This document outlines room requirements for a salad and sandwich preparation space as part of a federal construction contract solicitation. The space must include food preparation counters and storage constructed of stainless steel, with full height stainless steel corner guards and .060-inch thick extruded PETG wall protection up to six feet high. Plumbing, ventilation, and electrical fixtures are specified to accommodate personnel and the intended food service operations. Fire suppression requirements include a wet chemical system within the kitchen hood and ductwork. The related federal contract opportunity is solicitation number N4008519R9255 from the Naval Facilities Engineering Command for Hurricane Florence recovery support and applied instruction facilities at Marine Corps Base Camp Lejeune, under package five for Hadnot Point Mess Hall part three.

View the file

Other files

File Type Posted
19R9255 0016.pdf PDF
N4008519R9255-0015 combined.pdf PDF
19R9255-0014.pdf PDF
19R9255 0013.pdf PDF
19R9255 0012.pdf PDF
P1519_PART 6_AV Requirements.pdf PDF
19R9255 0011.pdf PDF
19R9255 0010.pdf PDF
P1312_4.1_Space Tabulation.pdf PDF
Food Service Equipment Schedule 100 percent.pdf PDF
Part 6 - TFF 5 - Site Bubble Diagram-P1312.pdf PDF
19R9255 0009.pdf PDF
Part 6 - TFF 5 - Site Bubble Diagram-P1533.pdf PDF
Haz Test Part 1 of 2.zip ZIP file
19R9255 0008.pdf PDF
Navfac_Fact_Sheet-Vapor Intrusion.pdf PDF
Haz Test Part 2 of 2.zip ZIP file
Pak5_B (1).zip ZIP file
Pak5_A.1.zip ZIP file
19R9255 0007.pdf PDF
Pak5_A.2 (1).zip ZIP file
PDFs.zip ZIP file
19R9255 0006.pdf PDF
19R9255 Amendment 0005.pdf PDF
TFF Package 5 Price Proposal.pdf PDF
TFF 5 RFP RTA PART6 CHAPTER Ca_16MAR2020 (3 of 5) REV.pdf PDF
TFF 5 RFP RTA PART6 CHAPTER A-B_16MAR2020 (2 of 5).pdf PDF
TFF 5 RFP RTA PART1 - PART5_16MAR2020 (1 of 5).pdf PDF
TFF 5 RFP RTA PART6 CHAPTER Ca_16MAR2020 (3 of 5).pdf PDF
19R9255 PKG 5 Am 0004 PH II.pdf PDF
TFF 5 RFP RTA PART6 CHAPTER D-K_16MAR2020 (5 of 5).pdf PDF
TFF 5 RFP RTA PART6 CHAPTER Cb_16MAR2020 (4 of 5).pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Attachment B SECNAV 5512.pdf PDF
N40085-19-R-9255 HFRM PKG 5.pdf PDF
Attachment I One Day Pass Request.xls XLS spreadsheet
ATTACHMENT F - PPQ.pdf PDF
ATTACHMENT D- SB SUBCONTRACTING RECORD.pdf PDF
ATTACHMENT H- PROPOSED PROJ DURATIONS.pdf PDF
ATTACHMENT C - CON DES EXP DATA SHEET.pdf PDF
ATTACHMENT G - SB SUBCONTRACTING PLAN.pdf PDF
ATTACHMENT E - SB PART AND COMMIT STRAT.pdf PDF
Attachment A - PPI Inquiry Log.xls XLS spreadsheet
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HURRICANE FLORENCE RECOVERY SUPPORT FY20 PKG 5

AND APPLIED INSTRUCTION FACILITIES AT MCB CAMP LEJEUNE Sol. # N4008519R9525

P883 HADNOT POINT MESS HALL

PART 3 – CHAPTER 5a – Page 15

SALAD / SANDWICH PREP

Space Characteristics

Function/Adjacencies: Area for preparation of salads and sandwiches. Adjacent to salad chill refrigeration.

Special Dimensions: Minimum Ceiling Height: 9 ft. (2.74 m)

Acoustics: 50 STC. Provide baffles/screens on openings to the dining area and adjacent kitchen prep areas.

Access: Staff

Number of Occupants: based on staffing plan

Other/special requirements:

Uniformat System

Description Specific Requirements

C102091 Other Interior Personnel Doors

Provide dual swing doors between salad prep area and kitchen areas.

C1030 Interior Construction

C103008 COUNTERS & C103009 CABINETS- Provide food prep counters and storage construction as necessary to accommodate the number of personnel to be served, the food delivery methodology, the menu, the bussing style and the storage capacities. Counters and storage to be stainless steel.

C301005 Wall Coverings Provide full height, flush mounted, stainless steel corner guards on all outside corners

C301005 Wall Coverings Provide .060” thick, extruded PETG, sheet wall protection up to 6 feet high on all walls

D2010 Plumbing – Fixtures Provide fixtures per FC 4-722-01N, Chapter 3, Plumbing, and to accommodate the number of personnel to be served, the food delivery methodology, the menu, the bussing style and the storage capacities.

D2090 Plumbing - Other Provide plumbing to indicated equipment in ESR E10 and Chapter 6 attachments G3 Kitchen Equipment. Plumbing to be in compliance with FC 4-722-01N Chapter 3, Plumbing.

D209001 Special Piping Systems

Provide piping, fittings and fixtures necessary for complete installation and functionality of Total Oil Management System. Provide materials and perform work in accordance with specification provided by the vendor of Total Oil Management System.

D30 HVAC Kitchen exhaust and makeup air equipment to be installed on the roof

D305006 HVAC Package Units Kitchen makeup air to be dehumidified and cooled (heated when needed). Salad prep room requires independent controls from main kitchen prep areas.

D40 Fire Protection Provide wet chemical fire suppression system within hood and duct system.

D4090 Fire Protection Provide kitchen hood system with wet chemical or water assisted wet chemical per NFPA 96 and UFC 3-600-01.

D50 Electrical Provide electrical connections to all electric kitchen equipment. Coordinate connection type (plug-in, safety switch junction box) with equipment list and food service designer.

E10 Equipment Provide kitchen equipment as indicated in ESR E10 and Chapter 6 attachments G3 Kitchen Equipment.