1614696dwg06of22_CIVIL-SITE.pdf
PDF 20 MB Posted
- Attached to
- P-095 Pier 3 Recap Naval Station Norfolk, VA
- Solicitation number
- N4008521R0219
About this file
This document provides details on a federal solicitation for pier recapitalization work at Naval Station Norfolk in Virginia. The solicitation number is N4008521R0219 and concerns recapitalization of Pier 3, with responses due by July 15, 2021. The work is being conducted by the Department of the Navy Naval Facilities Engineering Command and involves general repairs and replacement of pilings, decking, utilities, and other pier infrastructure elements to restore the structure to full operational capacity. Offerors can expect the ensuing contract to be set aside for small businesses.
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P 101.10
STRUCTURE DEMOLITION, SEE SD DRAWINGS
CEP-176 WHARF EXCAVATION
DEMOLITION AC PAVEMENT, FULL DEPTH
DEMOLISH CONCRETE PAVEMENT,
CURB & GUTTER AND SIDEWALK
DEMOLITION ITEM
DEMOLITION UTILITY
ABANDON UTILITY IN PLACE
PLUG OR CAP EXISTING UTILITY
PIPE BOLLARD
STORM DRAIN
SHEET FLOW DIRECTION
CURB DROP INLET
DROP INLET
WHARF DROP INLET
STORM SEWER MANHOLE
GUARD RAIL
DEMOLITION CONTROL POINT
PAVEMENT / CURB CONSTRUCTION CONTROL POINT
ALIGNMENT CONTROL POINT
PAVEMENT ELEVATION
FINISHED FLOOR ELEVATION
CONTOUR
TEMPORARY SILT FENCE (SF)
(USE TEMPORARY STRAW WATTLE (SW) AT
PAVED AREAS)
TEMPORARY INLET PROTECTION
CDI
FFE = 104.00
DIDI
CDI
OR
OR
WDI
DP#
CP#
AP#
ASPHALTIC CONCRETE
CONNECTION TO EXISTING UTILITY
CLEANOUT
CAST IRON
CATCH BASIN
CORROSION RESISTANT STEEL
DROP INLET
MANHOLE
REINFORCED CONCRETE PIPE
UTILITY WITH CASING PIPE
INVERT ELEVATION
OILY WASTER MAIN
SANITARY SEWER MAIN
WATER MAIN
FIRE HYDRANT
WATER VALVE
POST INDICATOR VALVE
SANITARY SEWER MANHOLE
OILY WASTE MANHOLE
ELECTRIC MANHOLE
COMMUNICATION MANHOLE
SECURITY FENCE & GATE
CONCRETE PAVEMENT OR SIDEWALK
ASPHALT PAVEMENT, FULL DEPTH
ASPHALT PAVEMENT OVERLAY
TOPSOIL, SEED, FERTILIZE AND MULCH
SITE LIGHT
CI
INV EL
CO
RCP
DI
LIGHT POLE
OVERHEAD LIGHTS
CRES
HYD
PIV
WV
S
OW
E
C
OW
SS
W
OR
MH
CB
AC
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
C-
1.
dw g L
AY
O
UT
N
AM
E:
L
EG
EN
D
P
LO
TT
ED
: M on da y, M ar ch
9,
- 9 :5
7a m
U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
EJA
DSN
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
, V
A
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
CIVIL DEMOLITION, SITE, GRADING AND DRAINAGE, AND UTILITIES LEGEND:
CI
VI
L
LE
GE
ND
S
AN
D
AB
BR
EV
IA
TI
ON
S
C-001 12829019
AS NOTED
WBE DLK TRR
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
C-
2.
dw g L
AY
O
UT
N
AM
E:
C
IV
IL
G
EN
ER
AL
N
O
TE
S P
LO
TT
ED
: M on da y, M ar ch
9,
- 9
:5 8a m U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
GENERAL CONSTRUCTION NOTES
1. UTILITY SERVICES TO ALL BUILDINGS AND PIERS MUST BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. SHUT DOWN
PERIODS FOR TRANSFER OF UTILITY SERVICES MUST BE KEPT TO A MINIMUM AND MUST BE SUBJECT TO THE APPROVAL OF
THE CONTRACTING OFFICER.
2. CONTRACTOR MUST PROVIDE AND MAINTAIN ADEQUATE TRAFFIC CONTROL DEVICES OUTSIDE OF WORK AREAS.
3. CONTRACTOR MUST PROVIDE NECESSARY TEMPORARY STRUCTURAL CONNECTIONS OR TEMPORARY SUPPORTS FOR ALL STRUCTURAL COMPONENTS WHICH MAY BE AFFECTED BY WIND AND SNOW LOADING, TIDAL FLUCTUATIONS, AND WAVES
DURING CONSTRUCTION PERIOD.
4. CONTRACTOR MUST NOT COMMENCE ANY DEMOLITION OR CONSTRUCTION OPERATION UNLESS IT IS VERIFIED THAT
RELEVANT CONSTRUCTION/ ENVIRONMENTAL PERMITS HAVE BEEN ACQUIRED.
5. ALL SUBDRAINS AND STORM DRAIN PIPE LENGTHS ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF
STRUCTURE.
6. THE CONTRACTOR MUST BE RESPONSIBLE FOR REPLACING WITH MATCHING MATERIAL ANY ITEMS THAT MAY BE CUT OR
DAMAGED DURING CONSTRUCTION AT HIS OWN EXPENSE.
7. PAVEMENT MARKINGS MUST BE PROVIDED AT THE COMPLETION OF EACH PHASE OF CONSTRUCTION PRIOR ACCEPTANCE OF
PHASE BY THE CONTRACTING OFFICER.
8. ALL DIMENSIONS ARE FROM INSIDE FACE OF CURB OR FACE OF BUILDING OR OTHER STRUCTURE, UNLESS OTHERWISE
INDICATED.
9. CONTRACTOR MUST ESTABLISH CONTROL POINTS AND MAINTAIN THEM THROUGHOUT CONSTRUCTION. PROVIDE CONTROL POINT DATA TO CONTRACTING OFFICER INCLUDING NORTHING, EASTING, ELEVATION, DESCRIPTION, AND GENERAL
LOCATION DESCRIPTION.
10. FOR GENERAL CONSTRUCTION PHASING, SEE SHEETS G-121 THRU G-128.
11. EXPANSION JOINTS MUST BE PROVIDED AROUND CONCRETE PAVEMENTS AT BUILDINGS, JUNCTIONS, STRUCTURES, UTILITY TRENCHES, OR FIXED OBSTRUCTIONS. TRANSVERSE EXPANSION JOINTS MUST BE PROVIDED AT 30 FOOT INTERVALS AND TRANSVERSE CONTROL JOINTS MUST BE PROVIDED AT 10 FOOT INTERVALS, UNLESS OTHERWISE INDICATED. THICKENED EDGES MUST BE PROVIDED AT SIDES OF CONCRETE PAVEMENT OR SLABS THAT ARE NOT AGAINST BUILDINGS OR UTILITY
TRENCHES.
12. SEE SHEETS S-001 AND S-002 FOR LOAD REQUIREMENTS OF STRUCTURES
13. PAVEMENT MARKINGS MUST BE INSTALLED AT THE COMPLETION OF EACH PHASE OF CONSTRUCTION. PAVEMENT MARKINGS MUST MATCH EXISTING MARKING CONFIGURATION PRIOR TO CONSTRUCTION AND MUST BE INSTALLED ON PAVED AREAS THAT ARE DISTURBED AS A PART OF CONSTRUCTION. CONTRACTOR MUST DOCUMENT EXISTING PAVEMENT MARKINGS
PRIOR TO DEMOLITION AND SUBMIT TO CONTRACTING OFFICER.
DEMOLITION NOTES
1. PRIOR TO DEMOLITION PROVIDE PROTECTIVE MEASURES TO PREVENT DAMAGE TO EXISTING UTILITIES AND STRUCTURES
DURING CONSTRUCTION.
2. ALL PIPE SIZES AND LOCATIONS ARE APPROXIMATE. CONTRACTOR TO VERIFY IN FIELD PRIOR TO BEGINNING DEMOLITION.
3. CONTRACTOR MUST CONFIRM LOCATION OF NEAREST PIPING SYSTEM SHUT-OFF OR ISOLATION VALVE PRIOR TO DEMOLITION.
4. CONTRACTOR MUST REQUEST FOR OUTAGE PRIOR TO ANY VALVE CLOSING.
5. CONTRACTOR MUST PROCEED WITH DEMOLITION AFTER SPECIFIC VALVES HAVE BEEN DETERMINED BY "FEAD CONSTRUCTION
MANAGER" FOR CLOSURE AND ARE TAGGED BY GOVERNMENT.
6. CONTRACTOR MUST ADD TAG TO GOVERNMENT'S TAGGED VALVES.
7. CONTRACTOR MUST NOT OPERATE ANY EXISTING UTILITY VALVES. COORDINATE WITH "FEAD CONSTRUCTION MANAGER" WHEN VALVE SHUT-OFFS ARE REQUIRED. PROVIDE 15 DAY ADVANCE NOTICE FOR ANY REQUESTED VALVE OPERATIONS.
8. PIPES TO BE ABANDONED IN PLACE MUST BE PLUGGED AT LIMITS OF EXCAVATION. PIPES LARGER THAN 6-INCHES DIAMETER INDICATED TO BE ABANDONED MUST BE FILLED WITH CONTROLLED LOW-STRENGTH MATERIAL (CLSM).
9. REFER TO BORING LOGS FOR AVAILABLE EXISTING PAVEMENT COMPOSITION AND THICKNESS INFORMATION. SAWCUT EXISTING PAVEMENT IN STRAIGHT LINES AT LEAST ONE FOOT BEYOND THE THE MAXIMUM LIMITS OF EXCAVATION. PROTECT SAWCUT PAVEMENT EDGES FROM CRACKING, SLOUGHING, DAMAGE, OR UNDERMINING UNTIL TIME FOR PERMANENT PAVEMENT PATCHING. ADDITIONAL PAVEMENT SAWCUTS AND DEMOLITION NEEDED TO CORRECT EDGE DAMAGE PRIOR TO
PAVING MUST BE PERFORMED AT THE CONTRACTOR'S EXPENSE.
10. ALL EDGES OF PAVEMENT DEMOLITION MUST BE CLEAN, STRAIGHT SAWCUTS.
11. CONCRETE PAVEMENT DEMOLITION, REMOVE CONCRETE TO NEAREST EXPANSION OR CONTROL JOINT BEYOND THE LIMITS OF EXCAVATION. PROTECT PAVEMENT EDGE FROM DAMAGE OR UNDERMINING UNTIL TIME FOR PERMANENT PAVEMENT IS CONSTRUCTED. ADDITIONAL CONCRETE PAVEMENT DEMOLITION AS NEEDED TO CORRECT EDGE DAMAGE PRIOR TO PAVING
MUST BE PERFORMED AT THE CONTRACTOR'S EXPENSE.
12. CONTRACTOR MUST PROVIDE AND SUBMIT FOR APPROVAL TEMPORARY DRAINAGE PLAN PRIOR TO STORM PIPE AND STORM
STRUCTURE DEMOLITION.
13. AFTER DEMOLITION OF EXISTING STORM DRAINAGE SYSTEMS, CONTRACTOR MUST PROVIDE TEMPORARY DRAINAGE MEASURES (NOT LIMITED TO PIPING, PUMPING, ETC.) UNTIL STORM SYSTEM REPAIRS ARE COMPLETED.
14. REFER TO 'V' AND 'CD' DRAWINGS FOR EXISTING UTILITIES AND REQUIREMENTS FOR THEIR DEMOLITION. NOTE THAT ACTUAL
CONDITION MAY BE DIFFERENT.
15. UTILITIES THAT ARE CONFIRMED TO BE ABANDONED BY THE CONTRACTING OFFICER MUST BE DEMOLISHED FROM THE WORK ZONE IF IN CONFLICT WITH CONSTRUCTION. CAP ENDS OF ABANDONED UTILITY AT EDGE OF WORK ZONE.
16. STORM SEWER SYSTEMS MARKED FOR DEMOLITION MUST BE DEMOLISHED STARTING UPSTREAM AND MOVING IN
DOWNSTREAM DIRECTION.
CI
VI
L
GE
NE
RA
L
NO
TE
S
WBE DLK TRR
AS NOTED
12829020
C-002
DLB
FUEL SERVICE DEMOLITION NOTES
1. THE FOLLOWING NOTES PERTAIN TO UNDERGROUND STORAGE TANKS AND FUEL LINES ASSOCIATED WITH THE P-095 PROJECT
WORK.
2. DISCRETE/GRAB SAMPLES MUST BE COLLECTED ALONG CLOSED SECTIONS OF THE PIPELINE TO MEET THE SAMPLING REQUIREMENT OF SECTION 330 OF THE UNDERGROUND STORAGE TANK TECH REGULATION (GROUNDWATER OR SOIL, DEPENDING UPON SITE CONDITIONS). COMPOSITE SAMPLES (I.E. SOIL MIXTURES OR WATER MIXTURES) ARE NOT ACCEPTABLE.
SAMPLES SHOULD BE COLLECTED EVERY 250'. FOR SECTIONS OF THE PIPELINE THAT ARE CLOSED IN-PLACE, GRAB SAMPLING VIA DIRECT-PUSH TECHNOLOGY (GEOPROBE, ETC.) CAN BE USED TO ADVANCE THE SOIL BORINGS THROUGH
ASPHALT/CONCRETE NECESSARY FOR SAMPLE COLLECTION.
3. SAMPLES COLLECTED MUST BE ANALYZED FOR TPH-DRO (EPA METHOD 8015C).
4. A CLOSURE ASSESSMENT REPORT IS REQUIRED IN ALL CASES EXCEPT WHERE THE UNDERGROUND STORAGE TANK HAS VERIFIABLE EXTERNAL VAPOR OR GROUND WATER MONITORING (SEE 9 VAC 25-580-330). SUBMIT THE CLOSURE ASSESSMENT
REPORT TO BASE PUBLIC WORKS DEPARTMENT FOR REVIEW.
5. A CLOSURE ASSESSMENT REPORT INCLUDES THE FOLLOWING:
· A SITE MAP CONTAINING:
A. SCALE, NORTH ARROW, AND LEGEND.
B. ALL BUILDINGS AND ROADS (LABELED).
C. THE ENTIRE UST SYSTEM (THIS INCLUDES PIPES AND PUMP ISLANDS).
D. SOIL OR GROUNDWATER SAMPLE LOCATIONS AND DEPTHS.
E. OTHER IMPORTANT FEATURES INCLUDING MONITORING WELLS, DRINKING WATER WELLS, STREAMS, ETC.
· SAMPLE COLLECTION AND ANALYSIS:
A. IF OBVIOUS SIGNS OF CONTAMINATION ARE PRESENT (E.G. FREE PRODUCT, CONTAMINATED GROUND WATER, STAINED
SOIL, ETC.) THE COLLECTION OF SAMPLES IS NOT NECESSARY. CONTACT THE TANK/POL PROGRAM MANAGER IN THE EV DEPARTMENT AT PWD NORFOLK AND REPORT THE RELEASE WITHIN 24 HOURS OF DISCOVERY OF A REGULATED
SUBSTANCE IN THE ENVIRONMENT.
B. IF CONTAMINATION IS NOT OBVIOUS, SAMPLES SHOULD BE COLLECTED EVERY 250' ALONG THE CLOSED PIPELINE. SOIL SAMPLES MUST BE COLLECTED FROM: BENEATH THE PIPELINES IN SECTIONS WHERE THE PIPELINE IS DEMOED; AND ALONGSIDE THE BOTTOM OF THE PIPELINE IN SECTIONS WHERE THE JP-5 LINE WILL BE CLOSED IN-PLACE. IF GROUND WATER IS ENCOUNTERED, SOIL SAMPLES SHOULD BE COLLECTED FROM JUST ABOVE THE SOIL - GROUND WATER
INTERFACE.
C. ALL SAMPLES MUST BE COLLECTED FROM DISCRETE LOCATIONS. COMPOSITE SAMPLES (MIXTURES OF SOIL FROM
DIFFERENT LOCATIONS) ARE NOT ACCEPTABLE.
D. SAMPLES MUST BE ANALYZED FOR TPH-DRO USING EPA METHOD 8015C.
E. IF THE TANK CONTAINED PETROLEUM, LAB RESULTS FOR SOIL SAMPLES THAT EQUAL OR EXCEED 100 MG/KG TPH OR
WATER SAMPLES THAT EQUAL OR EXCEED 1 MG/L TPH MUST BE REPORTED TO DEQ. IF THE TANK CONTAINED A REGULATED SUBSTANCE (CERCLA LISTED SUBSTANCE) OTHER THAN PETROLEUM, ANALYTICAL RESULTS THAT EXCEED THE DETECTION LIMIT FOR THAT SUBSTANCE MUST BE REPORTED TO DEQ WITHIN 24 HOURS. PLEASE REPORT TO EV;
EV WILL REPORT TO VDEQ.
· ANY ADDITIONAL INFORMATION (PHOTOS, MAPS, NOTES FROM THE BUILDING INSPECTOR CONCERNING THE CLOSURE, OR
ANY OTHER DOCUMENTATION) THAT MAY HELP EVALUATE THE CLOSURE.
6. A CLOSURE PACKET MUST BE FILED WITHIN 30 DAYS OF THE TANK CLOSURE. THIS CLOSURE PACKET MUST BE SENT TO THE NAVFAC TANK/POL PROGRAM MANAGER FOR REVIEW AND FINALIZATION. NAVFAC PROGRAM MANAGER WILL SUBMIT TO
APPLICABLE DEQ REGIONAL OFFICE.
· THE CLOSURE PACKET WILL CONSIST OF:
A. THE COMPLETED AND SIGNED NOTIFICATION FORM 7530-3.
B. THE CLOSURE ASSESSMENT.
C. LAB SHEETS FROM ALL ANALYSES.
D. COPIES OF ALL DISPOSAL MANIFESTS (SLUDGE, CONTAMINATED SOIL AND/OR WATER, PIPING).
UTILITY NOTES
1. ALL STORM DRAIN PIPES MUST BE CLASS V RCP, UON.
2. TOPS OF MANHOLES AND CLEANOUTS TO BE SET TO ELEVATIONS MATCHING SURROUNDING FINAL GRADE UNLESS
OTHERWISE INDICATED.
3. STORM DRAIN MANHOLES AND INLETS MUST BE EITHER CAST-IN-PLACE OR PRECAST REINFORCED CONCRETE STRUCTURES.
4. ALL PIPELINES MUST BE PROVIDED WITH A MINIMUM OF 8-INCHES OF BEDDING.
5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND IDENTIFYING ALL VALVES OF EXISTING UTILITIES, AND MANHOLES
PRIOR TO STARTING DEMOLITION.
A. THE CONTRACTOR MUST MAINTAIN FULL ACCESS TO VALVES, HYDRANTS, AND MANHOLES.
B. THE CONTRACTOR MUST REPLACE ANY VALVE BOXES, RISERS, OR LIDS LOST OR DAMAGED DURING CONSTRUCTION AT
THEIR EXPENSE.
7. EXCEPT WHERE DIRECTED OTHERWISE, MAINTAIN MINIMUM 3 FEET HORIZONTAL AND ONE FOOT VERTICAL CLEARANCE BETWEEN UTILITY LINES AND OTHER STRUCTURES OR UTILITIES. WHERE LESS THAN ONE FOOT VERTICAL SEPARATION IS INDICATED, NEOPRENE PAD MUST BE INSTALLED BETWEEN THE UTILITIES, DUCTBANKS OR OTHER STRUCTURES.
8. THE SITE CONTRACTOR MUST ADJUST THE TOPS OF ALL MANHOLES, CLEANOUTS, AND VALVE COVERS SUCH THAT THEY ARE
FLUSH WITH THE TOP OF FINAL PAVEMENT SURFACE.
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
C-
3.
dw g L
AY
O
UT
N
AM
E:
E
RO
SI
O
N
CO
NT
RO
L
NO
TE
S
P
LO
TT
ED
: M on da y, M ar ch
9,
- 9 :5
8a m
U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
EROSION CONTROL NOTES
1. EROSION AND SEDIMENT CONTROL MEASURES MUST BE PROVIDED AND MAINTAINED IN ACCORDANCE WITH
SPECIFICATIONS AND THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH), WHEN THE HANDBOOK CONFLICTS WITH THE SPECIFICATIONS, THE SPECIFICATIONS MUST TAKE PRECEDENCE.
1. TEMPORARY & PERMANENT SOIL STABILIZATION MUST BE IN ACCORDANCE WITH VIRGINIA EROSION CONTROL
MINIMUM STANDARDS.
2. DURING CONSTRUCTION OF THE PROJECT, TEMPORARY SOIL STOCK PILES AND BORROW AREAS MUST BE STABILIZED OR PROTECTED WITH AN APPROPRIATE SEDIMENT CONTROL MEASURE. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES
BOTH ON SITE AS WELL AS AT OFF-SITE BORROW AND DISPOSAL AREAS.
3. STABILIZATION MEASURES MUST BE APPLIED TO EARTHEN STRUCTURES SUCH AS SLOPES, DIKES, AND
DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
4. EROSION AND SEDIMENT CONTROL DEVICES MUST BE PROVIDED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND MUST BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
5. CONTRACTOR MUST PROVIDE AND MAINTAIN POLLUTION PREVENTION MEASURES TO:
A. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH
WATER, AND OTHER WASH WATERS;
B. MINIMIZE THE EXPOSURE OF BUILDING MATERIALS, BUILDING PRODUCTS, CONSTRUCTION WASTES, TRASH, LANDSCAPE MATERIALS, FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS, SANITARY
WASTE, AND OTHER MATERIALS PRESENT ON-SITE TO PRECIPITATION AND TO STORMWATER;
C. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM SPILLS AND LEAKS AND IMPLEMENT CHEMICAL SPILL
AND LEAK PREVENTION AND RESPONSE PROCEDURES;
D. PROHIBIT THE DISCHARGE OF WASTEWATER FROM THE WASHOUT OF CONCRETE;
E. PROHIBIT THE DISCHARGE OF WASTEWATER FROM THE WASHOUT AND CLEANOUT OF PAINT, FORM
RELEASE OILS, CURING COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS; AND
F. PROHIBIT THE DISCHARGE OF FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT
OPERATION AND MAINTENANCE.
6. EFFLUENT FROM DEWATERING MUST BE FILTERED AS INDICATED HANDLED ACCORDING TO SPECIFICATIONS
AND NAVAL STATION NORFOLK INDIVIDUAL PERMIT.
7. THE CONTRACTOR MUST INSPECT THE EROSION CONTROL MEASURES AT LEAST ONCE IN EVERY TWO WEEK PERIOD AND AFTER EACH RUNOFF- PRODUCING STORM EVENT. DEFICIENCIES MUST BE CORRECTED
IMMEDIATELY.
8. ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED BY CONTRACTING OFFICER IF DEEMED
NECESSARY TO COMPLY WITH VESCH.
9. ALL EROSION CONTROL DEVICES MUST BE IN PLACE AND FUNCTIONAL AT ALL TIMES AND IF REMOVED FOR
CONSTRUCTION PROGRESS, MUST BE PROVIDED BY THE CLOSE OF EACH WORK DAY.
10. FINAL REMOVAL OF EROSION CONTROL DEVICES MUST NOT OCCUR UNTIL THE CONTRACTING OFFICER DEEMS
THE SITE STABILIZED.
11. THE CONTRACTOR IS RESPONSIBLE FOR THE OFF-SITE DISPOSAL AND STABILIZATION OF EXCESS SOIL IN ACCORDANCE WITH VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS.
AN EROSION CONTROL PLAN MUST BE SUBMITTED BY THE CONTRACTOR TO THE CONTRACTING OFFICER FOR REVIEW, AND APPROVAL PRIOR TO ANY LAND DISTURBING ACTIVITIES AT ANY OFF-SITE DISPOSAL AREAS. THE SOIL MUST BE SPREAD, FERTILIZED, SEEDED AND MULCHED. ALL EROSION CONTROL REQUIREMENTS LISTED
ABOVE MUST BE FOLLOWED.
VIRGINIA EROSION CONTROL MINIMUM STANDARDS
1. PERMANENT OR TEMPORARY SOIL STABILIZATION MUST BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS
AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION MUST BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE A FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION MUST BE APPLIED TO AREAS THAT ARE
TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS MUST BE STABILIZED OR
PROTECTED WITH SEDIMENT TRAPPING MEASURES. TEMPORARY PROTECTION AND PERMANENT
STABILIZATION MUST BE APPLIED TO ALL SOIL STOCKPILES ON SITE AND BORROW AREAS OR SOIL
INTENTIONALLY TRANSFERRED OFF SITE.
3. PERMANENT VEGETATIVE COVER MUST BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE
PERMANENTLY STABILIZED. PERMANENT VEGETATION MUST NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT MUST BE PROVIDED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND MUST BE MADE
FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
5. STABILIZATION MEASURES MUST BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND
DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
6. SEDIMENT TRAPS AND SEDIMENT BASINS MUST BE DESIGNED AND PROVIDED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. SEDIMENT TRAPS MUST BE PROVIDED TO CONTROL DRAINAGE AREAS LESS THAN THREE ACRES WITH MINIMUM STORAGE CAPACITY OF 134 CUBIC YARDS/ACRE OF DRAINAGE AREA. SEDIMENT BASINS MUST BE PROVIDED TO CONTROL DRAINAGE AREAS GREATER THAN THREE ACRES WITH MINIMUM STORAGE CAPACITY OF 134 CUBIC YARDS/ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM MUST AT A MINIMUM MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25
YEAR STORM OF 24 HOUR DURATION.
7. CUT AND FILL SLOPES MUST BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION.
SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION MUST BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
8. CONCENTRATED RUNOFF MUST NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN
ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION MUST BE
PROVIDED.
10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION MUST BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED
OR OTHERWISE TREATED TO REMOVE SEDIMENT.
11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING MUST BE
PROVIDED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS MUST BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST
EXTENT POSSIBLE DURING CONSTRUCTION. NON-ERODIBLE MATERIAL MUST BE USED FOR THE
CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESES STRUCTURES
IF ARMORED BY NON-ERODIBLE COVER MATERIALS.
13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NON-ERODIBLE
MATERIAL MUST BE PROVIDED.
14. ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE
WATERCOURSES MUST BE MET.
15. THE BED AND BANKS OF A WATERCOURSE MUST BE STABILIZED IMMEDIATELY AFTER WORK IN THE
WATERCOURSE IS COMPLETED.
16. UNDERGROUND UTILITY LINES MUST BE PROVIDED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN
ADDITION TO OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME
B. EXCAVATED MATERIAL MUST BE PLACED ON THE UPHILL SIDE OF TRENCHES
C. EFFLUENT FROM DEWATERING OPERATIONS MUST BE FILTERED OR PASSED THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY
AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES MUST BE PROPERLY COMPACTED IN ORDER TO MINIMIZE
EROSION AND PROMOTE STABILIZATION.
E. RE-STABILIZATION MUST BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS.
F. APPLICABLE SAFETY REGULATIONS MUST BE COMPLIED WITH.
17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS MUST BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE.
WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE MUST BE CLEANED THOROUGHLY AT THE END OF THE DAY. SEDIMENT MUST BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING MUST BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION MUST APPLY TO
INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND-DISTURBING ACTIVITIES.
18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES MUST BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES MUST BE PERMANENTLY
STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.
19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES MUST BE PROTECTED FROM THE SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW
RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN
ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE MUST BE DISCHARGED DIRECTLY INTO ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE, OR STORM SEWER SYSTEM. FOR THOSE SITES, DOWNSTREAM STABILITY
ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM MUST BE PERFORMED.
ER
OS
IO
N
CO
NT
RO
L
NO
TE
S
WBE DLK TRR
AS NOTED
12829021
C-003
DLB
XX
EXISTING PIER 4
EXISTING SECURITY BARRIER
EXISTING PIER 5
EXISTING PIER 2
EXISTING PIER 1
EXISTING PIER 3
EXISTING PIER 3T
A AVENUE
B AVENUE
2n d
ST
RE
ET
CEP198
CE
P2
EX
IS
TI
NG
C
EP
-1
W
HA
RF
EXISTING CEP-176 BULKHEAD
3r d
ST
RE
ET
ZONE X
ZONE AE
ZONE AE
ZONE AE
ZONE AE
ZONE X
ZONE X
ZONE VE
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
CD
0.
dw g L
AY
O
UT
N
AM
E:
C
IV
IL
D
EM
O
LI
TI
O N
ER
O
SI
O N
CO
NT
RO
L
O
VE
RA
LL
K
EY
P
LA
N P
LO
TT
ED
: M on da y, M ar ch
9,
- 9
:5 8a m U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
PLAN
NORTH
SCALE: 1" = 160'
CIVIL DEMOLITION & EROSION CONTROL OVERALL KEY PLAN
AREA 104 - SEE SHEET CD104 AREA 103 - SEE SHEET CD103AREA 105AREA 106AREA 107
AREA 102 - SEE SHEET CD102 AREA 101
AREA 111 - SEE SHEET CD111
AREA 110 - SEE SHEET CD110
AREA 109 - SEE SHEET CD109 AREA 108 - SEE SHEET CD108
AREA 112 - SEE SHEET CD112
AREA 113 - SEE SHEET CD113 CI
VI
L
DE
M
OL
IT
IO
N
ER
OS
IO
N
CO
NT
RO
L
OV
ER
AL
L
KE
Y
PL
AN
WBE DLK TRR
AS NOTED
12829022
CD100
DLB
AREA 114 - SEE SHEET CD110
320'0 160'
X
XX
X
X
X X X X X X
X
EXISTING PIER 3T
±200 SY1
FOR EXISTING PIER 3T DEMOLITION, SEE SD DRAWINGS
± 25 LF2
±40 LF 3
±36 LF 4
DP1
DP2
DP3
DP4
DP5
DP6
DP7
DP8
DP9
DP10
DP11
DP12
±20 SY9
±28 LF 22
±36 LF3
CAP WATER
PROVIDE THRUST RESTRAINT
SEE B1/CU502
1 DEMOLISH AC PAVEMENT, FULL DEPTH.
2 DEMOLISH OILY WASTE PIPE TO NEAREST MH AND PLUG.
3 DEMOLISH SANITARY SEWER TO NEAREST MH AND PLUG.
4 DEMOLISH WATER MAIN.
9 DEMOLISH CONCRETE PAVEMENT.
22 ABANDON WATER LINE, PLUG AND FILL WITH CLSM, SEE B1/CD502.
23 DEMOLISH TRENCH COVER.
24 PLUG EXISTING MANHOLE PIPE CONNECTION, SEE A3/CD502.
25 ABANDON EXISTING MANHOLE, SEE A4/CD502.
31 DEMOLISH BACKFLOW PREVENTERS AND VALVES.
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
CD
2.
dw g L
AY
O
UT
N
AM
E:
C
IV
IL
D
EM
O
LI
TI
O N
ER
O
SI
O N
CO
NT
RO
L
- A
RE
A
P
LO
TT
ED
: M on da y, M ar ch
9,
- 9
:5 9a m U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
PLAN
NORTH
SCALE: 1" = 20'
CIVIL DEMOLITION & EROSION CONTROL - AREA 102
MATCHLINE - SEE CD104
AREA 101AREA 102
AREA 103AREA 104AREA 105AREA 106AREA 107
AREA 108AREA 109
AREA 110
AREA 111
AREA 112
AREA 113
KEY PLAN
PLAN
NORTH
AREA 114
NOTES:
1. SEE C-001 & C-002 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. SEE C-003 FOR EROSION CONTROL NOTES.
3. FOR DEMOLITION OF PIER 3T, SEE STRUCTURAL DEMOLITION
DRAWINGS.
4. FOR MECHANICAL DEMOLITION IN THIS AREA SEE MECHANICAL
DEMOLITION DRAWINGS.
5. SEE CD601 FOR DEMOLITION CONTROL POINT (DP) TABLE.
6. SEE V-001 THRU V-003 FOR EXISTING SURVEY LEGEND, NOTES AND
SCHEDULES.
