This document provides answers to questions regarding solicitation number N3220520R4051 for repair, overhaul, and drydocking of the USNS Supply. The solicitation involves standard work items for categories A and B. Key work includes propeller and rudder stock clearances, exhaust plenum repairs, firefighting system inspections, potable water tank cleaning and painting, line shaft bearing inspection and replacement, gas turbine intake inspection and repair, oily water separator installation, and drydocking and hull preservation services. The Navy's Military Sealift Command is the contracting agency, and the document provides additional clarification to support offerors in developing proposals for the work on the USNS Supply.

View the file

Other files for this federal contract opportunity

Other files attached to USNS SUPPLY ROH/DD, newest first.
File Type Posted
N2.35.6100.1-Q Novel Coronavirus Disease Response Plan_Rev 4_5-8-2020.pdf PDF
N3220520R4051 Amendment 00011.docx DOCX document
0026_A_VESSEL FINAL CLEANING REV A.docx DOCX document
Products List.pdf PDF
Directive Interim Change Notice 05 Novel Coronavirus Disease Response Plan Rev 4 Chg 1_051520.pdf PDF
0513_B_LAGGING AND INSULATION REPAIRS modified for cost.doc DOC document
N3220520R4051 Amendment 00010.docx DOCX document
0010_A_FURNISH OFFICE FOR OMT REV 20May20.doc DOC document
0514_A_CHT piping repairsrev 20may20.doc DOC document
N3220520R4051 Amendment 00009.docx DOCX document
0011_A_GENERAL SERVICES FOR THE SHIP (T-AOE)REV 23Apr20 PORTAL (002).docx DOCX document
N3220520R4051_0008.docx DOCX document
J - 2 Category A Items SUPPLY_AMEND_7.xls XLS spreadsheet
N3220520R4051_0006.docx DOCX document
N3220520R4051_0005.docx DOCX document
N3220520R4051_0004.docx DOCX document
N3220520R4051_0003.docx DOCX document
SUPPLY J4 VERS 2-1 2020 ROH.xlsx XLSX spreadsheet
J - 2 Category A Items SUPPLY_AMEND_2.xls XLS spreadsheet
JA N3220520R4051 USNS SUPPLY 2020 ROH_REV4__Redacted.pdf PDF
N3220520R4051_0002.docx DOCX document
FY20 4TH QRT ROH WI Index_FINAL_REVISED.xlsx XLSX spreadsheet
N3220520R4051_0001.docx DOCX document
J - 2 Category A Items SUPPLY.xls XLS spreadsheet
JA N3220520R4051 USNS SUPPLY 2020 ROH_REV (003)_Redacted.pdf PDF
J ATTACHMENTS.zip ZIP file
SUPPLY N3220520R4051_ FINAL.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220520R4051

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

AMENDMENT 7 RFCS

SPECIFICATION ITEM NO.: 917

PARAGRAPH / SECTION NO: 7.1.1

TITLE: Propeller and Rudder Stock Clearances

QUESTION: 57

According to drawings, the propeller fairwaters are bolted on. It states that “new fairwaters shall be fit at reassembly”. Please specify if new propeller fairwaters are to be installed and who is to furnish the new fairwaters.

ANSWER: Fairwaters are welded as per Para 7.2.1. Contractor is to furnish new fairwaters

SPECIFICATION ITEM NO.: 540

PARAGRAPH / SECTION NO: NA

TITLE: E1-257-1 Exhaust Plenum Repairs

QUESTION: 58

Please clarify scope of work. Spec says Replace removed section with 11 gage stainless steel. From the photos, it looks like the area to be removed is actually the plenum bulkhead. Is this the intent or is there a duct inside the plenum.

Also, please advise sizes of the 2 screens. The reference drawing is frame 393-459. The item location says frame 245-260 ------01 Level Port side--

ANSWER: It is the Duct work internal to the Plenum, Interior Plenum Bulkhead bottom section ( wasted lower area) and the screen lip external to the bulkhead duct internal to the plenum. See additional pictures for Screen size. The Location is correct. I have been unable to locate a drawing for the location. However, all of the main deck plenums are designed the same. See attached Previous work item for REFERENCE ONLY

SPECIFICATION ITEM NO.: 502

PARAGRAPH / SECTION NO: 2.1

TITLE: Firefighting System Annual Inspections

QUESTION: 59

Please provide the following references:

MSC SWI 28 Firefighting System Inspection and Testing DWG. 6360224-Circuit FH Sprinkling Alarm Circuit DWG. 8394052 Fire and Smoke Detection DWG. 8394456 Fire and Smoke Detection DWG. 8394038 Halon Damper Install

ANSWER: Please see attached. Please substitute DWG 8390433_B for DWG 8394052 and substitute DWG8390875 for DWG 839456

SPECIFICATION ITEM NO.: ________________________________

PARAGRAPH / SECTION NO: __________________________________

TITLE: __Vessel Availability for Ship Check_________________________

QUESTION: 60

Please advise if MSC is able to provide an additional ship check date.

ANSWER: The Sister Ship USNS ARCTIC is in Detyens Shipyard. USNS Supply Is deployed until the end of June. If additional ship check dates are needed please contact John.bolan@navy.mil for access to the ship. Ship checkers will need to complete Detyens Shipyard Covis-19 Check list prior to requesting access to the yard and ship

SPECIFICATION ITEM NO.: ___917_____________________________

PARAGRAPH / SECTION NO: __7.1_____________________________

TITLE: __Propeller and Rudder Stock Clearances____________________

QUESTION: 61

7.1.1 states that the propeller fairwater is welded on, new fairwaters shall be fit at reassembly. Please clarify if only propeller fairwaters (items 9 - 10 in Dwg 6360800) are to be new and fit at reassembly or if all fairwaters (items 5 - 10 in Dwg 6360800, not to include the coupling covers) are to be new and fit at reassembly.

ANSWER: Propeller fairwaters only. If other fairwaters require replacement that will be done with a CCO

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C – 2 List of Standard WIs included for this solicitation:

CATEGORY A

0001INTENT, SCOPE, GENERAL CONDITION AND DEFINITIONS
0002TECHNICAL AND MANUFACTURER’S REPRESENTATIVES
0003APPROACH, BERTH AND MOORING REQUIREMENTS
0004TESTING AND QUALITY ASSURANCE
0005ELECTRICAL SAFETY PROCEDURE REQUIREMENTS
0006HEAVY WEATHER PLAN
0007COLD WEATHER PLAN
0010FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM
0011GENERAL SERVICES FOR SHIP, T-AOE
0012INFORMATION TECHNOLOGY SERVICES
0013PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS
0014WEIGHT AND MOMENT REPORT
0015INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS
0016FIRE PROTECTION AND SHIP'S SAFETY PROGRAM
0017HANDLING OF SHIP'S STORES
0018DELIVERY AND REDELIVERY OF THE VESSEL
0019SHIPBOARD ACCESS AND SECURITY
0020GAS FREE CERTIFICATES
0021CLEAN AND GAS FREE TANKS, VOIDS, AND COFFERDAMS
0022MACHINERY SPACE TURNOVER, DOCK TRIALS AND SEA TRIALS
0023HAZARDOUS WASTE DISPOSAL AT CONTRACTOR’S FACILITY
0024PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY
0101SHIP YARD SUPPORT FOR ABS SURVEY
0103TANK INSPECTION AND BOUNDARY TESTING (ABS)
0104TANK ENTRANCE COMBING REPAIR (3C & 4C)
0105FLIGHT DECK SAFETY NET REPAIRS
0107FLIGHT DECK DRAIN PIPING REPLACEMENT
0110AFT CHT TANKS MAINTENANCE COAT REV
0111FWD CHT TANKS MAINTENANCE COAT REV - FWD
0112FWD AFT MSD V1 AND V2 TANKS CLEANING AND PAINTING
0113WEATHERDECK HANDRAILS, BULWARK EDGES REPLACEMENT
0114REPLACE 04 LEVEL NON SKID
0115REPLACEMENT OF STEEL DECK BENEATH STATION 9 TOPPING WINCH
0116LADDER PLATFORM INSERT REPAIR
0117SHAFT ALLEY WORKING PLATFORM (T-ALT 17-326)
0120CARGO TIE DOWN DECK SOCKET REPLACMENT
0125CARGO TLI SYSTEM SENSOR INSTALL
0133POTABLE WATER TANKS CLEANING AND PAINTING
0201LINE SHAFT BEARINGS OPEN & INSPECT
0209PORT AND STBD LINE SHAFT BEARING REACTIONS
0215GAS TURBINE INTAKE INSPECTION AND REPAIR
0301STUFFING TUBE REPLACEMENT
0310SSDG TOP END OVERHAUL (20,000 HR) SSDG 2 & 5
0315CAPSTAN CONTROLLER OVERHAUL AND REPAIR
0328SSDG HEAT EXCHANGER REPAIRS (TWO SSDG)
0329SSDG FUEL OIL COOLER REPLACEMENT
0401GMDSS SAFETY RADIO CERTIFICATION
0402RADAR PREVENTATIVE MAINTENANCE
0403ANTENNA PREVENTATIVE MAINTENANCE
0406UHF TRANSCEIVER GROOM
0407OE-82B ANTENNA GROUP MAINTENANCE
0410FATHOMETER PREVENTATIVE MAINTENANCE AND REPAIR
04111B CLUTCH CANNON PLUG REPLACEMENT
0412S/Y SUPPORT FOR PELCO CAMERA INSTALLATION
0413STEERING CONTROL CIRCUIT CARD MAINTENANCE
0415GYROCOMPASS AND REPEATER GRROM
0428TV-DTS SATELLITE SYSTEM UPGRADES (T-AOE 6-13-023R)
0501ASSIST SHIPS FORCE
0502FIREFIGHTING SYSTEM ANNUAL INSPECTION
0503SCBA COMPRESSOR MAINTENANCE AND CERTIFICATION
0504PORT AND STBD RHIB DAVIT INSPECTION
0505PORT AND STBD RHIB INSPECTION
0506AUXILARY BOILER INSPECTION
0510PALLET CONVEYOR RESTORATION
0513LAGING AND INSULATION REPAIR
0514PIPING REPAIRS REV B
0515ASSIST L3 BUILD 26 SUPPORT AND ETHERNET REDUNDANT LOOP
0516REPLACE PURIFIER FLEX HOSES
0517WATERTIGHT DOOR REFURBISHMENT
0518AIR COMPRESSOR GROOM AND REPAIR
0525FAIRLEAD CONTROLLER INSPECTION
0530STEERING PUMP OVEHAUL
0531MISC EQUIPMENT AND MOTOR OVERHAUL
0535PIPING REPAIRS VARIOUS
0536CARGO REFRIGERATION PLENUM REPAIRS
0539AMR HALON FIRE DAMPERS INSTALLATION
0540E1-257-1 EXHAUST PLENUM REPAIRS
0541INSTALL GAS TURBINE FUEL SENSORS IN FUEL OIL SERVICE SYSTEM (ABS)
0542INSTALL SSDGs AND AUX BOILERS FUEL SENSORS IN FUEL OIL SERVICE SYSTEM (ABS)
0543DEGAUSSING QIQP COIL CONDUIT PRESERVATION
0552STEERING AND RUDDER ANGLE INDICATOR CHECKS
0555INSTALL OILY WATER SEPARATOR (OWS) UNIT TA301
0601GALLEY AND SCULLERY EQUIPMENT MAINTENANCE
0604LIFE RAFTS AND EMBARKATION LADDER CERTIFICATION
0606INTERIOR TILE REPLACEMENT WITH STRATICA FLOORING
0607INTERIOR CPC DECK REPLACMENT REV 1
0608INTERIOR CPC DECK REPLACMENT CPO
0801HABITABILITY SPACES VENT SYSTEMS CLEANING
0901DRY-DOCKING AND UNDOCKING VESSEL
0903SEA VALVES
0904RUDDER AND STERN FRAME EXAMINATION
0905BILGE KEEL EXAMINATION
0906CATHODIC PROTECTION SYSTEM MAINTENANCE
0907CATHELCO PROTECTION SYSTEM PREVENTATIVE MAINTENANCE
0908ZINC RENEWAL
0909ULTRA SONIC TESTING
0910CHAIN AND LOCKER PAINTING
0911HULL FREEBOARD CLEANING AND PAINTING
0912HULL FREEBOARD CLEANING AND PAINTING 30%
0913MAIN PROPULSION SHAFTING
0914REPLACE STERN TUBE SHAFT BEARING LINERS
0915PROPELLER CLEAN AND REPAIR
0916PROPELLER SHAFT INSTALLATION PREPARATIONS
0917PROPELLER AND RUDDER STOCK CLEARANCES
0918SEA SUCTION AND DISCHARGE LINES (ABS)
0919FOREPEAK TANK REPAIR (ABS OSR)
0920PORT & STBD ANCHOR WINDLASS BRAKE REPAIR
0921SHELL PLATE WELDING AND REPAIR (ABS OSR)
1002HIGH PRESSURE AIR RELIEF VALVE CALIBRATION
1003TOPPING WINCH FOUNDATION AND WINCH REFURB
1004GYPSY WINCH FOUNDATION AND WINCH REPAIRS
1005SLIDING BLOCK CHAIN REPLACEMENT
1006WINCH CONTROL BOOTH WINDOW REPLACEMENT, LATCHES AND STOPS

CATEGORY B

0025PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTIONCONDITIONS CHARLIE – DELTA
0030CONTINUATION OF SERVICES
0304STUFFING TUBE REPLACEMENT
0305MULTIPLE CABLE TRANSIT REPAIRS
0513LAGGING AND INSULATION REPAIR
0902DRY DOCKING AND UNDOCKING VESSEL
0928SHELL PLATE AND WELDING REPAIR
0929STEEL RENEWAL
0932ULTRASONIC TESTING