ELINS-11 Totals
| N40080-13-R-1608 | ||||
| Firm | Indefinite | |||
| Fixed-Price | Quantity | Totals | ||
| Contract Base Period | $ - 0 | |||
| 1st Contract Option Period | $ - 0 | |||
| 2nd Contract Option Period | $ - 0 | |||
| 3rd Contract Option Period | $ - 0 | |||
| 4th Contract Option Period | $ - 0 | |||
| Total | $ - 0 | $ - 0 | $ - 0 | |
| FACILITY SUPPORT CONTRACTS - Washington Navy Yard | ||||
| INNOVATION - LEADERSHIP - PERFORMANCE | ||||
| Chuck Hower, Naval Facilities Engineering Command Washington |
11-Base Year
| Solicitation No. N40080-13-R-1608 | ||||
| ATTACHMENT J-0200000-11-Exhibit A | ||||
| Base Period Firm Fixed-Price Exhibit Line Item Numbers (ELINs) | ||||
| 1 April 2014 - 31 March 2015 | ||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||
| ELIN | Supplies/Services | QTY | UNIT OF | |
| ISSUE | UNIT | |||
| PRICE | EXTENDED |
PRICE
| A001 | Public Works Department JBAB Washington, DC - WHCA (Complex 2) | |||||
| A001 AA | Service Calls | 1,100 | EA | $ - 0 | ||
| A001 AB | Emergency Service Calls | 275 | EA | $ - 0 | ||
| A001 AC | PM Equipment | 12 | MO | $ - 0 | ||
| A001 AD | Inspection & Testing for Boilers & UPV | 12 | MO | $ - 0 | ||
| A001 AE | Inspection & Testing for Backflow Prevention Devices | 12 | MO | $ - 0 | ||
| A001 AF | Inspection for Pavement Joints | 12 | MO | $ - 0 | ||
| A001 AG | Inspection & Testing for VTE | 12 | MO | $ - 0 | ||
| A001 AH | Maintain, Inspect & Testing UPS | 12 | MO | $ - 0 | ||
| A001 AJ | Boiler Water Treatment Program | 12 | MO | $ - 0 | ||
| A001 AK | Chiller Plant Water Treatment & Testing | 12 | MO | $ - 0 | ||
| A001 AL | Start-up Shut Down of HVAC Systems | 12 | MO | $ - 0 | ||
| A001 AM | Read Utility Meters | 12 | MO | $ - 0 | ||
| A001 AN | Peform Relamping | 12 | MO | $ - 0 | ||
| A001 AP | Operate Classified Material Destructor | 12 | MO | $ - 0 | ||
| A001 AQ | Recurring Custodial Services Complex 2 - CNIC COL 1 | 12 | MO | $ - 0 | ||
| A001 AR | Pest Control - Recurring Services | 12 | MO | $ - 0 | ||
| A001 AS | Pest Control - Non-Recurring Services | 12 | MO | $ - 0 | ||
| A001 AT | Maintain Grounds Complex 2 - CNIC COL1 | 12 | MO | $ - 0 | ||
| A001 AU | Trash & Litter Removal | 12 | MO | $ - 0 | ||
| A001 AV | Pavement Sweeping At CNIC Prescribed Levels - Complex 2 | 12 | MO | $ - 0 | ||
| A001 AW | Snow and Ice Removal | 12 | MO | $ - 0 | ||
| A001 | SubTotal for Base Period ELIN A001 AA-A001 AW | $ - 0 | ||||
| A002 | Public Works Department JBAB Washington, DC - HMX (Complex 1) | |||||
| A002 AA | PM for Direct Fueling System | 12 | MO | $ - 0 | ||
| A002 AB | Service Calls | 200 | EA | $ - 0 | ||
| A002 AC | Emergency Service Calls | 50 | EA | $ - 0 | ||
| A002 AD | PM for Equipment | 12 | MO | $ - 0 | ||
| A002 AE | Inspection & Testing for Boilers & UPV | 12 | MO | $ - 0 | ||
| A002 AF | Inspection & Testing for Backflow Prevention Devices | 12 | MO | $ - 0 | ||
| A002 AG | Inspection & Testing for Crane Trackage | 12 | MO | $ - 0 | ||
| A002 AH | Inspection & Testing for WHE | 12 | MO | $ - 0 | ||
| A002 AJ | Inspection for Pavement Joints | 12 | MO | $ - 0 | ||
| A002 AK | Read Utility Meters | 12 | MO | $ - 0 | ||
| A002 AL | Boiler Water Treatment Program | 12 | MO | $ - 0 | ||
| A002 AM | Start-up Shut Down of HVAC Systems | 12 | MO | $ - 0 | ||
| A002 AN | Peform Relamping | 12 | MO | $ - 0 | ||
| A002 AP | Recurring Custodial Services Complex 1 At CNIC COL 1 | 12 | MO | $ - 0 | ||
| A002 AQ | Pest Control - Recurring Services | 12 | MO | $ - 0 | ||
| A002 AR | Pest Control - Non-Recurring Services | 12 | MO | $ - 0 | ||
| A002 AS | Maintain Grounds Complex 1 - COL 1 | 12 | MO | $ - 0 | ||
| A002 AT | Trash & Litter Removal | 12 | MO | $ - 0 | ||
| A002 AU | Pavement Sweeping At CNIC Prescribed Levels - Complex 1 | 12 | MO | $ - 0 | ||
| A002 AV | Snow and Ice Removal | 12 | MO | $ - 0 | ||
| A002 | SubTotal for Base Period ELIN A002 AA- A002 AV | $ - 0 | ||||
| A003 | Public Works Department JBAB Washington, DC - Anacostia | |||||
| A003 AA | Service Calls | 200 | EA | $ - 0 | ||
| A003 AB | Emergency Service Calls | 50 | EA | $ - 0 | ||
| A003 AC | PM Equipment | 12 | MO | $ - 0 | ||
| A003 AD | Inspection & Testing for Boilers & UPV | 12 | MO | $ - 0 | ||
| A003 AE | Inspection & Testing for Backflow Prevention Devices | 12 | MO | $ - 0 | ||
| A003 AF | Inspection for Pavement Joints | 12 | MO | $ - 0 | ||
| A003 AG | Inspection & Testing for VTE | 12 | MO | $ - 0 | ||
| A003 AH | Maintain, Inspect & Testing UPS | 12 | MO | $ - 0 | ||
| A003 AJ | Boiler Water Treatment Program | 12 | MO | $ - 0 | ||
| A003 AK | Chiller Plant Water Treatment & Testing | 12 | MO | $ - 0 | ||
| A003 AL | Start-up Shut Down of HVAC Systems | 12 | MO | $ - 0 | ||
| A003 AM | Read Utility Meters | 12 | MO | $ - 0 | ||
| A003 AN | Peform Relamping | 12 | MO | $ - 0 | ||
| A003 AP | Recurring Custodial Services - COL 1 | 12 | MO | $ - 0 | ||
| A003 AQ | Pest Control - Recurring Services | 12 | MO | $ - 0 | ||
| A003 AR | Pest Control - Non-Recurring Services | 12 | MO | $ - 0 | ||
| A003 AS | Maintain Prestige Grounds - COL 1 | 12 | MO | $ - 0 | ||
| A003 AT | Trash & Litter Removal | 12 | MO | $ - 0 | ||
| A003 AU | Pavement Sweeping | 12 | MO | $ - 0 | ||
| A003 AV | Snow and Ice Removal | 12 | MO | $ - 0 | ||
| A003 AW | Inspection & Testing Fire Alarm Maintenance | 12 | MO | $ - 0 | ||
| A003 | SubTotal for Base Period ELIN A003 AA - A003 AD | |||||
| Total Base Year Period Firm Fixed Price (Total of ELINS A001 through A003) | $ - 0 | |||||
| COMMON OUTPUT LEVEL OPTIONS - COL 2 | ||||||
| ELIN | Supplies/Services | QTY | UNIT OF | |||
| ISSUE | UNIT | |||||
| PRICE | EXTENDED |
PRICE
| A00401 | Recurring Custodial Services Complex 2 | 12 | MO | $ - 0 | |
| A00402 | Maintain Grounds Complex 2 | 12 | MO | $ - 0 | |
| A00403 | Recurring Custodial Services Complex 1 | 12 | MO | $ - 0 | |
| A00404 | Maintain Grounds Complex 1 | 12 | MO | $ - 0 | |
| A00405 | Recurring Custodial Services Bldg 91 | 12 | MO | $ - 0 | |
| A00406 | Maintain Grounds Bldg 91 | 12 | MO | $ - 0 | |
| OPTION - COL2 Additional Measures Total | |||||
| COMMON OUTPUT LEVEL OPTIONS - COL 3 | |||||
| ELIN | Supplies/Services | QTY | UNIT OF | ||
| ISSUE | UNIT | ||||
| PRICE | EXTENDED |
PRICE
| A00501 | Recurring Custodial Services Complex 2 | 12 | MO | $ - 0 | |
| A00502 | Maintain Grounds Complex 2 | 12 | MO | $ - 0 | |
| A00503 | Recurring Custodial Services Complex 1 | 12 | MO | $ - 0 | |
| A00504 | Maintain Grounds Complex 1 | 12 | MO | $ - 0 | |
| A00505 | Recurring Custodial Services Bldg 91 | 12 | MO | $ - 0 | |
| A00506 | Maintain Grounds Bldg 91 | 12 | MO | $ - 0 | |
| OPTION - COL3 Additional Measures Total | |||||
| COMMON OUTPUT LEVEL OPTIONS - COL 4 | |||||
| ELIN | Supplies/Services | QTY | UNIT OF | ||
| ISSUE | UNIT | ||||
| PRICE | EXTENDED |
PRICE
| A00601 | Recurring Custodial Services Complex 2 | 12 | MO | $ - 0 |
| A00602 | Maintain Grounds Complex 2 | 12 | MO | $ - 0 |
| A00603 | Recurring Custodial Services Complex 1 | 12 | MO | $ - 0 |
| A00604 | Maintain Grounds Complex 1 | 12 | MO | $ - 0 |
| A00605 | Recurring Custodial Services Bldg 91 | 12 | MO | $ - 0 |
| A00606 | Maintain Grounds Bldg 91 | 12 | MO | $ - 0 |
| OPTION - COL4 Additional Measures Total |
11-IDIQ-Base Year
| Solicitation No. N40080-13-R-1608 | ||||||
| ATTACHMENT J-0200000-11-Exhibit B | ||||||
| Base Period IDIQ Exhibit Line Item Numbers (ELINs) | ||||||
| 1 April 2014 - 31 March 2015 | ||||||
| COMPLEX 1 | ||||||
| UNIT PRICED LABOR (UPL) WORK (NEGOTIATED) | ||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | |||||
| PRICE | TOTAL |
AMOUNT
| B001 | 711S | Composite Unskilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 500 | LH | ||
| B002 | 711S | Composite Skilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 2,500 | LH | ||
| B003 | 711S | Material and Equipment for all UPL Work | Not-to-exceed amount to be funded and unilaterally changed at the discretion of the Government | N/A | LS | ||
| TOTAL for IQ LINE ITEMS - B001 THROUGH B003 | |||||||
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 150200 , Facility Investment | |||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | ||
| ISSUE | UNIT | ||||||
| PRICE | TOTAL |
AMOUNT
| B004 | 711S | Airfield Lamp Replacement | Provide labor and materials to relamp airfield lighting fixtures. Fixture shall be opened, the burned out lamp shall be removed and replaced and the fixture shall be resealed. The lamp shall be tested for proper operation upon completion of the relamping. New lamps shall be identical or equal to existing lamps. Relamping shall be accomplished within one day of tasking. | 30 | EA | ||
| TOTAL IQ LINE ITEMS - B004 | $ - 0 | ||||||
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE | |||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | ||
| ISSUE | UNIT | ||||||
| PRICE | TOTAL |
AMOUNT
| B005 | 9410 | Shrub Pruning | Shrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units. | 150 | EA |
| B006 | 9410 | Tree Pruning | Trees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days. | 10 | EA |
| B007 | 9410 | Shrub Removal | Shrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day. | 2,500 | SF |
| B008 | 9410 | Irrigation | Irrigation shall be accomplished by means of hoses and portable sprinklers. Irrigation shall be performed in the evening hours after 8:00 PM or in the early morning hours before, 9:00 AM. Irrigation shall be performed for a minimum of 3 days, uynless directed otherwise by the Contracting Officer. Irrigation time shall be of a sufficient period of time to saturate the area to a minimum depth of 1 inch. Hoses and sprinklers shall be removed from completed irigated areas on a daily basis. | 53 | KSF |
| B009 | 9410 | Seeding | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | 1 | KSF | |||||
| B010 | 9410 | Raking | Rake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 10 | KSF | ||
| B011 | 9410 | Pesticide Treatment | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days. | 1 | KSF | ||
| B012 | 9410 | Herbicide Treatment | Provide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days. | 1 | KSF | ||
| TOTAL IQ LINE ITEMS - B005 THROUGH B012 | $ - 0 | ||||||
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal | |||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | ||
| ISSUE | UNIT | ||||||
| PRICE | TOTAL |
AMOUNT
| B013 | 9240 | Snow Removal - Complex 1 | The Contractor shall remove snow from runways, taxiways, parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Work shall be completed within 1 calendar day of order. | 16 | Acre | ||
| B014 | 9240 | Joint Replacement - Complex 1 | Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628. | 1000 | LF | ||
| TOTAL IQ LINE ITEMS - B013 THROUGH B014 | $ - 0 | ||||||
| TOTAL for all IQ Line Items --- B001 through B014 | $ - 0 | ||||||
| COMPLEX 2 | |||||||
| UNIT PRICED LABOR (UPL) WORK (NEGOTIATED) | |||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | ||
| ISSUE | UNIT | ||||||
| PRICE | TOTAL |
AMOUNT
| B015 | 713S | Composite Unskilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 1,500 | LH | |||
| B016 | 713S | Composite Skilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 8,000 | LH | |||
| B017 | 713S | Material and Equipment for all UPL Work | Not-to-exceed amount to be funded and unilaterally changed at the discretion of the Government | N/A | LS | |||
| TOTAL IQ LINE ITEMS - B015 THROUGH B017 | $ - 0 | |||||||
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE | ||||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |||
| ISSUE | UNIT | |||||||
| PRICE | TOTAL |
AMOUNT
| B018 | 9410 | Shrub Pruning | Shrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units. | 150 | EA |
| B019 | 9410 | Tree Pruning | Trees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days. | 10 | EA |
| B020 | 9410 | Shrub Removal | Shrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day. | 2,500 | SF |
| B021 | 9410 | Seeding | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | 1 | KSF | |||||
| B022 | 9410 | Raking | Rake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 10 | KSF | ||
| B023 | 9410 | Pesticide Treatment | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days. | 1 | KSF | ||
| B024 | 9410 | Herbicide Treatment | Provide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days. | 1 | KSF | ||
| TOTAL IQ LINE ITEMS - B018 THROUGH B024 | $ - 0 | ||||||
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal | |||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | ||
| ISSUE | UNIT | ||||||
| PRICE | TOTAL |
AMOUNT
| B025 | 9240 | Joint Replacement - Complex 2 | Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628. | 100 | LF | |
| B026 | 9240 | Pavement Sweeping - Complex 2 | The Contractor shall sweep paved surfaces indicated. Work shall be completed within 5 calendar days of order. | 100 | KSF | |
| TOTAL IQ LINE ITEMS - B025 THROUGH B026 | $ - 0 | |||||
| TOTAL for all IQ Line Items --- B015 through B026 | $ - 0 | |||||
| TOTAL for all IQ Line Items ---B001 through B026 | $ - 0 |
11-1st OY
| Solicitation No. N40080-13-R-1608 | ||||
| ATTACHMENT J-0200000-11-Exhibit C | ||||
| 1st Option Period Firm Fixed-Price Exhibit Line Item Numbers (ELINs) | ||||
| 1 April 2015 - 31 March 2016 | ||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||
| ELIN | Supplies/Services | QTY | UNIT OF | |
| ISSUE | UNIT | |||
| PRICE | EXTENDED |
PRICE
| C001 | Public Works Department JBAB Washington, DC - WHCA (Complex 2) | |||||
| C001 AA | Service Calls | 1,100 | EA | $ - 0 | ||
| C001 AB | Emergency Service Calls | 275 | EA | $ - 0 | ||
| C001 AC | PM Equipment | 12 | MO | $ - 0 | ||
| C001 AD | Inspection & Testing for Boilers & UPV | 12 | MO | $ - 0 | ||
| C001 AE | Inspection & Testing for Backflow Prevention Devices | 12 | MO | $ - 0 | ||
| C001 AF | Inspection for Pavement Joints | 12 | MO | $ - 0 | ||
| C001 AG | Inspection & Testing for VTE | 12 | MO | $ - 0 | ||
| C001 AH | Maintain, Inspect & Testing UPS | 12 | MO | $ - 0 | ||
| C001 AJ | Boiler Water Treatment Program | 12 | MO | $ - 0 | ||
| C001 AK | Chiller Plant Water Treatment & Testing | 12 | MO | $ - 0 | ||
| C001 AL | Start-up Shut Down of HVAC Systems | 12 | MO | $ - 0 | ||
| C001 AM | Read Utility Meters | 12 | MO | $ - 0 | ||
| C001 AN | Peform Relamping | 12 | MO | $ - 0 | ||
| C001 AP | Operate Classified Material Destructor | 12 | MO | $ - 0 | ||
| C001 AQ | Recurring Custodial Services Complex 2 - CNIC COL 1 | 12 | MO | $ - 0 | ||
| C001 AR | Pest Control - Recurring Services | 12 | MO | $ - 0 | ||
| C001 AS | Pest Control - Non-Recurring Services | 12 | MO | $ - 0 | ||
| C001 AT | Maintain Grounds Complex 2 - CNIC COL1 | 12 | MO | $ - 0 | ||
| C001 AU | Trash & Litter Removal | 12 | MO | $ - 0 | ||
| C001 AV | Pavement Sweeping At CNIC Prescribed Levels - Complex 2 | 12 | MO | $ - 0 | ||
| C001 AW | Snow and Ice Removal | 12 | MO | $ - 0 | ||
| C001 | SubTotal for Base Period ELIN C001 AA-C001 AW | $ - 0 | ||||
| C002 | Public Works Department JBAB Washington, DC - HMX (Complex 1) | |||||
| C002 AA | PM for Direct Fueling System | 12 | MO | $ - 0 | ||
| C002 AB | Service Calls | 200 | EA | $ - 0 | ||
| C002 AC | Emergency Service Calls | 50 | EA | $ - 0 | ||
| C002 AD | PM for Equipment | 12 | MO | $ - 0 | ||
| C002 AE | Inspection & Testing for Boilers & UPV | 12 | MO | $ - 0 | ||
| C002 AF | Inspection & Testing for Backflow Prevention Devices | 12 | MO | $ - 0 | ||
| C002 AG | Inspection & Testing for Crane Trackage | 12 | MO | $ - 0 | ||
| C002 AH | Inspection & Testing for WHE | 12 | MO | $ - 0 | ||
| C002 AJ | Inspection for Pavement Joints | 12 | MO | $ - 0 | ||
| C002 AK | Read Utility Meters | 12 | MO | $ - 0 | ||
| C002 AL | Boiler Water Treatment Program | 12 | MO | $ - 0 | ||
| C002 AM | Start-up Shut Down of HVAC Systems | 12 | MO | $ - 0 | ||
| C002 AN | Peform Relamping | 12 | MO | $ - 0 | ||
| C002 AP | Recurring Custodial Services Complex 1 At CNIC COL 1 | 12 | MO | $ - 0 | ||
| C002 AQ | Pest Control - Recurring Services | 12 | MO | $ - 0 | ||
| C002 AR | Pest Control - Non-Recurring Services | 12 | MO | $ - 0 | ||
| C002 AS | Maintain Grounds Complex 1 - COL 1 | 12 | MO | $ - 0 | ||
| C002 AT | Trash & Litter Removal | 12 | MO | $ - 0 | ||
| C002 AU | Pavement Sweeping At CNIC Prescribed Levels - Complex 1 | 12 | MO | $ - 0 | ||
| C002 AV | Snow and Ice Removal | 12 | MO | $ - 0 | ||
| C002 | SubTotal for Base Period ELIN C002 AA- C002 AV | $ - 0 | ||||
| C003 | Public Works Department JBAB Washington, DC - Anacostia | |||||
| C003 AA | Service Calls | 200 | EA | $ - 0 | ||
| C003 AB | Emergency Service Calls | 50 | EA | $ - 0 | ||
| C003 AC | PM Equipment | 12 | MO | $ - 0 | ||
| C003 AD | Inspection & Testing for Boilers & UPV | 12 | MO | $ - 0 | ||
| C003 AE | Inspection & Testing for Backflow Prevention Devices | 12 | MO | $ - 0 | ||
| C003 AF | Inspection for Pavement Joints | 12 | MO | $ - 0 | ||
| C003 AG | Inspection & Testing for VTE | 12 | MO | $ - 0 | ||
| C003 AH | Maintain, Inspect & Testing UPS | 12 | MO | $ - 0 | ||
| C003 AJ | Boiler Water Treatment Program | 12 | MO | $ - 0 | ||
| C003 AK | Chiller Plant Water Treatment & Testing | 12 | MO | $ - 0 | ||
| C003 AL | Start-up Shut Down of HVAC Systems | 12 | MO | $ - 0 | ||
| C003 AM | Read Utility Meters | 12 | MO | $ - 0 | ||
| C003 AN | Peform Relamping | 12 | MO | $ - 0 | ||
| C003 AP | Recurring Custodial Services - COL 1 | 12 | MO | $ - 0 | ||
| C003 AQ | Pest Control - Recurring Services | 12 | MO | $ - 0 | ||
| C003 AR | Pest Control - Non-Recurring Services | 12 | MO | $ - 0 | ||
| C003 AS | Maintain Prestige Grounds - COL 1 | 12 | MO | $ - 0 | ||
| C003 AT | Trash & Litter Removal | 12 | MO | $ - 0 | ||
| C003 AU | Pavement Sweeping | 12 | MO | $ - 0 | ||
| C003 AV | Snow and Ice Removal | 12 | MO | $ - 0 | ||
| C003 AW | Inspection & Testing Fire Alarm Maintenance | 12 | MO | $ - 0 | ||
| C003 | SubTotal for Base Period ELIN C003 AA - C003 AD | |||||
| Total Base Year Period Firm Fixed Price (Total of ELINS C001 through C003) | $ - 0 | |||||
| COMMON OUTPUT LEVEL OPTIONS - COL 2 | ||||||
| ELIN | Supplies/Services | QTY | UNIT OF | |||
| ISSUE | UNIT | |||||
| PRICE | EXTENDED |
PRICE
| C00401 | Recurring Custodial Services Complex 2 | 12 | MO | $ - 0 | |
| C00402 | Maintain Grounds Complex 2 | 12 | MO | $ - 0 | |
| C00403 | Recurring Custodial Services Complex 1 | 12 | MO | $ - 0 | |
| C00404 | Maintain Grounds Complex 1 | 12 | MO | $ - 0 | |
| C00405 | Recurring Custodial Services Bldg 91 | 12 | MO | $ - 0 | |
| C00406 | Maintain Grounds Bldg 91 | 12 | MO | $ - 0 | |
| OPTION - COL2 Additional Measures Total | |||||
| COMMON OUTPUT LEVEL OPTIONS - COL 3 | |||||
| ELIN | Supplies/Services | QTY | UNIT OF | ||
| ISSUE | UNIT | ||||
| PRICE | EXTENDED |
PRICE
| C00501 | Recurring Custodial Services Complex 2 | 12 | MO | $ - 0 | |
| C00502 | Maintain Grounds Complex 2 | 12 | MO | $ - 0 | |
| C00503 | Recurring Custodial Services Complex 1 | 12 | MO | $ - 0 | |
| C00504 | Maintain Grounds Complex 1 | 12 | MO | $ - 0 | |
| C00505 | Recurring Custodial Services Bldg 91 | 12 | MO | $ - 0 | |
| C00506 | Maintain Grounds Bldg 91 | 12 | MO | $ - 0 | |
| OPTION - COL3 Additional Measures Total | |||||
| COMMON OUTPUT LEVEL OPTIONS - COL 4 | |||||
| ELIN | Supplies/Services | QTY | UNIT OF | ||
| ISSUE | UNIT | ||||
| PRICE | EXTENDED |
PRICE
| C00601 | Recurring Custodial Services Complex 2 | 12 | MO | $ - 0 |
| C00602 | Maintain Grounds Complex 2 | 12 | MO | $ - 0 |
| C00603 | Recurring Custodial Services Complex 1 | 12 | MO | $ - 0 |
| C00604 | Maintain Grounds Complex 1 | 12 | MO | $ - 0 |
| C00605 | Recurring Custodial Services Bldg 91 | 12 | MO | $ - 0 |
| C00606 | Maintain Grounds Bldg 91 | 12 | MO | $ - 0 |
| OPTION - COL4 Additional Measures Total |
11-IDIQ-1st OY
| Solicitation No. N40080-13-R-1608 | ||||||
| ATTACHMENT J-0200000-11-Exhibit D | ||||||
| 1st Option Period IDIQ Exhibit Line Item Numbers (ELINs) | ||||||
| 1 April 2015 - 31 March 2016 | ||||||
| COMPLEX 1 | ||||||
| UNIT PRICED LABOR (UPL) WORK (NEGOTIATED) | ||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | |||||
| PRICE | TOTAL |
AMOUNT
| D001 | 711S | Composite Unskilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 500 | LH | ||
| D002 | 711S | Composite Skilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 2,500 | LH | ||
| D003 | 711S | Material and Equipment for all UPL Work | Not-to-exceed amount to be funded and unilaterally changed at the discretion of the Government | N/A | LS | ||
| TOTAL for IQ LINE ITEMS - D001 THROUGH D003 | |||||||
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 150200 , Facility Investment | |||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | ||
| ISSUE | UNIT | ||||||
| PRICE | TOTAL |
AMOUNT
| D004 | 711S | Airfield Lamp Replacement | Provide labor and materials to relamp airfield lighting fixtures. Fixture shall be opened, the burned out lamp shall be removed and replaced and the fixture shall be resealed. The lamp shall be tested for proper operation upon completion of the relamping. New lamps shall be identical or equal to existing lamps. Relamping shall be accomplished within one day of tasking. | 30 | EA | ||
| TOTAL IQ LINE ITEMS - D004 | $ - 0 | ||||||
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE | |||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | ||
| ISSUE | UNIT | ||||||
| PRICE | TOTAL |
AMOUNT
| D005 | 9410 | Shrub Pruning | Shrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units. | 150 | EA |
| D006 | 9410 | Tree Pruning | Trees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days. | 10 | EA |
| D007 | 9410 | Shrub Removal | Shrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day. | 2,500 | SF |
| D008 | 9410 | Irrigation | Irrigation shall be accomplished by means of hoses and portable sprinklers. Irrigation shall be performed in the evening hours after 8:00 PM or in the early morning hours before, 9:00 AM. Irrigation shall be performed for a minimum of 3 days, uynless directed otherwise by the Contracting Officer. Irrigation time shall be of a sufficient period of time to saturate the area to a minimum depth of 1 inch. Hoses and sprinklers shall be removed from completed irigated areas on a daily basis. | 53 | KSF |
| D009 | 9410 | Seeding | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | 1 | KSF | |||||
| D010 | 9410 | Raking | Rake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 10 | KSF | ||
| D011 | 9410 | Pesticide Treatment | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days. | 1 | KSF | ||
| D012 | 9410 | Herbicide Treatment | Provide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days. | 1 | KSF | ||
| TOTAL IQ LINE ITEMS - D005 THROUGH D012 | $ - 0 | ||||||
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal | |||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | ||
| ISSUE | UNIT | ||||||
| PRICE | TOTAL |
AMOUNT
| D013 | 9240 | Snow Removal - Complex 1 | The Contractor shall remove snow from runways, taxiways, parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Work shall be completed within 1 calendar day of order. | 16 | Acre | ||
| D014 | 9240 | Joint Replacement - Complex 1 | Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628. | 1000 | LF | ||
| TOTAL IQ LINE ITEMS - D013 THROUGH D014 | $ - 0 | ||||||
| TOTAL for all IQ Line Items --- D001 through D014 | $ - 0 | ||||||
| COMPLEX 2 | |||||||
| UNIT PRICED LABOR (UPL) WORK (NEGOTIATED) | |||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | ||
| ISSUE | UNIT | ||||||
| PRICE | TOTAL |
AMOUNT
| D015 | 713S | Composite Unskilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 1,500 | LH | |||
| D016 | 713S | Composite Skilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 8,000 | LH | |||
| D017 | 713S | Material and Equipment for all UPL Work | Not-to-exceed amount to be funded and unilaterally changed at the discretion of the Government | N/A | LS | |||
| TOTAL IQ LINE ITEMS - D015 THROUGH D017 | $ - 0 | |||||||
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE | ||||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |||
| ISSUE | UNIT | |||||||
| PRICE | TOTAL |
AMOUNT
| D018 | 9410 | Shrub Pruning | Shrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units. | 150 | EA |
| D019 | 9410 | Tree Pruning | Trees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days. | 10 | EA |
| D020 | 9410 | Shrub Removal | Shrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day. | 2,500 | SF |
| D021 | 9410 | Seeding | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | 1 | KSF | |||||
| D022 | 9410 | Raking | Rake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 10 | KSF | ||
| D023 | 9410 | Pesticide Treatment | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days. | 1 | KSF | ||
| D024 | 9410 | Herbicide Treatment | Provide labor and materials to control weeds in turf areas and in ornamental plant beds. Time Period to Respond: 1 week. Complete work in five calendar days. | 1 | KSF | ||
| TOTAL IQ LINE ITEMS - D018 THROUGH D024 | $ - 0 | ||||||
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503060 , Pavement Sweeping & Snow Removal | |||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | ||
| ISSUE | UNIT | ||||||
| PRICE | TOTAL |
AMOUNT
| D025 | 9240 | Joint Replacement - Complex 2 | Joints with sealant separation shall have the sealant removed and replaced per the manufaturer's recommendation. Joints with soil, grass, weeds, gravel or debris shall be raked to full depth to remove all foreign matter and then refilled with joint material and sealant. Joint sealant shall be as specified in Federal Specification SS-S-1614 and SS-S-200D. Joint filler shall be as specified in ASTM D 1752 and D 2628. | 100 | LF | |
| D026 | 9240 | Pavement Sweeping - Complex 2 | The Contractor shall sweep paved surfaces indicated. Work shall be completed within 5 calendar days of order. | 100 | KSF | |
| TOTAL IQ LINE ITEMS - D025 THROUGH D026 | $ - 0 | |||||
| TOTAL for all IQ Line Items --- D015 through D026 | $ - 0 | |||||
| TOTAL for all IQ Line Items ---D001 through D026 | $ - 0 |
11- 2nd OY
| Solicitation No. N40080-13-R-1608 | ||||
| ATTACHMENT J-0200000-11-Exhibit E | ||||
| 2nd Option Period Firm Fixed-Price Exhibit Line Item Numbers (ELINs) | ||||
| 1 April 2016 - 31 March 2017 | ||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||
| ELIN | Supplies/Services | QTY | UNIT OF | |
| ISSUE | UNIT | |||
| PRICE | EXTENDED |
PRICE
| E001 | Public Works Department JBAB Washington, DC - WHCA (Complex 2) | |||||
| E001 AA | Service Calls | 1,100 | EA | $ - 0 | ||
| E001 AB | Emergency Service Calls | 275 | EA | $ - 0 | ||
| E001 AC | PM Equipment | 12 | MO | $ - 0 | ||
| E001 AD | Inspection & Testing for Boilers & UPV | 12 | MO | $ - 0 | ||
| E001 AE | Inspection & Testing for Backflow Prevention Devices | 12 | MO | $ - 0 | ||
| E001 AF | Inspection for Pavement Joints | 12 | MO | $ - 0 | ||
| E001 AG | Inspection & Testing for VTE | 12 | MO | $ - 0 | ||
| E001 AH | Maintain, Inspect & Testing UPS | 12 | MO | $ - 0 | ||
| E001 AJ | Boiler Water Treatment Program | 12 | MO | $ - 0 | ||
| E001 AK | Chiller Plant Water Treatment & Testing | 12 | MO | $ - 0 | ||
| E001 AL | Start-up Shut Down of HVAC Systems | 12 | MO | $ - 0 | ||
| E001 AM | Read Utility Meters | 12 | MO | $ - 0 | ||
| E001 AN | Peform Relamping | 12 | MO | $ - 0 | ||
| E001 AP | Operate Classified Material Destructor | 12 | MO | $ - 0 | ||
| E001 AQ | Recurring Custodial Services Complex 2 - CNIC COL 1 | 12 | MO | $ - 0 | ||
| E001 AR | Pest Control - Recurring Services | 12 | MO | $ - 0 | ||
| E001 AS | Pest Control - Non-Recurring Services | 12 | MO | $ - 0 | ||
| E001 AT | Maintain Grounds Complex 2 - CNIC COL1 | 12 | MO | $ - 0 | ||
| E001 AU | Trash & Litter Removal | 12 | MO | $ - 0 | ||
| E001 AV | Pavement Sweeping At CNIC Prescribed Levels - Complex 2 | 12 | MO | $ - 0 | ||
| E001 AW | Snow and Ice Removal | 12 | MO | $ - 0 | ||
| E001 | SubTotal for Base Period ELIN E001 AA-E001 AW | $ - 0 | ||||
| E002 | Public Works Department JBAB Washington, DC - HMX (Complex 1) | |||||
| E002 AA | PM for Direct Fueling System | 12 | MO | $ - 0 | ||
| E002 AB | Service Calls | 200 | EA | $ - 0 | ||
| E002 AC | Emergency Service Calls | 50 | EA | $ - 0 | ||
| E002 AD | PM for Equipment | 12 | MO | $ - 0 | ||
| E002 AE | Inspection & Testing for Boilers & UPV | 12 | MO | $ - 0 | ||
| E002 AF | Inspection & Testing for Backflow Prevention Devices | 12 | MO | $ - 0 | ||
| E002 AG | Inspection & Testing for Crane Trackage | 12 | MO | $ - 0 | ||
| E002 AH | Inspection & Testing for WHE | 12 | MO | $ - 0 | ||
| E002 AJ | Inspection for Pavement Joints | 12 | MO | $ - 0 | ||
| E002 AK | Read Utility Meters | 12 | MO | $ - 0 | ||
| E002 AL | Boiler Water Treatment Program | 12 | MO | $ - 0 | ||
| E002 AM | Start-up Shut Down of HVAC Systems | 12 | MO | $ - 0 | ||
| E002 AN | Peform Relamping | 12 | MO | $ - 0 | ||
| E002 AP | Recurring Custodial Services Complex 1 At CNIC COL 1 | 12 | MO | $ - 0 | ||
| E002 AQ | Pest Control - Recurring Services | 12 | MO | $ - 0 | ||
| E002 AR | Pest Control - Non-Recurring Services | 12 | MO | $ - 0 | ||
| E002 AS | Maintain Grounds Complex 1 - COL 1 | 12 | MO | $ - 0 | ||
| E002 AT | Trash & Litter Removal | 12 | MO | $ - 0 | ||
| E002 AU | Pavement Sweeping At CNIC Prescribed Levels - Complex 1 | 12 | MO | $ - 0 | ||
| E002 AV | Snow and Ice Removal | 12 | MO | $ - 0 | ||
| E002 | SubTotal for Base Period ELIN E002 AA- E002 AV | $ - 0 | ||||
| E003 | Public Works Department JBAB Washington, DC - Anacostia | |||||
| E003 AA | Service Calls | 200 | EA | $ - 0 | ||
| E003 AB | Emergency Service Calls | 50 | EA | $ - 0 | ||
| E003 AC | PM Equipment | 12 | MO | $ - 0 | ||
| E003 AD | Inspection & Testing for Boilers & UPV | 12 | MO | $ - 0 | ||
| E003 AE | Inspection & Testing for Backflow Prevention Devices | 12 | MO | $ - 0 | ||
| E003 AF | Inspection for Pavement Joints | 12 | MO | $ - 0 | ||
| E003 AG | Inspection & Testing for VTE | 12 | MO | $ - 0 | ||
| E003 AH | Maintain, Inspect & Testing UPS | 12 | MO | $ - 0 | ||
| E003 AJ | Boiler Water Treatment Program | 12 | MO | $ - 0 | ||
| E003 AK | Chiller Plant Water Treatment & Testing | 12 | MO | $ - 0 | ||
| E003 AL | Start-up Shut Down of HVAC Systems | 12 | MO | $ - 0 | ||
| E003 AM | Read Utility Meters | 12 | MO | $ - 0 | ||
| E003 AN | Peform Relamping | 12 | MO | $ - 0 | ||
| E003 AP | Recurring Custodial Services - COL 1 | 12 | MO | $ - 0 | ||
| E003 AQ | Pest Control - Recurring Services | 12 | MO | $ - 0 | ||
| E003 AR | Pest Control - Non-Recurring Services | 12 | MO | $ - 0 | ||
| E003 AS | Maintain Prestige Grounds - COL 1 | 12 | MO | $ - 0 | ||
| E003 AT | Trash & Litter Removal | 12 | MO | $ - 0 | ||
| E003 AU | Pavement Sweeping | 12 | MO | $ - 0 | ||
| E003 AV | Snow and Ice Removal | 12 | MO | $ - 0 | ||
| E003 AW | Inspection & Testing Fire Alarm Maintenance | 12 | MO | $ - 0 | ||
| E003 | SubTotal for Base Period ELIN E003 AA - E003 AD | |||||
| Total Base Year Period Firm Fixed Price (Total of ELINS E001 through E003) | $ - 0 | |||||
| COMMON OUTPUT LEVEL OPTIONS - COL 2 | ||||||
| ELIN | Supplies/Services | QTY | UNIT OF | |||
| ISSUE | UNIT | |||||
| PRICE | EXTENDED |
PRICE
| E00401 | Recurring Custodial Services Complex 2 | 12 | MO | $ - 0 | |
| E00402 | Maintain Grounds Complex 2 | 12 | MO | $ - 0 | |
| E00403 | Recurring Custodial Services Complex 1 | 12 | MO | $ - 0 | |
| E00404 | Maintain Grounds Complex 1 | 12 | MO | $ - 0 | |
| E00405 | Recurring Custodial Services Bldg 91 | 12 | MO | $ - 0 | |
| E00406 | Maintain Grounds Bldg 91 | 12 | MO | $ - 0 | |
| OPTION - COL2 Additional Measures Total | |||||
| COMMON OUTPUT LEVEL OPTIONS - COL 3 | |||||
| ELIN | Supplies/Services | QTY | UNIT OF | ||
| ISSUE | UNIT | ||||
| PRICE | EXTENDED |
PRICE
| E00501 | Recurring Custodial Services Complex 2 | 12 | MO | $ - 0 | |
| E00502 | Maintain Grounds Complex 2 | 12 | MO | $ - 0 | |
| E00503 | Recurring Custodial Services Complex 1 | 12 | MO | $ - 0 | |
| E00504 | Maintain Grounds Complex 1 | 12 | MO | $ - 0 | |
| E00505 | Recurring Custodial Services Bldg 91 | 12 | MO | $ - 0 | |
| E00506 | Maintain Grounds Bldg 91 | 12 | MO | $ - 0 | |
| OPTION - COL3 Additional Measures Total | |||||
| COMMON OUTPUT LEVEL OPTIONS - COL 4 | |||||
| ELIN | Supplies/Services | QTY | UNIT OF | ||
| ISSUE | UNIT | ||||
| PRICE | EXTENDED |
PRICE
| E00601 | Recurring Custodial Services Complex 2 | 12 | MO | $ - 0 |
| E00602 | Maintain Grounds Complex 2 | 12 | MO | $ - 0 |
| E00603 | Recurring Custodial Services Complex 1 | 12 | MO | $ - 0 |
| E00604 | Maintain Grounds Complex 1 | 12 | MO | $ - 0 |
| E00605 | Recurring Custodial Services Bldg 91 | 12 | MO | $ - 0 |
| E00606 | Maintain Grounds Bldg 91 | 12 | MO | $ - 0 |
| OPTION - COL4 Additional Measures Total |
11 -IDIQ-2nd OY
| Solicitation No. N40080-13-R-1608 | ||||||
| ATTACHMENT J-0200000-11-Exhibit F | ||||||
| 2nd Option Period IDIQ Exhibit Line Item Numbers (ELINs) | ||||||
| 1 April 2016 - 31 March 2017 | ||||||
| COMPLEX 1 | ||||||
| UNIT PRICED LABOR (UPL) WORK (NEGOTIATED) | ||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | |
| ISSUE | UNIT | |||||
| PRICE | TOTAL |
AMOUNT
| F001 | 711S | Composite Unskilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 500 | LH | ||
| F002 | 711S | Composite Skilled Labor | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call. Task order completion times and applicable IMAP cost account codes (CAC) will be specified on each order. | 2,500 | LH | ||
| F003 | 711S | Material and Equipment for all UPL Work | Not-to-exceed amount to be funded and unilaterally changed at the discretion of the Government | N/A | LS | ||
| TOTAL for IQ LINE ITEMS - F001 THROUGH F003 | |||||||
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 150200 , Facility Investment | |||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | ||
| ISSUE | UNIT | ||||||
| PRICE | TOTAL |
AMOUNT
| F004 | 711S | Airfield Lamp Replacement | Provide labor and materials to relamp airfield lighting fixtures. Fixture shall be opened, the burned out lamp shall be removed and replaced and the fixture shall be resealed. The lamp shall be tested for proper operation upon completion of the relamping. New lamps shall be identical or equal to existing lamps. Relamping shall be accomplished within one day of tasking. | 30 | EA | ||
| TOTAL IQ LINE ITEMS - F004 | $ - 0 | ||||||
| INDEFINITE QUANTITY UNIT PRICE TASK WORK FOR SUB ANNEX 1503050 , GROUNDS MAINTENANCE | |||||||
| ELIN | CAC | SHORT DESCRIPTION | FULL DESCRIPTION | EST QTY | UNIT OF | ||
| ISSUE | UNIT | ||||||
| PRICE | TOTAL |
AMOUNT
| F005 | 9410 | Shrub Pruning | Shrubs shall be pruned so as to reduce the size and growth rate of each shrub. Evenly form and balance the shrub in order to shape it according to its natural growth characteristics leaving them well shaped and balanced and to promote proper health and growth. Remove dead, damaged or diseased growth. If the entire shrub is dead, remove the entire plant 6 inches below ground level. The hole and other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. Remove vines, tree sprouts or other extraneous vegetative growth from under or on the shrubbery. Prune or remove growth in front of windows or over entrance ways. All pruned vegetation shall be removed from the worksite and disposed of the same day at the landfill. The Contracting Officer may elect to require some or all vegetation be run through a chipper and the resulting material deposited at stockpile site.Work to be completed within 3 calendar days for quantities ordered up to 30 units. | 150 | EA |
| F006 | 9410 | Tree Pruning | Trees shall be pruned according to their growth characteristics, to evenly form and balance the tree, to promote proper health and growth. Tree pruning shall shape the tree rather than notch the top, remove dead, damaged or diseased wood or structurally weak limbs that may cause a safety hazard or unsightly appearance, including removal of dead palm tree fronds. Tree pruning shall remove branches that extend over buildings and endanger roofs, eaves and windows. Limbs pruned over 3” diameter shall be treated with lime wash to prevent insect infestation, rot or detrimental bleeding. All pruned vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 2 calendar days. | 10 | EA |
| F007 | 9410 | Shrub Removal | Shrubs, above ground roots and any exposed roots shall be removed to a depth of 6 inches below the normal ground elevation. Treat to prevent regrowth. The hole and any other surface damage caused by removal shall be filled with topsoil, leveled, raked and replanted with the same type of vegetation as the surrounding area. All vegetation removed from the worksite shall be disposed of the same day at the landfill. Work to be completed within 1 calendar day. | 2,500 | SF |
| F008 | 9410 | Irrigation | Irrigation shall be accomplished by means of hoses and portable sprinklers. Irrigation shall be performed in the evening hours after 8:00 PM or in the early morning hours before, 9:00 AM. Irrigation shall be performed for a minimum of 3 days, uynless directed otherwise by the Contracting Officer. Irrigation time shall be of a sufficient period of time to saturate the area to a minimum depth of 1 inch. Hoses and sprinklers shall be removed from completed irigated areas on a daily basis. | 53 | KSF |
| F009 | 9410 | Seeding | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | 1 | KSF | |||||
| F010 | 9410 | Raking | Rake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 10 | KSF | ||
| F011 | 9410 | Pesticide Treatment | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work in 5 calendar days. | 1 | KSF |