This document is an amendment to a federal solicitation for construction services. The amendment provides responses to 183 pre-proposal questions regarding requirements for Hurricane Florence Recovery Support and Applied Instruction Facilities at Marine Corps Base Camp Lejeune. Key details include specifications for mechanical, electrical and plumbing systems at multiple buildings, clarification of outdoor lab and generator specifications, confirmation of submittal requirements and response timelines. The Department of the Navy Naval Facilities Engineering Command is the contracting agency. Pricing terms and award dates are not discussed; the amendment focuses on clarifying technical requirements for interested offerors prior to the proposal due date.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RFP revisions and Provide PPI responses 36, 53, 67, 69, 78 REV, 91, 92, 93, 95, 97, 98, 103, 104, 105, 108, 109, 110, 115, 118, 119, 120, 124, 125, 126, 128, 134, 141, 144, 146, 151, 152, 153, 155, 156, 157, 182, 183
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9255
X 9B. DATED (SEE ITEM 11)
19-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-May-2020
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R9255
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0011
This amendment hereby incorporates:
1. Per FAR subpart 9.5, offerors are to advise the Contracting Officers of any potential Organizational Conflict of Interest (OCI), and provide a mitigation plan addressing any potential OCI, as appropriate, for the Contracting Officer’s review and assessment.
2. PART 3.1 - P883 HADNOT POINT MESS HALL, ESR
Provide 180 deg. F water for dishwasher (140 deg. F might be acceptable if the machine is equipped with heat booster) and to pot and pan wash, as well as can wash areas. Sanitary drain serving dishwasher as well as pot, pan and can wash areas running up to grease interceptor to be built of ductile iron hub and spigot pipe utilizing high temperature silicone gaskets. No hot water over 140 deg. F is required for Fire Houses.
3. This project will adopt the FEMA National Flood Insurance Program, Flood Insurance Rate Maps dated 6/30/2016 (Preliminary). This will impact P1312 and P1533.
The following additional requirements are to be incorporated.
P1312 and P1533 are to meet, at a minimum, the new flood elevations and UFC 1-200-01 Civil Engineering. In addition, the parking lots for P1312 and P1533 are to meet the minimum base flood elevation (BFE).
4. In regard to PPI 78, use these specifications for preparing bids.
200 kW Generator Set 50/60Hz Fuel Tank Capacity (gal) - 128 Fuel Type – Diesel/JP-8 Engine Type – 4 cycle, liquid turbo cooled Number of Engine Cylinders – 4 Engine Displacement (in^2) – 732 Engine Compression Ratio – 18.5:1 Engine Speed (RPM) – 1500/1800 A/C Generator Power Requirements – Rotating Field, Synchronous, 3 Phase Current Ratings (amps) – 120/208V – 694, 240/416V – 347
5. Provide PPI responses 36, 53, 67, 69, 78 REV, 91, 92, 93, 95, 97, 98, 103, 104, 105, 108, 109, 110, 115, 118, 119, 120, 124, 125, 126, 128, 134, 141, 144, 146, 151, 152, 153, 155, 156, 157, 182, 183
# Reference Question Government Response
Page Sec Para 36 D20C1
030, Part 3
Buildings P883:
P1203:
Specific requirements notes to provide high-temperature hot water. Hot water to be stored at 140 degree F.. 140 degree F. to be provided
See Amendment 0011.
Store the hot water at 140 deg. F. However hot water needs to be at 180 deg. F for the dishwasher, pot and
Chapte r 5a.
P1518: as high-temperature hot water, if hotter water is required please note temperature required.
pan wash as well as can wash areas based on:
a. 2015 IPC Commentary list 180 deg. F as needed for dishwasher to be able to sterilize the dishware (140 deg. F is sufficient if dishwasher has internal heat booster) b. FC 4-722-01N NAVY AND
MARINE CORPS DINING FACILITIES i. 3-
6.1.3 Water Supply Systems calls for “Provide high-
temperature water supply in accordance with UFC 3- 420-01, Plumbing Systems, for the dishwasher, pot and pan wash, as well as can wash areas.” Table B- 1 calls for “Water temperature booster 180 deg. F”
53 RFP
Part 3.1
¶B10 Supers tructur e
All Part 3.1 ¶B10 states:
"Seismic Design Category Base bid on Seismic Design Category B. Final determination of Seismic Design Category in accordance with UFC 3-301-01 Structural Engineering and ASCE 7 is the responsibility of the DOR.
Wind Exposure
Base bid on wind Exposure C. Final determination of Exposure Category in accordance with UFC 3-301-01 Structural Engineering and ASCE 7 is the responsibility of the DOR."
Please confirm that if the DOR determines during design that seismic and wind categories are other than as stated above for “base bid” and there is a consequent cost difference from the bid price, a change order will be processed for the difference.
No compensation will be provided for consequences resulting from a Seismic Design Category or Wind
Exposure Category greater than what is presented in the RFP. The RFP base bid is based on conservative assumptions. The bidder may have their design engineer verify the Seismic Design Category and
Wind Exposure Category prior to bidding and submit an additional RFI, with justification, if they believe a more stringent criteria is appropriate.
67 RFP
Attach ment E
All Camp Lejeune mechanical design guide calls for several things that don’t match or have been omitted from RFP proper. Most notably:
a. OAT also at peak dehumidification of
140gr/lb and MCDB (design DB is in the RFP but not design gr/lb).
b. OAT at 99.6% which is 22F (99% of 26F is all that is listed in RFP).
c. Wants indoor design conditions at 70F when OAT<50F, 76F when OAT>80F and varying between. Design for +/1F. Allow local users +/-3F local control. (instead of just 78F and 68F listed in RFP)
d. If only one chiller provide a connection to future temporary chiller.
e. SAT reset not allowed.
Question: I understand that the RFP has precedent for conflicts like OAT winter and indoor design conditions, but what about for additional requirements that were omitted from the RFP directly like peak dehumidifcation?
a. Bid per RFP, the RFP outdoor design temperatures generate the most demanding criteria
(the highest enthalpy) therefore the contractor should follow.
b. the req't is UFC 3-410-01 Section 3-5.3.5 to use the 99.6% OAT for freeze protection along with the 99% OAT for comfort heating in general (Section 3-
5.2.4).
c. Follow Order of precedence, 78/68 deg. req't for most inside rooms is in RFP and UFC 3-410-01 (sections 3-5.3.1 and 3-5.3.3).
d. follow Camp LeJeune Guide, provide emergency chiller connection independent of number of chillers.
e. Bid per RFP.
69 UFC All UFC 3-410-01 c6 requires LCCA of 3 Bid per RFP. LCCA not needed. Provide systems
3-410- 01c6, Chapte r 3, 3-1 options, however RFP includes a fairly presrciptive design. RFP also requires LCCA but does not require 3 options be evaluated. Is only a single LCCA proving the proposed design meets energy goals, the only LCCA required? This appears to be a non-issue if
Change 6 is not part of the scope.
that comply with D30 and D20.
1107/
Chapte r 5
Room Requir ement s P1312
Several indoor and outdoor labs require vent connections for generator exhaust. Later Chapter 6 ESR D30 states to design exhaust systems per ACGIH. Can more information be provided about the generators used or specific criteria for how to size exhaust drops for generators? Assumed 200cfm per drop, is this acceptable for estimating purposes?
Design per RFP. Existing generator data is provided in Amendment 0011.
91 2.b.
Non- Price
Factors 4&5:
(1)
Solicit ation
Submit tal
Requir ements
Amendment
In amendment 0005, on page 6 of 9, there is a bullet item that states “Additionally, include an electronic version of the price and non-price proposal on a CD-ROM.” Please confirm this line should be deleted as the Price and Technical submissions are on different days.
Bid Per RFP, CD’s should be submitted with their respective hard copy proposals.
92 D20/C hapter
Building P1312
The outdoor lab spaces located remote from the building are to be open and partially heated with infrared heaters, however the heating system will not provide sufficient freeze protection for plumbing equipment such as emergency fixtures and hose bibbs as required by the Room Requirements. Please confirm that the plumbing services and fixtures are required for the outdoor lab spaces remote to the building and verify if freeze protection measures would therefore be required.
Bid per RFP. Provide fixtures per room requirements. Provide heat trace on all hydronic piping exposed to freezing conditions per ESR
D309090 OTHER SPECIAL MECHANICAL
SYSTEMS. Non-freeze hydrants not to be used on this project. Hose bibbs are acceptable for use. per
PTS D202002 VALVES & HYDRANTS
93 1179 D20/C hapter
Building P1312
The outdoor lab spaces located remote from the building are to be open and partially heated with infrared heaters, however the heating system will not provide sufficient freeze protection for compressed air equipment. Per section D20 an Air Dryer is not required. Please confirm that air drop are required for the outdoor lab spaces remote to the building and how to treat the air.
Bid per RFP. Provide air drops per room requirements. Provide Low-pressure compressed air dryer of the mechanical refrigeration type, equipped with an automatic temperature shutdown switch to prevent freezing per PTS D209005 1.2 REFRIGERATED AIR DRYER . Provide heat trace on all hydronic piping exposed to freezing conditions per ESR D309090 OTHER SPECIAL
MECHANICAL SYSTEMS.
95 1179 D20/C hapter
Building P1312
Lab-General states “Labs will not receive HVAC with exceptions listed on following pages”. The Labs omit HVAC requirements.
This will not provide sufficient freeze protection for compressed air equipment. Per section D20 an Air Dryer is not required.
Bid per RFP. Provide air drops per room requirements. Provide Low-pressure compressed air dryer of the mechanical refrigeration type, equipped with an automatic temperature shutdown switch to prevent freezing per PTS D209005 1.2 REFRIGERATED AIR DRYER . Provide heat trace
Please confirm that air drops are required for the lab spaces and how to treat the air.
on all hydronic piping exposed to freezing conditions per ESR D309090 OTHER SPECIAL
MECHANICAL SYSTEMS.
97 1179 D2090
Building P1312
Section D209005 Compressed Air System.
Guidance on sizing the air compressor system is required. Provide specific air usage for each air drop or provide a specific tool to be used. Note that “Pneumatic Tools” require anywhere from 3 CFM up to 30+ CFM depending on the type of tool.
Bid per RFP. Provide air drops per room requirements. Compressor to be 200 psig rated per PTS D209005 1.1 AIR COMPRESSOR . Piping to be rated for the same pressure. Pipes to be sized based on specific tooling requirement provided by the user during the design process.
98 1179 D2090
Building P1312
Section D209005 Compressed Air System.
Please provide the diversity to be used when sizing the air compressor.
Bid per RFP. Provide air drops per room requirements. Compressor to be 200 psig rated per
PTS D209005 1.1 AIR COMPRESSOR . Pipes to be sized based on specific tooling requirement provided by the user during the design process. Diversity to be cestablished based on tool usage pattern provided by the user during design process.
103 Should we include the parking deck as part of the Factor 5 sketches for the dining facility?
YES, parking deck is inclusive of parking for Factor
4. See Amendment 0011.
104 LAB-
SMALL
CRAFT
Data Sheet. It is Part 3.3 –
P1312 Project
Program Chapter 5, (Page 1116 of 3682
The room data sheet for the Small Craft Lab states “Lab will receive oil/water interceptor to hold 8 test tanks (5’x5’x5’ each tank).” It is unclear what the drainage requirements are for this space. Is the intent for the oil/water separator to contain the entire volume of all
(8) tanks at the same time? The volume of all
(8) tanks is approximately 7,480 gallons, which would require a large interceptor.
Generally, an oil/water separator is sized based on a specific flow rate through the drainage line. Please provide clarity, such as time allowed to drain tanks, to allow proper sizing of interceptor.
Lab will receive oil/water interceptor to hold 8 test tanks (5’x5’x5’ each tank).
105 part 3- Chapte r 3
LSSS
3.1.2.3 New
Site Work
New site work for LSSS facility references Part 6, Chapter B, B.3 Site Bubble diagram.
The same paragraph notes several requirements. The building should face Holcomb and be located so that the front aligns with the other buildings facing Holcomb to the SW of the site Based on the
Adjacendy plan referenced above the Setbacks are approximately 170'. The paragraph also states that the drive connecting Molly Pitcher is to be expanded to min. 3 lanes. The same paragraph also states the building must have 33' unobstructed space around it's perimeter.
The site is 301' deep. The required setbacks noted above are 170' on the Holcomb side +
33' on the access drive side+ 36' to accomodate 3 lanes on the access drive. This totals 239' of required setback and road leaving only 62' of width for the LSSS building. The typical Courtroom alone is 54' deep not counting lobby areas to the south or restricted corridors and judges chambers to the
ATFP requirements must be enforced. Bid per RFP.
north. Will site requirements outlined in this paragraph be amended to reduce the required setbacks along Holcomb drive and if so what is the minimum allowed setback on Holcomb drive?
108 Pages
9-21 Part 3- Chapte r 5
INSTR
UCTI
ONAL
FACIL
ITY
TFF+5+RFP
+RTA+PAR
T6+CHAPT
ER+A-
B_16MAR2
020+(2+of+
5)
P1312 Instruction Facility.Please confirm which labs require building HVAC. Labs –
General indicates Labs will not receive HVAC with exceptions listed on following pages. Lab
– Wiring, Lab – Soldering, Lab – NIDA, Lab
– Bract, Lab – Small Craft are indicated to receive HVAC. Please confirm no other Labs to receive HVAC.
Bid per RFP
109 Pages 12 and
Part 3- Chapte r 5
INSTR
UCTI
ONAL
FACIL
ITY
TFF+5+RFP
+RTA+PAR
T6+CHAPT
ER+A-
B_16MAR2
020+(2+of+
5)
P1312 Instruction Facility. Wiring Lab requires HVAC per Data Sheet. Plumbing Lab does not require HVAC per Data Sheet.
However, these two spaces are connected to one another with operable partition. Please confirm HVAC requirements for both rooms
Bid per RFP
110 Pages 9 -21
Part 3- Chapte r 5
INSTR
UCTI
ONAL
FACIL
ITY
TFF+5+RFP
+RTA+PAR
T6+CHAPT
ER+A-
B_16MAR2
020+(2+of+
5)
P1312 Instruction Facility. For Labs and Outdoor Labs - compressed air is noted as a requirement. Please clarify if this is to be provided locally or if a building compressed air system is required. Please clarify the size of compressed air outlet required.
Bid per RFP. Provide air drops per room requirements. Compressor to be 200 psig rated per PTS D209005 1.1 AIR COMPRESSOR . Number and location of the compressors is not limited. Piping to be rated for the same pressure. Pipes to be sized based on specific tooling requirement provided by the user during the design process.
115 page
Part 3- Chapte r 5
INSTR
UCTI
ONAL
FACIL
ITY
TFF+5+RFP
+RTA+PAR
T6+CHAPT
ER+A-
B_16MAR2
020+(2+of+
5)
Elevator machine room are shown in the requirements in various sections of the RFP.
Will the NAVFAC allow machineroomless
MRL elevators with integrated controllers in the jamb of the elevator hoistway?
Bid per RFP, see UFC 3-490-06 Elevators for further information.
118 Page 1, 2
Part 3- Chapte r 5
INSTR
UCTI
ONAL
FACIL
ITY,Pa rt 3 Chapte r 3
TFF+5+RFP
+RTA+PAR
T6+CHAPT
ER+A-
B_16MAR2
020+(2+of+
5)
Instructional facility SF requirements conflicts. Part 3, Chapter 2, Par 2.2 chart lists
Outdoor covered lab as 11,197 Sf, Part 3 Chapter 4, page 1 space tabulation lists the outdoor lab spaces as 10,350 which is correct?
Revise Part 3 Chapter 4 space tabulation as follow.
Outdoor Lab-Maintenance (5,047 SF), Outdoor Lab-
Bract (2,050 SF), Outdoor Lab- Small Craft (2050 SF), Outdoor Lab- Construction (2,050 SF) for a total of 11,197 SF.
119 Page 1, 2
Part 3- Chapte r 5
INSTR
UCTI
ONAL
TFF+5+RFP
+RTA+PAR
T6+CHAPT
ER+A-
B_16MAR2
020+(2+of+
Part 3 Chapter 4, page 1 space tabulation lists the outdoor lab spaces as 10,350 in the breakdown of outdoor spaces but the total 10,350 SF listed for the 4 outdoor labs does not total into the 43,377 SF NET building area, Should the outdoor lab spaces be moved
No, the outdoor lab spaces are not "physically connected" to the facility and therefore not included in the building SF.
FACIL
ITY,Pa rt 3 Chapte r 3
5) below the line? Is a gross factor applied to the outdoor lab area?
120 Page 1, 2
Part 3- Chapte r 5
INSTR
UCTI
ONAL
FACIL
ITY,Pa rt 3 Chapte r 3
TFF+5+RFP
+RTA+PAR
T6+CHAPT
ER+A-
B_16MAR2
020+(2+of+
5)
Part 3 Chapter 4, page 1 space tabulation lists the outdoor lab spaces as 10,350 in the breakdown of outdoor spaces but the total 10,350 SF listed for the 4 outdoor labs. Is there an assumed occupancy load for additional personnel occuping these labs simultaneously in addition to the indoor occupancy that should be used for toilet counts?
No, the outdoor spaces are assigned to the corresponding classrooms. The interior and exterior will not have simultaneous training.
124 Page 1 Part 3.3-
Chapte r 6
ENGI
NEERI
NG
SYST
EM
REQU
IREM
ENTS,
Part 3 Chapte r
6/ESR
D40
P1312 F
TFF_5_RFP
_RTA_PAR
T1_-
_PART5_16
MAR2020_(
1_of_5)
We are aware that the hazmat storage structures are located in close proximity to the
P1312F Academic Instruction Building, however, please clarify if chemicals will be used/stored temporarily within the labs of the Academic Building. If so, what kind of chemicals and what approximate quantities? Is it safe to assume that the quantities will be within the Maximum Allowable Quantities
(MAQ) limits as outlined within NFPA 400?
Quantities stored within the laboratory will be within the maximum allowable limit allowed.
125 Page 1 Part 3.3-
Chapte r 6
ENGI
NEERI
NG
SYST
EM
REQU
IREM
ENTS,
Part 3 Chapte r
6/ESR
TFF_5_RFP
_RTA_PAR
T1_-
_PART5_16
MAR2020_(
1_of_5)
How will the labs within the P1312F Academic Instructional Building be utilized?
What processes are expected to occur within the labs? Will combustible dust be produced by any of the machinery?
One lab process includes 8 saw tables and special saw dust vacuum system.
D40
P1312
F
126 P883 PART 3 -
CHAPTER
2 - Page 18;
CH 3 - Page
3;
Will the additional 2 trailers to be delivered to the site require us to connect electrical, water and sewer service?
No.
128 NA NA NA Would NAVFAC consider allowing the use of an alternative/betterment approach for heating/cooling systems that deviates from the instructions in the solicitation (natural gas based systems).
In accordance with the April 2016 Department of Defense Source Selection Procedures, a Strength is defined as “an aspect of an offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.” The Government may identify Strengths for aspects of the Offeror’s proposal that have merit or exceed specified performance or capability requirements in a way that will be advantageous to the Government during contract performance. Factor 4, Basis of Evaluation states “The Government will evaluate the Offeror's technical solution to determine adherence to or enhancing of the technical requirements of the RFP.”
The Government will evaluate the Offeror’s Factor 4 proposal to determine adherence to or enhancing of the technical requirements of the RFP and may identify Strengths for aspects of the Offeror’s Factor 4 proposal that have merit or exceed specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
134 5 Part 3.5, Chapte r 6
G2030
2 The number of FTEs is not provided in the Project Program for P1519, only the maximum occupancy. Please provide the number of FTEs or clarify if the max occupancy should be used to provide bike racks.
The number of required bike racks may be determined as a percentage of the maximum occupancy. See Amendment 0011.
141 Attach ment F
Section 1.1 Please clarify the requirement of design for FF&E items since no CLIN provision is given to cost the design of FF&E items
Bid per RFP (FF&E design is included in Construction Contract).
144 Part 2- Sectio n 01
14 00.
05 20
Section 1.2 (b)
Please confirm the Client shall provide new facilities and relocation support required for the tenants of the facilities to be demolished.
Yes
146 Part 2
Sectio n 01
91 00.
15 22
Section 1.3 Please confirm the number of systems to be commissioned is limited to the maximum number of items listed in section 1.3 of specification 01 91 00.15 22 for each building and all the listed commissioning will be done by the Client appointed commissioning agency.
Commissioning to be conducted by 3rd party.
151 Part 3 Chapte r 6
ESR
D30
Space available for mechanical rooms is very limited and it will be difficult to meet RFP requirements for clearances without exceeding building square footage limitations.
Part 3 Chapter 6 ESR D30 has a requirement for “Total chilled water system volume must be a minimum of 7 gallons per ton of cooling.
Provide an insulated storage tank within the mechanical room to meet this requirement.”
As the storage tank will not require routine maintenance, will it be acceptable to install the tank adjacent to the chiller in the mechanical yard? This has been done at past
Camp Lejeune projects without an issue.
Bid per RFP.
152 section D2020
Standard Performance Technical Specifications section D20 Plumbing states to use type “L” copper for 4” pipe & under above ground w/solder fittings & type “K” w/solder fittings for buried pipe. However in the Part 3.6 documents it states in Part 6, Engineering Systems Requirements section D202001 Pipes & Fittings to use type “K” copper tubing & fittings for above ground & buried pipe. Which statement supersedes the other? Will we be required to use type “K” or “L” for above grade domestic water piping?
As quoted in PTS D20: "RFP Part 3 including the Engineering System Requirements (ESR) provide project specific requirements. The RFP Part 4, Performance Technical Sections (PTS) provide generalized technical requirements that apply to multiple facility types and include more requirements than are applicable to any one project. Therefore, only the RFP Part 4 requirements that apply to the project and further define the RFP Part 3 project specific requirements are required." - Provide type K copper tubing and fittings for above ground and buried piping.
153 D2090
Interce ptors
Section D209003 Interceptors requires an oil/water interceptor for the parking spaces & circulation area in the Parking Garage for the Mess Hall. These are typically not required by code for parking garages. Please indicate whether this interceptor will be required to treat all drains, including for rain water on the top deck, or only internal floor drains below the top deck.
See response to PPI #99: This requirement will be removed. See Amendment 0011.
155 P883 Mess Hall
Part 3 Chapte r 6
ESR
D30
The P883 Mess Hall Part 3 Chapter 6 ESR D30 has indoor design conditions criteria of 78 F and 50%. In the kitchen area, this will require substantial energy in the summer to cool air to 55 F or less and potentially reheat to maintain the 50% RH at 78 F indoor temperature. Previous Navy projects have required us to temper air to the kitchen to 10 F less then ambient, without subcooling for dehumidification. Is that acceptable for this job to reduce energy consumption and reduce chiller plant size? Conditions in the seating area would be maintained at 78 F and 50%
RH.
Bid per RFP. Provide 78 F/50% kitchen space conditions.
156 P1312 Lab
Room Data
Sheets
The Room Data Sheets for P1312 require 24 generator exhaust vents in multiple labs.
There is no indication on how to size these.
Please provide sizing information to permit pricing. In addition, does this vent need to meet design criteria for typical generator
See response to PPI #78: Designer of Record has to size generator and design accordingly.
flues, such as 1,400 F temperature rating?
157 01 32
17.00 20, 01
17.05
ALL
PROJECTS
"Two scheduling specification sections were provided in Part 2 of the RFP. Spec Section
01 32 17.00 20 par 1.10.2.9 and Section 01 32
17.05 20 par 1.6.2.4 both reference Weather
Days to be based off of a 30 year NOAA Average with 0.10” precipitation parameter.
Section 01 32 17.05 20 par 1.6.2.4 also gives a prescribed weather calendar that does not seem to align with historical data at the referenced 0.10” parameter. Carrying more weather days than necessary will artificially inflate the schedule duration and increase price.
Specification 01 31 19.05 20 paragraph 1.3.8 states to use 01 32 17.00 20 for the design and construction baseline guidelines. Please confirm specification 01 32 17.05 20 is not applicable to this project."
Scheduling in both parts of 01 32 17 are to be followed. Additional requirements are required.
182 Amen
d. #10
ALL
PROJE
CTS
The Hurricane Florence Relief Packages 05 (Thursday, JUNE 4 2020, 1600 EST) and 07 (Tuesday, June 9, 2020, 2:00 pm Eastern Time) are currently scheduled to have price proposals due within five business days between submissions. To provide a better opportunity for subcontractors and vendors to participate in both pricing efforts, can the price proposal due date for HFRM Package 05 be rescheduled one week later? (Tuesday, June 16, 2020, 2:00 pm Eastern Time)
Additionally, the successor price submissions would need to change. See below for the proposed revised submission dates:
• Electronic Price Proposal Tuesday, June 16, 2020, 2:00 pm Eastern Time.
• Electronic Factor 6 Proposal Wednesday, June 17, 2020, 2:00 pm Eastern Time.
• Hard Copy Price and Factor 6 Proposal
Wednesday, June 24, 2020, 2:00 pm Eastern Time
Bid per RFP.
Currently, PKG 5 Amendment 0010 issued 12 May 2020 has electronic price submissions due Tuesday, June 9, 2020 by 1400 EST.
Currently, PKG 7 Amendment 0009 issued 13 May 2020 has electronic price submissions due Tuesday, June 4, 2020 by 1600 EST.
183 Amen
d. #10
PPI
#89
PPI #89 regarding seismic design response directs us to see response to PPI #53. PPI #53 has not been addressed in prior amendments.
See PPI response #53 in this amendment.
(End of Summary of Changes)