0514_A_CHT piping repairsrev 20may20.doc
DOC document 589 KB Posted
- Attached to
- USNS SUPPLY ROH/DD Federal contract opportunity
- Solicitation number
- N3220520R4051
About this file
This document outlines repair requirements for piping systems on the USNS SUPPLY (T-AOE 6). The Navy seeks repairs to CHT piping in multiple locations including the aft CHT room, upper level MMR 2, CHT RM No. 1/FWD MSD RM, and others. Repairs include replacing approximately sixteen feet of 4-inch and ten feet of 8-inch CU-NI piping, along with supplying elbows, tees, reducers, flanges, and additional piping lengths up to 30 feet of 4-inch and 5-inch CU-NI as needed. Bidders must also provide licensed marine chemists to certify work areas as safe for hot work, and properly dispose of removed piping and waste. The solicitation number for this opportunity is N3220520R4051 issued by the Department of the Navy Military Sealift Command for repairs aboard the USNS SUPPLY.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS SUPPLY
(T-AOE 6)
AUXILLARY EQUIPMENT
N32205-20-R-4051
22 March 2018
ITEM NO. 514
CATEGORY "A"
MSC/PM1CM6/DRM
PIPING REPAIRS REV C
1.0 ABSTRACT:
1.1. This item describes the repair of CHT piping multiple locations on the ship.
2.0 REFERENCES:
2.1. NAVSEA Drawing 521-6360567; CHT System Diagram.
2.2. Alternate Drawing 05021155; MSD & CHT System Diagram.
3.0 ITEM LOCATION/DESCRIPTION: See addendum 1 below.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:
4.1 GFE: None
4.2 GFM: None
4.3 SERVICES: None
5.0 NOTES:
5.1. The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine their effect on the work items in this work package, which may be effected by the requirements of this item.
5.2. The contractor and all subcontractors, regardless of tier, are advised to review the other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to the performance of this work item are found in Work Item 001.
5.3. The contractor will provide a Licensed Marine Chemist to certify and main all areas of this repair requiring hotwork as “Safe for Men/Safe for Hotwork”.
5.4. Work Area will be sterilized to prevent contamination of the ship with sewage effluent from cut sections or any leakage. Removed piping that is being replaced will be double bagged prior to transport through the ship.
5.4.1. The contractor is responsible for disposal of all scrap generated in this repair IAW Local Laws and Customs
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional
7.0 STATEMENT OF WORK REQUIRED:
7.1. Removals:
7.1.1. With the assistance of Ship’s Force Lock Out the affected piping.
7.1.2. Thoroughly drain and dispose of the residual liquids in accordance with the local, state and federal regulations.
7.1.3. Clean each area, gas free, and maintain work site Safe for Workers, Safe for Hot Work for duration of work.
7.1.4. Piping may be up to eight feet above the deck. Contractor is responsible for staging to access pipe areas
7.1.5. Temporarily remove interferences required to facilitate this repair.
7.1.6. Replace piping identified in Para 3 see addendum below
a. Replace all hardware and gasket using SSTL
b. *CHECKPOINT* Conduct an NDT test to prove weld and flow integrity on all areas welded. Demostrate open and close operation on CHT-V-1
c. Cantractor shall also price for locations to be determined:
i. 50 Feet of 4 inch CUNI pipe.
ii. 50 Feet of 5 inch CUNI pipe.
iii. Assume all locations will not require staging.
7.1.7. Renew all and paint all disturbed surfaces to match surrounding area. Paint shall be GFM.
7.2. Preparation of Drawings: None
7.3. Manufacturer's Representative: None
8.0 GENERAL REQUIREMENTS: None Additional
ADDENDUM 1:
*No staging is required, a 6ft ladder should suffice for all repairs*
AFT CHT Room, approximately sixteen (16) linear feet class 299 4 inch 90-10 CU-NI
Upper Level MMR 2, approximately ten (10) linear feet of eight(8) inch sched 40 CU-NI CHT RM No. 1/FWD MSD RM 3-161-1-Q/3-183-1-Q CHT PMP No. 1 SUCT PRESSUE GA ROOT
Contractor Supply
Two 3inch diameter 90⁰ Sweeping Braze Elbows 400W
1ft length of 3inch diameter CuNi Pipe
One 1/2inch CuNi Socket Weld Half Coupling
1ft length of 1/2inch diameter CuNi Pipe
One 1/2inch Braze Ball Valve
CHT/MSD/OVBD Piping
2ft length of 4inch diameter CuNi Pipe
Two 4inch diameter CuNi Butt Weld 45⁰ Elbows
One 4inch diameter CuNi Butt Weld Tee
AFT MSD RM 2-667-1-A
AFT CHT/MSD/OVBD Piping
3ft length of 4inch diameter CuNi Pipe
One 4inch diameter CuNi Butt Weld Tee
One 4inch diameter CuNi Butt Weld 90⁰ Elbow
One 1½inch CuNi Clean Out
One 1½inch NPT threaded brass cap No. 3 MSD Overboard Piping
2ft length of 3/4inch CuNi Pipe
One 3/4inch diameter CuNi Braze Union
One 3/4inch diameter CuNi 90⁰ Braze Elbow
One 3/4inch diameter CuNi Socket Weld Half Coupling No. 2 CHT RM 3-605-0-Q CHT/MSD/OVBD Pipping
One 4inch diameter CuNi 90⁰ Butt Weld Sweeping Elbow
3ft length of 4inch diameter CuNi Pipe
No. 3 and No. 4 CHT Pump Discharge
5ft length of 3inch diameter CuNi Pipe
Two 3inch diameter 8 bolt Braze Flanges
One 3inch diameter CuNi 90⁰ Sweeping Butt Weld Elbow
One 3inch diameter CuNi Tee
One 3inch to 4inch Butt Weld Concentric Reducer
One 4inch 8 bolt Braze Flange
Vestibule to Berthing No. 9 2-612-1
2 4inch diameter CuNi 90⁰ Sweeping Butt Weld Elbows
1ft length of 4inch diameter Pipe
Crew WC 2-616-0-L
MSD to CHT Overflow Pipping
5ft length of 5inch diameter CuNi Pipe
Contactor Supply
2ft length of 4inch diameter CuNi Pipe
Locations to be determined for pricing:
30 Feet of 4 inch CUNI pipe
30 Feet of 5 inch CUNI pipe
Assume all locations will not require staging.
Figure 1 8" CHT piping MER2
Berthing 9
514-1