About this file

ELIN Structure

View the file

Other files

File Type Posted
FINAL-_blank_Section_J_0200000-11_ELINS_.xlsx XLSX spreadsheet
N40080-13-R-1608_0010.pdf PDF
0009.pdf PDF
9-1-Section_J_0200000.pdf PDF
Amendment_0008.pdf PDF
COMMON_OUTPUT_LEVELS.pdf PDF
Schedule_A.PDF PDF
final_J-0200000-11_ELINs-Rev_10-1-13.xls XLS spreadsheet
Amendment_07.pdf PDF
0006.pdf PDF
NAVFAC_DD254.PDF PDF
This_Notice_is_to_clarify_what_has_been_posted_to_FBO.pdf PDF
dd254.pdf PDF
Revised_J-1502000-06.pdf PDF
0005.pdf PDF
ATTACHMENT_J-1502000-04_398.pdf PDF
J-0200000-12__Wage_Determination_WD_2005-2013_REV_13.pdf PDF
J-0200000-10_Partnering_Instruction.pdf PDF
J-1502000-11.pdf PDF
J-0200000-08_General_Security_Requirements.pdf PDF
J-0200000-02_CPAR_Form.pdf PDF
Full_RFP.pdf PDF
ATTACHMENT_C_Corporate_Experience_Questionnaire.pdf PDF
0004.pdf PDF
SITE_VISIT_SIGN_IN_SHEET1.PDF PDF
final_site_visit__PPT.ppt PPT presentation
APP_Review__Training_Power_Point.ppt PPT presentation
minutes_pre_proposal_confer.pdf PDF
ATTACHMENT_D_Past_Performance_Questionaire.pdf PDF
FINAL__pre_proposal_confer.pdf PDF
Attachment_J-0200000-09.pdf PDF
amendment_0003.pdf PDF
10-2-Section_J-_15020000_BLDG_399_FRE_ALM_INVT1.PDF PDF
Amendment_0002.pdf PDF
amendment_1.pdf PDF
Anacostia_CBA_with_IUOE_Local_99_10.1.2010-9.30.2013.pdf PDF
Anacostia_CBA_with_SEIU_Local_32BJ_10.1.2010-9.30.2013.pdf PDF
N4008013R1608_Synopsis_WHCA.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELINS-11 Totals

N40080-13-R-1608
FirmIndefinite
Fixed-PriceQuantityTotals
Contract Base Period$ - 0
1st Contract Option Period$ - 0
2nd Contract Option Period$ - 0
3rd Contract Option Period$ - 0
4th Contract Option Period$ - 0
Total$ - 0$ - 0$ - 0
FACILITY SUPPORT CONTRACTS - Washington Navy Yard
INNOVATION - LEADERSHIP - PERFORMANCE
Chuck Hower, Naval Facilities Engineering Command Washington

11-Base Year

Solicitation No. N40080-13-R-1608
ATTACHMENT J-0200000-11-Exhibit A
Base Period Firm Fixed-Price Exhibit Line Item Numbers (ELINs)
1 April 2014 - 31 March 2015
PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINSupplies/ServicesQTYUNIT OF
ISSUEUNIT
PRICEEXTENDED

