J - 2 Category A Items SUPPLY_AMEND_2.xls
XLS spreadsheet 69 KB Posted
- Attached to
- USNS SUPPLY ROH/DD Federal contract opportunity
- Solicitation number
- N3220520R4051
About this file
This document appears to be an Excel spreadsheet containing line item details for Category A work items required for the overhaul and drydocking of the USNS SUPPLY under solicitation N3220520R4051 issued by the Department of the Navy Military Sealift Command. The spreadsheet includes over 100 line items grouped under general requirements, structural, main propulsion machinery, electrical, electronics, auxiliary equipment, habitability, heating/ventilation/air conditioning, dry-docking and underwater hull categories. For each line item, the spreadsheet requests pricing details from potential prime contractors and subcontractors for labor hours and materials, as well as any technical representative costs. The total proposed price is also a required field for each line item. This level of detailed line item breakdown and pricing data is likely being requested from offerors under the referenced solicitation for the planned overhaul and maintenance of the USNS SUPPLY.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 0000 | GENERAL REQUIREMENTS | |||||||||||
| 0001 | INTENT, SCOPE, GENERAL CONDITION AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 0002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 0003 | APPROACH, BERTH AND MOORING REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 0004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 0005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 0006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 0007 | COLD WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 0010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | - 0 | $ - 0 | $0 | ||||||||
| 0011 | FURNISH GENERAL SERVICES | - 0 | $ - 0 | $0 | ||||||||
| 0012 | INFORMATION TECHNOLOGY SERVICES | - 0 | $ - 0 | $0 | ||||||||
| 0013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | - 0 | $ - 0 | $0 | ||||||||
| 0014 | WEIGHT AND MOMENT REPORT | - 0 | $ - 0 | $0 | ||||||||
| 0015 | INTEGRATED LOGISTICS AND GFM SUPPORT | - 0 | $ - 0 | $0 | ||||||||
| 0016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | - 0 | $ - 0 | $0 | ||||||||
| 0017 | HANDLING OF SHIP'S STORES | - 0 | $ - 0 | $0 | ||||||||
| 0018 | DELIVERY AND REDELIVERY | - 0 | $ - 0 | $0 | ||||||||
| 0019 | SHIPBOARD ACCESS | - 0 | $ - 0 | $0 | ||||||||
| 0020 | GAS FREE CERTIFICATES | - 0 | $ - 0 | $0 | ||||||||
| 0021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS | - 0 | $ - 0 | $0 | ||||||||
| 0022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | - 0 | $ - 0 | $0 | ||||||||
| 0023 | HAZARDOUS WASTE DISPOSAL | - 0 | $ - 0 | $0 | ||||||||
| 0024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 100 | STRUCTURAL | |||||||||||
| 0101 | SHIPYARD SUPPORT FOR ABS SURVEY | - 0 | $ - 0 | $0 | ||||||||
| 0103 | TANK INSPECTION AND BOUNDARY TESTING ( ABS Special Survey) | - 0 | $ - 0 | $0 | ||||||||
| 0104 | TANK ENTRANCE COMBING REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 0105 | FLIGHT DECK SAFETY NETS REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 0107 | FLIGHT DECK DRAIN PIPING REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 0110 | AFT CHT TANKS MAINTENANCE COAT REV | - 0 | $ - 0 | $0 | ||||||||
| 0111 | FWD CHT TANKS MAINTENANCE COAT REV-FWD | - 0 | $ - 0 | $0 | ||||||||
| 0112 | FWD AFT MSD V1 AND V2 TANKS CLEANING AND PAINTING | - 0 | $ - 0 | $0 | ||||||||
| 0113 | WEATHERDECK HANDRAILS, BULWARK EDGES REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 0114 | REPLACE 04 LEVEL NON SKID | - 0 | $ - 0 | $0 | ||||||||
| 0115 | REPLACEMENT OF STEEL DECK BENEATH STATION 9 TOPPING WINCH | - 0 | $ - 0 | $0 | ||||||||
| 0116 | LADDER PLATFORM INSERT REPAIR | $ - 0 | $0 | |||||||||
| 0117 | SHAFT ALLEY WORKING PLATFORM T-ALT 17-326 | - 0 | $ - 0 | $0 | ||||||||
| 0120 | CARGO TIE DOWN DECK SOCKET REPLACMENT | - 0 | $ - 0 | $0 | ||||||||
| 0125 | CARGO TLI SYSTEM SENSOR INSTALL | - 0 | $ - 0 | $0 | ||||||||
| 0133 | POTABLE WATER TANKS CLEANING AND PAINTING | - 0 | $ - 0 | $0 | ||||||||
| 200 | MAIN PROPULSION MACHINERY | |||||||||||
| 0201 | LINE SHAFT BEARINGS OPEN AND INSPECT | - 0 | $ - 0 | $0 | ||||||||
| 0209 | PORT AND STBD LINE SHAFT BEARING REACTIONS | - 0 | $ - 0 | $0 | ||||||||
| 0215 | GAS TURBINE INTAKE INSPECTION AND REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 300 | ELECTRICAL | |||||||||||
| 0301 | STUFFING TUBE REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 0310 | SSDG TOP END OVERHAUL (20,000 Hr) SSDG 2 & 5 | - 0 | $ - 0 | $0 | ||||||||
| 0315 | CAPSTAN CONTROLLER OVERHAUL AND REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 0328 | SSDG HEAT EXCHANGER REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 0329 | SSDG FUEL OIL COOLER REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 400 | ELECTRONICS | |||||||||||
| 0401 | GMDSS SAFETY RADIO CERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 0402 | RADAR PREVENTATIVE MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 0403 | ANTENNA PREVENTATIVE MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 0406 | UHF TRANSCEIVER GROOM | - 0 | $ - 0 | $0 | ||||||||
| 0407 | OE-82B ANTENNA GROUP MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 0410 | FATHOMETER PM AND REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 0411 | 1B CLUTCH CANNON PLUG REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 0412 | S/Y SUPPORT FOR PELCO CAMERA INSTALLATION | - 0 | $ - 0 | $0 | ||||||||
| 0413 | STEERING CONTROL CIRCUIT CARD MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 0415 | GYRO COMPASS AND REPEATER GROOM | - 0 | $ - 0 | $0 | ||||||||
| 0428 | TV-DTS SATELLITE SYSTEM UPGRADES (TAOE 6-13-023R) | - 0 | $ - 0 | $0 | ||||||||
| 500 | AUXILIARY EQUIPMENT | |||||||||||
| 0501 | ASSIST SHIPS FORCE | - 0 | $ - 0 | $0 | ||||||||
| 0502 | FIREFIGHTING SYSTEM ANNUAL INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 0503 | SCBA COMPRESSOR MAINTENANCE AND CERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 0504 | PORT AND STBD RHIB DAVIT INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 0505 | PORT AND STBD RHIB INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 0506 | AUXILIARY BOILER INSPECTION REV | - 0 | $ - 0 | $0 | ||||||||
| 0510 | PALLET CONVEYOR RESTORATION | - 0 | $ - 0 | $0 | ||||||||
| 0514 | PIPING REPAIRS REV B | - 0 | $ - 0 | $0 | ||||||||
| 0515 | ASSIST L3 BUILD 26 SUPPORT AND ETHERNET REDUNDANT LOOP | - 0 | $ - 0 | $0 | ||||||||
| 0516 | REPLACE PURIFIER FLEX HOSES | - 0 | $ - 0 | $0 | ||||||||
| 0517 | WATERTIGHT DOOR REFURBISHMENT | - 0 | $ - 0 | $0 | ||||||||
| 0518 | AIR COMPRESSOR GROOM AND REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 0525 | FAIRLEAD CONTROLLER INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 0530 | STEERING PUMP OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 0531 | MISC EQUIPMENT AND MOTOR OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 0535 | PIPING REPAIR VARIOUS | - 0 | $ - 0 | $0 | ||||||||
| 0536 | CARGO REFRIGERATION PLENUM REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 0540 | E1-257-1 EXHAUST PLENUM REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 0541 | INSTALL GAS TURBINE FUEL SENSORS IN FUEL OIL SERVICE SYSTEM (ABS) T-ALT | - 0 | $ - 0 | $0 | ||||||||
| 0542 | INSTALL SSDGs AND AUX BOILERS FUEL SENSORS IN FUEL OIL SERVICE SYSTEM (ABS) T-ALT | - 0 | $ - 0 | $0 | ||||||||
| 0543 | DEGAUSSING QIQP COIL CONDUIT PRESERVATION | - 0 | $ - 0 | $0 | ||||||||
| 0552 | STEERING AND RUDDER ANGLE INDICATOR CHECKS | - 0 | $ - 0 | $0 | ||||||||
| 0555 | INSTALL OILY WATER SEPARATOR (OWS) UNIT TA301 | - 0 | $ - 0 | $0 | ||||||||
| 600 | HABITABILITY | |||||||||||
| 0601 | GALLEY AND SCULLERY EQUIP MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 0604 | LIFE RAFTS AND EMBARKATION LADDER CERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 0606 | INTERIOR TILE REPLACEMENT WITH STRATICA FLOORING | - 0 | $ - 0 | $0 | ||||||||
| 0607 | INTERIOR CPC DECK REPLACEMENT REV 1 | - 0 | $ - 0 | $0 | ||||||||
| 0608 | INTERIOR CPC DECK REPLACMENT CPO | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | HABITABILITY SPACES VENT SYSTEMS CLEANING | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRY-DOCKING AND UNDERWATER HULL | |||||||||||
| 0901 | DRY DOCKING AND UNDOCKING VESSEL | - 0 | $ - 0 | $0 | ||||||||
| 0903 | SEA VALVES | - 0 | $ - 0 | $0 | ||||||||
| 0904 | RUDDERS AND STERN FRAME EXAMINATION | - 0 | $ - 0 | $0 | ||||||||
| 0905 | BILGE KEEL EXAMINATION | - 0 | $ - 0 | $0 | ||||||||
| 0906 | CATHODIC PROTECTION SYSTEM MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 0907 | CATHELCO PROTECTION SYSTEM PM | - 0 | $ - 0 | $0 | ||||||||
| 0908 | ZINC RENEWAL | - 0 | $ - 0 | $0 | ||||||||
| 0909 | ULTRASONIC TESTING | - 0 | $ - 0 | $0 | ||||||||
| 0910 | CHAIN AND LOCKER PAINTING | - 0 | $ - 0 | $0 | ||||||||
| 0911 | HULL FREEBOARD CLEANING AND PAINTING | - 0 | $ - 0 | $0 | ||||||||
| 0912 | HULL FREEBOARD CLEANING AND PAINTING 30% | - 0 | $ - 0 | $0 | ||||||||
| 0913 | MAIN PROPULSION SHAFTING | - 0 | $ - 0 | $0 | ||||||||
| 0914 | REPLACE STERN TUBE SHAFT BEARING LINERS | - 0 | $ - 0 | $0 | ||||||||
| 0915 | PROPELLER CLEAN AND REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 0916 | PROPELLER SHAFT INSTALLATION PREPARATIONS | - 0 | $ - 0 | $0 | ||||||||
| 0917 | PROPELLER AND RUDDER STOCK CLEARANCES | - 0 | $ - 0 | $0 | ||||||||
| 0918 | SEA SUCTION AND DISCHARGE LINES (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 0919 | FOREPEAK TANK REPAIR (ABS OSR) | - 0 | $ - 0 | $0 | ||||||||
| 0920 | PORT & STBD ANCHOR WINDLASS BRAKE REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 0921 | SHELL PLATE WELDING AND REPAIR (ABS OSR) | - 0 | $ - 0 | $0 | ||||||||
| 1000 | UNREP/VERTREP GEAR | |||||||||||
| 1002 | HIGH PRESSURE AIR RELIEF VALVE CALIBRATION | - 0 | $ - 0 | $0 | ||||||||
| 1003 | TOPPING WINCH FOUNDATION AND WINCH REFURB | - 0 | $ - 0 | $0 | ||||||||
| 1004 | GYPSY WINCH FOUNDATION AND WINCH REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 1005 | SLIDING BLOCK CHAIN REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 1006 | WINCH CONTROL BOOTH WINDOW REPLACEMENT, LATCHES AND STOPS | - 0 | $ - 0 | $0 | ||||||||
| TOTAL CAT "A" | $0.00 |
&LUSNS SUPPLY (T-AOE 6)&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN3220520R4051
&CATTACHMENT J-2