CI
VI
L
DE
M
OL
IT
IO
N
ER
OS
IO
N
CO
NT
RO
L
- A
RE
A
WBE DLK TRR
AS NOTED
12829023
CD102
DLB
40'10'0 20'
DEMOLITION NOTES:
(QUANTITIES SHOWN ARE FOR THIS SHEET ONLY)
u u u u u u u u u u u u u u u u u u u u u
X X
X X
XXXX
X X
X X
X
XX
X
X
±8700 SY, DEPTH VARIES
FROM APPROX 7" TO 9"1
FOR EXISTING CEP-176 DEMOLITION, SEE SD DRAWINGS
±196 LF6
±488 LF15
±488 LF15 ±488 LF15
±25 LF 6
DP13
DP18
DP19
DP84
DP83
DP87
SEE NOTE 7
±94 LF6
± 74 LF 6
PLUG PIPE
±285 LF4
±36 LF30
±14 LF6
N: 3508437.57 E: 12117949.6731
DP61
DP62
B1
SD302
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
CD
3.
dw g L
AY
O
UT
N
AM
E:
C
IV
IL
D
EM
O
LI
TI
O N
ER
O
SI
O N
CO
NT
RO
L
- A
RE
A
P
LO
TT
ED
: M on da y, M ar ch
9,
- 9
:5 9a m U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
PLAN
NORTH
SCALE: 1" = 20'
CIVIL DEMOLITION & EROSION CONTROL - AREA 103
M
AT
CH
LI
NE
SE
E
CD
MATCHLINE - SEE CD101
MATCHLINE - SEE CD108
AREA 101AREA 102
AREA 103AREA 104AREA 105AREA 106AREA 107
AREA 108AREA 109
AREA 110
AREA 111
AREA 112
AREA 113
KEY PLAN
PLAN
NORTH
AREA 114 CI
VI
L
DE
M
OL
IT
IO
N
ER
OS
IO
N
CO
NT
RO
L
- A
RE
A
WBE DLK TRR
AS NOTED
12829024
CD103
DLB
1 DEMOLISH EXISTING AC PAVEMENT, FULL DEPTH.
4 DEMOLISH WATER.
5 EXISTING CEP-176 WHARF EXCAVATION TO EL +3±. DEMOLISH
ALL BUILDINGS, PAVEMENT AND UTILITIES IN THIS AREA.
6 DEMOLISH DRAINAGE PIPE.
7 DEMOLISH DRAINAGE DI OR MH.
8 DEMOLISH LIGHT AND POLE, SEE ED DRAWINGS.
DEMOLITION NOTES:
(QUANTITIES SHOWN ARE FOR THIS SHEET ONLY)
NOTES:
1. SEE C-001 & C-002 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. SEE C-003 FOR EROSION CONTROL NOTES.
3. FOR DEMOLITION OF CEP-176, SEE STRUCTURAL DEMOLITION DRAWINGS.
4. FOR MECHANICAL DEMOLITION IN THIS AREA SEE MECHANICAL DEMOLITION
DRAWINGS.
5. FOR ELECTRICAL DEMOLITION IN THIS AREA SEE ELECTRICAL DEMOLITION
DRAWINGS.
6. SEE CD601 FOR DEMOLITION CONTROL POINT (DP) TABLE.
7. CONTRACTOR MUST RE-ESTABLISH SITE CONTROL PRIOR TO DEMOLITION OF
CONTROL POINT.
8. SEE V-001 THRU V-003 FOR EXISTING SURVEY LEGEND, NOTES AND SCHEDULES.
40'10'0 20'
15 DEMOLISH FUEL LINE.
30 ABANDON DRAINAGE PIPE. PLUG AND FILL WITH
CLSM, SEE B1/CD502.
31 CAP FOR CONNECTION IN FUTURE PHASE. SEE
A1/CD501
M
AT
CH
LI
NE
SE
E
CD
X
X X
XXXXXXXX
X X
X X
X
X
X
XX
X X
X X
X
±6250 SY, DEPTH
VARIES 7" TO 15"1
FOR EXISTING CEP-176 DEMOLITION, SEE SD DRAWINGS
FOR EXISTING CEP-102
BULKHEAD DEMOLITION,
SEE SD DRAWINGS
FOR EXISTING PIER 3
DEMOLITION, SEE SD
DRAWINGS
±26 LF 6
3r d
ST
RE
ET
±50 LF6
±232 SY9
±72 SY9
±84 LF 6
± 32 LF6
±276 LF15
±236 LF15
±150 LF15
±56 LF 15
PIER 3
±44 SY9
±710 SY 9
±32 SY 9
DP88
DP92 DP91
DP90
DP76
DP86
DP85
DP75
DP89
3 20
1 ±108 LF3
1 ±98 LF4
1 2
5 26
6 ±118 SY10
7 ±42 SY27
±20 LF4
±130 LF3
±306 LF4
±8 LF 4
±130 LF15
±276 LF15
PLUG
PIPE
DP63
M
AT
CH
LI
NE
SE
E
CD
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
CD
4.
dw g L
AY
O
UT
N
AM
E:
C
IV
IL
D
EM
O
LI
TI
O N
ER
O
SI
O N
CO
NT
RO
L
- A
RE
A
P
LO
TT
ED
: M on da y, M ar ch
9,
- 9
:5 9a m U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
PLAN
NORTH
SCALE: 1" = 20'
CIVIL DEMOLITION & EROSION CONTROL - AREA 104
MATCHLINE - SEE CD109
MATCHLINE - SEE CD102
AREA 101AREA 102
AREA 103AREA 104AREA 105AREA 106AREA 107
AREA 108AREA 109
AREA 110
AREA 111
AREA 112
AREA 113
KEY PLAN
PLAN
NORTH
AREA 114 CI
VI
L
DE
M
OL
IT
IO
N
ER
OS
IO
N
CO
NT
RO
L
- A
RE
A
WBE DLK TRR
AS NOTED
12829025
CD104
DLB
NOTES:
1. SEE C-001 & C-002 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. SEE C-003 FOR EROSION CONTROL NOTES.
3. FOR DEMOLITION OF EXISTING CEP-176 BULKHEAD, SEE STRUCTURAL
DEMOLITION DRAWINGS.
4. FOR DEMOLITION OF EXISTING CEP-102 BULKHEAD, SEE STRUCTURAL
DEMOLITION DRAWINGS.
5. FOR DEMOLITION OF EXISTING PIER 3, SEE STRUCTURAL DEMOLITION
DRAWINGS.
6. FOR MECHANICAL DEMOLITION IN THIS AREA SEE MECHANICAL
DEMOLITION DRAWINGS.
7. FOR ELECTRICAL DEMOLITION IN THIS AREA SEE ELECTRICAL
DEMOLITION DRAWINGS.
8. SEE CD601 FOR DEMOLITION CONTROL POINT (DP) TABLE.
9. SEE V-001 THRU V-003 FOR EXISTING SURVEY LEGEND, NOTES AND
SCHEDULES.
40'10'0 20'
1 DEMOLISH AC PAVEMENT, FULL DEPTH.
2 DEMOLISH OILY WASTE PIPE.
3 DEMOLISH SANITARY SEWER PIPE.
4 DEMOLISH WATER.
5 CEP-176 WHARF EXCAVATION TO EL +3±. DEMOLISH ALL
BUILDINGS, PAVEMENT AND UTILITIES IN THIS AREA.
6 DEMOLISH DRAINAGE PIPE.
7 DEMOLISH DRAINAGE DI OR MH.
8 DEMOLISH LIGHT, POLE AND FOUNDATION TO A DEPTH OF 12" BELOW
FINAL GRADE , SEE ED DRAWINGS.
9 DEMOLISH CONC PAVEMENT, CURB & GUTTER OR SIDEWALK.
10 DEMOLISH CONC DUMPSTER PAD & CMU WALL.
13 DEMOLISH 1 STORY BLOCK FUEL OIL BUILDING. DEMOLISH VALVE PIT
VP23, FUEL LINES AND APPURTENANCES AND BACKFILL.
14 DEMOLISH HIGH MAST LIGHT & FOUNDATION TO A DEPTH A MINIMUM
OF TWO FEET BELOW SUBGRADE ELEVATION.
15 DEMOLISH FUEL LINE.
20 DEMOLISH FIRE ALARM PULL BOX.
26 DEMOLISH UNDERGROUND FUEL TANK AND APPURTENANCES.
27 DEMOLISH FENCE ENCLOSURE AND CONCRETE PAD.
28 DEMOLISH MANHOLE.
29 DEMOLISH FIRE HYDRANT.
1 MAINTAIN WATER, SEWER, AND OILY WASTE SERVICE TO PIER 3 UNTIL
PHASE 5 CONSTRUCTION, SEE PHASING DRAWINGS. DEMOLISH IN
PHASE 5.
2 MAINTAIN WATER METER AND BACKFLOW PREVENTER FOR PIER 3
SERVICE UNTIL PHASE 5 CONSTRUCTION, SEE PHASING DRAWINGS.
DEMOLISH DURING PHASE 5 CONSTRUCTION.
3 RETURN EXISTING ALARM SYSTEM TO OPERATIONAL WITH THE
EXCEPTION OF THE DEMOLISHED NODES.
4 INLET WAS NOT FIELD LOCATED. DI POSSIBLY LOCATED UNDER
TEMPORARY METAL BUILDING. DI TO BE DEMOLISHED IF PRESENT.
WORK NOTES:
5 CAPPED PVC INDICATES LOCATION OF UNDERGROUND FUEL TANK.
6 REMOVE AND SALVAGE DUMPSTER EQUIPMENT IN PHASE 5.
7 REMOVE AND SALVAGE REFRIGERATED FOOD STORAGE
CONTAINER.
8 PROTECT ELECTRICAL EQUIPMENT.
DEMOLITION NOTES:
(QUANTITIES SHOWN ARE FOR THIS SHEET ONLY)
B1
SD302
X
X
X X
XXXXXXXXXXX
X X
X X
X
XXXXXXXXX
X X
X X
±4080 SY, DEPTH
VARIES 9" TO 12"1
±12 LF6
±210 SY,
±12" DEPTH1
±116 SY9
±28 SY9
±76 LF 12
±294 LF 12
±304 LF 12
±7 SY 17
±248 SY,
±12" DEPTH1
DP82
DP81
DP80
DP24
DP95
DP104
DP96
DP103
DP97
DP102
DP23DP22
DP21
DP20
DP36
DP35
DP37
DP38
DP79
PROTECT LIGHT POLE,
CONDUIT & CIRCUITS
PROTECT PULL BOX,
CONDUIT & CIRCUITS
SEE NOTE 4
±108 LF30
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
CD
8.
dw g L
AY
O
UT
N
AM
E:
C
IV
IL
D
EM
O
LI
TI
O N
ER
O
SI
O N
CO
NT
RO
L
- A
RE
A
P
LO
TT
ED
: M on da y, M ar ch
9,
- 1
0:
am U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
PLAN
NORTH
SCALE: 1" = 20'
CIVIL DEMOLITION & EROSION CONTROL - AREA 108
MATCHLINE - SEE CD103
MATCHLINE - SEE CD110
M
AT
CH
LI
NE
SE
E
CD
AREA 101AREA 102
AREA 103AREA 104AREA 105AREA 106AREA 107
AREA 108AREA 109
AREA 110
AREA 111
AREA 112
AREA 113
KEY PLAN
PLAN
NORTH
AREA 114 CI
VI
L
DE
M
OL
IT
IO
N
ER
OS
IO
N
CO
NT
RO
L
- A
RE
A
WBE DLK TRR
AS NOTED
12829026
CD108
DLB
NOTE:
1. SEE C-001 & C-002 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. SEE C-003 FOR EROSION CONTROL NOTES.
3. SEE CD601 FOR DEMOLITION CONTROL POINT (DP) TABLE.
4. CONTRACTOR MUST RE-ESTABLISH SITE CONTROL PRIOR TO
DEMOLITION OF CONTROL POINT.
5. SEE V-001 THRU V-003 FOR EXISTING SURVEY LEGEND, NOTES AND
SCHEDULES.
40'10'0 20'
1 DEMOLISH AC PAVEMENT, FULL DEPTH.
6 DEMOLISH DRAINAGE PIPE.
7 DEMOLISH DRAINAGE DI OR MH.
8 DEMOLISH LIGHT AND POLE.
9 DEMOLISH CONC PAVEMENT, CURB & GUTTER OR SIDEWALK.
12 DEMOLISH CONC WALL.
17 DEMOLISH CONC PAD TO A MINIMUM OF 18" BELOW EXISTING GRADE.
18 DEMOLISH PIPE BOLLARD & CONC BASE TO A MINIMUM OF 18" BELOW
EXISTING GRADE.
24 PLUG EXISTING DROP INLET PIPE CONNECTION, SEE A3/CD502.
30 ABANDON DRAINAGE PIPE. PLUG AND FILL WITH CLSM, SEE B1/CD502.
±72 SY,
±14" DEPTH 1
SALVAGE LUMINAIRE FOR
REINSTALLATION ON NEW POLE, SEE
ELECTRICAL PLANS FOR NEW LOCATION
X
XX
FOR EXISTING CEP-102
BULKHEAD DEMOLITION,
SEE SD DRAWINGS
±630 SY 9
3r d
ST
RE
ET
±54 LF 6
±32 SY 9
±1000 SY,
±16" DEPTH 1
REMOVE LUMINAIRE,
POLE TO REMAIN8
±54 LF677
±28 LF 6
±720 SY 9
±22 SY 9
±110 SY,
±13" DEPTH1
±40 LF 6
±116 LF12
± 118 LF12
±716 LF15
±2016 SY,
±12" DEPTH1
±68 LF6
±130 LF6
±37 SY 9
±48SY,
±16" DEPTH 1
±615 SY,
±16" DEPTH1
±78 SY,
±12" DEPTH1
±18 LF 6
SALVAGE LUMINAIRE FOR
REINSTALLATION ON NEW POLE, SEE
ELECTRICAL PLANS FOR NEW LOCATION
EXISTING CONCRETE PAD W/
TRANSFORMERS AND SWITCH GEAR TO
REMAIN, SEE ELECTRICAL DRAWINGS
DP78
DP77
DP25
DP71DP72
DP73
DP74
DP26
DP99 DP98
DP69
DP101DP100
DP27
DP70
DP28 DP29
DP30
DP31
DP32 DP33
DP65
DP66
DP68
DP67
DP131
DP57
DP56
DP55
DP58
DP59
DP60
DP53DP54
DP132
DP133
±670 SY,
±12" DEPTH1
TYP, 619
TYP, 1318
TYP, 418
7 7 7
±33 LF 6 ±18 LF 6 ±30 LF 6 ±18 LF6
DP134
DP135
DP136
DP137
DP140
DP141
DP139DP138
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
CD
9.
dw g L
AY
O
UT
N
AM
E:
C
IV
IL
D
EM
O
LI
TI
O N
ER
O
SI
O N
CO
NT
RO
L
- A
RE
A
P
LO
TT
ED
: M on da y, M ar ch
9,
- 1
0:
am U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
PLAN
NORTH
SCALE: 1" = 20'
CIVIL DEMOLITION & EROSION CONTROL - AREA 109
MATCHLINE - SEE CD104
MATCHLINE - SEE CD111
M
AT
CH
LI
NE
SE
E
CD
AREA 101AREA 102
AREA 103AREA 104AREA 105AREA 106AREA 107
AREA 108AREA 109
AREA 110
AREA 111
AREA 112
AREA 113
KEY PLAN
PLAN
NORTH
AREA 114 CI
VI
L
DE
M
OL
IT
IO
N
ER
OS
IO
N
CO
NT
RO
L
- A
RE
A
WBE DLK TRR
AS NOTED
12829027
CD109
DLB
NOTES:
1. SEE C-001 & C-002 FOR LEGEND, ABBREVIATIONS AND GENERAL
NOTES.
2. SEE C-003 FOR EROSION CONTROL NOTES.
3. FOR DEMOLITION OF EXISTING CEP-102 BULKHEAD, SEE STRUCTURAL
DEMOLITION DRAWINGS.
4. FOR MECHANICAL DEMOLITION IN THIS AREA SEE MECHANICAL
DEMOLITION DRAWINGS.
5. FOR ELECTRICAL DEMOLITION IN THIS AREA SEE ELECTRICAL
DEMOLITION DRAWINGS.
6. SEE CD601 FOR DEMOLITION CONTROL POINT (DP) TABLE.
7. SEE V-001 THRU V-003 FOR EXISTING SURVEY LEGEND, NOTES AND
SCHEDULES.
40'10'0 20'
1 DEMOLISH AC PAVEMENT, FULL DEPTH.
6 DEMOLISH DRAINAGE PIPE.
7 DEMOLISH DRAINAGE DI OR MH.
8 DEMOLISH LIGHT AND POLE, SEE ED DRAWINGS.
9 DEMOLISH CONC PAVEMENT, CURB & GUTTER OR SIDEWALK.
11 DEMOLISH CLEAT.
12 DEMOLISH CONC WALL.
15 DEMOLISH FUEL LINE.
18 DEMOLISH PIPE BOLLARD & CONC BASE TO A MINIMUM OF 18" BELOW
EXISTING GRADE.
19 DEMOLISH CONC POST BASE TO A MINIMUM OF 18" BELOW
EXISTING GRADE.
B AVENUE
±80 SY,
±14" DEPTH1
±11 SY,
±9" DEPTH1
±76 SY9
±545 SY,
±12" DEPTH1
±22 SY9
DP40
DP39 DP129
DP128DP127
DP125
DP126
u u u u u u u u u u u u u u u uuuuu u u u u uu u uu
XXXXXXXX
XX
±212 LF16
±324 LF16
±296 LF16
PLUG PIPE @
FUEL HOUSE
PLUG PIPE
A AVENUE
PLUG PIPE
±433 SY,
±9" DEPTH1
DP14
DP15
DP16
DP17
PLUG PIPE
PLUG PIPE
±8 LF15
±8 LF15
±8 LF15
PLUG PIPE
N: 3508517.25 E 12118421.31
N: 3508573.05 E: 12118399.1924
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
CD
0.
dw g L
AY
O
UT
N
AM
E:
C
IV
IL
D
EM
O
LI
TI
O N
ER
O
SI
O N
CO
NT
RO
L
- A
RE
A
P
LO
TT
ED
: M on da y, M ar ch
9,
- 1
0:
am U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
MATCHLINE - SEE CD108
M
AT
CH
LI
NE
SE
E
CD
AREA 101AREA 102
AREA 103AREA 104AREA 105AREA 106AREA 107
AREA 108AREA 109
AREA 110
AREA 111
AREA 112
AREA 113
KEY PLAN
PLAN
NORTH
AREA 114
CI
VI
L
DE
M
OL
IT
IO
N
ER
OS
IO
N
CO
NT
RO
L
- A
RE
A
AR
EA
WBE DLK TRR
AS NOTED
12829028
CD110
DLB
NOTE:
1. SEE C-001 & C-002 FOR LEGEND, ABBREVIATIONS AND GENERAL
NOTES.
2. SEE C-003 FOR EROSION CONTROL NOTES.
3. SEE CD601 FOR DEMOLITION CONTROL POINT (DP) TABLE.
4. TOPOGRAPHY SHOWN EAST OF SURVEY LIMITS WAS TAKEN FROM
EXISTING BASE GIS MAPPING.
5. SEE V-001 THRU V-003 FOR EXISTING SURVEY LEGEND, NOTES AND
SCHEDULES.
1 DEMOLISH AC PAVEMENT, FULL DEPTH.
8 DEMOLISH LIGHT AND POLE, SEE ED DRAWINGS.
9 DEMOLISH CONC PAVEMENT, CURB & GUTTER OR SIDEWALK.
15 DEMOLISH FUEL LINE.
16 ABANDON FUEL LINE. PLUG AND FILL WITH CLSM TO VALVE AT 2ND
STREET. 725 LF OF FUEL PIPE TOTAL TO BE ABANDONED TO 2ND
STREET VALVE HOUSE.
24 PLUG EXISTING MANHOLE PIPE CONNECTION, SEE A3/CD502.
31 ASPHALT BERM. SEE A5/CD501
±50 SY9
M
AT
CH
LI
NE
SE
E
CD
PLAN
NORTH
40'10'0 20'
40'10'0 20'
SCALE: 1" = 20'
CIVIL DEMOLITION AND EROSION CONTROL - AREA 110C1
NORTH
SCALE: 1" = 20'
CIVIL DEMOLITION AND EROSION CONTROL - AREA 114A1
FOR EXISTING CEP-102
BULKHEAD DEMOLITION,
SEE SD DRAWINGS
±150 SY 9
3r d
ST
RE
ET
B AVENUE
PIER 2
±1530 SY,
±12" DEPTH1
±60 LF6
±52 LF6
±282 SY9
±104 SY9
REMOVE LUMINAIRE,
POLE TO REMAIN8
±1720 SY,
±12" DEPTH 1
±82 SY 9
PLUG PIPE
±24 LF15
±200 LF15
±480 LF16
±144SY,
±16" DEPTH1
±28 SY9
±208 SY,
±12" DEPTH1
±36 SY,
±12" DEPTH 1
PLUG PIPE
PLUG PIPE
±126 LF21
DP43DP44
DP45DP46
DP47DP48
DP52
DP51
DP50
DP49
DP94
DP93
DP106 DP105
DP107
DP108
REMOVE LUMINAIRE,
POLE TO REMAIN8
R=30.5'
SEE NOTE 5
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
CD
1.
dw g L
AY
O
UT
N
AM
E:
C
IV
IL
D
EM
O
LI
TI
O N
ER
O
SI
O N
CO
NT
RO
L
- A
RE
A
P
LO
TT
ED
: M on da y, M ar ch
9,
- 1
0:
am U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
PLAN
NORTH
SCALE: 1" = 20'
CIVIL DEMOLITION & EROSION CONTROL - AREA 111
MATCHLINE - SEE CD109
MATCHLINE - SEE CD112
M
AT
CH
LI
NE
SE
E
CD
AREA 101AREA 102
AREA 103AREA 104AREA 105AREA 106AREA 107
AREA 108AREA 109
AREA 110
AREA 111
AREA 112
AREA 113
KEY PLAN
PLAN
NORTH
AREA 114 CI
VI
L
DE
M
OL
IT
IO
N
ER
OS
IO
N
CO
NT
RO
L
- A
RE
A
WBE DLK TRR
AS NOTED
12829029
CD111
DLB
NOTES:
1. SEE C-001 & C-002 FOR LEGEND, ABBREVIATIONS AND GENERAL
NOTES.
2. SEE C-003 FOR EROSION CONTROL NOTES.
3. FOR DEMOLITION OF EXISTING CEP-102 BULKHEAD, SEE STRUCTURAL
DEMOLITION DRAWINGS.
4. SEE CD601 FOR DEMOLITION CONTROL POINT (DP) TABLE.
5. CONTRACTOR MUST RE-ESTABLISH SITE CONTROL PRIOR TO
DEMOLITION OF CONTROL POINT.
6. SEE V-001 THRU V-003 FOR EXISTING SURVEY LEGEND, NOTES AND
SCHEDULES.
40'10'0 20'
1 DEMOLISH AC PAVEMENT, FULL DEPTH.
6 DEMOLISH DRAINAGE PIPE.
7 DEMOLISH DRAINAGE DI OR MH.
8 DEMOLISH LIGHT AND POLE, SEE ED DRAWINGS.
9 DEMOLISH CONC PAVEMENT, CURB & GUTTER OR SIDEWALK.
11 DEMOLISH CLEAT.
13 DEMOLISH 1 STORY BLOCK FUEL OIL BUILDING. DEMOLISH VALVE
PIT VP22, FUEL LINES AND APPURTENANCES AND BACKFILL.
15 DEMOLISH FUEL LINE.
16 ABANDON FUEL LINE. PLUG AND FILL WITH CLSM TO
VALVE PIT VP21.
21 ABANDON STORM DRAIN PIPE. PLUG AND FILL WITH CLSM.
DP42
DP41
DP34DP130
3r d
ST
RE
ET
PIER 2
REMOVE LUMINAIRE,
POLE TO REMAIN8
±21 SY, DEPTH
VARIES 7" TO 14" 1
±32 SY 9
±480 LF16
±144 LF16
±22 SY, DEPTH
VARIES 7" TO 14"1
±27 SY, DEPTH
VARIES 7" TO 14"1
±2 SY, DEPTH
VARIES 7" TO 14"1
±38 SY 9
DP112DP111
DP109
DP110
DP113
DP116
DP115
DP114
DP119
DP118
DP117
DP120
REMOVE LUMINAIRE,
POLE TO REMAIN8
REMOVE LUMINAIRE,
POLE TO REMAIN8
REMOVE LUMINAIRE,
POLE TO REMAIN8
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
CD
2.
dw g L
AY
O
UT
N
AM
E:
C
IV
IL
D
EM
O
LI
TI
O N
ER
O
SI
O N
CO
NT
RO
L
- A
RE
A
P
LO
TT
ED
: M on da y, M ar ch
9,
- 1
0:
am U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
PLAN
NORTH
SCALE: 1" = 20'
CIVIL DEMOLITION & EROSION CONTROL - AREA 112
MATCHLINE - SEE CD111
MATCHLINE - SEE CD113
AREA 101AREA 102
AREA 103AREA 104AREA 105AREA 106AREA 107
AREA 108AREA 109
AREA 110
AREA 111
AREA 112
AREA 113
KEY PLAN
PLAN
NORTH
AREA 114 CI
VI
L
DE
M
OL
IT
IO
N
ER
OS
IO
N
CO
NT
RO
L
- A
RE
A
WBE DLK TRR
AS NOTED
12829030
CD112
DLB
NOTE:
1. SEE C-001 & C-002 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. SEE C-003 FOR EROSION CONTROL NOTES.
3. SEE CD601 FOR DEMOLITION CONTROL POINT (DP) TABLE.
4. SEE V-001 THRU V-003 FOR EXISTING SURVEY LEGEND, NOTES AND
SCHEDULES.
40'10'0 20'
1 DEMOLISH AC PAVEMENT, FULL DEPTH.
8 DEMOLISH LIGHT AND POLE, SEE ED DRAWINGS.
9 DEMOLISH CONC PAVEMENT, CURB & GUTTER OR SIDEWALK.
16 ABANDON FUEL LINE. PLUG AND FILL WITH CLSM TO VALVE PIT VP21.
X X
X
X
X
X
3r d
ST
RE
ET
PIER 1
±53 SY, DEPTH
VARIES 7" TO 14"1
±27 SY 9
REMOVE LUMINAIRE,
POLE TO REMAIN8
DP124
DP121
DP123
DP122
REMOVE LUMINAIRE,
POLE TO REMAIN8
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
Pi er
\P
IE
RP
5-
6-
CD
3.
dw g L
AY
O
UT
N
AM
E:
C
IV
IL
D
EM
O
LI
TI
O N
ER
O
SI
O N
CO
NT
RO
L
- A
RE
A
P
LO
TT
ED
: M on da y, M ar ch
9,
- 1
0:
am U
SE
R:
d ko on s
A
B
C
D
2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
TE
M
S C
O M
M A
N D
UNCLASSIFIED
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
P -0
R
E P
LA
C
E S
U B
M A
R
IN
E P
IE
R
N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1614696
WMS/IAS
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C C
I C O
R E
H
A M
P
TO
N R
O A
D S
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
P
S
N
RRO F E S S I O N A L E N G I N E E R
T A
T
E O F M A R Y
L A
N
DW
I L
L IA M WHEATON
O . 2 4 6 2 8 E G I S T E R E D
H.
GEOFFREY R. MOSS
DIRECTOR OF WARFARE REQUIREMENTS
SUBMARINE FORCES ATLANTIC
03/05/2021
JAMES E. DONAHUE, R.A.
PLAN
NORTH
SCALE: 1" = 20'
CIVIL DEMOLITION & EROSION CONTROL - AREA 113
MATCHLINE - SEE CD112
AREA 101AREA 102
AREA 103AREA 104AREA 105AREA 106AREA 107
AREA 108AREA 109
AREA 110
AREA 111
AREA 112
AREA 113
KEY PLAN
PLAN
NORTH
AREA 114 CI
VI
L
DE
M
OL
IT
IO
N
ER
OS
IO
N
CO
NT
RO
L
- A
RE
A
WBE DLK TRR
AS NOTED
12829031
CD113
DLB
40'10'0 20'
NOTE:
1. SEE C-001 & C-002 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. SEE C-003 FOR EROSION CONTROL NOTES.
3. SEE CD601 FOR DEMOLITION CONTROL POINT (DP) TABLE.
4. SEE V-001 THRU V-003 FOR EXISTING SURVEY LEGEND, NOTES AND
SCHEDULES.
1 DEMOLISH AC PAVEMENT, FULL DEPTH.
8 DEMOLISH LIGHT AND POLE, SEE ED DRAWINGS.
9 DEMOLISH CONC PAVEMENT, CURB & GUTTER OR SIDEWALK.
NOTES:
1. LOCATE AT POINTS OF INGRESS & EGRESS. ENTRANCE LOCATIONS
MAY VARY DURING CONSTRUCTION PERIOD.
2. LOCATIONS TO BE DETERMINED BY THE CONTRACTING OFFICER.
' M
IN
' M
IN
TY
P
10' MIN
TYP
EDGE OF EXISTING ROADWAY OR PAVEMENT
6" THICK LAYER OF COARSE
AGGREGATE (2" TO 3" DIA STONE)
12' MIN
FILTER FABRIC ATTACHED TO WIRE
FENCE (MESH SPACING = 6" MAX, 12 1/2
GAUGE MIN)
6' MAX
FLOW
EXTENSION OF FABRIC AND WIRE
INTO THE TRENCH
1'- 0"
M
IN
1'- 4"
M
IN
2'-
" M
AX
FILTER FABRIC ATTACHED TO WIRE FENCE
(MESH SPACING = 6" MAX, 12 1/2 GAUGE MIN)
STEEL OR WOOD
POST, TYP
STEEL OR WOOD
POST
GROUND LINE
WIRE
FILTER FABRIC
4"x4" TRENCH W/
COMPACTED BACKFILL
DEPTH OF THE SEDIMENT SACK SHALL BE DETERMINED BY THE DEPTH
AND FLOW REQUIREMENTS OF THE DROP INLET STRUCTURE AND THE
MANUFACTURER'S RECOMMENDATIONS.
THE SEDIMENT SACK SHALL BE MADE FROM A WOVEN
POLYPROPYLENE FABRIC WITH AN OIL ABSORBENT PILLOW
INSERT. WHERE A HIGH OIL CONTENT IN THE STORM
WATER SHALL OCCUR, AN OIL SEDIMENT SACK MADE
COMPLETELY OF AN OIL ABSORBTION MATERIAL WITH A
WOVEN PILLOW INSERT SHALL BE USED.
= DEPTH
OIL-ABSORBENT SEDIMENT SACK
SEDIMENT SACK SPECIFICATIONS
NOTE:
THE SEDIMENT SACK SHALL BE MANUFACTURED
FROM A WOVEN POLYPROPYLENE FABRIC THAT
MEETS OR EXCEEDS THE FOLLOWING
SPECIFICATIONS.
PROPERTIES UNITS
GRAB TENSILE STRENGTH
GRAB TENSILE ELONGATION
PUNCTURE
MULLEN BURST TRAPEZOID
TEAR UV RESISTANCE
APPARENT OPENING SIZE
FLOW RATE
PERMITTIVITY
265 LBS
20 %
135 LBS
420 PSI
45 LBS
90 %
20 US SIEVE 200
GAL/MIN/SQ FT 1.5 SEC -1
DUMP LOOPS
EXISTING DROP INLET GRATE
SEDIMENT SACK
OPTIONAL OVERFLOW
1" REBAR FOR BAG
REMOVAL FROM INLET
EXISTING DROP INLET GRATE
EXPANSION RESTRAINT
EXISTING DROP INLET
STRAW ROLLS MUST BE PLACED
ALONG EDGE OF DISTURBANCE
NOTE:
STRAW ROLL INSTALLATION REQUIRES THE PLACEMENT AND SECURE STAKING OF THE ROLL IN
A TRENCH, 3"-5" DEEP, DUG ON CONTOUR, IN UNPAVED AREAS. IN PAVED AREAS, DRIVE LARGE
NAIL THROUGH WATTLE; BRICKS MAY BE USED TO HOLD WATTLES IN PLACE. RUNOFF MUST
NOT BE ALLOWED TO RUN UNDER OR AROUND ROLL.
UNPAVED PLACEMENT
PAVED PLACEMENT
8" - 10" DIA
3"
5"
8" - 10" DIA
EXISTING PAVEMENT
EDGE OF PAVEMENT
DEMOLITION / DISTURBANCE
LARGE NAIL
1" x 1" STAKE PURPOSE:
1. THE PURPOSE OF A DEWATERING BAG IS TO COLLECT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .