N3220520R4051_0003.docx
DOCX document 30 KB Posted
- Attached to
- USNS SUPPLY ROH/DD Federal contract opportunity
- Solicitation number
- N3220520R4051
About this file
This document contains amendments to specifications for the solicitation N3220520R4051 for repair and drydocking of the USNS SUPPLY. The amendments provide answers to questions on several work items including cargo sensor installation, sea valves overhaul, oil water separator unit installation, galley equipment maintenance, pallet conveyor restoration, and associated drawings and references. Specific details addressed include confirmation that over 200 sea valves require renewal or overhaul, the provision of requested drawings and clarification that a book on bilge water cleaning systems is not available electronically. Clarification is also provided on the scope of work for various items indicating whether parts are to be removed, inspected, repaired and reinstalled or considered government furnished material for replacement.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220520R4051
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been added by full text:
AMENDMENT 3 RFC'S
SPECIFICATION ITEM NO.: ___125__________________
PARAGRAPH / SECTION NO: __2.4______________________________________
TITLE: __Cargo TLI System Sensor Install ________________________________
QUESTION: 23
Please provide reference 2.4, Figure 1: Photo of TLI Head Guard.
ANSWER: TLI Head Guards were made during last Availability. If more are needed it will be VIA Change order with sample provided
SPECIFICATION ITEM NO.: ___903________________________________
PARAGRAPH / SECTION NO: __2.4, 7.1, 7.10, 7.18____________________
TITLE: __Sea Valves______________________________________________
QUESTION: 24
Please confirm all valves in document “Work Item 903 Sea Valve List” require renewal or overhaul per Work Item 903.
ANSWER: Confirmed, ABS requirement, all 200+
SPECIFICATION ITEM NO.: ___555________________________________
PARAGRAPH / SECTION NO: __2.1______________________________________
TITLE: __Install OWS Unit Rev A__________________________________________
QUESTION: 25
Please provide the below references:
2.1.1 Drawing 505-8613401
2.1.2 Drawing 512-8613400
2.1.3 Drawing 180-8613402
2.1.4 Drawing 320-8613403
2.1.6 Pure Bilge Water Cleaning System Book 592108-02 V8
ANSWER: See drawings submitted. There is no electronic copy of the Pure Bilge book.
SPECIFICATION ITEM NO.: ___601________________________________
PARAGRAPH / SECTION NO: __2.1______________________________________
TITLE: __Galley and Scullery Equip Maintenance _____________________________
QUESTION: 26
Please provide reference 2.1, USNS Supply Main Configuration List (EXCEL)
ANSWER: See reference
SPECIFICATION ITEM NO.: ___510________________________________
PARAGRAPH / SECTION NO: __7.1.2_______________________________
TITLE: __Pallet Conveyor Restoration________________________________
QUESTION: 27
7.1.2 - Please identify which brackets will require manufacture. There are multiple pieces that can be considered brackets in Ref 2.1 and multiple brackets are identified in Ref 2.2.
4.2, 7.1.4, 7.1.5, 7.1.6, 7.2– Please clarify the scope of work:
- Are the items in 4.2 GFM that replace the items removed or are the items to be removed, inspected, described in condition report and reinstalled after any repairs?
- How many sheathing sections are to be removed and installed?
ANSWER: See Continental Tides report 8-28-2018 Conveyor parts are removed, inspected and crated