PRICE

A001Public Works Department JBAB Washington, DC - WHCA (Complex 2)
A001 AAService Calls1,100EA$ - 0
A001 ABEmergency Service Calls275EA$ - 0
A001 ACPM Equipment12MO$ - 0
A001 ADInspection & Testing for Boilers & UPV12MO$ - 0
A001 AEInspection & Testing for Backflow Prevention Devices12MO$ - 0
A001 AFInspection for Pavement Joints12MO$ - 0
A001 AGInspection & Testing for VTE12MO$ - 0
A001 AHMaintain, Inspect & Testing UPS12MO$ - 0
A001 AJBoiler Water Treatment Program12MO$ - 0
A001 AKChiller Plant Water Treatment & Testing12MO$ - 0
A001 ALStart-up Shut Down of HVAC Systems12MO$ - 0
A001 AMRead Utility Meters12MO$ - 0
A001 ANPeform Relamping12MO$ - 0
A001 APOperate Classified Material Destructor12MO$ - 0
A001 AQRecurring Custodial Services Complex 2 above CNIC proscribed levels12MO$ - 0
A001 ARPest Control - Recurring Services12MO$ - 0
A001 ASPest Control - Non-Recurring Services12MO$ - 0
A001 ATMaintain Prestige Grounds Above CNIC Prescribed Levels - Complex 212MO$ - 0
A001 AUTrash & Litter Removal12MO$ - 0
A001 AVPavement Sweeping At CNIC Prescribed Levels - Complex 212MO$ - 0
A001 AWSnow and Ice Removal12MO$ - 0
A001SubTotal for Base Period ELIN A001 AA-A001 AW$ - 0
A002Public Works Department JBAB Washington, DC - HMX (Complex 1)
A002 AAPM for Direct Fueling System12MO$ - 0
A002 ABService Calls200EA$ - 0
A002 ACEmergency Service Calls50EA$ - 0
A002 ADPM for Equipment12MO$ - 0
A002 AEInspection & Testing for Boilers & UPV12MO$ - 0
A002 AFInspection & Testing for Backflow Prevention Devices12MO$ - 0
A002 AGInspection & Testing for Crane Trackage12MO$ - 0
A002 AHInspection & Testing for WHE12MO$ - 0
A002 AJInspection for Pavement Joints12MO$ - 0
A002 AKRead Utility Meters12MO$ - 0
A002 ALBoiler Water Treatment Program12MO$ - 0
A002 AMStart-up Shut Down of HVAC Systems12MO$ - 0
A002 ANPeform Relamping12MO$ - 0
A002 APRecurring Custodial Services Complex 1 At CNIC Prescribed Levels (COL 3)12MO$ - 0
A002 AQPest Control - Recurring Services12MO$ - 0
A002 ARPest Control - Non-Recurring Services12MO$ - 0
A002 ASMaintain Grounds At CNIC Prescribed Levels - Complex 112MO$ - 0
A002 ATTrash & Litter Removal12MO$ - 0
A002 AUPavement Sweeping At CNIC Prescribed Levels - Complex 112MO$ - 0
A002 AVSnow and Ice Removal12MO$ - 0
A002SubTotal for Base Period ELIN A002 AA- A002 AV$ - 0
A003Public Works Department JBAB Washington, DC - Anacostia
A003 AARecurring Custodial Services Complex 1 At CNIC Prescribed Levels12MO$ - 0
A003 ABMaintain Grounds At CNIC Prescribed Levels - Complex 112MO$ - 0
A003 ACPavement Sweeping At CNIC Prescribed Levels - Complex 112MO$ - 0
A003 ADInspection & Testing Fire Alarm Maintenance12MO$ - 0
A003 AEMaintain Grounds At CNIC Prescribed Levels - Complex 212MO$ - 0
A003 AFRecurring Custodial Services Complex 2 At CNIC Prescribed Levels12MO$ - 0
A003SubTotal for Base Period ELIN A003 AA - A003 AD$ - 0
Total Base Year Period Firm Fixed Price (Total of ELINS A001 through A003)$ - 0

11-IDIQ-Base Year

Solicitation No. N40080-13-R-1608
ATTACHMENT J-0200000-11-Exhibit B
Base Period IDIQ Exhibit Line Item Numbers (ELINs)
1 April 2014 - 31 March 2015
COMPLEX 1
UNIT PRICED LABOR (UPL) WORK (NEGOTIATED)
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

B001711SComposite Unskilled LaborPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order.500LH
B002711SComposite Skilled LaborPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order.2,500LH
B003711SMaterial and Equipment for all UPL WorkNot-to-exceed amount to be funded and unilaterally changed at the discretion of the GovernmentN/ALS
TOTAL for IQ LINE ITEMS - B001 THROUGH B003
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 150200 , Facility Investment
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

B004711SAirfield Lamp ReplacementProvide labor and materials to relamp airfield lighting fixtures. Fixture shall be opened, the burned out lamp shall be removed and replaced and the fixture shall be resealed. The lamp shall be tested for proper operation upon completion of the relamping. New lamps shall be identical or equal to existing lamps. Relamping shall be accomplished within one day of tasking.30EA
TOTAL IQ LINE ITEMS - B004$ - 0
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

B0059410Shrub PruningShrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units.150EA
B0069410Tree PruningTrees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days.10EA
B0079410Shrub RemovalShrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day.2,500SF
B0089410IrrigationIrrigation shall be accomplished by means of hoses and portable sprinklers. Irrigation shall be performed in the evening hours after 8:00 PM or in the early morning hours before, 9:00 AM. Irrigation shall be performed for a minimum of 3 days, uynless directed otherwise by the Contracting Officer. Irrigation time shall be of a sufficient period of time to saturate the area to a minimum depth of 1 inch. Hoses and sprinklers shall be removed from completed irigated areas on a daily basis.53KSF
B0099410SeedingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.1KSF
B0109410RakingRake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days.10KSF
B0119410Pesticide TreatmentProvide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days.1KSF
B0129410Herbicide TreatmentProvide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days.1KSF
TOTAL IQ LINE ITEMS - B005 THROUGH B012$ - 0
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

B0139240Snow Removal - Complex 1The Contractor shall remove snow from runways, taxiways, parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Work shall be completed within 1 calendar day of order.16Acre
B0149240Joint Replacement - Complex 1Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628.1000LF
TOTAL IQ LINE ITEMS - B013 THROUGH B014$ - 0
TOTAL for all IQ Line Items --- B001 through B014$ - 0
COMPLEX 2
UNIT PRICED LABOR (UPL) WORK (NEGOTIATED)
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

B015713SComposite Unskilled LaborPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order.1,500LH
B016713SComposite Skilled LaborPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order.8,000LH
B017713SMaterial and Equipment for all UPL WorkNot-to-exceed amount to be funded and unilaterally changed at the discretion of the GovernmentN/ALS
TOTAL IQ LINE ITEMS - B015 THROUGH B017$ - 0
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

B0189410Shrub PruningShrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units.150EA
B0199410Tree PruningTrees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days.10EA
B0209410Shrub RemovalShrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day.2,500SF
B0219410SeedingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.1KSF
B0229410RakingRake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days.10KSF
B0239410Pesticide TreatmentProvide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days.1KSF
B0249410Herbicide TreatmentProvide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days.1KSF
TOTAL IQ LINE ITEMS - B018 THROUGH B024$ - 0
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

B0259240Joint Replacement - Complex 2Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628.100LF
B0269240Pavement Sweeping - Complex 2The Contractor shall sweep paved surfaces indicated. Work shall be completed within 5 calendar days of order.100KSF
TOTAL IQ LINE ITEMS - B025 THROUGH B026$ - 0
TOTAL for all IQ Line Items --- B015 through B026$ - 0
TOTAL for all IQ Line Items ---B001 through B026$ - 0

11-1st OY

Solicitation No. N40080-13-R-1608
ATTACHMENT J-0200000-11-Exhibit C
1st Option Period Firm Fixed-Price Exhibit Line Item Numbers (ELINs)
1 April 2015 - 31 March 2016
PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINSupplies/ServicesQTYUNIT OF
ISSUEUNIT
PRICEEXTENDED

PRICE

C001Public Works Department JBAB Washington, DC - WHCA (Complex 2)
C001 AAService Calls1,100EA$ - 0
C001 ABEmergency Service Calls275EA$ - 0
C001 ACPM Equipment12MO$ - 0
C001 ADInspection & Testing for Boilers & UPV12MO$ - 0
C001 AEInspection & Testing for Backflow Prevention Devices12MO$ - 0
C001 AFInspection for Pavement Joints12MO$ - 0
C001 AGInspection & Testing for VTE12MO$ - 0
C001 AHMaintain, Inspect & Testing UPS12MO$ - 0
C001 AJBoiler Water Treatment Program12MO$ - 0
C001 AKChiller Plant Water Treatment & Testing12MO$ - 0
C001 ALStart-up Shut Down of HVAC Systems12MO$ - 0
C001 AMRead Utility Meters12MO$ - 0
C001 ANPeform Relamping12MO$ - 0
C001 APOperate Classified Material Destructor12MO$ - 0
C001 AQRecurring Custodial Services Complex 2 above CNIC proscribed levels12MO$ - 0
C001 ARPest Control - Recurring Services12MO$ - 0
C001 ASPest Control - Non-Recurring Services12MO$ - 0
C001 ATMaintain Prestige Grounds Above CNIC Prescribed Levels - Complex 212MO$ - 0
C001 AUTrash & Litter Removal12MO$ - 0
C001 AVPavement Sweeping At CNIC Prescribed Levels - Complex 212MO$ - 0
C001 AWSnow and Ice Removal12MO$ - 0
C001SubTotal for Base Period ELIN C001 AA-C001 AW$ - 0
C002Public Works Department JBAB Washington, DC - HMX (Complex 1)
C002 AAPM for Direct Fueling System12MO$ - 0
C002 ABService Calls200EA$ - 0
C002 ACEmergency Service Calls50EA$ - 0
C002 ADPM for Equipment12MO$ - 0
C002 AEInspection & Testing for Boilers & UPV12MO$ - 0
C002 AFInspection & Testing for Backflow Prevention Devices12MO$ - 0
C002 AGInspection & Testing for Crane Trackage12MO$ - 0
C002 AHInspection & Testing for WHE12MO$ - 0
C002 AJInspection for Pavement Joints12MO$ - 0
C002 AKRead Utility Meters12MO$ - 0
C002 ALBoiler Water Treatment Program12MO$ - 0
C002 AMStart-up Shut Down of HVAC Systems12MO$ - 0
C002 ANPeform Relamping12MO$ - 0
C002 APRecurring Custodial Services Complex 1 At CNIC Prescribed Levels (COL 3)12MO$ - 0
C002 AQPest Control - Recurring Services12MO$ - 0
C002 ARPest Control - Non-Recurring Services12MO$ - 0
C002 ASMaintain Grounds At CNIC Prescribed Levels - Complex 112MO$ - 0
C002 ATTrash & Litter Removal12MO$ - 0
C002 AUPavement Sweeping At CNIC Prescribed Levels - Complex 112MO$ - 0
C002 AVSnow and Ice Removal12MO$ - 0
C002SubTotal for Base Period ELIN C002 AA- C002 AV$ - 0
C003Public Works Department JBAB Washington, DC - Anacostia
C003 AARecurring Custodial Services Complex 1 At CNIC Prescribed Levels12MO$ - 0
C003 ABMaintain Grounds At CNIC Prescribed Levels - Complex 112MO$ - 0
C003 ACPavement Sweeping At CNIC Prescribed Levels - Complex 112MO$ - 0
C003 ADInspection & Testing Fire Alarm Maintenance12MO$ - 0
C003 AEMaintain Grounds At CNIC Prescribed Levels - Complex 212MO$ - 0
C003 AFRecurring Custodial Services Complex 2 At CNIC Prescribed Levels12MO$ - 0
C003SubTotal for Base Period ELIN C003 AA - C003 AD$ - 0
Total Base Year Period Firm Fixed Price (Total of ELINS C001 through C003)$ - 0

11-IDIQ-1st OY

Solicitation No. N40080-13-R-1608
ATTACHMENT J-0200000-11-Exhibit D
1st Option Period IDIQ Exhibit Line Item Numbers (ELINs)
1 April 2015 - 31 March 2016
COMPLEX 1
UNIT PRICED LABOR (UPL) WORK (NEGOTIATED)
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

D001711SComposite Unskilled LaborPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order.500LH
D002711SComposite Skilled LaborPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order.2,500LH
D003711SMaterial and Equipment for all UPL WorkNot-to-exceed amount to be funded and unilaterally changed at the discretion of the GovernmentN/ALS
TOTAL for IQ LINE ITEMS - D001 THROUGH D003
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 150200 , Facility Investment
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

D004711SAirfield Lamp ReplacementProvide labor and materials to relamp airfield lighting fixtures. Fixture shall be opened, the burned out lamp shall be removed and replaced and the fixture shall be resealed. The lamp shall be tested for proper operation upon completion of the relamping. New lamps shall be identical or equal to existing lamps. Relamping shall be accomplished within one day of tasking.30EA
TOTAL IQ LINE ITEMS - D004$ - 0
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

D0059410Shrub PruningShrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units.150EA
D0069410Tree PruningTrees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days.10EA
D0079410Shrub RemovalShrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day.2,500SF
D0089410IrrigationIrrigation shall be accomplished by means of hoses and portable sprinklers. Irrigation shall be performed in the evening hours after 8:00 PM or in the early morning hours before, 9:00 AM. Irrigation shall be performed for a minimum of 3 days, uynless directed otherwise by the Contracting Officer. Irrigation time shall be of a sufficient period of time to saturate the area to a minimum depth of 1 inch. Hoses and sprinklers shall be removed from completed irigated areas on a daily basis.53KSF
D0099410SeedingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.1KSF
D0109410RakingRake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days.10KSF
D0119410Pesticide TreatmentProvide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days.1KSF
D0129410Herbicide TreatmentProvide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days.1KSF
TOTAL IQ LINE ITEMS - D005 THROUGH D012$ - 0
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

D0139240Snow Removal - Complex 1The Contractor shall remove snow from runways, taxiways, parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Work shall be completed within 1 calendar day of order.16Acre
D0149240Joint Replacement - Complex 1Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628.1000LF
TOTAL IQ LINE ITEMS - D013 THROUGH D014$ - 0
TOTAL for all IQ Line Items --- D001 through D014$ - 0
COMPLEX 2
UNIT PRICED LABOR (UPL) WORK (NEGOTIATED)
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

D015713SComposite Unskilled LaborPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order.1,500LH
D016713SComposite Skilled LaborPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order.8,000LH
D017713SMaterial and Equipment for all UPL WorkNot-to-exceed amount to be funded and unilaterally changed at the discretion of the GovernmentN/ALS
TOTAL IQ LINE ITEMS - D015 THROUGH D017$ - 0
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

D0189410Shrub PruningShrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units.150EA
D0199410Tree PruningTrees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days.10EA
D0209410Shrub RemovalShrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day.2,500SF
D0219410SeedingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.1KSF
D0229410RakingRake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days.10KSF
D0239410Pesticide TreatmentProvide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days.1KSF
D0249410Herbicide TreatmentProvide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days.1KSF
TOTAL IQ LINE ITEMS - D018 THROUGH D024$ - 0
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

D0259240Joint Replacement - Complex 2Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628.100LF
D0269240Pavement Sweeping - Complex 2The Contractor shall sweep paved surfaces indicated. Work shall be completed within 5 calendar days of order.100KSF
TOTAL IQ LINE ITEMS - D025 THROUGH D026$ - 0
TOTAL for all IQ Line Items --- D015 through D026$ - 0
TOTAL for all IQ Line Items ---D001 through D026$ - 0

11- 2nd OY

Solicitation No. N40080-13-R-1608
ATTACHMENT J-0200000-11-Exhibit E
2nd Option Period Firm Fixed-Price Exhibit Line Item Numbers (ELINs)
1 April 2016 - 31 March 2017
PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINSupplies/ServicesQTYUNIT OF
ISSUEUNIT
PRICEEXTENDED

PRICE

E001Public Works Department JBAB Washington, DC - WHCA (Complex 2)
E001 AAService Calls1,100EA$ - 0
E001 ABEmergency Service Calls275EA$ - 0
E001 ACPM Equipment12MO$ - 0
E001 ADInspection & Testing for Boilers & UPV12MO$ - 0
E001 AEInspection & Testing for Backflow Prevention Devices12MO$ - 0
E001 AFInspection for Pavement Joints12MO$ - 0
E001 AGInspection & Testing for VTE12MO$ - 0
E001 AHMaintain, Inspect & Testing UPS12MO$ - 0
E001 AJBoiler Water Treatment Program12MO$ - 0
E001 AKChiller Plant Water Treatment & Testing12MO$ - 0
E001 ALStart-up Shut Down of HVAC Systems12MO$ - 0
E001 AMRead Utility Meters12MO$ - 0
E001 ANPeform Relamping12MO$ - 0
E001 APOperate Classified Material Destructor12MO$ - 0
E001 AQRecurring Custodial Services Complex 2 above CNIC proscribed levels12MO$ - 0
E001 ARPest Control - Recurring Services12MO$ - 0
E001 ASPest Control - Non-Recurring Services12MO$ - 0
E001 ATMaintain Prestige Grounds Above CNIC Prescribed Levels - Complex 212MO$ - 0
E001 AUTrash & Litter Removal12MO$ - 0
E001 AVPavement Sweeping At CNIC Prescribed Levels - Complex 212MO$ - 0
E001 AWSnow and Ice Removal12MO$ - 0
E001SubTotal for Base Period ELIN E001 AA-E001 AW$ - 0
E002Public Works Department JBAB Washington, DC - HMX (Complex 1)
E002 AAPM for Direct Fueling System12MO$ - 0
E002 ABService Calls200EA$ - 0
E002 ACEmergency Service Calls50EA$ - 0
E002 ADPM for Equipment12MO$ - 0
E002 AEInspection & Testing for Boilers & UPV12MO$ - 0
E002 AFInspection & Testing for Backflow Prevention Devices12MO$ - 0
E002 AGInspection & Testing for Crane Trackage12MO$ - 0
E002 AHInspection & Testing for WHE12MO$ - 0
E002 AJInspection for Pavement Joints12MO$ - 0
E002 AKRead Utility Meters12MO$ - 0
E002 ALBoiler Water Treatment Program12MO$ - 0
E002 AMStart-up Shut Down of HVAC Systems12MO$ - 0
E002 ANPeform Relamping12MO$ - 0
E002 APRecurring Custodial Services Complex 1 At CNIC Prescribed Levels (COL 3)12MO$ - 0
E002 AQPest Control - Recurring Services12MO$ - 0
E002 ARPest Control - Non-Recurring Services12MO$ - 0
E002 ASMaintain Grounds At CNIC Prescribed Levels - Complex 112MO$ - 0
E002 ATTrash & Litter Removal12MO$ - 0
E002 AUPavement Sweeping At CNIC Prescribed Levels - Complex 112MO$ - 0
E002 AVSnow and Ice Removal12MO$ - 0
E002SubTotal for Base Period ELIN E002 AA- E002 AV$ - 0
E003Public Works Department JBAB Washington, DC - Anacostia
E003 AARecurring Custodial Services Complex 1 At CNIC Prescribed Levels12MO$ - 0
E003 ABMaintain Grounds At CNIC Prescribed Levels - Complex 112MO$ - 0
E003 ACPavement Sweeping At CNIC Prescribed Levels - Complex 112MO$ - 0
E003 ADInspection & Testing Fire Alarm Maintenance12MO$ - 0
E003 AEMaintain Grounds At CNIC Prescribed Levels - Complex 212MO$ - 0
E003 AFRecurring Custodial Services Complex 2 At CNIC Prescribed Levels12MO$ - 0
E003SubTotal for Base Period ELIN E003 AA - E003 AD$ - 0
Total Base Year Period Firm Fixed Price (Total of ELINS E001 through E003)$ - 0

11 -IDIQ-2nd OY

Solicitation No. N40080-13-R-1608
ATTACHMENT J-0200000-11-Exhibit F
2nd Option Period IDIQ Exhibit Line Item Numbers (ELINs)
1 April 2016 - 31 March 2017
COMPLEX 1
UNIT PRICED LABOR (UPL) WORK (NEGOTIATED)
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

F001711SComposite Unskilled LaborPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order.500LH
F002711SComposite Skilled LaborPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order.2,500LH
F003711SMaterial and Equipment for all UPL WorkNot-to-exceed amount to be funded and unilaterally changed at the discretion of the GovernmentN/ALS
TOTAL for IQ LINE ITEMS - F001 THROUGH F003
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 150200 , Facility Investment
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

F004711SAirfield Lamp ReplacementProvide labor and materials to relamp airfield lighting fixtures. Fixture shall be opened, the burned out lamp shall be removed and replaced and the fixture shall be resealed. The lamp shall be tested for proper operation upon completion of the relamping. New lamps shall be identical or equal to existing lamps. Relamping shall be accomplished within one day of tasking.30EA
TOTAL IQ LINE ITEMS - F004$ - 0
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

F0059410Shrub PruningShrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units.150EA
F0069410Tree PruningTrees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days.10EA
F0079410Shrub RemovalShrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day.2,500SF
F0089410IrrigationIrrigation shall be accomplished by means of hoses and portable sprinklers. Irrigation shall be performed in the evening hours after 8:00 PM or in the early morning hours before, 9:00 AM. Irrigation shall be performed for a minimum of 3 days, uynless directed otherwise by the Contracting Officer. Irrigation time shall be of a sufficient period of time to saturate the area to a minimum depth of 1 inch. Hoses and sprinklers shall be removed from completed irigated areas on a daily basis.53KSF
F0099410SeedingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.1KSF
F0109410RakingRake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days.10KSF
F0119410Pesticide TreatmentProvide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days.1KSF
F0129410Herbicide TreatmentProvide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days.1KSF
TOTAL IQ LINE ITEMS - F005 THROUGH F012$ - 0
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

F0139240Snow Removal - Complex 1The Contractor shall remove snow from runways, taxiways, parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Work shall be completed within 1 calendar day of order.16Acre$0.00
F0149240Joint Replacement - Complex 1Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628.1000LF$0.00
TOTAL IQ LINE ITEMS - F013 THROUGH F014$ - 0
TOTAL for all IQ Line Items --- F001 through F014$ - 0
COMPLEX 2
UNIT PRICED LABOR (UPL) WORK (NEGOTIATED)
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

F015713SComposite Unskilled LaborPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order.1,500LH
F016713SComposite Skilled LaborPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order.8,000LH
F017713SMaterial and Equipment for all UPL WorkNot-to-exceed amount to be funded and unilaterally changed at the discretion of the GovernmentN/ALS
TOTAL IQ LINE ITEMS - F015 THROUGH F017$ - 0
INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

F0189410Shrub PruningShrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units.150EA
F0199410Tree PruningTrees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days.10EA
F0209410Shrub RemovalShrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day.2,500SF
F0219410SeedingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.1KSF
F0229410RakingRake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days.10KSF