This document provides details on a federal solicitation for pier recapitalization services at Naval Station Norfolk in Virginia. The solicitation number is N4008521R0219 and is being issued by the Department of the Navy Naval Facilities Engineering Command for Pier 3 recapitalization work. Bids are due by the date specified in the solicitation documentation. The work involves recapitalization of Pier 3 to renovate, repair, and replace components to extend the service life of the structure. Pricing should be submitted according to the terms outlined in the solicitation.
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CEP-176 BULKHEAD (806'-6")
EXIST. PIER 4
PIER 3 (1323'-6")
500'-0"
500'-0"
50'-0"
50'-0"
150'-0"
X X
X X X X
X X
175'+/-
C
CC
E E
E
E
E
E
EE
E
UTILITY SERVICES BUILDING UTILITY SERVICES BUILDING
GUARD
BOOTH
FFE=8.75'
GATEHOUSE
FFE=8.5'
X X X X X X X X X X
X
X
X X
X X
X X
X
X X
X X
X
X
X X
X X
XX X
X
E
E
C
C
C
E
E
C
E
E
E
W
WV
HYD D
WV
OW
HYD E WV
WV
W W W
W
HYD B
WVWV
W
HYD F
WV
HYD AWV
W
HYD C
WV
SS
SS SS
S
S
S
O W
OW
OW
OW
S
CO
W
8" DI
" D
I
6" DI
WV
CO
WV
1.25" PVC
WV
WV
3R D
ST
RE
ET
B AVENUE
A AVENUE
100'-0"
CONTRACTOR PARKING
CONTRACTOR LAYDOWN
CE
P-
2 B
UL
KH
EA
D
BI
D
OP
TI
ON
(4
'-6
CE
P-
BU
LK
HE
AD
(2
'-1
PLAN
NORTH
SCALE:1" = 100'
CONSTRUCTION PHASE 5 - PLAN
LEGEND:
CONTRACT WORK IN CURRENT PHASE
PHASE 5: WORK LIMITS NOTES:
1. WORK INCLUDED IN THIS PHASE:
A. MAINTAIN TEMPORARY SECURITY PERIMETER ALONG THE
INDICATED PORTIONS OF CEP-176, PIER 3, AND THE AREA
WEST OF THE UTILITY SERVICES BUILDING.
B. CONTINUED CONSTRUCTION OF INDICATED PORTIONS OF
PERMANENT SECURITY PERIMETER.
C. DEMOLITION AND CONSTRUCTION OF CEP-102 BULKHEAD.
DEMOLITION AND CONSTRUCTION IN THE IMMEDIATE VICINITY
OF EXISTING PIER 3 IS RESTRICTED, SEE NOTE 1.D BELOW.
D. DEMOLISH EXISTING PIER 3. DEMOLITION CAN COMMENCE
AFTER COMPLETION OF GOVERNMENT'S RADIOLOGICAL
CONTAMINATION (RADCON) SURVEY. ALLOW SIX (6) MONTHS
AFTER COMPLETION OF PHASE 4 FOR RADCON SURVEY TO BE
COMPLETED.
E. DEMOLITION AND CONSTRUCTION OF UTILITIES, SITE WORK,
AND SOUTH RAMP TO CEP-176 AT THE HEAD OF EXISTING PIER
3.
2. THE TRANSITION FROM PHASE 5 TO PHASE 6 CORRESPONDS WITH
COMPLETION OF DEMOLISH EXISTING PIER 3. OBTAIN WRITTEN
NOTICE TO PROCEED TO PHASE 6 FROM THE CONTRACTING
OFFICER.
3. THE HATCHED AREA PROVIDES THE SPACE AVAILABLE TO THE
CONTRACTOR FOR LAYDOWN, OFFICES, MOORING OF BARGES, AND
CONSTRUCTION/DEMOLITION. THE LIMITS ARE DEFINED AS
FOLLOWS:
A. A MINIMUM OF 50 FT SOUTH FROM THE SOUTH FACE OF PIER
3.
B. A MAXIMUM OF 100 FT WEST FROM THE WEST END OF
EXISTING PIER 3.
C. A MINIMUM OF 500 FT NORTH FROM THE NORTH FACE OF
EXISTING PIER 2 EXCEPT AS NOTED IN 3.D.
D. A MAXIMUM OF 150 FT WEST FROM THE FACE OF EXISTING
CEP-102 BULKHEAD AND THE PARKING LOT BETWEEN
EXISTING CEP-102 BULKHEAD AND 3RD STREET WITHIN THE
NORTH-SOUTH LIMITS OF 3.C.
4. MOVEMENT OF CONTRACTOR BARGES, TUGS, AND OTHER SERVICE
CRAFT WILL REQUIRE COORDINATION WITH CONTRACTING
OFFICER.
5. THE ENTIRE SLIP BETWEEN THE CONTRACTOR'S AVAILABLE SPACE
AND THE NORTH SIDE OF PIER 2 WILL BE ACTIVELY USED BY THE
NAVY FOR VESSEL (I.E., SHIPS, BARGES, AND OTHER WATERCRAFT)
MOVEMENT AND BERTHING THROUGHOUT THE DURATION OF THE
PHASE.
6. EXISTING PIERS 2 AND 4 AND THE NORTH SIDE OF PIER 3 / CEP-176
BULKHEAD MUST REMAIN IN OPERATION. THE CONTRACTOR MUST
ENSURE UNIMPEDED PERSONNEL, VEHICULAR, AND MOBILE CRANE
ACCESS TO AND ALONG EXISTING PIERS 2 AND 4 AND PIER 3 /
CEP-176 BULKHEAD. FULL UTILITY SERVICES MUST REMAIN IN
OPERATION ALONG EXISTING PIERS 2 AND 4 AND PIER 3 / CEP-176
BULKHEAD.
7. CEP-176 BULKHEAD, PIER 3, UTILITY SERVICES BUILDING, GUARD
BOOTH, INDICATED PORTION OF THE PERMANENT SECURITY
PERIMETER, FLOATING SECURITY BARRIER, THE INDICATED
PORTION OF CEP-102 BULKHEAD, REFRIGERATOR CONCRETE PAD,
DUMPSTER ENCLOSURE, AND THE PROVISIONS FOR SECURITY AND
BERTHING OPERATIONS ARE SUBSTANTIALLY COMPLETE AND ARE
ACCEPTED BY AND TURNED OVER TO THE GOVERNMENT.
PH
AS
IN
G
PL
AN
PH
AS
E
BWT BWT MLC
AS NOTED
12828967
G-125
200'0 100'
AREA AVAILABLE TO CONTRACTOR IN
CURRENT PHASE
EXIST. PIER 3, SEE NOTE 1.D
PIER 3, SEE NOTE 7
CEP-176 BULKHEAD, SEE NOTE 7
GUARD BOOTH, SEE NOTE 7
PERMANENT SECURITY
PERIMETER CONSTRUCTION,
SEE NOTE 1.B
PERMANENT SECURITY
PERIMETER CONSTRUCTION,
SEE NOTE 1.B
CEP-102 BULKHEAD, SEE NOTE 7 UTILITY SERVICES BUILDING,
SEE NOTE 7
PERMANENT SECURITY
PERIMETER, SEE NOTE 7
TEMPORARY SECURITY BARRIER,
SEE NOTE 1.A
TEMPORARY SECURITY
BARRIER, SEE NOTE 1.A
CEP-102 BULKHEAD DEMOLITION
AND CONSTRUCTION, SEE NOTE
1.C
DEMOLITION AND CONSTRUCTION OF
UTILITIES, SITE WORK, AND SOUTH RAMP
TO CEP-176 BULKHEAD, SEE NOTE 1.E
EXIST. PIER 2, SEE NOTE 6
FLOATING SECURITY
BARRIER, SEE NOTE 7
FI
LE
N
AM
E:
Z
:\C lie nt s\
AN
F\
US
Na vy \M id At
\W at er fro nt
ID
IQ
\1
8_ Pi er 3-
De sig n\ De sig n\
Ci vil
\S he et s\
P0
-1
-G -1
.d wg L
AY
O
UT
N
AM
E:
P
HA
SI
NG
P
LA
N
- P
HA
SE
P
LO
TT
ED
: F rid ay
, S ep te m be r 1
0,
- 1 0:
am
U
SE
R:
b wt ur le y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
EJA
DSN
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
, V
A
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
DLB
CONCRETE REFRIGERATOR
PAD, SEE NOTE 7
DUMPSTER ENCLOSURE,
SEE NOTE 7
CEP-102 BULKHEAD BID OPTION
BID OPTION GENERAL NOTES:
1. ALL WORK SHOWN IS BASE BID UNLESS IDENTIFIED
AS A BID OPTION.
2. WORK ASSOCIATED WITH THE DEMOLITION AND
CONSTRUCTION OF CEP-102 BEYOND 216'-1" FROM
EDGE OF NEW PIER 3 IS BID OPTION
BW
T
B
ID
O
PT
IO
NS
/10
/20
UTILITY SERVICES BUILDING UTILITY SERVICES BUILDING
GUARD
BOOTH
FFE=8.75'
GATEHOUSE
FFE=8.5'
X X X X X X X X X X
X
X
X X
X X
X X
X
X X
X X
X
X
X X
X X
XX X
X
E
E
C
C
C
E
E
C
E
E
E
CEP-176 BULKHEAD (806'-6")
EXIST. PIER 4
PIER 3 (1323'-6")
500'-0"
500'-0"
50'-0"
50'-0"
150'-0"
X X
X X X X
X X
C
CC
E E
E
E
E
E
EE
E
EXIST. PIER 3
3R D
ST
RE
ET
B AVENUE
A AVENUE
W
WV
HYD D
WV
OW
HYD E WV
WV
W W W
W
HYD B
WVWV
W
HYD F
WV
HYD AWV
W
HYD C
WV
SS
SS SS
S
S
S
O W
OW
OW
OW
S
CO
W
8" DI
" D
I
6" DI
WV
CO
WV
1.25" PVC
WV
WV
100'-0"
CONTRACTOR PARKING
CONTRACTOR LAYDOWN
CE
P-
2 B
UL
KH
EA
D
BI
D
OP
TI
ON
(4
'-6
CE
P-
BU
LK
HE
AD
(2
'-1
PLAN
NORTH
SCALE:1" = 100'
CONSTRUCTION PHASE 6 - PLAN
LEGEND:
CONTRACT WORK IN CURRENT PHASE
PHASE 6: WORK LIMITS NOTES:
1. WORK INCLUDED IN THIS PHASE:
A. MAINTAIN TEMPORARY SECURITY PERIMETER ALONG THE
INDICATED PORTIONS OF CEP-176, PIER 3, AND THE AREA WEST
OF THE UTILITY SERVICES BUILDING.
B. CONTINUED CONSTRUCTION OF PERMANENT SECURITY
PERIMETER.
C. CONTINUED CONSTRUCTION AND DEMOLITION OF CEP-102
BULKHEAD.
D. DREDGING FOR CEP-102 BULKHEAD AND FOOTPRINT OF
DEMOLISHED PIER 3.
E. CONTINUED DEMOLITION AND CONSTRUCTION OF UTILITIES,
SITE WORK, AND SOUTH RAMP TO CEP-176 AT THE HEAD OF
EXISTING PIER 3.
2. THE TRANSITION FROM PHASE 6 TO PHASE 7 CORRESPONDS WITH
SUBSTANTIAL COMPLETION OF THE INDICATED PORTIONS OF THE
PERMANENT SECURITY BARRIER, CEP-102 BULKHEAD, DREDGING
OPERATIONS, AND UTILITIES, SITE WORK, AND SOUTH RAMP TO
CEP-176 AT THE HEAD OF EXISTING PIER 3.
3. THE HATCHED AREA PROVIDES THE SPACE AVAILABLE TO THE
CONTRACTOR FOR LAYDOWN, OFFICES, MOORING OF BARGES, AND
CONSTRUCTION/DEMOLITION. THE LIMITS ARE DEFINED AS FOLLOWS:
A. A MINIMUM OF 50 FT SOUTH FROM THE SOUTH FACE OF PIER 3.
B. A MAXIMUM OF 100 FT WEST FROM THE WEST END OF
DEMOLISHED PIER 3.
C. A MINIMUM OF 500 FT NORTH FROM THE NORTH FACE OF
EXISTING PIER 2 EXCEPT AS NOTED IN 3.D.
D. A MAXIMUM OF 150 FT WEST FROM THE FACE OF EXISTING
CEP-102 BULKHEAD AND THE PARKING LOT BETWEEN EXISTING
CEP-102 BULKHEAD AND 3RD STREET WITHIN THE NORTH-SOUTH
LIMITS OF 3.C.
4. MOVEMENT OF CONTRACTOR BARGES, TUGS, AND OTHER SERVICE
CRAFT WILL REQUIRE COORDINATION WITH CONTRACTING OFFICER.
5. THE ENTIRE SLIP BETWEEN THE CONTRACTOR'S AVAILABLE SPACE
AND THE NORTH SIDE OF PIER 2 WILL BE ACTIVELY USED BY THE
NAVY FOR VESSEL (I.E., SHIPS, BARGES, AND OTHER WATERCRAFT)
MOVEMENT AND BERTHING THROUGHOUT THE DURATION OF THE
PHASE.
6. EXISTING PIERS 2 AND 4 AND THE NORTH SIDE OF PIER 3 / CEP-176
BULKHEAD MUST REMAIN IN OPERATION. THE CONTRACTOR MUST
ENSURE UNIMPEDED PERSONNEL, VEHICULAR, AND MOBILE CRANE
ACCESS TO AND ALONG EXISTING PIERS 2 AND 4 AND PIER 3 / CEP-176
BULKHEAD. FULL UTILITY SERVICES MUST REMAIN IN OPERATION
ALONG EXISTING PIERS 2 AND 4 AND PIER 3 / CEP-176 BULKHEAD.
7. CEP-176 BULKHEAD, PIER 3, UTILITY SERVICES BUILDING, GUARD
BOOTH, INDICATED PORTION OF THE PERMANENT SECURITY
PERIMETER, FLOATING SECURITY BARRIER, THE INDICATED PORTION
OF CEP-102 BULKHEAD, REFRIGERATOR CONCRETE PAD, DUMPSTER
ENCLOSURE, AND THE PROVISIONS FOR SECURITY AND BERTHING
OPERATIONS ARE SUBSTANTIALLY COMPLETE AND ARE ACCEPTED BY
AND TURNED OVER TO THE GOVERNMENT.
PH
AS
IN
G
PL
AN
PH
AS
E
BWT BWT MLC
AS NOTED
12828968
G-126
200'0 100'
AREA AVAILABLE TO CONTRACTOR IN
CURRENT PHASE
PIER 3, SEE NOTE 7
CEP-176 BULKHEAD, SEE NOTE 7
GUARD BOOTH, SEE NOTE 7
PERMANENT SECURITY
PERIMETER CONSTRUCTION,
SEE NOTE 1.B
PERMANENT SECURITY
PERIMETER CONSTRUCTION,
SEE NOTE 1.B
CEP-102 BULKHEAD, SEE NOTE 7
PERMANENT SECURITY
PERIMETER, SEE NOTE 7
TEMPORARY SECURITY BARRIER,
SEE NOTE 1.A
TEMPORARY SECURITY
BARRIER, SEE NOTE 1.A
DEMOLITION AND CONSTRUCTION OF
UTILITIES, SITE WORK, AND SOUTH
RAMP TO CEP-176 BULKHEAD, SEE
NOTE 1.E
CEP-102 BULKHEAD DEMOLITION
AND CONSTRUCTION, SEE NOTE
1.C
DREDGING AT EXISTING PIER 3,
CEP-102 BULKHEAD AND CEP-102
BULKHEAD BID OPTION, SEE NOTE 1.D
EXIST. PIER 2, SEE NOTE 6EXIST. PIER 2, SEE NOTE 6
FLOATING SECURITY
BARRIER, SEE NOTE 7
FI
LE
N
AM
E:
Z
:\C lie nt s\
AN
F\
US
Na vy \M id At
\W at er fro nt
ID
IQ
\1
8_ Pi er 3-
De sig n\ De sig n\
Ci vil
\S he et s\
P0
-1
-G -1
.d wg L
AY
O
UT
N
AM
E:
P
HA
SI
NG
P
LA
N
- P
HA
SE
P
LO
TT
ED
: F rid ay
, S ep te m be r 1
0,
- 1 0:
am
U
SE
R:
b wt ur le y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
EJA
DSN
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
DLB
UTILITY SERVICES BUILDING,
SEE NOTE 7
CONCRETE REFRIGERATOR
PAD, SEE NOTE 7
DUMPSTER ENCLOSURE,
SEE NOTE 7
CEP-102 BULKHEAD BID OPTION
BID OPTION GENERAL NOTES:
1. ALL WORK SHOWN IS BASE BID UNLESS IDENTIFIED
AS A BID OPTION.
2. WORK ASSOCIATED WITH THE DEMOLITION AND
CONSTRUCTION OF CEP-102 BEYOND 216'-1" FROM
EDGE OF NEW PIER 3 IS BID OPTION
B
ID
O
PT
IO
NS
/10
PIER 3 (1323'-6")
X X
X X X X
X X
C
CC
E E
E
E
E
E
EE
E
X X X X X X X X X X
X
X
X X
X X
X X
X
X X
X X
X
X
X X
X X
XX X
X
E
E
C
C
C
E
E
C
E
E
E
UTILITY SERVICES BUILDING UTILITY SERVICES BUILDING
GUARD
BOOTH
FFE=8.75'
GATEHOUSE
FFE=8.5'
W
WV
HYD D
WV
OW
HYD E WV
WV
W W W
W
HYD B
WVWV
W
HYD F
WV
HYD AWV
W
HYD C
WV
SS
SS SS
S
S
S
O W
OW
OW
OW
S
CO
W
8" DI
" D
I
6" DI
WV
CO
WV
1.25" PVC
WV
WV
3R D
ST
RE
ET
B AVENUE
A AVENUE
100'-0" 100'-0"
CONTRACTOR PARKING
CONTRACTOR LAYDOWN
CE
P-
2 B
UL
KH
EA
D
BI
D
OP
TI
ON
(4
'-6
CE
P-
BU
LK
HE
AD
(2
'-1
PLAN
NORTH
SCALE:1" = 100'
CONSTRUCTION PHASE 7 - PLAN
LEGEND:
CONTRACT WORK IN CURRENT PHASE
PHASE 7: WORK LIMITS NOTES:
1. WORK INCLUDED IN THIS PHASE:
A. MAINTAIN TEMPORARY SECURITY PERIMETER ALONG THE
INDICATED PORTIONS OF CEP-176, PIER 3, AND THE AREA
WEST OF THE UTILITY SERVICES BUILDING.
B. CONSTRUCTION OF REMAINING PIER 3 PERMANENT SECURITY
PERIMETER. CONSTRUCTION OF THE POP-UP BARRIERS MUST
OCCUR ONE AT A TIME TO MAINTAIN ONE LANE OF TRAFFIC.
C. CONSTRUCTION OF SECURITY ENCLAVE ENTRANCE.
CONSTRUCTION OF THE POP-UP BARRIERS, GATEHOUSE, AND
CANOPY MUST BE SEQUENCED TO MAINTAIN ONE LANE OF
TRAFFIC.
D. DEMOLITION AND CONSTRUCTION OF EXISTING PARKING LOT
AND DRIVE AISLES. WORK IS LIMITED TO ONLY TWO EXISTING
ROWS OF PARKING AT A TIME.
E. DEMOLITION OF TEMPORARY SECURITY BARRIERS AT THE
ENTRANCE TO EXISTING PIER 4.
2. THE TRANSITION FROM PHASE 7 TO PHASE 8 CORRESPONDS WITH
SUBSTANTIAL COMPLETION AND CONTRACTING OFFICER
ACCEPTANCE OF THE WORK WITHIN PHASE 7. LIMITED NOTICE TO
PROCEED TO PHASE 8 MAY BE PROVIDED UPON ACCEPTANCE OF
PIER 3 PERMANENT SECURITY PERIMETER AND SECURITY ENCLAVE
ENTRANCE.
3. THE HATCHED AREA PROVIDES THE SPACE AVAILABLE TO THE
CONTRACTOR FOR LAYDOWN, OFFICES, AND
CONSTRUCTION/DEMOLITION. THE LIMITS ARE DEFINED AS
FOLLOWS:
A. A 100 FT BY 100 FT AREA IMMEDIATELY ADJACENT TO THE
SECURITY ENCLAVE ENTRANCE.
4. EXISTING PIERS 2 AND 4, PIER 3 / CEP-176 BULKHEAD, AND CEP-102
BULKHEAD MUST REMAIN IN OPERATION. THE CONTRACTOR MUST
ENSURE UNIMPEDED PERSONNEL, VEHICULAR, AND MOBILE CRANE
ACCESS TO AND ALONG EXISTING PIERS 2 AND 4, PIER 3 / CEP-176
BULKHEAD, AND CEP-102 BULKHEAD. FULL UTILITY SERVICES MUST
REMAIN IN OPERATION ALONG EXISTING PIERS 2 AND 4 AND PIER 3 /
CEP-176 BULKHEAD.
5. CEP-176 BULKHEAD, PIER 3, UTILITY SERVICES BUILDING, GUARD
BOOTH, INDICATED PORTION OF THE PERMANENT SECURITY
PERIMETER, FLOATING SECURITY BARRIER, CEP-102 BULKHEAD,
REFRIGERATOR CONCRETE PAD, DUMPSTER ENCLOSURE, AND THE
PROVISIONS FOR SECURITY AND BERTHING OPERATIONS ARE
SUBSTANTIALLY COMPLETE AND ARE ACCEPTED BY AND TURNED
OVER TO THE GOVERNMENT.
PH
AS
IN
G
PL
AN
PH
AS
E
BWT BWT MLC
AS NOTED
12828969
G-127
200'0 100'
AREA AVAILABLE TO CONTRACTOR IN
CURRENT PHASE
PIER 3, SEE NOTE 5
CEP-176 BULKHEAD, SEE NOTE 5
GUARD BOOTH, SEE NOTE 5
SUBSTANTIALLY COMPLETE
PORTION OF PERMANENT
SECURITY PERIMETER, SEE
NOTE 5
SUBSTANTIALLY COMPLETE
PORTION OF PERMANENT
SECURITY PERIMETER, SEE
NOTE 5
UTILITY SERVICES BUILDING,
SEE NOTE 5
PERMANENT SECURITY
PERIMETER, SEE NOTE 5
TEMPORARY SECURITY BARRIER,
SEE NOTE 1.A
CEP-102
BULKHEAD, SEE
NOTE 5
REMAINING PIER 3
PERMANENT
SECURITY PERIMETER
CONSTRUCTION, SEE
NOTE 1.B
SECURITY ENCLAVE ENTRANCE
CONSTRUCTION, SEE NOTE 1.C
DEMOLITION AND
CONSTRUCTION OF EXISTING
PARKING LOT AND DRIVE
AISLES, SEE NOTE 1.D
TEMPORARY SECURITY
BARRIER, SEE NOTE 1.A
DEMOLITION OF TEMPORARY
SECURITY BARRIERS FOR EXISTING
PIER 4, SEE NOTE 1.E
FLOATING SECURITY
BARRIER, SEE NOTE 5
FI
LE
N
AM
E:
Z
:\C lie nt s\
AN
F\
US
Na vy \M id At
\W at er fro nt
ID
IQ
\1
8_ Pi er 3-
De sig n\ De sig n\
Ci vil
\S he et s\
P0
-1
-G -1
.d wg L
AY
O
UT
N
AM
E:
P
HA
SI
NG
P
LA
N
- P
HA
SE
P
LO
TT
ED
: F rid ay
, S ep te m be r 1
0,
- 1 0:
am
U
SE
R:
b wt ur le y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
EJA
DSN
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
DLB
CONCRETE REFRIGERATOR
PAD, SEE NOTE 5
DUMPSTER ENCLOSURE,
SEE NOTE 5
DEMOLITION AND
CONSTRUCTION OF
SITE FEATURES
AISLES, SEE NOTE 1.D
CEP-102 BULKHEAD BID OPTION
BID OPTION GENERAL NOTES:
1. ALL WORK SHOWN IS BASE BID UNLESS IDENTIFIED
AS A BID OPTION.
2. WORK ASSOCIATED WITH THE DEMOLITION AND
CONSTRUCTION OF CEP-102 BEYOND 216'-1" FROM
EDGE OF NEW PIER 3 IS BID OPTION
B
ID
O
PT
IO
NS
/10
PIER 3 (1323'-6")
X X
X X X X
X X
X X X X X X X X X X
X
X
X X
X X
X X
X
X X
X
X
X X
X X
XX X
X
E
E
C
C
C
E
E
C
E
E
C
CC
E E
E
E
E
E
EE
E
C
CC
E E
E
E
E
E
EE
E
X X X X X X X X X X
X
X
X X
X X
X X
X
X X
X
X
X X
X X
XX X
X
E
E
C
C
C
E
E
C
E
E
UTILITY SERVICES BUILDING UTILITY SERVICES BUILDING
GUARD
BOOTH
FFE=8.75'
GATEHOUSE
FFE=8.5'
CONTRACTOR PARKING
CONTRACTOR LAYDOWN
CE
P-
2 B
UL
KH
EA
D
BI
D
OP
TI
ON
(4
'-6
CE
P-
BU
LK
HE
AD
(2
'-1
PLAN
NORTH
SCALE:1" = 100'
CONSTRUCTION PHASE 8 - PLAN
LEGEND:
CONTRACT WORK IN CURRENT PHASE
PHASE 8: WORK LIMITS NOTES:
1. WORK INCLUDED IN THIS PHASE:
A. DEMOLITION OF TEMPORARY SECURITY PERIMETER ALONG
THE INDICATED PORTIONS OF CEP-176, PIER 3, AND THE AREA
WEST OF THE UTILITY SERVICES BUILDING. WORK WILL OCCUR
WITHIN THE PIER 3 SECURITY PERIMETER. COORDINATE
ACCESS WITH THE CONTRACTING OFFICER.
2. EXISTING PIERS 2 AND 4, PIER 3 / CEP-176 BULKHEAD, AND CEP-102
BULKHEAD MUST REMAIN IN OPERATION. THE CONTRACTOR MUST
ENSURE UNIMPEDED PERSONNEL, VEHICULAR, AND MOBILE CRANE
ACCESS TO AND ALONG EXISTING PIERS 2 AND 4, PIER 3 / CEP-176
BULKHEAD, AND CEP-102 BULKHEAD. FULL UTILITY SERVICES MUST
REMAIN IN OPERATION ALONG EXISTING PIERS 2 AND 4 AND PIER 3 /
CEP-176 BULKHEAD.
3. CEP-176 BULKHEAD, PIER 3, UTILITY SERVICES BUILDING, GUARD
BOOTH, GATEHOUSE, CANOPY, THE PERMANENT SECURITY
PERIMETER, SECURITY ENCLAVE ENTRANCE, FLOATING SECURITY
BARRIER, REFRIGERATOR CONCRETE PAD, DUMPSTER ENCLOSURE,
AND CEP-102 BULKHEAD ARE SUBSTANTIALLY COMPLETE AND ARE
ACCEPTED BY AND TURNED OVER TO THE GOVERNMENT.
PH
AS
IN
G
PL
AN
PH
AS
E
BWT BWT MLC
AS NOTED
12828970
G-128
200'0 100'
PIER 3, SEE NOTE 3
CEP-176 BULKHEAD, SEE NOTE 3
GUARD BOOTH, SEE NOTE 3
PERMANENT SECURITY
PERIMETER, SEE NOTE 3
PERMANENT SECURITY
PERIMETER, SEE NOTE 3
UTILITY SERVICES BUILDING,
SEE NOTE 3
PERMANENT
SECURITY PERIMETER,
SEE NOTE 3
TEMPORARY SECURITY BARRIER
DEMOLITION, SEE NOTE 1.A
CEP-102
BULKHEAD,
SEE NOTE 3
SECURITY ENCLAVE
ENTRANCE, SEE NOTE 3
TEMPORARY SECURITY BARRIER
DEMOLITION, SEE NOTE 1.A
FLOATING SECURITY
BARRIER, SEE NOTE 3
FI
LE
N
AM
E:
Z
:\C lie nt s\
AN
F\
US
Na vy \M id At
\W at er fro nt
ID
IQ
\1
8_ Pi er 3-
De sig n\ De sig n\
Ci vil
\S he et s\
P0
-1
-G -1
.d wg L
AY
O
UT
N
AM
E:
P
HA
SI
NG
P
LA
N
- P
HA
SE
P
LO
TT
ED
: F rid ay
, S ep te m be r 1
0,
- 1 0:
am
U
SE
R:
b wt ur le y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
EJA
DSN
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
DLB
CONCRETE REFRIGERATOR
PAD, SEE NOTE 3
DUMPSTER ENCLOSURE,
SEE NOTE 3
CEP-102 BULKHEAD BID OPTION
BID OPTION GENERAL NOTES:
1. ALL WORK SHOWN IS BASE BID UNLESS IDENTIFIED
AS A BID OPTION.
2. WORK ASSOCIATED WITH THE DEMOLITION AND
CONSTRUCTION OF CEP-102 BEYOND 216'-1" FROM
EDGE OF NEW PIER 3 IS BID OPTION
B
ID
O
PT
IO
NS
/10
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
G -4
A.
dw g
L
AY
O
UT
N
AM
E:
E
NL
AR
G
ED
B
ER
TH
IN
G P
LA
N
(B O
W -O
UT
PL
O
TT
ED
: F rid ay , S ep te m be r 1 0,
- 1
0:
am U
SE
R:
w ta fe l
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
EJA
DSN
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
SRETNIW.EELEKI
M
ENO
RTH CAROL I NA
ENG I NEER
FORP LA
NOISS
SEAL
026433
NC FIRM LICENSE NO. F-0105
PLAN
NORTH
SCALE: 1" = 20'
ENLARGED BERTHING PLAN (BOW-OUT)
NOTES:
1. MOORING LAYOUT SLIGHTLY MODIFIED FROM SHORE SUPPORT
HANDBOOK, FIGURE 3-7 IN ORDER TO ACCOMMODATE PIER
GEOMETRY.
2. PRVT = PRESSURE RELIEF VALVE TESTING.
3. PERSONNEL AND UTILITY BROWS NOT SHOWN, BUT CAN BE PLACED
AS NEEDED TO ACCESS SUBMARINES.
4. PRVT TRAVEL ZONE SHOWN FOR REFERENCE ONLY. NO STRIPING
REQUIRED IN THIS AREA.
UTILITY BOOM, TYP
COMPOSITE CAMEL (COMPOSITE CAMEL
BID OPTION @ BERTHS 1, 4 & 6), TYP, SEE
241'-5"
C/C DISTANCE BETWEEN CAMEL
157'-7"
C/C DISTANCE BETWEEN CAMEL
55'-0", TYP
PRVT TRAILER ZONEPRVT TRAILER ZONE
PRVT TRAILER ZONEPRVT TRAILER ZONE
'-0
2'-6"
2'-6"
CAMEL FENDER PLACEMENT ZONE, TYPICAL @ EACH BERTH (345'-4")FENDER PILES @ 8'-0" O.C. FENDER PILES @ 8'-0" O.C.
50 TON DOUBLE BITT, TYP
96'-6"
96'-6"
EN
LA
RG
ED
B
ER
TH
IN
G
PL
AN
(B
OW
-O
UT
BA/AC WBT PRG
AS NOTED
12828971
G-401
NBJ
FENDER PILE, TYP
ELECTRICAL
SUBSTATION, TYP
40'10'0 20'G-111
FIRE LANE
SUBMARINE MOORING LINE, TYP
COMPOSITE
CAMEL, TYP, SEE C1
SS550
BID OPTION GENERAL NOTE:
ALL WORK SHOWN SHALL BE PERFORMED AS A PART OF
THE BASE BID, UNLESS IDENTIFIED AS A BID OPTION OR
OTHERWISE NOTED.
C1
SS550
BI
D
OP
TI
ON
S 9/
/2
M
EW
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FIR
E L
AN
E
DO
NO
T B
LO
CK
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
G -4
A.
dw g
L
AY
O
UT
N
AM
E:
E
NL
AR
G
ED
B
ER
TH
IN
G P
LA
N
(B O
W
-IN
PL
O
TT
ED
: F rid ay
, S ep te m be r 1
0,
- 1 0:
am
U
SE
R:
w ta fe l
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
EJA
DSN
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
SRETNIW.EELEKI
M
ENO
RTH CAROL I NA
ENG I NEER
FORP LA
NOISS
SEAL
026433
NC FIRM LICENSE NO. F-0105
PLAN
NORTH
SCALE: 1" = 20'
ENLARGED BERTHING PLAN (BOW-IN)
NOTES:
241'-5"
C/C DISTANCE BETWEEN CAMEL
157'-7"
C/C DISTANCE BETWEEN CAMEL
55'-0", TYP
PRVT TRAILER ZONEPRVT TRAILER ZONE
PRVT TRAILER ZONEPRVT TRAILER ZONE
CAMEL FENDER PLACEMENT ZONE, TYPICAL @ EACH BERTH (345'-4")FENDER PILES @ 8'-0" O.C. FENDER PILES @ 8'-0" O.C.
50 TON DOUBLE BITT, TYP
96'-6"
96'-6"
FENDER PILE, TYP
UTILITY BOOM, TYP
'-0
2'-6"
2'-6"
EN
LA
RG
ED
B
ER
TH
IN
G
PL
AN
(B
OW
-IN
BA/AC WBT PRG
AS NOTED
12828972
G-402
NBJ
ELECTRICAL
SUBSTATION, TYP
40'10'0 20'G-112
FIRE LANE
SUBMARINE MOORING LINE, TYP
1. MOORING LAYOUT SLIGHTLY MODIFIED FROM SHORE SUPPORT
HANDBOOK, FIGURE 3-7 IN ORDER TO ACCOMMODATE PIER
GEOMETRY.
2. PRVT = PRESSURE RELIEF VALVE TESTING.
3. PERSONNEL AND UTILITY BROWS NOT SHOWN, BUT CAN BE PLACED
AS NEEDED TO ACCESS SUBMARINES.
4. PRVT TRAVEL ZONE SHOWN FOR REFERENCE ONLY. NO STRIPING
REQUIRED IN THIS AREA.
COMPOSITE CAMEL (COMPOSITE CAMEL
BID OPTION @ BERTHS 1, 4 & 6), TYP, SEE C1
SS550
COMPOSITE
CAMEL, TYP, SEE C1
SS550
BID OPTION GENERAL NOTE:
ALL WORK SHOWN SHALL BE PERFORMED AS A PART OF
THE BASE BID, UNLESS IDENTIFIED AS A BID OPTION OR
OTHERWISE NOTED.
BI
D
OP
TI
ON
S 9/
/2
M
EW
| G-125-PHASING PLAN - PHASE 5 |
| G-126-PHASING PLAN - PHASE 6 |
| G-127-PHASING PLAN - PHASE 7 |
| G-128-PHASING PLAN - PHASE 8 |
| G-401-ENLARGED BERTHING PLAN (BOW-OUT) |
| G-402-ENLARGED BERTHING PLAN (BOW-IN) |
2021-09-10T16:06:33-0400
2021-09-10T16:06:56-0400
2021-09-10T16:06:47-0400
2021-09-10T16:07:22-0400
| 2021-09-14T16:08:25-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-09-14T16:08:54-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-09-14T16:08:57-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-09-14T16:08:59-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-09-14T16:09:01-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-09-14T16:09:02-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-09-14T16:11:03-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-09-14T16:11:19-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-09-14T16:11:22-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-09-14T16:11:24-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-09-14T16:11:25-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-09-14T16:11:27-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .