N3220520R4051_0003.docx

DOCX document 30 KB Posted

Attached to
USNS SUPPLY ROH/DD Federal contract opportunity
Solicitation number
N3220520R4051
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains amendments to specifications for the solicitation N3220520R4051 for repair and drydocking of the USNS SUPPLY. The amendments provide answers to questions on several work items including cargo sensor installation, sea valves overhaul, oil water separator unit installation, galley equipment maintenance, pallet conveyor restoration, and associated drawings and references. Specific details addressed include confirmation that over 200 sea valves require renewal or overhaul, the provision of requested drawings and clarification that a book on bilge water cleaning systems is not available electronically. Clarification is also provided on the scope of work for various items indicating whether parts are to be removed, inspected, repaired and reinstalled or considered government furnished material for replacement.

View the file

Other files for this federal contract opportunity

Other files attached to USNS SUPPLY ROH/DD, newest first.
File Type Posted
N2.35.6100.1-Q Novel Coronavirus Disease Response Plan_Rev 4_5-8-2020.pdf PDF
N3220520R4051 Amendment 00011.docx DOCX document
Directive Interim Change Notice 05 Novel Coronavirus Disease Response Plan Rev 4 Chg 1_051520.pdf PDF
0026_A_VESSEL FINAL CLEANING REV A.docx DOCX document
Products List.pdf PDF
0513_B_LAGGING AND INSULATION REPAIRS modified for cost.doc DOC document
N3220520R4051 Amendment 00010.docx DOCX document
0010_A_FURNISH OFFICE FOR OMT REV 20May20.doc DOC document
0011_A_GENERAL SERVICES FOR THE SHIP (T-AOE)REV 23Apr20 PORTAL (002).docx DOCX document
0514_A_CHT piping repairsrev 20may20.doc DOC document
N3220520R4051 Amendment 00009.docx DOCX document
N3220520R4051_0008.docx DOCX document
J - 2 Category A Items SUPPLY_AMEND_7.xls XLS spreadsheet
N3220520R4051_0007.docx DOCX document
N3220520R4051_0006.docx DOCX document
N3220520R4051_0005.docx DOCX document
N3220520R4051_0004.docx DOCX document
SUPPLY J4 VERS 2-1 2020 ROH.xlsx XLSX spreadsheet
J - 2 Category A Items SUPPLY_AMEND_2.xls XLS spreadsheet
JA N3220520R4051 USNS SUPPLY 2020 ROH_REV4__Redacted.pdf PDF
N3220520R4051_0002.docx DOCX document
FY20 4TH QRT ROH WI Index_FINAL_REVISED.xlsx XLSX spreadsheet
N3220520R4051_0001.docx DOCX document
J - 2 Category A Items SUPPLY.xls XLS spreadsheet
JA N3220520R4051 USNS SUPPLY 2020 ROH_REV (003)_Redacted.pdf PDF
J ATTACHMENTS.zip ZIP file
SUPPLY N3220520R4051_ FINAL.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220520R4051

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

AMENDMENT 3 RFC'S

SPECIFICATION ITEM NO.: ___125__________________

PARAGRAPH / SECTION NO: __2.4______________________________________

TITLE: __Cargo TLI System Sensor Install ________________________________

QUESTION: 23

Please provide reference 2.4, Figure 1: Photo of TLI Head Guard.

ANSWER: TLI Head Guards were made during last Availability. If more are needed it will be VIA Change order with sample provided

SPECIFICATION ITEM NO.: ___903________________________________

PARAGRAPH / SECTION NO: __2.4, 7.1, 7.10, 7.18____________________

TITLE: __Sea Valves______________________________________________

QUESTION: 24

Please confirm all valves in document “Work Item 903 Sea Valve List” require renewal or overhaul per Work Item 903.

ANSWER: Confirmed, ABS requirement, all 200+

SPECIFICATION ITEM NO.: ___555________________________________

PARAGRAPH / SECTION NO: __2.1______________________________________

TITLE: __Install OWS Unit Rev A__________________________________________

QUESTION: 25

Please provide the below references:

2.1.1 Drawing 505-8613401

2.1.2 Drawing 512-8613400

2.1.3 Drawing 180-8613402

2.1.4 Drawing 320-8613403

2.1.6 Pure Bilge Water Cleaning System Book 592108-02 V8

ANSWER: See drawings submitted. There is no electronic copy of the Pure Bilge book.

SPECIFICATION ITEM NO.: ___601________________________________

PARAGRAPH / SECTION NO: __2.1______________________________________

TITLE: __Galley and Scullery Equip Maintenance _____________________________

QUESTION: 26

Please provide reference 2.1, USNS Supply Main Configuration List (EXCEL)

ANSWER: See reference

SPECIFICATION ITEM NO.: ___510________________________________

PARAGRAPH / SECTION NO: __7.1.2_______________________________

TITLE: __Pallet Conveyor Restoration________________________________

QUESTION: 27

7.1.2 - Please identify which brackets will require manufacture. There are multiple pieces that can be considered brackets in Ref 2.1 and multiple brackets are identified in Ref 2.2.

4.2, 7.1.4, 7.1.5, 7.1.6, 7.2– Please clarify the scope of work:

- Are the items in 4.2 GFM that replace the items removed or are the items to be removed, inspected, described in condition report and reinstalled after any repairs?

- How many sheathing sections are to be removed and installed?

ANSWER: See Continental Tides report 8-28-2018 Conveyor parts are removed, inspected and crated

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .