1614696spc11of19_APP-B3.pdf
PDF 17 MB Posted
- Attached to
- P-095 Pier 3 Recap Naval Station Norfolk, VA
- Solicitation number
- N4008521R0219
About this file
This solicitation is for Pier 3 Recapitalization work at Naval Station Norfolk, Virginia. The Department of the Navy Naval Facilities Engineering Command is seeking proposals for construction services including structural repairs and upgrades, electrical system replacements, and HVAC renovations. Offerors must submit proposals no later than July 6, 2021, and the contract is to be awarded by September 30, 2021. The opportunity is set aside for small businesses.
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX - B
(PART-3)
GEOTECHNICAL
ENGINEERING REPORT
FY21 MCON PROJECT P-095
REPLACE SUBMARINE PIER 3
NAVAL STATION NORFOLK, NORFOLK, VA
eProjects Work Order No. 1614696 A-E Contract No. N40085-18-D-1100
Delivery Order N40085-19-F-4195
APPENDIX VIII
SHELBY TUBE CLASSIFICATIONS
Location: Norfolk Naval Station, Norfolk, VA
Client: Moffatt & Nichol
Date Sampled: 1/14/2019
Depth below mudline
(ft.)
30-32 ft.
Length
(in.)
Depth below
Top of
Pier Deck
(ft.)
24 66-68
Natural Moisture -#200 Sieve Atterberg Limits
(%) (%) LL/PL/PI
87.9 99.1 82/33/49
Boring: B-2
Project: P-095 Replace Submarine Pier 3
Job No: VB18-344G
Sample No.: 11
Description:
Gray, wet, Fat CLAY (CH) with little to some organic material, soft
Picture:
Date Sampled: 1/19/2019 Depth below mudline (ft.)
16-18 ft.
Length (in.)
Depth below Top of Pier Deck (ft.)
24 36-38
Natural Moisture -#200 Sieve Atterberg Limits
(%) (%) LL/PL/PI
85 88 112/37/75
Sample No.: 8
Description:
Gray, wet, Fat CLAY (CH) Picture:
Boring: B-3
Project: P-095 Replace Submarine Pier 3
Job No: VB18-344G
Date Sampled: 1/19/2019
Depth below mudline
(ft.)
20-22 ft.
Length
(in.)
Depth below
Top of
Pier Deck
(ft.)
24 40-42
Natural Moisture -#200 Sieve Atterberg Limits
(%) (%) LL/PL/PI
76.4 98.9 79/25/54
Boring: B-3
Project: P-095 Replace Submarine Pier 3
Job No: VB18-344G
Sample No.: 10
Description:
Gray, wet, Fat CLAY (CH)
Date Sampled: 1/19/2019
Depth below mudline
(ft.)
26-28 ft.
Length
(in.)
Depth below
Top of
Pier Deck
(ft.)
24 46-48
Natural Moisture -#200 Sieve Atterberg Limits
(%) (%) LL/PL/PI
73.5 98.6 101/35/66
Sample No.: 12
Description:
Gray, wet, Fat CLAY (CH)
Picture:
Boring: B-3
Date Sampled: 1/19/2019
Depth below mudline
(ft.)
30-32
Length
(in.)
Depth below
Top of
Pier Deck
(ft.)
24 50-52
Natural Moisture -#200 Sieve Atterberg Limits
(%) (%) LL/PL/PI
71.2 99.2 93/38/55
Sample No.: 14
Description:
Gray, wet, Fat CLAY (CH)
Picture:
Boring: B-3
Date Sampled: 1/19/2019
Depth below mudline
(ft.)
36-38 ft.
Length
(in.)
Depth below
Top of
Barge
(ft.)
24 56-58
Natural Moisture -#200 Sieve Atterberg Limits
(%) (%) LL/PL/PI
69.9 99.8 96/37/59
Sample No.: 16
Description:
Gray, wet, Fat CLAY (CH)
Picture:
Boring: B-3
Date Sampled: 1/19/2019
Depth below mudline
(ft.)
40-42 ft.
Length
(in.)
Depth below
Top of
Barge
(ft.)
24 60-62
Natural Moisture -#200 Sieve Atterberg Limits
(%) (%) LL/PL/PI
128.7 81.4 193/111/82
Boring: B-3
Project: P-095 Replace Submarine Pier 3
Job No: VB18-344G
Sample No.: 18
Description:
Gray, wet, Fat CLAY (CH)
Date Sampled: 1/17/2019
Depth below mudline
(ft.)
26-28 ft.
Length
(in.)
Depth below
Top of
Barge
(ft.)
24 55-57
Natural Moisture -#200 Sieve Atterberg Limits
(%) (%) LL/PL/PI
50.4 59.4 67/20/47
Sample No.: 10
Description:
Gray, wet, Fat CLAY (CH)
Picture:
Boring: B-5
Date Sampled: 1/7/2019 Depth below grade (ft.)
20-22 ft.
Length (in.)
Depth below grade (ft.)
24 20-22
Natural Moisture -#200 Sieve Atterberg Limits
(%) (%) LL/PL/PI
30 22.8 33/20/13
Boring: B-6
Project: P-095 Replace Submarine Pier 3
Job No: VB18-344G
Sample No.: 9
Description:
Mottled Brown, wet, Clayey fine to medium SAND (SC)
Date Sampled: 1/11/2019 Depth below grade (ft.)
50-52 ft.
Length (in.)
Depth below
Grade (ft) 24 50-52
Natural Moisture -#200 Sieve Atterberg Limits
(%) (%) LL/PL/PI
46 22.4 27/17/10
Boring: B-7
Project: P-095 Replace Submarine Pier 3
Job No: VB18-344G
Sample No.: 15
Description:
Gray, wet, Clayey fine to medium SAND (SC)
APPENDIX IX
CONSOLIDATION AND COMPRESSION TEST RESULTS
TRIAXIAL SHEAR TEST REPORT
GET SOLUTIONS, INC.
Client: Moffat & Nichol
Project: P-095 Replace Submarine Pier 3
Location: B-2 (30-32 ft. below mudline)
Sample Number: B-3 Depth: 66-68 ft.
Proj. No.: VB18-344G Date Sampled: 1/14/19
Type of Test:
Unconsolidated Undrained
Sample Type: Shelby Tube
Description: Gray, Fat CLAY
LL= 82 PI= 49PL= 33
Assumed Specific Gravity= 2.7
Remarks: Passing #200 Sieve = 99.1%
Natural Moisture = 87.9%
Figure
Sample No.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Strain rate, in./min.
Back Pressure, psi
Cell Pressure, psi
Fail. Stress, tsf
Ult. Stress, tsf s1 Failure, tsf s3 Failure, tsf
In iti al At
T es t
88.4 49.6 99.4
2.3993 2.85 6.08
88.2 49.6 99.2
2.3993 2.85 6.08
1.000
0.00
22.20
0.63
1.60
2.23
87.3 50.1 99.6
2.3669 2.86 6.02
86.3 50.1 98.5
2.3669 2.86 6.02
1.000
0.00
44.40
0.61
3.20
3.81
D ev ia to r S tre ss , t sf
0.15
0.3
0.45
0.6
0.75
0.9
Axial Strain, %
0 5 10 15 20
Sh ea r S tre ss , t sf
0.7
1.4
2.1
Normal Stress, tsf
0 0.7 1.4 2.1 2.8 3.5 4.2
C, tsf f, deg Tan(f)
Results 0.311
Client: Moffat & Nichol
Location: B-2 (30-32 ft. below mudline) Depth: 66-68 ft. Sample Number: B-3
Project No.: VB18-344G Figure GET Solutions, Inc.
q, ts f
0.8
1.6
2.4 p, tsf
0 0.8 1.6 2.4 3.2 4 4.8
Peak Strength Total a= a= tan a=
0.31 tsf
0.0 deg 0.00
D ev ia to r S tre ss ts f
0.15
0.3
0.45
0.6
0.75
0% 8% 16%
D ev ia to r S tre ss ts f
0.15
0.3
0.45
0.6
0.75
0% 8% 16%
D ev ia to r S tre ss ts f
0.15
0.3
0.45
0.6
0.75
0% 8% 16%
D ev ia to r S tre ss ts f
0.15
0.3
0.45
0.6
0.75
0% 8% 16%
Client: Moffat & Nichol
Project: P-095 Replace Submarine Pier 3
Location: B-3 (20-22 ft. below mudline)
Sample Number: #7 Depth: 40-42 ft.
Proj. No.: VB18-344G Date Sampled: 1/19/19
Type of Test:
Unconsolidated Undrained
Sample Type: Shelby Tube
Description: Gray, Fat CLAY
LL= 79 PI= 54PL= 25
Assumed Specific Gravity= 2.7
Remarks: Passing #200 Sieve = 98.9%
Natural Moisture = 76.4%
Figure
Sample No.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Strain rate, in./min.
Back Pressure, psi
Cell Pressure, psi
Fail. Stress, tsf
Ult. Stress, tsf s1 Failure, tsf s3 Failure, tsf
In iti al At
T es t
73.7 55.3 97.1
2.0488 2.85 5.95
72.4 55.3 95.4
2.0488 2.85 5.95
0.080
0.00
14.30
0.84
1.03
1.87
73.9 55.0 96.7
2.0621 2.87 6.01
64.9 55.0 85.0
2.0621 2.87 6.01
0.080
0.00
28.60
0.81
2.06
2.87
D ev ia to r S tre ss , t sf
0.15
0.3
0.45
0.6
0.75
0.9
Axial Strain, %
0 5 10 15 20
Sh ea r S tre ss , t sf
0.5
1.5
Normal Stress, tsf
0 0.5 1 1.5 2 2.5 3
C, tsf f, deg Tan(f)
Results 0.412
Location: B-3 (20-22 ft. below mudline) Depth: 40-42 ft. Sample Number: #7
Project No.: VB18-344G Figure GET Solutions, Inc.
q, ts f
0.5
1.5 p, tsf
0 0.5 1 1.5 2 2.5 3
Peak Strength Total a= a= tan a=
0.41 tsf
0.0 deg 0.00
D ev ia to r S tre ss ts f
0.2
0.4
0.6
0.8
0% 8% 16%
D ev ia to r S tre ss ts f
0.2
0.4
0.6
0.8
0% 8% 16%
D ev ia to r S tre ss ts f
0.2
0.4
0.6
0.8
0% 8% 16%
D ev ia to r S tre ss ts f
0.2
0.4
0.6
0.8
Client: Moffat & Nichol
Project: P-095 Replace Submarine Pier 3
Location: B-3 (26-28 ft. below mudline)
Sample Number: B-3 Depth: 46-48 ft.
Proj. No.: VB18-344G Date Sampled: 1/19/19
Type of Test:
Unconsolidated Undrained
Sample Type: Shelby tube
Description: Gray, Fat CLAY
LL= 101 PI= 66PL= 35
Assumed Specific Gravity= 2.7
Remarks: Passing #200 Sieve = 98.6%
Natural Moisture = 73.5%
Figure
Sample No.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Strain rate, in./min.
Back Pressure, psi
Cell Pressure, psi
Fail. Stress, tsf
Ult. Stress, tsf s1 Failure, tsf s3 Failure, tsf
In iti al At
T es t
72.5 56.9 99.7
1.9630 2.85 5.99
69.2 56.9 95.2
1.9630 2.85 5.99
1.000
0.00
16.00
0.82
1.15
1.97
71.1 57.3 98.9
1.9423 2.85 6.01
64.6 57.3 89.8
1.9423 2.85 6.01
1.000
0.00
32.00
0.80
2.30
3.11
D ev ia to r S tre ss , t sf
0.15
0.3
0.45
0.6
0.75
0.9
Axial Strain, %
0 5 10 15 20
Sh ea r S tre ss , t sf
0.6
1.2
1.8
Normal Stress, tsf
0 0.6 1.2 1.8 2.4 3 3.6
C, tsf f, deg Tan(f)
Results 0.406
Location: B-3 (26-28 ft. below mudline) Depth: 46-48 ft. Sample Number: B-3
Project No.: VB18-344G Figure GET Solutions, Inc.
q, ts f
0.5
1.5 p, tsf
0 0.5 1 1.5 2 2.5 3
Peak Strength Total a= a= tan a=
0.41 tsf
0.0 deg 0.00
D ev ia to r S tre ss ts f
0.2
0.4
0.6
0.8
0% 8% 16%
D ev ia to r S tre ss ts f
0.2
0.4
0.6
0.8
0% 8% 16%
D ev ia to r S tre ss ts f
0.2
0.4
0.6
0.8
0% 8% 16%
D ev ia to r S tre ss ts f
0.2
0.4
0.6
0.8
Client: Moffat & Nichol
Project: P-095 Replace Submarine Pier 3
Location: B-3 (30-32 ft. below mudline)
Sample Number: B-3 Depth: 50-52 ft.
Proj. No.: VB18-344G Date Sampled: 1/12/19
Type of Test:
Unconsolidated Undrained
Sample Type: Shelby Tube
Description: Gray, Fat CLAY
LL= 93 PI= 55PL= 38
Assumed Specific Gravity= 2.7
Remarks: Passing #200 Sieve = 99.2%
Natural Moisture = 71.2%
Figure
Sample No.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Strain rate, in./min.
Back Pressure, psi
Cell Pressure, psi
Fail. Stress, tsf
Ult. Stress, tsf s1 Failure, tsf s3 Failure, tsf
In iti al At
T es t
73.0 56.5 99.4
1.9820 2.85 6.06
69.3 56.5 94.5
1.9820 2.85 6.06
1.000
0.00
22.20
0.87
1.60
2.47
69.2 58.5 99.2
1.8835 2.85 5.99
65.5 58.5 93.9
1.8835 2.85 5.99
1.000
0.00
44.40
0.93
3.20
4.13
D ev ia to r S tre ss , t sf
0.25
0.5
0.75
1.25
1.5
Axial Strain, %
0 5 10 15 20
Sh ea r S tre ss , t sf
0.7
1.4
2.1
Normal Stress, tsf
0 0.7 1.4 2.1 2.8 3.5 4.2
C, tsf f, deg Tan(f)
Results 0.393
1.1 0.02
Location: B-3 (30-32 ft. below mudline) Depth: 50-52 ft. Sample Number: B-3
Project No.: VB18-344G Figure GET Solutions, Inc.
q, ts f
0.8
1.6
2.4 p, tsf
0 0.8 1.6 2.4 3.2 4 4.8
Peak Strength Total a= a= tan a=
0.39 tsf
1.1 deg 0.02
D ev ia to r S tre ss ts f
0.25
0.5
0.75
1.25
0% 8% 16%
D ev ia to r S tre ss ts f
0.25
0.5
0.75
1.25
0% 8% 16%
D ev ia to r S tre ss ts f
0.25
0.5
0.75
1.25
0% 8% 16%
D ev ia to r S tre ss ts f
0.25
0.5
0.75
1.25
Client: Moffat & Nichol
Project: P-095 Replace Submarine Pier 3
Location: B-3 (36-38 ft. below mudline)
Sample Number: B-3 Depth: 56-58 ft.
Proj. No.: VB18-344G Date Sampled:
Type of Test:
Unconsolidated Undrained
Sample Type: Shelby Tube
Description: Gray, Fat CLAY
LL= 96 PI= 59PL= 37
Assumed Specific Gravity= 2.7
Remarks: Passing #200 Sieve = 99.8%
Natural Moisture = 69.9%
Figure
Sample No.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Strain rate, in./min.
Back Pressure, psi
Cell Pressure, psi
Fail. Stress, tsf
Ult. Stress, tsf s1 Failure, tsf s3 Failure, tsf
In iti al At
T es t
71.4 57.5 99.7
1.9337 2.83 6.01
70.1 57.5 97.9
1.9337 2.83 6.01
1.000
0.00
23.60
0.64
1.70
2.34
70.8 57.2 98.3
1.9459 2.84 5.94
69.8 57.2 96.9
1.9459 2.84 5.94
1.000
0.00
47.20
0.64
3.40
4.04
D ev ia to r S tre ss , t sf
0.15
0.3
0.45
0.6
0.75
0.9
Axial Strain, %
0 5 10 15 20
Sh ea r S tre ss , t sf
0.7
1.4
2.1
Normal Stress, tsf
0 0.7 1.4 2.1 2.8 3.5 4.2
C, tsf f, deg Tan(f)
Results 0.321
0.0 0.00
Location: B-3 (36-38 ft. below mudline) Depth: 56-58 ft. Sample Number: B-3
Project No.: VB18-344G Figure GET Solutions, Inc.
q, ts f
0.8
1.6
2.4 p, tsf
0 0.8 1.6 2.4 3.2 4 4.8
Peak Strength Total a= a= tan a=
0.32 tsf
0.0 deg 0.00
D ev ia to r S tre ss ts f
0.15
0.3
0.45
0.6
0.75
0% 8% 16%
D ev ia to r S tre ss ts f
0.15
0.3
0.45
0.6
0.75
0% 8% 16%
D ev ia to r S tre ss ts f
0.15
0.3
0.45
0.6
0.75
0% 8% 16%
D ev ia to r S tre ss ts f
0.15
0.3
0.45
0.6
0.75
Client: Moffat & Nichol
Project: P-095 Replace Submarine Pier 3
Location: B-3 (40-42 ft. below mudline) Sample Number: B-3 Depth: 60-62 ft.
Proj. No.: VB18-344G Date Sampled: 1/18/19
Type of Test:
Unconsolidated Undrained
Sample Type: Shelby Tube Description: Dark Brown, Organic Silt with
SAND
LL= 193 PI= 82PL= 111
Assumed Specific Gravity= 2.7 Remarks: Passing #200 Sieve = 81.4%
Natural Moisture = 128.7%
Figure
Sample No.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Strain rate, in./min.
Back Pressure, psi
Cell Pressure, psi
Fail. Stress, tsf
Ult. Stress, tsf s1 Failure, tsf s3 Failure, tsf
In iti al At
Te st
127.5
37.9 99.9
3.4473 2.85 6.05
126.0 37.9 98.7
3.4473 2.85 6.05
1.000 0.00
25.00 1.12
1.80 2.92
128.8
36.9 97.5
3.5687 2.86 6.02
125.5 36.9 94.9
3.5687 2.86 6.02
1.000 0.00
50.00 1.11
3.60 4.71
D ev ia to rS tre ss ,t sf
0.25
0.5
0.75
1.25
1.5
Axial Strain, %
0 5 10 15 20
S he ar S tre ss
,t sf
0.8
1.6
2.4
Normal Stress, tsf
0 0.8 1.6 2.4 3.2 4 4.8
C, tsf f, deg Tan(f)
Results 0.557
Location: B-3 (40-42 ft. below mudline) Depth: 60-62 ft. Sample Number: B-3 Project No.: VB18-344G Figure GET Solutions, Inc.
q, ts f
0.8
1.6
2.4 p, tsf
0 0.8 1.6 2.4 3.2 4 4.8
Peak Strength Total a= a= tan a=
0.56 tsf
0.0 deg 0.00
D ev ia to rS tre ss ts f
0.25
0.5
0.75
1.25
0% 8% 16%
D ev ia to rS tre ss ts f
0.25
0.5
0.75
1.25
0% 8% 16%
D ev ia to rS tre ss ts f
0.25
0.5
0.75
1.25
0% 8% 16%
D ev ia to rS tre ss ts f
0.25
0.5
0.75
1.25
Client: Moffat & Nichol
Project: P-095 Replace Submarine Pier 3
Location: B-5 (26-28 ft. below mudline)
Sample Number: B-5 Depth: 55-57 ft.
Proj. No.: VB18-344G Date Sampled: 1/18/19
Type of Test:
Unconsolidated Undrained
Sample Type: Shelby Tube
Description: Gray, Sandy Fat CLAY
LL= 67 PI= 47PL= 20
Assumed Specific Gravity= 2.7
Remarks: Passing #200 Sieve = 59.4%
Natural Moisture = 50.4%
Figure
Sample No.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Water Content, % Dry Density, pcf Saturation, % Void Ratio Diameter, in.
Height, in.
Strain rate, in./min.
Back Pressure, psi
Cell Pressure, psi
Fail. Stress, tsf
Ult. Stress, tsf s1 Failure, tsf s3 Failure, tsf
In iti al At
T es t
51.3 70.3 99.0
1.3985 2.87 5.96
48.8 70.3 94.1
1.3985 2.87 5.96
1.000
0.00
16.00
0.66
1.15
1.81
51.4 70.4 99.5
1.3942 2.87 6.11
48.4 70.4 93.8
1.3942 2.87 6.11
1.000
0.00
31.90
0.69
2.30
2.98
D ev ia to r S tre ss , t sf
0.15
0.3
0.45
0.6
0.75
0.9
Axial Strain, %
0 5 10 15 20
Sh ea r S tre ss , t sf
0.5
1.5
Normal Stress, tsf
0 0.5 1 1.5 2 2.5 3
C, tsf f, deg Tan(f)
Results 0.312
0.7 0.01
Location: B-5 (26-28 ft. below mudline) Depth: 55-57 ft. Sample Number: B-5
Project No.: VB18-344G Figure GET Solutions, Inc.
q, ts f
0.5
1.5 p, tsf
0 0.5 1 1.5 2 2.5 3
Peak Strength Total a= a= tan a=
0.31 tsf
0.7 deg 0.01
D ev ia to r S tre ss ts f
0.2
0.4
0.6
0.8
0% 8% 16%
D ev ia to r S tre ss ts f
0.2
0.4
0.6
0.8
0% 8% 16%
D ev ia to r S tre ss ts f
0.2
0.4
0.6
0.8
0% 8% 16%
D ev ia to r S tre ss ts f
0.2
0.4
0.6
0.8
CONSOLIDATION TEST REPORT
V oi d
R at io
0.90
1.05
1.20
1.35
1.50
1.65
1.80
1.95
2.10
2.25
2.40
Applied Pressure - tsf
0.1 1 10
Natural Dry Dens. LL PI Sp. Gr. USCS AASHTO Initial Void Saturation Moisture (pcf) Ratio
97.4 % 76.4 % 57.7 79 54 2.7 CH A-7-6(62) 2.117
Gray, Fat CLAY
VB18-344G Moffat & Nichol P-095 Replace Submarine Pier 3 Passing #200 Sieve = 98.9%
MATERIAL DESCRIPTION
Project No. Client: Remarks:
Project:
Loc.: B-3 (20-22 ft. below mudline) Depth: 40-42 ft. Sample No.: B-3
GET SOLUTIONS, INC. Figure
Dial Reading vs. Time Project No.:
Project:
Location: B-3 (20-22 ft. below mudline) Depth: 40-42 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.082 ft.2/day
Ca = 0.000
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.197 ft.2/day
Ca = 0.000
VB18-344G
P-095 Replace Submarine Pier 3
0.13 tsf
0.9999 0.9990 0.9981
6.01 min.
0.25 tsf
0.9972 0.9959 0.9947
2.49 min.
D ia lR ea di ng
(in
0.99775
0.99800
0.99825
0.99850
0.99875
0.99900
0.99925
0.99950
0.99975
1.00000
1.00025
Elapsed Time (min.)
0.1 1 10 100 1000
D ia lR ea di ng
(in
0.9942
0.9945
0.9948
0.9951
0.9954
0.9957
0.9960
0.9963
0.9966
0.9969
0.9972
Elapsed Time (min.)
0.1 1 10 100
Figure GET Solutions, Inc.
Project:
Location: B-3 (20-22 ft. below mudline) Depth: 40-42 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.062 ft.2/day
Ca = 0.000
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.046 ft.2/day
Ca = 0.001
VB18-344G
P-095 Replace Submarine Pier 3
0.50 tsf
0.9932 0.9893 0.9854
7.77 min.
1.00 tsf
0.9836 0.9741 0.9647
10.20 min.
D ia lR ea di ng
(in
0.984
0.985
0.986
0.987
0.988
0.989
0.990
0.991
0.992
0.993
0.994
Elapsed Time (min.)
0.1 1 10 100 1000
D ia lR ea di ng
(in
0.9600
0.9625
0.9650
0.9675
0.9700
0.9725
0.9750
0.9775
0.9800
0.9825
0.9850
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (20-22 ft. below mudline) Depth: 40-42 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.020 ft.2/day
Ca = 0.003
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.012 ft.2/day
Ca = 0.008
VB18-344G
P-095 Replace Submarine Pier 3
2.00 tsf
0.9611 0.9371 0.9131
21.86 min.
4.00 tsf
0.9083 0.8632 0.8182
31.75 min.
D ia lR ea di ng
(in
0.89
0.90
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
Elapsed Time (min.)
0.1 1 10 100 1000
D ia lR ea di ng
(in
0.795
0.810
0.825
0.840
0.855
0.870
0.885
0.900
0.915
0.930
0.945
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (20-22 ft. below mudline) Depth: 40-42 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.053 ft.2/day
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.013 ft.2/day
VB18-344G
P-095 Replace Submarine Pier 3
1.00 tsf
0.8167 0.8250 0.8332
6.26 min.
0.25 tsf
0.8346 0.8525 0.8703
28.01 min.
D ia lR ea di ng
(in
0.836
0.834
0.832
0.830
0.828
0.826
0.824
0.822
0.820
0.818
0.816
Elapsed Time (min.)
0.1 1 10 100
D ia lR ea di ng
(in
0.880
0.875
0.870
0.865
0.860
0.855
0.850
0.845
0.840
0.835
0.830
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (20-22 ft. below mudline) Depth: 40-42 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.069 ft.2/day
Ca = 0.000
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.030 ft.2/day
Ca = 0.001
VB18-344G
P-095 Replace Submarine Pier 3
0.50 tsf
0.8710 0.8687 0.8664
5.42 min.
1.00 tsf
0.8650 0.8590 0.8530
12.07 min.
D ia lR ea di ng
(in
0.863
0.864
0.865
0.866
0.867
0.868
0.869
0.870
0.871
0.872
0.873
Elapsed Time (min.)
0.1 1 10 100 1000
D ia lR ea di ng
(in
0.8505
0.8520
0.8535
0.8550
0.8565
0.8580
0.8595
0.8610
0.8625
0.8640
0.8655
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (20-22 ft. below mudline) Depth: 40-42 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.033 ft.2/day
Ca = 0.001
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.026 ft.2/day
Ca = 0.003
VB18-344G
P-095 Replace Submarine Pier 3
2.00 tsf
0.8516 0.8418 0.8321
10.65 min.
4.00 tsf
0.8302 0.8148 0.7995
12.41 min.
D ia lR ea di ng
(in
0.8288
0.8313
0.8338
0.8363
0.8388
0.8413
0.8438
0.8463
0.8488
0.8513
0.8538
Elapsed Time (min.)
0.1 1 10 100 1000
D ia lR ea di ng
(in
0.792
0.796
0.800
0.804
0.808
0.812
0.816
0.820
0.824
0.828
0.832
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (20-22 ft. below mudline) Depth: 40-42 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.012 ft.2/day
Ca = 0.003
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.013 ft.2/day
Ca = 0.002
VB18-344G
P-095 Replace Submarine Pier 3
8.00 tsf
0.7959 0.7609 0.7259
23.18 min.
16.00 tsf
0.7183 0.6876 0.6569
18.65 min.
D ia lR ea di ng
(in
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.80
0.81
Elapsed Time (min.)
0.1 1 10 100 1000
D ia lR ea di ng
(in
0.64
0.65
0.66
0.67
0.68
0.69
0.70
0.71
0.72
0.73
0.74
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (20-22 ft. below mudline) Depth: 40-42 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.034 ft.2/day
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.009 ft.2/day
VB18-344G
P-095 Replace Submarine Pier 3
4.00 tsf
0.6600 0.6681 0.6761
6.38 min.
1.00 tsf
0.6786 0.6939 0.7092
26.05 min.
D ia lR ea di ng
(in
0.679
0.677
0.675
0.673
0.671
0.669
0.667
0.665
0.663
0.661
0.659
Elapsed Time (min.)
0.1 1 10 100 1000
D ia lR ea di ng
(in
0.716
0.712
0.708
0.704
0.700
0.696
0.692
0.688
0.684
0.680
0.676
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (20-22 ft. below mudline) Depth: 40-42 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.006 ft.2/day
VB18-344G
P-095 Replace Submarine Pier 3
0.25 tsf
0.7106 0.7269 0.7433
46.00 min.
D ia lR ea di ng
(in
0.757
0.752
0.747
0.742
0.737
0.732
0.727
0.722
0.717
0.712
0.707
Elapsed Time (min.)
0.1 1 10 100 1000
CONSOLIDATION TEST REPORT
V oi d
R at io
1.1
1.3
1.5
1.7
1.9
2.1
2.3
2.5
2.7
2.9
3.1
Applied Pressure - tsf
0.1 1 10
Natural Dry Dens. LL PI Sp. Gr. USCS AASHTO Initial Void Saturation Moisture (pcf) Ratio
83.0 % 85.0 % 47.7 112 75 2.7 CH A-7-5(77) 2.764
Gray, Fat CLAY
VB18-344G Moffat & Nichol P-095 Replace Submarine Pier 3 Passing #200 Sieve = 88.0%
MATERIAL DESCRIPTION
Project No. Client: Remarks:
Project:
Loc.: B-3 (16-18 ft. below mudline) Depth: 36-38 ft. Sample No.: B-3
GET SOLUTIONS, INC. Figure
Project:
Location: B-3 (16-18 ft. below mudline) Depth: 36-38 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
1.009 ft.2/day
Ca = 0.000
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.059 ft.2/day
Ca = 0.000
VB18-344G
P-095 Replace Submarine Pier 3
0.13 tsf
1.0003 0.9995 0.9987
0.49 min.
0.25 tsf
0.9981 0.9972 0.9963
8.34 min.
D ia lR ea di ng
(in
0.9984
0.9986
0.9988
0.9990
0.9992
0.9994
0.9996
0.9998
1.0000
1.0002
1.0004
Elapsed Time (min.)
0.1 1 10 100
D ia lR ea di ng
(in
0.99575
0.99600
0.99625
0.99650
0.99675
0.99700
0.99725
0.99750
0.99775
0.99800
0.99825
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (16-18 ft. below mudline) Depth: 36-38 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
1.961 ft.2/day
Ca = 0.000
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.112 ft.2/day
Ca = 0.001
VB18-344G
P-095 Replace Submarine Pier 3
0.50 tsf
0.9962 0.9937 0.9911
0.25 min.
1.00 tsf
0.9881 0.9822 0.9762
4.24 min.
D ia lR ea di ng
(in
0.9904
0.9908
0.9912
0.9916
0.9920
0.9924
0.9928
0.9932
0.9936
0.9940
0.9944
Elapsed Time (min.)
0.1 1 10 100
D ia lR ea di ng
(in
0.9735
0.9750
0.9765
0.9780
0.9795
0.9810
0.9825
0.9840
0.9855
0.9870
0.9885
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (16-18 ft. below mudline) Depth: 36-38 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.020 ft.2/day
Ca = 0.004
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.057 ft.2/day
VB18-344G
P-095 Replace Submarine Pier 3
2.00 tsf
0.9689 0.9453 0.9216
22.30 min.
0.50 tsf
0.9244 0.9316 0.9387
7.41 min.
D ia lR ea di ng
(in
0.89
0.90
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
Elapsed Time (min.)
0.1 1 10 100 1000
D ia lR ea di ng
(in
0.943
0.941
0.939
0.937
0.935
0.933
0.931
0.929
0.927
0.925
0.923
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (16-18 ft. below mudline) Depth: 36-38 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.034 ft.2/day
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.188 ft.2/day
Ca = 0.000
VB18-344G
P-095 Replace Submarine Pier 3
0.13 tsf
0.9410 0.9482 0.9555
12.93 min.
0.25 tsf
0.9561 0.9552 0.9544
2.40 min.
D ia lR ea di ng
(in
0.959
0.957
0.955
0.953
0.951
0.949
0.947
0.945
0.943
0.941
0.939
Elapsed Time (min.)
0.1 1 10 100
D ia lR ea di ng
(in
0.95375
0.95400
0.95425
0.95450
0.95475
0.95500
0.95525
0.95550
0.95575
0.95600
0.95625
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (16-18 ft. below mudline) Depth: 36-38 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.118 ft.2/day
Ca = 0.000
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.099 ft.2/day
Ca = 0.001
VB18-344G
P-095 Replace Submarine Pier 3
0.50 tsf
0.9534 0.9505 0.9477
3.78 min.
1.00 tsf
0.9460 0.9405 0.9351
4.40 min.
D ia lR ea di ng
(in
0.945
0.946
0.947
0.948
0.949
0.950
0.951
0.952
0.953
0.954
0.955
Elapsed Time (min.)
0.1 1 10 100 1000
D ia lR ea di ng
(in
0.9315
0.9330
0.9345
0.9360
0.9375
0.9390
0.9405
0.9420
0.9435
0.9450
0.9465
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (16-18 ft. below mudline) Depth: 36-38 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.026 ft.2/day
Ca = 0.002
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.014 ft.2/day
Ca = 0.004
VB18-344G
P-095 Replace Submarine Pier 3
2.00 tsf
0.9313 0.9182 0.9052
15.98 min.
4.00 tsf
0.9035 0.8555 0.8075
25.73 min.
D ia lR ea di ng
(in
0.900
0.904
0.908
0.912
0.916
0.920
0.924
0.928
0.932
0.936
0.940
Elapsed Time (min.)
0.1 1 10 100 1000
D ia lR ea di ng
(in
0.780
0.795
0.810
0.825
0.840
0.855
0.870
0.885
0.900
0.915
0.930
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (16-18 ft. below mudline) Depth: 36-38 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.009 ft.2/day
Ca = 0.007
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.007 ft.2/day
Ca = 0.003
VB18-344G
P-095 Replace Submarine Pier 3
8.00 tsf
0.8037 0.7520 0.7003
30.39 min.
16.00 tsf
0.6926 0.6534 0.6142
30.96 min.
D ia lR ea di ng
(in
0.675
0.690
0.705
0.720
0.735
0.750
0.765
0.780
0.795
0.810
0.825
Elapsed Time (min.)
0.1 1 10 100 1000
D ia lR ea di ng
(in
0.60
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.70
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (16-18 ft. below mudline) Depth: 36-38 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.011 ft.2/day
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.005 ft.2/day
VB18-344G
P-095 Replace Submarine Pier 3
4.00 tsf
0.6183 0.6289 0.6395
17.02 min.
1.00 tsf
0.6423 0.6613 0.6804
46.05 min.
D ia lR ea di ng
(in
0.646
0.643
0.640
0.637
0.634
0.631
0.628
0.625
0.622
0.619
0.616
Elapsed Time (min.)
0.1 1 10 100 1000
D ia lR ea di ng
(in
0.690
0.685
0.680
0.675
0.670
0.665
0.660
0.655
0.650
0.645
0.640
Elapsed Time (min.)
0.1 1 10 100 1000
Project:
Location: B-3 (16-18 ft. below mudline) Depth: 36-38 ft. Sample Number: B-3
Load No.= Load=
D0 = D50 =
D100 = T50 =
Cv @ T50
0.004 ft.2/day
VB18-344G
P-095 Replace Submarine Pier 3
0.25 tsf
0.6822 0.6976 0.7129
54.52 min.
D ia lR ea di ng
(in
0.720
0.716
0.712
0.708
0.704
0.700
0.696
0.692
0.688
0.684
0.680
Elapsed Time (min.)
0.1 1 10 100 1000
APPENDIX X
HISTORICAL LAND USE PLAN
Historic Land Use Map (1978 Geology of Norfolk North Quadrangle) PROJECT: FY21 MCON P-095, Replace Submarine Pier 3/Norfolk, VA
PROJECT NO: VB18-344G
CLIENT: Moffatt & Nichol
APPENDIX XI
CALCULATIONS
NOTE: based on soil type (SP, SM, ML, CL), pile toe depth, and SPT value, this worksheet computes the ultimate compressive capacity for an HP-Sectioon Steel or SPPC pile (english units).
-38.0 feet 120.0 feet 6000 psi Design Cap. = 150 kips Project: P-095 Replace Submarine Pier 3
0.0 feet -104.0 feet 760 psi Req'd Ult. Cap. = 300 kips GET No.: VB18-344G
-38.0 feet (GROUND SURFACE) 15.5 feet Date: 3/13/2019
24.0 inches 53.5 feet 4.34 ksi Unit Weight= 0.152 kcf Boring: B-2
2.0 feet 66.0 feet 0.99 ksi E. Modulus= 5000 ksi Pile Location: Norfolk Naval Station
8.0 ft2/ft Required Safety Factor: 2.0 Wave Speed= 13000 ft/sec Engineer: MM
4.0 ft2 1.4 Concrete (as recommended by NAVFAC DM7.2) c=1.4; s=1.1 Structure: Proposed Berthing Pier 3
ENTER ENTER
(computed) (computed)
ENTER See: Note (2) See: Note (3) See: Note (4) Stratum Shaft Capacity Capacity @ Pile Toe (per Net Toe Area)
Notes Stratum Number
Soil Type:
1-SP; 2-SM
3-ML; 4-CL
*Pile Toe Depth (below reference)
Stratum Thickness
(L)
Elevation @ pile toe
SPT
N-value (cor) Toe Quake Skin
Damping Effective Unit Wt.
Soil Internal Angle of Friction
Cohesion
(C) N'c Adhesion
(Ca) N'q tanJ (J=0.75*phi)
Shaft Embedment
Cumulative Po' for
Stratum
Po' @ Pile Toe
Average Po' for Stratum
(Avg.Po'*Khc*tanJ*As*L )+ (Ca*As*L)
SAND: Po'*Nq*Ap CLAY: c*Nc*Ap feet feet feet blows/foot inches sec/foot pcf phi psf psf feet psf psf psf friction (kips) kips feet
1 2 3.0 3 -41 11.8 0.20 0.10 62 33.5 0 0 0 35 0.47 3 187 187 94 1.5 26.2 -41.0 2 2 8.0 5 -46 14.5 0.20 0.10 64 34.9 0 0 0 46 0.49 8 318 505 346 9.5 92.8 -46.0 3 2 13.0 5 -51 7.4 0.20 0.10 60 30.7 0 0 0 23 0.42 13 302 807 656 15.6 72.6 -51.0 4 4 18.0 5 -56 3.5 0.20 0.20 44 0.0 500 10 500 0 0.00 18 220 1,027 917 20.0 20.0 -56.0 5 4 23.0 5 -61 0.0 0.20 0.20 38 0.0 500 0 500 0 0.00 23 190 1,217 1122 20.0 0.0 -61.0 6 4 28.0 5 -66 3.3 0.20 0.20 44 0.0 500 10 500 0 0.00 28 220 1,437 1327 20.0 20.0 -66.0 7 2 33.0 5 -71 3.1 0.20 0.10 59 26.9 0 0 0 10 0.37 33 293 1,730 1583 32.6 69.2 -71.0 8 2 38.0 5 -76 3.0 0.20 0.10 59 26.8 0 0 0 10 0.37 38 293 2,023 1876 38.4 80.9 -76.0 9 2 43.0 5 -81 1.9 0.20 0.10 58 25.4 0 0 0 10 0.35 43 291 2,313 2168 42.0 92.5 -81.0 10 2 48.0 5 -86 6.5 0.20 0.10 60 30.0 0 0 0 18 0.41 48 300 2,614 2463 57.1 188.2 -86.0 11 2 53.0 5 -91 7.1 0.20 0.10 60 30.5 0 0 0 21 0.42 53 302 2,915 2765 65.3 244.9 -91.0 12 2 58.0 5 -96 6.9 0.20 0.10 60 30.3 0 0 0 21 0.42 58 301 3,217 3066 72.0 270.2 -96.0 13 2 63.0 5 -101 7.5 0.20 0.10 61 30.8 0 0 0 23 0.43 63 303 3,519 3368 80.4 316.7 -101.0 14 2 68.0 5 -106 7.3 0.20 0.10 60 30.6 0 0 0 23 0.42 68 302 3,821 3670 87.1 343.9 -106.0 15 2 73.0 5 -111 7.1 0.20 0.10 60 30.5 0 0 0 21 0.42 73 302 4,123 3972 93.8 346.3 -111.0 16 2 78.0 5 -116 7.7 0.20 0.10 61 30.9 0 0 0 23 0.43 78 303 4,426 4275 102.5 398.4 -116.0 17 2 83.0 5 -121 6.0 0.20 0.10 60 29.6 0 0 0 18 0.41 83 299 4,726 4576 104.7 340.2 -121.0 18 2 88.0 5 -126 8.8 0.20 0.10 61 31.7 0 0 0 27 0.44 88 305 5,031 4878 120.2 533.3 -126.0 19 2 93.0 5 -131 5.0 0.20 0.10 59 28.8 0 0 0 15 0.40 93 297 5,328 5180 114.9 319.7 -131.0 20 2 98.0 5 -136 6.3 0.20 0.10 60 29.9 0 0 0 18 0.41 98 300 5,628 5478 126.6 405.2 -136.0 21 2 103.0 5 -141 25.0 0.20 0.10 68 31.5 0 0 0 27 0.44 103 340 5,968 5798 142.0 632.7 -141.0 21 2 108.0 5 -146 26.0 0.20 0.10 68 31.5 0 0 0 27 0.44 108 342 6,311 6140 150.4 668.9 -146.0 21 2 113.0 5 -151 27.0 0.20 0.10 69 32.0 0 0 0 29 0.45 113 344 6,655 6483 161.6 772.0 -151.0
REFERENCES / PROJECT NOTES
Pile Toe Elev.
Pile Toe Depth (below reference)
Soil Type SPT N-value
Total Pile Capacity Toe Capacity
Cummulative Shaft
Capacity
Stratum Unit Shaft
Friction
Design Pile Capacity
Design Pile Capacity Toe Quake Skin Damping feet feet blows/foot kips kips kips ksf kips tons inches sec/foot
-41.0 3.0 SM 11.8 28 26.2 1.5 0.06 13.8 7 0.20 0.10
-46.0 8.0 SM 14.5 104 92.8 11.0 0.24 51.9 26 0.20 0.10
-51.0 13.0 SM 7.4 99 72.6 26.6 0.39 49.6 25 0.20 0.10
-56.0 18.0 CL 3.5 67 20.0 46.6 0.50 33.3 17 0.20 0.20
-61.0 23.0 CL 0.0 67 0.0 66.6 0.50 33.3 17 0.20 0.20
-66.0 28.0 CL 3.3 107 20.0 86.6 0.50 53.3 27 0.20 0.20
-71.0 33.0 SM 3.1 188 69.2 119.2 0.82 94.2 47 0.20 0.10
-76.0 38.0 SM 3.0 239 80.9 157.7 0.96 119.3 60 0.20 0.10
-81.0 43.0 SM 1.9 292 92.5 199.7 1.05 146.1 73 0.20 0.10
-86.0 48.0 SM 6.5 445 188.2 256.8 1.43 222.5 111 0.20 0.10
-91.0 53.0 SM 7.1 567 244.9 322.1 1.63 283.5 142 0.20 0.10
-96.0 58.0 SM 6.9 664 270.2 394.0 1.80 332.1 166 0.20 0.10
-101.0 63.0 SM 7.5 791 316.7 474.4 2.01 395.6 198 0.20 0.10
-106.0 68.0 SM 7.3 905 343.9 561.5 2.18 452.7 226 0.20 0.10
-111.0 73.0 SM 7.1 1002 346.3 655.3 2.35 500.8 250 0.20 0.10
-116.0 78.0 SM 7.7 1156 398.4 757.9 2.56 578.1 289 0.20 0.10
-121.0 83.0 SM 6.0 1203 340.2 862.6 2.62 601.4 301 0.20 0.10
-126.0 88.0 SM 8.8 1516 533.3 982.8 3.01 758.1 379 0.20 0.10
-131.0 93.0 SM 5.0 1417 319.7 1097.7 2.87 708.7 0.20 0.10
-136.0 98.0 SM 6.3 1630 405.2 1224.3 3.16 814.8 0.20 0.10 Cohesion=500 psf, from the laboratory tests (includes a SF)
-141.0 103.0 SM 25.0 1999 632.7 1366.3 3.55 999.5 0.20 0.10
Note (2) Effective Unit Wt.: above the water table separately enter the MOIST UNIT WEIGHT.
Note (1) SPT: SPT= 0 to 40, enter in 1 blow increments; then SPT=40 to 100 (max.), enter in increments of 10.
Pile Shaft Width:
Note (5): if preaugering - should make consideration for reduced shaft capacity through preauger depth.
Worksheet Notes and References:
Allow. Tensile Stress=Pile Side =
RESULTS
COMPUTATIONS
Allow. Compress. Stress=
Pile Toe Area =
(NOTE: yellow background data must be entered)INPUT
Evaluation of Ultimate Compressive Pile Capacity per NAVFAC DM-7.2 Utilizing Effective Soil Unit Weight - SPPC Piles - English Units The limiting dL embedment in a stratum is not considered in evaluation of capacity (change appropriate formula if desired).
(NOTE: yellow background data mush be entered. Red text pile data in column D is computed from green text input data.)
Stickup @ EOD = Embedment @ EOD:
Khc (1.0 to 1.5) =
Note Computation Changes (make above computation changes in bold red text):
Note (4) COHESION: The worksheet computes C based on SPT value and soil type CL (no phi value is assigned). Ca is factored from C (see Note 7).
Worksheet computes a maximum C=5000 psf (with Ca= 2000 psf). No phi value is assigned with soil type CL- therefore, directly enter a phi value if considered applicable.
Note (6): colored background indicates a change to the generic worksheet formula to consider conditions unique to the site or project characteristics (see Project Notes).
Pile Shaft Area (As) =
Toe Elevation
McGraw Hill; McCarthy, p.81, 5th Edition - Essentials of Soil Mechanics and Foundations, Prentice Hall (1998); NAVFAC DM 7.1, p.22 (1982); Kt: Bowles,
p. 767, 4th Edition-Foundation Analysis and Design.
Note (7): unit weight, phi, c per: Sowers p. 23, p. 88,4th Edition - Introductory Soil Mechanics and Foundations, MacMillan (1979); Das, p. 11, 1st Edition - Principles of Foundation Engineering, Brooks/Cole (1984); Bowles, p. 86, p. 141, 2nd (1984) & 4th (198) Editions-Foundation Analysis and Design, Note (3) PHI: The worksheet computes phi based on the SPT value and soil types SP, SM, or ML (no value is assigned for cohesion). A maximum phi=40 degrees is used for Nq determination. NOTE: all phi's are based on a fine grained sand, silty sand, (silt). No cohesion (C) value is assigned with soil types SP, SM, ML- therefore, directly enter a value for Cohesion (C) if considered applicable.
Toe Quake= d/120 Skin Damp.: sand=0.05, clay=0.20
Ground Elev. @ Boring:
PROJECT INFORMATIONPILE INFORMATION
Groundwater Elev.:
Reference Elev*.: Plan Head Elev.=
Pile Length= f'c = Resid. prestress =Plan Toe Elev.=
NOTE: based on soil type (SP, SM, ML, CL), pile toe depth, and SPT value, this worksheet computes the ultimate compressive capacity for an HP-Section Steel pile (english units).
10.0 feet 110.0 feet 6000 psi Design Cap. = 150 kips Project: P-095 Replace Submarine Pier 3
12.0 feet -95.0 feet 760 psi Req'd Ult. Cap. = 300 kips GET No.: VB18-344G
15.0 feet (GROUND SURFACE) 15.0 feet Date: 3/13/2019
16.0 inches 0.0 feet 4.34 ksi Unit Weight= 0.152 kcf Boring: B-5/B-6
1.3 feet 110.0 feet 0.99 ksi E. Modulus= 5000 ksi Pile Location: Norfolk Naval Station
5.3 ft2/ft Required Safety Factor: 2.0 Wave Speed= 13000 ft/sec Engineer: MM
1.8 ft2 0.5 Steel (as recommended by NAVFAC DM7.2) c=1.0-1.5; s=0.5-1.0 Structure: CEP-176 Wharf
ENTER ENTER
(computed) (computed)
ENTER See: Note (2) See: Note (3) See: Note (4) Stratum Shaft Capacity Capacity @ Pile Toe (per Net Toe Area)
Notes Stratum Number
Soil Type:
1-SP; 2-SM
3-ML; 4-CL
*Pile Toe Depth (below reference)
Stratum Thickness
(L)
Elevation @ pile toe
SPT
N-value (cor) Toe Quake Skin
Damping Effective Unit Wt.
Soil Internal Angle of Friction
Cohesion
(C) N'c Adhesion
(Ca) N'q tanJ (J=20° if Steel)
Shaft Embedment
Cumulative Po' for
Stratum
Po' @ Pile Toe
Average Po' for Stratum
(Avg.Po'*Khc*tanJ*As*L) + (Ca*As*L)
SAND: Po'*Nq*Ap CLAY: c*Nc*Ap feet feet feet blows/foot inches sec/foot pcf phi psf psf feet psf psf psf friction (kips) kips feet
1 2 2.0 2 13 147.5 0.13 0.10 121 28.0 0 0 0 15 0.36 2 241 241 121 0.2 6.4 13.0 2 2 4.0 2 11 87.8 0.13 0.10 95 28.0 0 0 0 15 0.36 4 190 431 336 0.7 11.5 11.0 3 2 6.0 2 9 65.0 0.13 0.10 85 28.0 0 0 0 15 0.36 6 170 602 517 1.0 16.1 9.0 4 2 8.0 2 7 62.1 0.13 0.10 84 28.0 0 0 0 15 0.36 8 168 770 686 1.3 20.5 7.0 5 2 10.0 2 5 52.1 0.13 0.10 80 28.0 0 0 0 15 0.36 10 159 929 850 1.6 24.8 5.0 6 2 12.0 2 3 52.3 0.13 0.10 80 28.0 0 0 0 15 0.36 12 160 1,089 1009 2.0 29.0 3.0 7 2 15.0 3 0 15.0 0.13 0.10 64 28.0 0 0 0 15 0.36 15 191 1,280 1184 3.4 34.1 0.0 8 2 20.0 5 -5 9.7 0.13 0.10 61 32.2 0 0 0 29 0.36 20 307 1,587 1434 7.0 81.8 -5.0 9 2 25.0 5 -10 7.7 0.13 0.10 61 30.9 0 0 0 23 0.36 25 303 1,890 1739 8.4 75.6 -10.0 10 2 30.0 5 -15 1.2 0.13 0.10 58 24.3 0 0 0 10 0.36 30 289 2,179 2035 9.9 38.7 -15.0 11 2 35.0 5 -20 2.3 0.13 0.10 58 25.9 0 0 0 10 0.36 35 291 2,471 2325 11.3 43.9 -20.0 12 2 40.0 5 -25 5.5 0.13 0.10 60 29.2 0 0 0 18 0.36 40 298 2,769 2620 12.7 88.6 -25.0 13 2 45.0 5 -30 3.1 0.13 0.10 59 27.0 0 0 0 10 0.36 45 293 3,062 2915 14.1 54.4 -30.0 14 2 50.0 5 -35 13.0 0.13 0.10 63 34.2 0 0 0 42 0.36 50 314 3,376 3219 15.6 252.1 -35.0 15 2 55.0 5 -40 37.0 0.13 0.10 73 43.9 0 0 0 145 0.36 55 366 3,742 3559 17.3 964.7 -40.0 16 2 60.0 5 -45 7.6 0.13 0.10 61 30.8 0 0 0 23 0.36 60 303 4,045 3894 18.9 161.8 -45.0 17 4 65.0 5 -50 1.8 0.13 0.20 39 0.0 500 8 500 0 0.36 65 195 4,240 4143 13.3 7.1 -50.0 18 4 70.0 5 -55 3.6 0.13 0.20 44 0.0 500 10 500 0 0.36 70 220 4,460 4350 13.3 8.9 -55.0 19 4 75.0 5 -60 2.6 0.13 0.20 41 0.0 500 9 500 0 0.36 75 205 4,665 4563 13.3 8.0 -60.0 20 2 80.0 5 -65 5.0 0.13 0.10 59 28.8 0 0 0 15 0.36 80 297 4,962 4814 23.4 132.3 -65.0 21 2 85.0 5 -70 25.0 0.13 0.10 68 31.5 0 0 0 27 0.36 85 340 5,302 5132 24.9 249.8 -70.0 22 2 90.0 5 -75 26.0 0.13 0.10 68 31.5 0 0 0 27 0.36 90 342 5,645 5474 26.6 265.9 -75.0 23 2 95.0 5 -80 27.0 0.13 0.10 69 32.0 0 0 0 29 0.36 95 344 5,989 5817 28.2 308.8 -80.0 24 2 100.0 5 -85 28.0 0.13 0.10 69 32.0 0 0 0 29 0.36 100 347 6,336 6162 29.9 326.6 -85.0 25 2 105.0 5 -90 29.0 0.13 0.10 70 32.0 0 0 0 29 0.36 105 349 6,336 6336 30.7 326.6 -90.0 26 2 110.0 5 -95 30.0 0.13 0.10 70 32.5 0 0 0 32 0.36 110 351 6,336 6336 30.7 360.4 -95.0 27 2 115.0 5 -100 31.0 0.13 0.10 71 32.5 0 0 0 32 0.36 115 353 6,336 6336 30.7 360.4 -100.0 28 2 120.0 5 -105 32.0 0.13 0.10 71 32.5 0 0 0 32 0.36 120 355 6,336 6336 30.7 360.4 -105.0 29 2 125.0 5 -110 33.0 0.13 0.10 71 32.5 0 0 0 32 0.36 125 357 6,336 6336 30.7 360.4 -110.0 30 2 130.0 5 -115 34.0 0.13 0.10 72 33.0 0 0 0 35 0.36 130 360 6,336 6336 30.7 394.2 -115.0 31 2 135.0 5 -120 35.0 0.13 0.10 72 33.0 0 0 0 35 0.36 135 362 6,336 6336 30.7 394.2 -120.0 32 2 140.0 5 -125 36.0 0.13 0.10 73 33.0 0 0 0 35 0.36 140 364 6,336 6336 30.7 394.2 -125.0
REFERENCES / PROJECT NOTES
Pile Toe Elev.
Pile Toe Depth (below reference)
Soil Type SPT N-value
Total Pile Capacity Toe Capacity
Cummulative Shaft
Capacity
Stratum Unit Shaft
Friction
Design Pile Capacity
Design Pile Capacity Toe Quake Skin Damping feet feet blows/foot kips kips kips ksf kips tons inches sec/foot
13.0 2.0 SM 147.5 7 6.4 0.2 0.02 3.3 2 0.13 0.10
11.0 4.0 SM 87.8 12 11.5 0.9 0.06 6.2 3 0.13 0.10
9.0 6.0 SM 65.0 18 16.1 1.9 0.09 9.0 4 0.13 0.10
7.0 8.0 SM 62.1 24 20.5 3.2 0.12 11.9 6 0.13 0.10
5.0 10.0 SM 52.1 30 24.8 4.9 0.15 14.8 7 0.13 0.10
3.0 12.0 SM 52.3 36 29.0 6.8 0.18 17.9 9 0.13 0.10
0.0 15.0 SM 15.0 44 34.1 10.3 0.22 22.2 11 0.13 0.10
-5.0 20.0 SM 9.7 99 81.8 17.2 0.26 49.5 25 0.13 0.10
-10.0 25.0 SM 7.7 101 75.6 25.7 0.32 50.6 25 0.13 0.10
-15.0 30.0 SM 1.2 74 38.7 35.5 0.37 37.1 19 0.13 0.10
-20.0 35.0 SM 2.3 91 43.9 46.8 0.42 45.4 23 0.13 0.10
-25.0 40.0 SM 5.5 148 88.6 59.5 0.48 74.1 37 0.13 0.10
-30.0 45.0 SM 3.1 128 54.4 73.7 0.53 64.1 32 0.13 0.10
-35.0 50.0 SM 13.0 341 252.1 89.3 0.59 170.7 85 0.13 0.10
-40.0 55.0 SM 37.0 1071 964.7 106.6 0.65 535.6 268 0.13 0.10
-45.0 60.0 SM 7.6 287 161.8 125.5 0.71 143.6 72 0.13 0.10
-50.0 65.0 CL 1.8 146 7.1 138.8 0.50 73.0 36 0.13 0.20
-55.0 70.0 CL 3.6 161 8.9 152.1 0.50 80.5 40 0.13 0.20
-60.0 75.0 CL 2.6 173 8.0 165.5 0.50 86.7 43 0.13 0.20 Phi=28 °, user defined to account for differing materials in the FILL layer.
-65.0 80.0 SM 5.0 321 132.3 188.8 0.88 160.6 80 0.13 0.10 Cohesion=500 psf, from the laboratory tests (includes a SF) -70.0 85.0 SM 25.0 464 249.8 213.7 0.93 231.8 116 0.13 0.10 Limiting depth (10B to 40B): depth beyond which the overburden pressure remains the same.
-75.0 90.0 SM 26.0 506 265.9 240.3 1.00 253.1 127 0.13 0.10
-80.0 95.0 SM 27.0 577 308.8 268.5 1.06 288.7 144 0.13 0.10
-85.0 100.0 SM 28.0 625 326.6 298.4 1.12 312.5 156 0.13 0.10
-90.0 105.0 SM 29.0 656 326.6 329.2 1.15 327.9 164 0.13 0.10
-95.0 110.0 SM 30.0 720 360.4 359.9 1.15 360.2 180 0.13 0.10
-100.0 115.0 SM 31.0 751 360.4 390.7 1.15 375.6 188 0.13 0.10
-105.0 120.0 SM 32.0 782 360.4 421.4 1.15 390.9 195 0.13 0.10
-110.0 125.0 SM 33.0 813 360.4 452.2 1.15 406.3 203 0.13 0.10
-115.0 130.0 SM 34.0 877 394.2 482.9 1.15 438.6 219 0.13 0.10
-120.0 135.0 SM 35.0 908 394.2 513.7 1.15 454.0 227 0.13 0.10
-125.0 140.0 SM 36.0 939 394.2 544.4 1.15 469.3 235 0.13 0.10
Resid. prestress =Plan Toe Elev.=
Embedment @ EOD:
Khc (1.0 to 1.5) =
Note Computation Changes (make above computation changes in bold red text):
Note (4) COHESION: The worksheet computes C based on SPT value and soil type CL (no phi value is assigned). Ca is factored from C (see Note 7).
Worksheet computes a maximum C=5000 psf (with Ca= 2000 psf). No phi value is assigned with soil type CL- therefore, directly enter a phi value if considered applicable.
Note (6): colored background indicates a change to the generic worksheet formula to consider conditions unique to the site or project characteristics (see Project Notes).
Pile Shaft Area (As) =
Toe Elevation
McGraw Hill; McCarthy, p.81, 5th Edition - Essentials of Soil Mechanics and Foundations, Prentice Hall (1998); NAVFAC DM 7.1, p.22 (1982); Kt: Bowles, p.
767, 4th Edition-Foundation Analysis and Design.
Note (7): unit weight, phi, c per: Sowers p. 23, p. 88,4th Edition - Introductory Soil Mechanics and Foundations, MacMillan (1979); Das, p. 11, 1st Edition - Principles of Foundation Engineering, Brooks/Cole (1984); Bowles, p. 86, p. 141, 2nd (1984) & 4th (198) Editions-Foundation Analysis and Design, Note (3) PHI: The worksheet computes phi based on the SPT value and soil types SP, SM, or ML (no value is assigned for cohesion). A maximum phi=40 degrees is used for Nq determination. NOTE: all phi's are based on a fine grained sand, silty sand, (silt). No cohesion (C) value is assigned with soil types SP, SM, ML- therefore, directly enter a value for Cohesion (C) if considered applicable.
Toe Quake= d/120 Skin Damp.: sand=0.05, clay=0.20
Note (5): if preaugering - should make consideration for reduced shaft capacity through preauger depth.
Worksheet Notes and References:
Allow. Tensile Stress=Pile Side =
RESULTS
COMPUTATIONS
Pile Toe Area =
(NOTE: yellow background data must be entered)INPUT
Evaluation of Ultimate Compressive Pile Capacity per NAVFAC DM-7.2 Utilizing Effective Soil Unit Weight - SPPC Piles - English Units This worksheet evaluates the ultimate compressive capacity of a driven HP-Section Steel pile. The limiting dL embedment in a stratum is considered in evaluation of capacity.
Note (2) Effective Unit Wt.: above the water table separately enter the MOIST UNIT WEIGHT.
Note (1) SPT: SPT= 0 to 40, enter in 1 blow increments; then SPT=40 to 100 (max.), enter in increments of 10.
Pile Shaft Width: Allow. Compress. Stress=
(NOTE: yellow background data mush be entered. Red text pile data in column D is computed from green text input data.)
Stickup @ EOD =
Ground Elev. @ Boring:
PROJECT INFORMATIONPILE INFORMATION
Groundwater Elev.:
Reference Elev*.: Plan Head Elev.=
Pile Length= f'c =
NOTE: based on soil type (SP, SM, ML, CL), pile toe depth, and SPT value, this worksheet computes the ultimate compressive capacity for an HP-Section Steel pile (english units).
10.0 feet 105.0 feet 6000 psi Design Cap. = 150 kips Project: P-095 Replace Submarine Pier 3
7.0 feet -95.0 feet 760 psi Req'd Ult. Cap. = 300 kips GET No.: VB18-344G
10.0 feet (GROUND SURFACE) 10.0 feet Date: 3/13/2019
16.0 inches 0.0 feet 4.34 ksi Unit Weight= 0.152 kcf Boring: B-5/B-6
1.3 feet 105.0 feet 0.99 ksi E. Modulus= 5000 ksi Pile Location: Norfolk Naval Station
5.3 ft2/ft Required Safety Factor: 2.0 Wave Speed= 13000 ft/sec Engineer: MM
1.8 ft2 0.5 Steel (as recommended by NAVFAC DM7.2) concrete=1.0-1.5; steel=0.5-1.0 Structure: CEP-102 Relieving Platform
ENTER ENTER
(computed) (computed)
ENTER See: Note (2) See: Note (3) See: Note (4) Stratum Shaft Capacity Capacity @ Pile Toe (per Net Toe Area)
Notes Stratum Number
Soil Type:
1-SP; 2-SM
3-ML; 4-CL
*Pile Toe Depth (below reference)
Stratum Thickness
(L)
Elevation @ pile toe
SPT
N-value (cor) Toe Quake Skin
Damping Effective Unit Wt.
Soil Internal Angle of Friction
Cohesion
(C) N'c Adhesion
(Ca) N'q tanJ (J=20° if Steel)
Shaft Embedment
Cumulative Po' for
Stratum
Po' @ Pile Toe
Average Po' for Stratum
(Avg.Po'*Khc*tanJ*As*L) + (Ca*As*L)
SAND: Po'*Nq*Ap CLAY: c*Nc*Ap feet feet feet blows/foot inches sec/foot pcf phi psf psf feet psf psf psf friction (kips) kips feet
1 2 2.0 2 8 133.7 0.13 0.10 115 28.0 0 0 0 15 0.36 2 230 230 115 0.2 6.1 8.0 2 2 4.0 2 6 87.8 0.13 0.10 95 28.0 0 0 0 15 0.36 4 190 420 325 0.6 11.2 6.0 3 2 6.0 2 4 67.2 0.13 0.10 86 28.0 0 0 0 15 0.36 6 172 592 506 1.0 15.8 4.0 4 2 8.0 2 2 66.3 0.13 0.10 86 28.0 0 0 0 15 0.36 8 172 764 678 1.3 20.4 2.0 5 2 10.0 2 0 18.9 0.13 0.10 65 28.0 0 0 0 15 0.36 10 131 894 829 1.6 23.8 0.0 6 2 12.0 2 -2 12.6 0.13 0.10 63 33.9 0 0 0 39 0.36 12 125 1,020 957 1.9 69.8 -2.0 7 2 15.0 3 -5 10.0 0.13 0.10 62 32.4 0 0 0 29 0.36 15 185 1,205 1112 3.2 62.1 -5.0 8 2 20.0 5 -10 1.5 0.13 0.10 58 24.8 0 0 0 10 0.36 20 290 1,494 1349 6.5 26.6 -10.0 9 2 25.0 5 -15 2.8 0.13 0.10 58 26.6 0 0 0 10 0.36 25 292 1,787 1640 8.0 31.8 -15.0 10 2 30.0 5 -20 6.5 0.13 0.10 60 30.0 0 0 0 21 0.36 30 300 2,087 1937 9.4 77.9 -20.0 11 2 35.0 5 -25 3.7 0.13 0.10 59 27.5 0 0 0 13 0.36 35 294 2,381 2234 10.8 52.9 -25.0 12 2 40.0 5 -30 15.0 0.13 0.10 64 35.2 0 0 0 50 0.36 40 319 2,700 2541 12.3 240.0 -30.0 13 2 45.0 5 -35 41.8 0.13 0.10 75 45.4 0 0 0 145 0.36 45 376 3,076 2888 14.0 793.0 -35.0 14 2 50.0 5 -40 8.4 0.13 0.10 61 31.4 0 0 0 24 0.36 50 304 3,381 3228 15.7 144.2 -40.0 15 4 55.0 5 -45 2.0 0.13 0.20 41 0.0 500 9 500 0 0.36 55 205 3,586 3483 13.3 8.0 -45.0 16 4 60.0 5 -50 4.0 0.13 0.20 44 0.0 500 10 500 0 0.36 60 220 3,806 3696 13.3 8.9 -50.0 17 4 65.0 5 -55 2.9 0.13 0.20 41 0.0 500 9 500 0 0.36 65 205 4,011 3908 13.3 8.0 -55.0 18 2 70.0 5 -60 5.6 0.13 0.10 60 29.2 0 0 0 18 0.36 70 298 4,309 4160 20.2 137.9 -60.0 19 2 75.0 5 -65 8.9 0.13 0.10 61 31.7 0 0 0 27 0.36 75 306 4,615 4462 21.7 217.4 -65.0 20 2 80.0 5 -70 6.9 0.13 0.10 60 30.3 0 0 0 21 0.36 80 301 4,916 4765 23.1 183.5 -70.0 21 2 85.0 5 -75 25.0 0.13 0.10 68 31.5 0 0 0 27 0.36 85 340 5,256 5086 24.7 247.6 -75.0 22 2 90.0 5 -80 26.0 0.13 0.10 68 31.5 0 0 0 27 0.36 90 342 5,598 5427 26.3 263.7 -80.0 23 2 95.0 5 -85 27.0 0.13 0.10 69 32.0 0 0 0 29 0.36 95 344 5,598 5598 27.2 288.6 -85.0 24 2 100.0 5 -90 28.0 0.13 0.10 69 32.0 0 0 0 29 0.36 100 347 5,598 5598 27.2 288.6 -90.0 25 2 105.0 5 -95 29.0 0.13 0.10 70 32.0 0 0 0 29 0.36 105 349 5,598 5598 27.2 288.6 -95.0 26 2 110.0 5 -100 30.0 0.13 0.10 70 32.5 0 0 0 32 0.36 110 351 5,598 5598 27.2 318.5 -100.0 27 2 115.0 5 -105 31.0 0.13 0.10 71 32.5 0 0 0 32 0.36 115 353 5,598 5598 27.2 318.5 -105.0 28 2 120.0 5 -110 32.0 0.13 0.10 71 32.5 0 0 0 32 0.36 120 355 5,598 5598 27.2 318.5 -110.0 29 2 125.0 5 -115 33.0 0.13 0.10 71 32.5 0 0 0 32 0.36 125 357 5,598 5598 27.2 318.5 -115.0 30 2 130.0 5 -120 34.0 0.13 0.10 72 33.0 0 0 0 35 0.36 130 360 5,598 5598 27.2 348.3 -120.0 31 2 135.0 5 -125 35.0 0.13 0.10 72 33.0 0 0 0 35 0.36 135 362 5,598 5598 27.2 348.3 -125.0 32 2 140.0 5 -130 36.0 0.13 0.10 73 33.0 0 0 0 35 0.36 140 364 5,598 5598 27.2 348.3 -130.0
REFERENCES / PROJECT NOTES
Pile Toe Elev.
Pile Toe Depth (below reference)
Soil Type SPT N-value
Total Pile Capacity Toe Capacity
Cummulative Shaft
Capacity
Stratum Unit Shaft
Friction
Design Pile Capacity
Design Pile Capacity Toe Quake Skin Damping feet feet blows/foot kips kips kips ksf kips Tons inches sec/foot
8.0 2.0 SM 133.7 6 6.1 0.2 0.02 3.2 2 0.13 0.10
6.0 4.0 SM 87.8 12 11.2 0.9 0.06 6.0 3 0.13 0.10
4.0 6.0 SM 67.2 18 15.8 1.8 0.09 8.8 4 0.13 0.10
2.0 8.0 SM 66.3 24 20.4 3.2 0.12 11.8 6 0.13 0.10
0.0 10.0 SM 18.9 29 23.8 4.8 0.15 14.3 7 0.13 0.10
-2.0 12.0 SM 12.6 76 69.8 6.6 0.17 38.2 19 0.13 0.10
-5.0 15.0 SM 10.0 72 62.1 9.9 0.20 36.0 18 0.13 0.10
-10.0 20.0 SM 1.5 43 26.6 16.4 0.25 21.5 11 0.13 0.10
-15.0 25.0 SM 2.8 56 31.8 24.4 0.30 28.1 14 0.13 0.10
-20.0 30.0 SM 6.5 112 77.9 33.8 0.35 55.8 28 0.13 0.10
-25.0 35.0 SM 3.7 98 52.9 44.6 0.41 48.8 24 0.13 0.10
-30.0 40.0 SM 15.0 297 240.0 56.9 0.46 148.5 74 0.13 0.10
-35.0 45.0 SM 41.8 864 793.0 71.0 0.53 432.0 216 0.13 0.10
-40.0 50.0 SM 8.4 231 144.2 86.6 0.59 115.4 58 0.13 0.10
-45.0 55.0 CL 2.0 108 8.0 100.0 0.50 54.0 27 0.13 0.20
-50.0 60.0 CL 4.0 122 8.9 113.3 0.50 61.1 31 0.13 0.20
-55.0 65.0 CL 2.9 135 8.0 126.6 0.50 67.3 34 0.13 0.20
-60.0 70.0 SM 5.6 285 137.9 146.8 0.76 142.3 71 0.13 0.10
-65.0 75.0 SM 8.9 386 217.4 168.5 0.81 192.9 96 0.13 0.10 Phi=28 °, user defined to account for differing materials in the FILL layer.
-70.0 80.0 SM 6.9 375 183.5 191.6 0.87 187.6 94 0.13 0.10 Cohesion=500 psf, from the laboratory tests (includes a SF) -75.0 85.0 SM 25.0 464 247.6 216.3 0.93 231.9 116 0.13 0.10 Limiting depth (10B to 40B): depth beyond which the overburden pressure remains the same.
-80.0 90.0 SM 26.0 506 263.7 242.6 0.99 253.2 127 0.13 0.10
-85.0 95.0 SM 27.0 558 288.6 269.8 1.02 279.2 140 0.13 0.10
-90.0 100.0 SM 28.0 586 288.6 296.9 1.02 292.8 146 0.13 0.10
-95.0 105.0 SM 29.0 613 288.6 324.1 1.02 306.4 153 0.13 0.10
-100.0 110.0 SM 30.0 670 318.5 351.3 1.02 334.9 167 0.13 0.10
-105.0 115.0 SM 31.0 697 318.5 378.4 1.02 348.5 174 0.13 0.10
-110.0 120.0 SM 32.0 724 318.5 405.6 1.02 362.0 181 0.13 0.10
-115.0 125.0 SM 33.0 751 318.5 432.8 1.02 375.6 188 0.13 0.10
-120.0 130.0 SM 34.0 808 348.3 460.0 1.02 404.1 202 0.13 0.10
-125.0 135.0 SM 35.0 835 348.3 487.1 1.02 417.7 209 0.13 0.10
-130.0 140.0 SM 36.0 863 348.3 514.3 1.02 431.3 216 0.13 0.10
Allow. Compress. Stress=
Pile Toe Area =
(NOTE: yellow background data must be entered)INPUT
Note (5): if preaugering - should make consideration for reduced shaft capacity through preauger depth.
Worksheet Notes and References:
Allow. Tensile Stress=Pile Side =
RESULTS
COMPUTATIONS
Stickup @ EOD = Embedment @ EOD:
Khc (1.0 to 1.5) =
Note Computation Changes (make above computation changes in bold red text):
Note (4) COHESION: The worksheet computes C based on SPT value and soil type CL (no phi value is assigned). Ca is factored from C (see Note 7).
Worksheet computes a maximum C=5000 psf (with Ca= 2000 psf). No phi value is assigned with soil type CL- therefore, directly enter a phi value if considered applicable.
Note (6): colored background indicates a change to the generic worksheet formula to consider conditions unique to the site or project characteristics (see Project Notes).
Pile Shaft Area (As) =
Toe Elevation
McGraw Hill; McCarthy, p.81, 5th Edition - Essentials of Soil Mechanics and Foundations, Prentice Hall (1998); NAVFAC DM 7.1, p.22 (1982); Kt: Bowles, p.
767, 4th Edition-Foundation Analysis and Design.
Note (7): unit weight, phi, c per: Sowers p. 23, p. 88,4th Edition - Introductory Soil Mechanics and Foundations, MacMillan (1979); Das, p. 11, 1st Edition - Principles of Foundation Engineering, Brooks/Cole (1984); Bowles, p. 86, p. 141, 2nd (1984) & 4th (198) Editions-Foundation Analysis and Design, Note (3) PHI: The worksheet computes phi based on the SPT value and soil types SP, SM, or ML (no value is assigned for cohesion). A maximum phi=40 degrees is used for Nq determination. NOTE: all phi's are based on a fine grained sand, silty sand, (silt). No cohesion (C) value is assigned with soil types SP, SM, ML- therefore, directly enter a value for Cohesion (C) if considered applicable.
Toe Quake= d/120 Skin Damp.: sand=0.05, clay=0.20
Note (2) Effective Unit Wt.: above the water table separately enter the MOIST UNIT WEIGHT.
Note (1) SPT: SPT= 0 to 40, enter in 1 blow increments; then SPT=40 to 100 (max.), enter in increments of 10.
Pile Shaft Width:
Groundwater Elev.:
Reference Elev*.: Plan Head Elev.=
Pile Length= f'c = Resid. prestress =Plan Toe Elev.=
Evaluation of Ultimate Compressive Pile Capacity per NAVFAC DM-7.2 Utilizing Effective Soil Unit Weight - SPPC Piles - English Units This worksheet evaluates the ultimate compressive capacity of a driven HP-Section Steel pile.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .