TOTALS
| N40080- |
| MINI BASE OPERATION SUPPORT CONTRACT FOR COMPLEX 1 & 2 |
JOINT BASE ANACOSTIA/BOLLING
| Firm | Indefinite | |
| Fixed-Price | Quantity | Totals |
Contract Base Period $ - 0
1st Contract Option Period $ - 0
2nd Contract Option Period $ - 0
3rd Contract Option Period $ - 0
4th Contract Option Period $ - 0
Total $ - 0 $ - 0 $ - 0
| FACILITY SUPPORT CONTRACTS - Washington Navy Yard |
| INNOVATION - LEADERSHIP - PERFORMANCE |
Chuck Hower, Naval Facilities Engineering Command Washington
New MINIBOS Contract Base Year
| Solicitation No. N40080-13-R-1608 | | | | |
| ATTACHMENT J-0200000-11 | | | | |
| JBAB MINI BASE OPERATIONS SUPPORT CONTRACT FOR COMPLEX 1 & 2 | | | | |
| AND BUILDING 91 | | | | |
| Base Year: 1 April 2014 - 31 March 2015 | | | | |
| | | UNIT OF | UNIT | TOTAL |
| ELIN | Supplies/Services | QUANITY | ISSUE | PRICE | AMOUNT |
| A001 | MINBOS CONTRACT | | | | |
| A001 AA | Service Calls | 1,300 | EA | | $ - 0 |
| A001 AB | Emergency Service Calls | 200 | EA | | $ - 0 |
| A001 AC | PM Equipment | 12 | MO | | $ - 0 |
| A001 AD | Inspection & Testing for Boilers & UPV | 12 | MO | | $ - 0 |
| A001 AE | Inspection & Testing for Backflow Prevention Devices | 12 | MO | | $ - 0 |
| A001 AF | Inspection for Pavement Joints | 12 | MO | | $ - 0 |
| A001 AG | Inspection & Testing for VTE | 12 | MO | | $ - 0 |
| A001 AH | Maintain, Inspect & Testing UPS | 12 | MO | | $ - 0 |
| A001 AJ | Boiler Water Treatment Program | 12 | MO | | $ - 0 |
| A001 AK | Chiller Plant Water Treatment & Testing | 12 | MO | | $ - 0 |
| A001 AL | Start-up Shut Down of HVAC Systems | 12 | MO | | $ - 0 |
| A001 AM | Read Utility Meters | 12 | MO | | $ - 0 |
| A001 AN | Peform Relamping | 12 | MO | | $ - 0 |
| A001 AP | Operate Classified Material Destructor | 12 | MO | | $ - 0 |
| A001 AQ | Recurring Custodial Services COL 1 | 12 | MO | | $ - 0 |
| A001 AR | Pest Control - Recurring Services | 12 | MO | | $ - 0 |
| A001 AS | Pest Control - Non-Recurring Services | 12 | MO | | $ - 0 |
| A001 AT | Maintain Prestige Grounds - COL 1 | 12 | MO | | $ - 0 |
| A001 AU | Trash & Litter Removal | 12 | MO | | $ - 0 |
| A001 AV | Pavement Sweeping - Complex 2 | 12 | MO | | $ - 0 |
| A001 AW | Snow and Ice Removal | 12 | MO | | $ - 0 |
| A001 AX | Inspection & Testing Fire Alarm Maintenance | 12 | MO | | $ - 0 |
| A001 AY | PM for Direct Fueling System | 12 | MO | | $ - 0 |
| A001 AZ | Inspection & Testing for Crane Trackage | 12 | MO | | $ - 0 |
| A001 BA | Inspection & Testing for WHE | 12 | MO | | $ - 0 |
| A001 | SubTotal for Base Period ELIN A001 AA thru A001 BA | | | | $ - 0 |
Total Base Year Period Firm Fixed Price Total of ELINS A001 $ - 0
| A001 | MINBOS CONTRACT COL 2 | | | |
| A001 BB | Recurring Custodial Services COL 2 | 12 | MO | $ - 0 |
| A001 BB | Maintain Grounds - COL 2 | 12 | MO | $ - 0 |
| A001 | MINBOS CONTRACT COL 3 | | | |
| A001 BC | Recurring Custodial Services COL 3 | 12 | MO | $ - 0 |
| A001 BD | Maintain Grounds - COL 3 | 12 | MO | $ - 0 |
| A001 | MINBOS CONTRACT COL 4 | | | |
| A001 BE | Recurring Custodial Services COL 4 | 12 | MO | $ - 0 |
| A001 BF | Maintain Grounds - COL 4 | 12 | MO | $ - 0 |
IDIQ Base Period
| Solicitation No. N40080- |
| ATTACHMENT J-0200000-11 |
| JBAB MINI BASE OPERATIONS SUPPORT CONTRACT FOR COMPLEX 1 & 2 |
| IDIQ BASE YEAR | 1 October 2014 - 30 September 2015 |
| COMPLEX 1 | | |
| UNIT PRICED LABOR (UPL) WORK (NEGOTIATED) | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF |
| ISSUE | UNIT | | | | | |
| PRICE | TOTAL | | | | | |
AMOUNT
| B001 | 711S | Composite Unskilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 500 | LH | | $0.00 |
| B002 | 711S | Composite Skilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 2,500 | LH | | $0.00 |
| B003 | 711S | Material and Equipment for all UPL Work | Not-to-exceed amount to be funded and unilaterally changed at the discretion of the Government | | N/A | LS | |
TOTAL for IQ LINE ITEMS - B001 THROUGH B003 $0.00
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 150200 , Facility Investment | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF |
| ISSUE | UNIT | | | | | |
| PRICE | TOTAL | | | | | |
AMOUNT
B004 711S Airfield Lamp Replacement Provide labor and materials to relamp airfield lighting fixtures. Fixture shall be opened, the burned out lamp shall be removed and replaced and the fixture shall be resealed. The lamp shall be tested for proper operation upon completion of the relamping. New lamps shall be identical or equal to existing lamps. Relamping shall be accomplished within one day of tasking. 30 EA $0.00
| | | TOTAL IQ LINE ITEMS - B004 | | | | $ - 0 |
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE | | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | | | | | | |
| PRICE | TOTAL | | | | | | |
AMOUNT
| B005 | 9410 | Shrub Pruning | Shrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units. | 150 | EA | $0.00 |
| B006 | 9410 | Tree Pruning | Trees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days. | 10 | EA | $0.00 |
| B007 | 9410 | Shrub Removal | Shrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day. | 2,500 | SF | $0.00 |
| B008 | 9410 | | | | | |
| Irrigation | Irrigation shall be accomplished by means of hoses and portable sprinklers. Irrigation shall be performed in the evening hours after 8:00 PM or in the early morning hours before, 9:00 AM. Irrigation shall be performed for a minimum of 3 days, uynless directed otherwise by the Contracting Officer. Irrigation time shall be of a sufficient period of time to saturate the area to a minimum depth of 1 inch. Hoses and sprinklers shall be removed from completed irigated areas on a daily basis. | 53 | KSF | | $0.00 | |
| B009 | 9410 | Seeding | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. | | | |
| Seed species will be identified in the task order. | 1 | KSF | | $0.00 | | | |
| B010 | 9410 | | | | | |
| Raking | Rake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 10 | KSF | | $0.00 | |
| B011 | 9410 | Pesticide Treatment | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days. | 1 | KSF | $0.00 |
| B012 | 9410 | Herbicide Treatment | Provide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days. | 1 | KSF | $0.00 |
| | | TOTAL IQ LINE ITEMS - B005 THROUGH B012 | | | | $ - 0 |
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal | | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | | | | | | |
| PRICE | TOTAL | | | | | | |
AMOUNT
| B013 | 9240 | Snow Removal - Complex 1 | The Contractor shall remove snow from runways, taxiways, parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Work shall be completed within 1 calendar day of order. | 16 | Acre | $0.00 |
| B014 | 9240 | Joint Replacement - Complex 1 | Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628. | 1000 | LF | $0.00 |
| TOTAL IQ LINE ITEMS - B013 THROUGH B014 | $ - 0 |
| TOTAL for all IQ Line Items --- B001 through B014 | | |
| | $ - 0 |
| | | | COMPLEX 2 | | |
| UNIT PRICED LABOR (UPL) WORK (NEGOTIATED) | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF |
| ISSUE | UNIT | | | | | |
| PRICE | TOTAL | | | | | |
AMOUNT
| B015 | 713S | Composite Unskilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 1,500 | LH | | $0.00 |
| B016 | 713S | Composite Skilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 8,000 | LH | | $0.00 |
| B017 | 713S | Material and Equipment for all UPL Work | Not-to-exceed amount to be funded and unilaterally changed at the discretion of the Government | | N/A | LS | |
| | | TOTAL IQ LINE ITEMS - B015 THROUGH B017 | | | | $ - 0 |
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE | | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | | | | | | |
| PRICE | TOTAL | | | | | | |
AMOUNT
| B018 | 9410 | Shrub Pruning | Shrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units. | 150 | EA | $0.00 |
| B019 | 9410 | Tree Pruning | Trees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days. | 10 | EA | $0.00 |
| B020 | 9410 | Shrub Removal | Shrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day. | 2,500 | SF | $0.00 |
| B021 | 9410 | Seeding | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. | | | |
| Seed species will be identified in the task order. | 1 | KSF | | $0.00 | | | |
| B022 | 9410 | | | | | |
| Raking | Rake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 10 | KSF | | $0.00 | |
| B023 | 9410 | Pesticide Treatment | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days. | 1 | KSF | $0.00 |
| B024 | 9410 | Herbicide Treatment | Provide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days. | 1 | KSF | $0.00 |
| | | TOTAL IQ LINE ITEMS - B018 THROUGH B024 | | | | $ - 0 |
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal | | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | | | | | | |
| PRICE | TOTAL | | | | | | |
AMOUNT
| B025 | 9240 | Joint Replacement - Complex 2 | Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628. | 100 | LF | $0.00 |
| B026 | 9240 | Pavement Sweeping - Complex 2 | The Contractor shall sweep paved surfaces indicated. Work shall be completed within 5 calendar days of order. | 100 | KSF | $0.00 |
TOTAL IQ LINE ITEMS - B025 THROUGH B026 $ - 0
| TOTAL for all IQ Line Items --- B015 through B026 | $ - 0 |
| TOTAL for all IQ Line Items ---B001 through B026 | $ - 0 |
1st Option Year
| Solicitation No. N40080-13-R-1608 | | | | |
| ATTACHMENT J-0200000-11 | | | | |
| JBAB MINI BASE OPERATIONS SUPPORT CONTRACT FOR COMPLEX 1 & 2 | | | | |
| AND BUILDING 91 | | | | |
| 1st Option Year: 1 April 2015 - 31 March 2016 | | | | |
| | | UNIT OF | UNIT | TOTAL |
| ELIN | Supplies/Services | QUANITY | ISSUE | PRICE | AMOUNT |
| C001 | MINBOS CONTRACT | | | | |
| C001 AA | Service Calls | 1,300 | EA | | $ - 0 |
| C001 AB | Emergency Service Calls | 200 | EA | | $ - 0 |
| C001 AC | PM Equipment | 12 | MO | | $ - 0 |
| C001 AD | Inspection & Testing for Boilers & UPV | 12 | MO | | $ - 0 |
| C001 AE | Inspection & Testing for Backflow Prevention Devices | 12 | MO | | $ - 0 |
| C001 AF | Inspection for Pavement Joints | 12 | MO | | $ - 0 |
| C001 AG | Inspection & Testing for VTE | 12 | MO | | $ - 0 |
| C001 AH | Maintain, Inspect & Testing UPS | 12 | MO | | $ - 0 |
| C001 AJ | Boiler Water Treatment Program | 12 | MO | | $ - 0 |
| C001 AK | Chiller Plant Water Treatment & Testing | 12 | MO | | $ - 0 |
| C001 AL | Start-up Shut Down of HVAC Systems | 12 | MO | | $ - 0 |
| C001 AM | Read Utility Meters | 12 | MO | | $ - 0 |
| C001 AN | Peform Relamping | 12 | MO | | $ - 0 |
| C001 AP | Operate Classified Material Destructor | 12 | MO | | $ - 0 |
| C001 AQ | Recurring Custodial Services COL 1 | 12 | MO | | $ - 0 |
| C001 AR | Pest Control - Recurring Services | 12 | MO | | $ - 0 |
| C001 AS | Pest Control - Non-Recurring Services | 12 | MO | | $ - 0 |
| C001 AT | Maintain Prestige Grounds - COL 1 | 12 | MO | | $ - 0 |
| C001 AU | Trash & Litter Removal | 12 | MO | | $ - 0 |
| C001 AV | Pavement Sweeping - Complex 2 | 12 | MO | | $ - 0 |
| C001 AW | Snow and Ice Removal | 12 | MO | | $ - 0 |
| C001 AX | Inspection & Testing Fire Alarm Maintenance | 12 | MO | | $ - 0 |
| C001 AY | PM for Direct Fueling System | 12 | MO | | $ - 0 |
| C001 AZ | Inspection & Testing for Crane Trackage | 12 | MO | | $ - 0 |
| C001 BA | Inspection & Testing for WHE | 12 | MO | | $ - 0 |
| C001 | SubTotal for Base Period ELIN C001 AA thru C001 BA | | | | $ - 0 |
Total 1st Option Period Firm Fixed Price Total of ELINS C001 $ - 0
| C001 | MINBOS CONTRACT COL 2 | | | |
| C001 BB | Recurring Custodial Services COL 2 | 12 | MO | $ - 0 |
| C001 BB | Maintain Grounds - COL 2 | 12 | MO | $ - 0 |
| C001 | MINBOS CONTRACT COL 3 | | | |
| C001 BC | Recurring Custodial Services COL 3 | 12 | MO | $ - 0 |
| C001 BD | Maintain Grounds - COL 3 | 12 | MO | $ - 0 |
| C001 | MINBOS CONTRACT COL 4 | | | |
| C001 BE | Recurring Custodial Services COL 4 | 12 | MO | $ - 0 |
| C001 BF | Maintain Grounds - COL 4 | 12 | MO | $ - 0 |
IDIQ 1st Option Year
| Solicitation No. N40080- |
| ATTACHMENT J-0200000-11 |
| JBAB MINI BASE OPERATIONS SUPPORT CONTRACT FOR COMPLEX 1 & 2 |
| IDIQ: 1ST OPTION YEAR | |
| | 1 October 2015 - 30 September 2016 |
| COMPLEX 1 | | |
| UNIT PRICED LABOR (UPL) WORK (NEGOTIATED) | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF |
| ISSUE | UNIT | | | | | |
| PRICE | TOTAL | | | | | |
AMOUNT
| D001 | 711S | Composite Unskilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 500 | LH | | $0.00 |
| D002 | 711S | Composite Skilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 2,500 | LH | | $0.00 |
| D003 | 711S | Material and Equipment for all UPL Work | Not-to-exceed amount to be funded and unilaterally changed at the discretion of the Government | | N/A | LS | |
TOTAL for IQ LINE ITEMS - D001 THROUGH D003 $0.00
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 150200 , Facility Investment | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF |
| ISSUE | UNIT | | | | | |
| PRICE | TOTAL | | | | | |
D004 711S Airfield Lamp Replacement Provide labor and materials to relamp airfield lighting fixtures. Fixture shall be opened, the burned out lamp shall be removed and replaced and the fixture shall be resealed. The lamp shall be tested for proper operation upon completion of the relamping. New lamps shall be identical or equal to existing lamps. Relamping shall be accomplished within one day of tasking. 30 EA $0.00
| | | TOTAL IQ LINE ITEMS - D004 | | | | $ - 0 |
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE | | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | | | | | | |
| PRICE | TOTAL | | | | | | |
AMOUNT
| D005 | 9410 | Shrub Pruning | Shrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units. | 150 | EA | $0.00 |
| D006 | 9410 | Tree Pruning | Trees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days. | 10 | EA | $0.00 |
| D007 | 9410 | Shrub Removal | Shrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day. | 2,500 | SF | $0.00 |
| D008 | 9410 | | | | | |
| Irrigation | Irrigation shall be accomplished by means of hoses and portable sprinklers. Irrigation shall be performed in the evening hours after 8:00 PM or in the early morning hours before, 9:00 AM. Irrigation shall be performed for a minimum of 3 days, uynless directed otherwise by the Contracting Officer. Irrigation time shall be of a sufficient period of time to saturate the area to a minimum depth of 1 inch. Hoses and sprinklers shall be removed from completed irigated areas on a daily basis. | 53 | KSF | | $0.00 | |
| D009 | 9410 | Seeding | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. | | | |
| Seed species will be identified in the task order. | 1 | KSF | | $0.00 | | | |
| D010 | 9410 | | | | | |
| Raking | Rake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 10 | KSF | | $0.00 | |
| D011 | 9410 | Pesticide Treatment | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days. | 1 | KSF | $0.00 |
| D012 | 9410 | Herbicide Treatment | Provide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days. | 1 | KSF | $0.00 |
| | | TOTAL IQ LINE ITEMS - D005 THROUGH D012 | | | | $ - 0 |
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal | | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | | | | | | |
| PRICE | TOTAL | | | | | | |
AMOUNT
| D013 | 9240 | Snow Removal - Complex 1 | The Contractor shall remove snow from runways, taxiways, parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Work shall be completed within 1 calendar day of order. | 16 | Acre | $0.00 |
| D014 | 9240 | Joint Replacement - Complex 1 | Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628. | 1000 | LF | $0.00 |
| TOTAL IQ LINE ITEMS - D013 THROUGH D014 | $ - 0 |
| TOTAL for all IQ Line Items --- D001 through D014 | | |
| | $ - 0 |
| | | | COMPLEX 2 | | |
| UNIT PRICED LABOR (UPL) WORK (NEGOTIATED) | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF |
| ISSUE | UNIT | | | | | |
| PRICE | TOTAL | | | | | |
AMOUNT
| D015 | 713S | Composite Unskilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 1,500 | LH | | $0.00 |
| D016 | 713S | Composite Skilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 8,000 | LH | | $0.00 |
| D017 | 713S | Material and Equipment for all UPL Work | Not-to-exceed amount to be funded and unilaterally changed at the discretion of the Government | | N/A | LS | $300,000.00 |
| | | TOTAL IQ LINE ITEMS - D015 THROUGH D017 | | | | $ 300,000.00 |
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE | | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | | | | | | |
| PRICE | TOTAL | | | | | | |
AMOUNT
| D018 | 9410 | Shrub Pruning | Shrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units. | 150 | EA | $0.00 |
| D019 | 9410 | Tree Pruning | Trees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days. | 10 | EA | $0.00 |
| D020 | 9410 | Shrub Removal | Shrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day. | 2,500 | SF | $0.00 |
| D021 | 9410 | Seeding | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. | | | |
| Seed species will be identified in the task order. | 1 | KSF | | $0.00 | | | |
| D022 | 9410 | | | | | |
| Raking | Rake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 10 | KSF | | $0.00 | |
| D023 | 9410 | Pesticide Treatment | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days. | 1 | KSF | $0.00 |
| D024 | 9410 | Herbicide Treatment | Provide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days. | 1 | KSF | $0.00 |
| | | TOTAL IQ LINE ITEMS - D018 THROUGH D024 | | | | $ - 0 |
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal | | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | | | | | | |
| PRICE | TOTAL | | | | | | |
AMOUNT
| D025 | 9240 | Joint Replacement - Complex 2 | Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628. | 100 | LF | $0.00 |
| D026 | 9240 | Pavement Sweeping - Complex 2 | The Contractor shall sweep paved surfaces indicated. Work shall be completed within 5 calendar days of order. | 100 | KSF | $0.00 |
TOTAL IQ LINE ITEMS - D025 THROUGH D026 $ - 0
| TOTAL for all IQ Line Items --- D015 through D026 | $ 300,000.00 |
| TOTAL for all IQ Line Items ---D001 through D026 | $ 300,000.00 |
2nd Option Year
| Solicitation No. N40080-13-R-1608 | | | | |
| ATTACHMENT J-0200000-11 | | | | |
| JBAB MINI BASE OPERATIONS SUPPORT CONTRACT FOR COMPLEX 1 & 2 | | | | |
| AND BUILDING 91 | | | | |
| 2nd Option Year: 1 April 2016 - 31 March 2017 | | | | |
| | | UNIT OF | UNIT | TOTAL |
| ELIN | Supplies/Services | QUANITY | ISSUE | PRICE | AMOUNT |
| E001 | MINBOS CONTRACT | | | | |
| E001 AA | Service Calls | 1,300 | EA | | $ - 0 |
| E001 AB | Emergency Service Calls | 200 | EA | | $ - 0 |
| E001 AC | PM Equipment | 12 | MO | | $ - 0 |
| E001 AD | Inspection & Testing for Boilers & UPV | 12 | MO | | $ - 0 |
| E001 AE | Inspection & Testing for Backflow Prevention Devices | 12 | MO | | $ - 0 |
| E001 AF | Inspection for Pavement Joints | 12 | MO | | $ - 0 |
| E001 AG | Inspection & Testing for VTE | 12 | MO | | $ - 0 |
| E001 AH | Maintain, Inspect & Testing UPS | 12 | MO | | $ - 0 |
| E001 AJ | Boiler Water Treatment Program | 12 | MO | | $ - 0 |
| E001 AK | Chiller Plant Water Treatment & Testing | 12 | MO | | $ - 0 |
| E001 AL | Start-up Shut Down of HVAC Systems | 12 | MO | | $ - 0 |
| E001 AM | Read Utility Meters | 12 | MO | | $ - 0 |
| E001 AN | Peform Relamping | 12 | MO | | $ - 0 |
| E001 AP | Operate Classified Material Destructor | 12 | MO | | $ - 0 |
| E001 AQ | Recurring Custodial Services COL 1 | 12 | MO | | $ - 0 |
| E001 AR | Pest Control - Recurring Services | 12 | MO | | $ - 0 |
| E001 AS | Pest Control - Non-Recurring Services | 12 | MO | | $ - 0 |
| E001 AT | Maintain Prestige Grounds - COL 1 | 12 | MO | | $ - 0 |
| E001 AU | Trash & Litter Removal | 12 | MO | | $ - 0 |
| E001 AV | Pavement Sweeping - Complex 2 | 12 | MO | | $ - 0 |
| E001 AW | Snow and Ice Removal | 12 | MO | | $ - 0 |
| E001 AX | Inspection & Testing Fire Alarm Maintenance | 12 | MO | | $ - 0 |
| E001 AY | PM for Direct Fueling System | 12 | MO | | $ - 0 |
| E001 AZ | Inspection & Testing for Crane Trackage | 12 | MO | | $ - 0 |
| E001 BA | Inspection & Testing for WHE | 12 | MO | | $ - 0 |
| E001 | SubTotal for Base Period ELIN E001 AA thru E001 BA | | | | $ - 0 |
Total 2nd Option Period Firm Fixed Price Total of ELINS E001 $ - 0
| E001 | MINBOS CONTRACT COL 2 | | | |
| E001 BB | Recurring Custodial Services COL 2 | 12 | MO | $ - 0 |
| E001 BB | Maintain Grounds - COL 2 | 12 | MO | $ - 0 |
| E001 | MINBOS CONTRACT COL 3 | | | |
| E001 BC | Recurring Custodial Services COL 3 | 12 | MO | $ - 0 |
| E001 BD | Maintain Grounds - COL 3 | 12 | MO | $ - 0 |
| E001 | MINBOS CONTRACT COL 4 | | | |
| E001 BE | Recurring Custodial Services COL 4 | 12 | MO | $ - 0 |
| E001 BF | Maintain Grounds - COL 4 | 12 | MO | $ - 0 |
IDIQ 2nd Option Year
| Solicitation No. N40080- |
| ATTACHMENT J-0200000-11 |
| JBAB MINI BASE OPERATIONS SUPPORT CONTRACT FOR COMPLEX 1 & 2 |
| IDIQ: 2ND OPTION YEAR | |
| 1 October 2016 - 30 September 2017 |
COMPLEX 1
| UNIT PRICED LABOR (UPL) WORK (NEGOTIATED) | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF |
| ISSUE | UNIT | | | | | |
| PRICE | TOTAL | | | | | |
AMOUNT
| F001 | 711S | Composite Unskilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 500 | LH | | $0.00 |
| F002 | 711S | Composite Skilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 2,500 | LH | | $0.00 |
| F003 | 711S | Material and Equipment for all UPL Work | Not-to-exceed amount to be funded and unilaterally changed at the discretion of the Government | | N/A | LS | |
TOTAL for IQ LINE ITEMS - F001 THROUGH F003 $0.00
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 150200 , Facility Investment | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF |
| ISSUE | UNIT | | | | | |
| PRICE | TOTAL | | | | | |
F004 711S Airfield Lamp Replacement Provide labor and materials to relamp airfield lighting fixtures. Fixture shall be opened, the burned out lamp shall be removed and replaced and the fixture shall be resealed. The lamp shall be tested for proper operation upon completion of the relamping. New lamps shall be identical or equal to existing lamps. Relamping shall be accomplished within one day of tasking. 30 EA $0.00
| | | TOTAL IQ LINE ITEMS - F004 | | | | $ - 0 |
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE | | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | | | | | | |
| PRICE | TOTAL | | | | | | |
AMOUNT
| F005 | 9410 | Shrub Pruning | Shrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units. | 150 | EA | $0.00 |
| F006 | 9410 | Tree Pruning | Trees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days. | 10 | EA | $0.00 |
| F007 | 9410 | Shrub Removal | Shrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day. | 2,500 | SF | $0.00 |
| F008 | 9410 | | | | | |
| Irrigation | Irrigation shall be accomplished by means of hoses and portable sprinklers. Irrigation shall be performed in the evening hours after 8:00 PM or in the early morning hours before, 9:00 AM. Irrigation shall be performed for a minimum of 3 days, uynless directed otherwise by the Contracting Officer. Irrigation time shall be of a sufficient period of time to saturate the area to a minimum depth of 1 inch. Hoses and sprinklers shall be removed from completed irigated areas on a daily basis. | 53 | KSF | | $0.00 | |
| F009 | 9410 | Seeding | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. | | | |
| Seed species will be identified in the task order. | 1 | KSF | | $0.00 | | | |
| F010 | 9410 | | | | | |
| Raking | Rake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 10 | KSF | | $0.00 | |
| F011 | 9410 | Pesticide Treatment | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days. | 1 | KSF | $0.00 |
| F012 | 9410 | Herbicide Treatment | Provide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days. | 1 | KSF | $0.00 |
| | | TOTAL IQ LINE ITEMS - F005 THROUGH F012 | | | | $ - 0 |
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal | | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | | | | | | |
| PRICE | TOTAL | | | | | | |
AMOUNT
| F013 | 9240 | Snow Removal - Complex 1 | The Contractor shall remove snow from runways, taxiways, parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Work shall be completed within 1 calendar day of order. | 16 | Acre | $0.00 |
| F014 | 9240 | Joint Replacement - Complex 1 | Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628. | 1000 | LF | $0.00 |
| TOTAL IQ LINE ITEMS - F013 THROUGH F014 | $ - 0 |
| TOTAL for all IQ Line Items --- F001 through F014 | | |
| | $ - 0 |
| | | | COMPLEX 2 | | |
| UNIT PRICED LABOR (UPL) WORK (NEGOTIATED) | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF |
| ISSUE | UNIT | | | | | |
| PRICE | TOTAL | | | | | |
AMOUNT
| F015 | 713S | Composite Unskilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 1,500 | LH | | $0.00 |
| F016 | 713S | Composite Skilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 8,000 | LH | | $0.00 |
| F017 | 713S | Material and Equipment for all UPL Work | Not-to-exceed amount to be funded and unilaterally changed at the discretion of the Government | | N/A | LS | |
| | | TOTAL IQ LINE ITEMS - F015 THROUGH F017 | | | | $ - 0 |
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE | | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | | | | | | |
| PRICE | TOTAL | | | | | | |
AMOUNT
| F018 | 9410 | Shrub Pruning | Shrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units. | 150 | EA | $0.00 |
| F019 | 9410 | Tree Pruning | Trees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days. | 10 | EA | $0.00 |
| F020 | 9410 | Shrub Removal | Shrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day. | 2,500 | SF | $0.00 |
| F021 | 9410 | Seeding | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. | | | |
| Seed species will be identified in the task order. | 1 | KSF | | $0.00 | | | |
| F022 | 9410 | | | | | |
| Raking | Rake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 10 | KSF | | $0.00 | |
| F023 | 9410 | Pesticide Treatment | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days. | 1 | KSF | $0.00 |
| F024 | 9410 | Herbicide Treatment | Provide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days. | 1 | KSF | $0.00 |
| | | TOTAL IQ LINE ITEMS - F018 THROUGH F024 | | | | $ - 0 |
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal | | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | | | | | | |
| PRICE | TOTAL | | | | | | |
AMOUNT
| F025 | 9240 | Joint Replacement - Complex 2 | Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628. | 100 | LF | $0.00 |
| F026 | 9240 | Pavement Sweeping - Complex 2 | The Contractor shall sweep paved surfaces indicated. Work shall be completed within 5 calendar days of order. | 100 | KSF | $0.00 |
TOTAL IQ LINE ITEMS - F025 THROUGH F026 $ - 0
| TOTAL for all IQ Line Items --- F015 through F026 | $ - 0 |
| TOTAL for all IQ Line Items ---F001 through F026 | $ - 0 |
3rd Option Year
| Solicitation No. N40080-13-R-1608 | | | | |
| ATTACHMENT J-0200000-11 | | | | |
| JBAB MINI BASE OPERATIONS SUPPORT CONTRACT FOR COMPLEX 1 & 2 | | | | |
| AND BUILDING 91 | | | | |
| 3rd Option Year: 1 April 2017 - 31 March 2018 | | | | |
| | | UNIT OF | UNIT | TOTAL |
| ELIN | Supplies/Services | QUANITY | ISSUE | PRICE | AMOUNT |
| G001 | MINBOS CONTRACT | | | | |
| G001 AA | Service Calls | 1,300 | EA | | $ - 0 |
| G001 AB | Emergency Service Calls | 200 | EA | | $ - 0 |
| G001 AC | PM Equipment | 12 | MO | | $ - 0 |
| G001 AD | Inspection & Testing for Boilers & UPV | 12 | MO | | $ - 0 |
| G001 AE | Inspection & Testing for Backflow Prevention Devices | 12 | MO | | $ - 0 |
| G001 AF | Inspection for Pavement Joints | 12 | MO | | $ - 0 |
| G001 AG | Inspection & Testing for VTE | 12 | MO | | $ - 0 |
| G001 AH | Maintain, Inspect & Testing UPS | 12 | MO | | $ - 0 |
| G001 AJ | Boiler Water Treatment Program | 12 | MO | | $ - 0 |
| G001 AK | Chiller Plant Water Treatment & Testing | 12 | MO | | $ - 0 |
| G001 AL | Start-up Shut Down of HVAC Systems | 12 | MO | | $ - 0 |
| G001 AM | Read Utility Meters | 12 | MO | | $ - 0 |
| G001 AN | Peform Relamping | 12 | MO | | $ - 0 |
| G001 AP | Operate Classified Material Destructor | 12 | MO | | $ - 0 |
| G001 AQ | Recurring Custodial Services COL 1 | 12 | MO | | $ - 0 |
| G001 AR | Pest Control - Recurring Services | 12 | MO | | $ - 0 |
| G001 AS | Pest Control - Non-Recurring Services | 12 | MO | | $ - 0 |
| G001 AT | Maintain Prestige Grounds - COL 1 | 12 | MO | | $ - 0 |
| G001 AU | Trash & Litter Removal | 12 | MO | | $ - 0 |
| G001 AV | Pavement Sweeping - Complex 2 | 12 | MO | | $ - 0 |
| G001 AW | Snow and Ice Removal | 12 | MO | | $ - 0 |
| G001 AX | Inspection & Testing Fire Alarm Maintenance | 12 | MO | | $ - 0 |
| G001 AY | PM for Direct Fueling System | 12 | MO | | $ - 0 |
| G001 AZ | Inspection & Testing for Crane Trackage | 12 | MO | | $ - 0 |
| G001 BA | Inspection & Testing for WHE | 12 | MO | | $ - 0 |
| G001 | SubTotal for Base Period ELIN G001 AA thru G001 BA | | | | $ - 0 |
Total 3rd Option Period Firm Fixed Price Total of ELINS G001 $ - 0
| G001 | MINBOS CONTRACT COL 2 | | | |
| G001 BB | Recurring Custodial Services COL 2 | 12 | MO | $ - 0 |
| G001 BB | Maintain Grounds - COL 2 | 12 | MO | $ - 0 |
| G001 | MINBOS CONTRACT COL 3 | | | |
| G001 BC | Recurring Custodial Services COL 3 | 12 | MO | $ - 0 |
| G001 BD | Maintain Grounds - COL 3 | 12 | MO | $ - 0 |
| G001 | MINBOS CONTRACT COL 4 | | | |
| G001 BE | Recurring Custodial Services COL 4 | 12 | MO | $ - 0 |
| G001 BF | Maintain Grounds - COL 4 | 12 | MO | $ - 0 |
IDIQ 3rd Option Year
| Solicitation No. N40080- |
| ATTACHMENT J-0200000-11 |
| JBAB MINI BASE OPERATIONS SUPPORT CONTRACT FOR COMPLEX 1 & 2 |
| IDIQ 3RD OPTION YEAR | |
| 1 October 2017 - 30 September 2018 |
COMPLEX 1
| UNIT PRICED LABOR (UPL) WORK (NEGOTIATED) | | | | | |
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF |