES NOT PROVIDE A
REQUIRED SIZE, HOWEVER, FROM
PREVIOUS WORK AT THE NORFOLK
NAVAL SHIP YARD IT IS OUR
UNDERSTANDING THAT THESE
VALVES ARE 3/4". PER THE
MANUFACTURE OF PREVIOUSLY
INSTALLED VALVES, THE NUMBER
OF VALVES SHOWN ON THE
CONTRACT PLANS IS INSUFFICIENT
AND COULD REQUIRE AS MANY AS
(15) MORE VALVES THAN ARE
SHOWN TO PROTECT THE 8" LOOP.
ADDITIONALLY THE PIPING
CONFIGUATION OF THESE VALVES
IS NOT SHOWN AS THEY SHOULD
BE PIPED OFF THE ENDS OF THE
FIRE PROTECTION STATION
OUTLETS SIMILAR TO THE PICTURE
BELOW. WHAT SIZE ARE THE
THERMOSTATIC VALVES AND
SHOULD THEY BE PIPED OFF OF THE
4" AND 8" LINES PER THE
MANUFACTURE'S
RECOMENDATIONS?
Provide valves sized with the smallest port available for the required flow;
flow per valve shall not exceed 6.5 gpm per Spec. 21 12 00, 2.1.6.3. Provide thermostatic valves in the trench as indicated on the contract drawings. Per UFC 4-150-02, 6-1.5.1, number of valves is based on bleeding the water in the pipe exposed in 8 to 12 hours, thus number of valves indicated is adequate.
The manufacturer figure provided is not applicable as all of the hose connection piping on the deck are protected by heated enclosures; thus providing the valves in a heated area at the end of the pipe would not open and flush water.
335 N/A N/A AP101-
AP500,5
03,601
DRAWINGS AP101,102 & 103
REFERENCE DRAWING AP500
DETAIL A1 FOR THE TRAP PRIMERS.
DETAIL C4 DWG. AP503 ALSO
SHOWS A TRAP PRIMER. DOES C4
ONLY APPLY TO THE GUARD HOUSE
Corrrect, Detail C4 Trap Primer - Detail applies only to the Guard House.
WHICH IS NOT LISTED ON THE DWG.
AP601 TRAP PRIMER SCHEDULE?
336 22 00
TABLE
II
AP500 SPECIFICATION 220000 PIPE AND
FITTINGS TABLE II INDICATES THAT
BELOW FLOOR PRESSURE PIPE IS TO
BE TYPE K SOFT COPPER.
HOWEVER, DWG. AP500 DETAIL A1
INDICATES "1/2" PEX, EXTEND AND
CONNECT TO FLOOR DRAIN".
WHICH IS CORRECT? IF, PEX IS
REQUIRED, PLEASE PROVIDE
SPECIFICATIONS.
On Detail A1 Trap Primer Detail delete the notes that indicate Plastic Tubing (PEX Equivalent) and Pipe Material Transition. Provide Type K Copper from Trap Primer to floor drain.
337 43430 0/400
2.1.4 AP114 -
SPEC. 434300.2.1.4 INDICATES THAT
PIPE & FITTINGS FOR THE
NITROGEN SYSTEM ARE TO BE PER
SPEC. 400513. HOWEVER, NOTHING
IN SPEC. 400513 INDICATES WHAT IS
TO BE USED FOR THE NITROGEN
PIPE. IS THE NITROGEN SYSTEM
(NS) PIPE IS TO BE SIMILAR TO THE
PW SPEC. 400513.2.4.1?
Addendum added to specify pipe material for nitrogen system. It is not same material as PW specified in section 40 05 13.
338 22161 9/221
2.2.9.2/ 2.5.2
N/A SPECIFICATION 221619.2.2.9.2
INDICATES THAT THE COMPRESSOR
OUTLETS WILL HAVE 150#
FLANGES, YET SPECIFICATION
221526.2.5.2 INDICATES THE PIPING
IS TO HAVE 300# FLANGES. WITH
THIS…