About this file
This document is an amendment to a federal solicitation for construction services. The solicitation is for Hurricane Florence Recovery Support and Applied Instruction Facilities at Marine Corps Base Camp Lejeune in North Carolina. It provides design-to-budget cost estimates totaling $231.8 million for seven construction projects. Phase II of the solicitation involves the submission of non-price and price proposals by pre-selected offerors due on May 20, 2020 and June 10, 2020 respectively. The amendment incorporates wage determinations for various construction labor categories. It also addresses questions on the technical requirements and provides clarification on the pre-proposal site visit due to COVID-19 policies.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 8
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
20-Mar-2020
4. REQUISITION/PURCHASE REQ. NO. 5. P ROJECT NO.(If applicable)
6. ISSUED BY CODE N40085 7. ADMINISTERED BY (Ifother than item6) CODE
NAVFAC MID
ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
See Item 6
8. NAME AND ADDRESS OF CONT RACT OR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICIT AT ION NO.
N4008519R9255
X 9B. DATED (SEE ITEM 11)
19-Dec-2019
10A. MOD. OF CONT RACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. T HIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt ofthis amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:
(a) By completing Items 8 and 15, and returning copies ofthe amendment; (b) By acknowledging receipt ofthis amendment on each copy ofthe offer submitted;
or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. Ifby virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)
13. THISITEM APPLIESONLY TO MODIFICATIONSOF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGESSET FORTH IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER ISMODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES(such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. T HIS SUPPLEMENTAL AGREEMENT IS ENT ERED INT O PURSUANT TO AUT HORIT Y OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, includingsolicitation/contract subject matter where feasible.)
SeeContinuation.
Except as provided herein, all terms and conditions ofthe document referenced in Item9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONT RACT OR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNIT ED ST AT ES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment hereby incorporates the following:
1. PHASE II SOLICITATION REQUIREMENTS:
Phase II Solicitation Requirements are for ONLY those Offerors selected and separately notified to participate in submitting Phase II Non-Price and Phase II Price Proposals.
Offerors selected to participate in Phase II are advised that there are separate due dates for the Phase II Non-Price proposal and Phase II Price proposal.
- Phase II Non-Price Proposal Due Date: Tuesday, May 20, 2020 at 2:00 PM local time.
- Phase II Price Proposal Due Date: Wednesday, June 10, 2020 at 2:00 PM local time.
All Offerors selected to participate in Phase II are required to provide both a Phase II Non-Price proposal and a Phase II Price proposal, both in accordance with the solicitation.
The evaluation factors, including both technical and price submittal requirements, are available in the base RFP document and previous amendments and have not been reproduced in this amendment. See Solicitation #N40085-19-R-9255 for Phase II Submittal Requirements.
Offerors selected for Phase II may be announced via amendment.
2. Design-To Budget for Package 5
The Estimated Costs of Construction for each Project in the Package are as follows and are provided for informational purposes and are not hard ceilings.
Project Project Title
P1203F Courthouse Bay Fire Station Replacement $17.1 P1312F MCES Applied Instruction Facility Replacement $76.7 P1506F Replace NCIS Facilities $18.1 P1519F LSSS Facility Replacement $21.5 P883F Hadnot Point Mess Hall Replacement $52.9 P1518F Fire Station Replacement, Hadnot Point $17.6 P1533F PMO Facility Replacement $27.8
Package 5 Total $231.8M
3. Pre-Proposal Inquiries
Pre Proposal Inquiries (PPIs): Offerors who determine that the technical and/or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing.
Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiries form attached to this solicitation as (Attachment A). All inquiries shall be submitted via email to Holly Snow, Holly.snow@navy.mil no later than 21 days prior to the non-price proposal due date by 1400 Local Time for Non-Price related Inquiries, and no later than 21 days prior to the price proposal due date by 1400 Local Time for Price Related Inquiries. A response will be published as an amendment to the solicitation. The Government may opt not to consider and/or respond to PPIs submitted after this date.
4. Issue Specifications and Supplementary attachments.
The Attachments will be uploaded to Beta.Sam.Gov. In the event there is an issue with accessing the attachments, the Contract Specialist will reach out to Phase II Offerors with alternative Instructions to Access.
a. The attachments included in this amendment are as follows:
TFF 5 RFP RTA PART1 - PART5_16MAR2020 (1 of 5) TFF 5 RFP RTA PART6 CHAPTER A-B_16MAR2020 (2 of 5) TFF 5 RFP RTA PART6 CHAPTER Ca_16MAR2020 (3 of 5) TFF 5 RFP RTA PART6 CHAPTER Cb_16MAR2020 (4 of 5) TFF 5 RFP RTA PART6 CHAPTER D-K_16MAR2020 (5 of 5)
The Price Proposal Form will be added via subsequent amendment.
5. Site Visit Information
Due to various formal guidance concerning COVID-19 , it is unknown if the Government will be able to hold a site visit. More information will be forthcoming in subsequent amendments if applicable.
6. Incorporate Wage Decision Number NC20200038 01/03/2020.
"General Decision Number: NC20200038 01/03/2020
Superseded General Decision Number: NC20190038
State: North Carolina
Construction Type: Building
County: Onslow County in North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/03/2020
IRON0848-005 02/01/2018
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 25.00 13.50
* PLUM0421-003 07/01/2018
Rates Fringes
PIPEFITTER.......................$ 28.00 12.01
SUNC2011-019 08/24/2011
0.00
LABORER: Common or General......$ 11.13 0.32
LABORER: Landscape & Irrigation.......................$ 9.13 0.28
LABORER: Pipelayer..............$ 13.35 2.80
LABORER: Mason Tender-Brick/Cement/Concrete.....$ 12.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 18.47 2.41
OPERATOR: Bulldozer.............$ 16.00 1.87
OPERATOR: Crane.................$ 19.77 4.48
OPERATOR: Forklift..............$ 13.86 0.00
Rates Fringes
BRICKLAYER. .................... $ 19.00 0.00
CARPENTER (Drywall Hanging Only)............................$ 13.83 0.00
CARPENTER (Form Work Only). ..... $ 13.38 1.80
CARPENTER, Excludes Drywall Hanging, and Form Work. ......... $ 16.39
4.26
CEMENT MASON/CONCRETE FINISHER...$ 15.80
ELECTRICIAN. .................... $ 20.64 6.68
HVAC MECHANIC (HVAC Duct Installation Only). ............. $ 17.37
1.82
OPERATOR: Grader/Blade..........$ 15.72 1.49
OPERATOR: Loader................$ 16.17 0.25
PAINTER: Brush, Roller and Spray............................$ 12.35 0.00
PLUMBER..........................$ 18.48 3.93
ROOFER...........................$ 11.75 1.06
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 15.81 1.40
TRUCK DRIVER.....................$ 13.38 1.48
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION