This document contains standard work instructions (WIs) for the overhaul and maintenance of the USNS SUPPLY (T-AOE 6) conducted under solicitation N3220520R4051. The WIs cover various ship systems including tanks, piping, machinery, electrical systems, and hull. Key items include cleaning and testing fuel and potable water tanks; repairing and replacing piping for bilge, ballast, and firemain systems; overhauling main propulsion components and generators; installing sensors for fuel and ballast systems; conducting structural repairs to decks, bulwarks and hull; and performing maintenance on cranes, winches and conveying equipment. The WIs provide requirements for planning, material, work procedures, testing and documentation. The solicitation is for the Department of the Navy Military Sealift Command to complete ROH/DD work for the USNS SUPPLY at a private shipyard facility in accordance with the standard WIs.

View the file

Other files for this federal contract opportunity

Other files attached to USNS SUPPLY ROH/DD, newest first.
File Type Posted
N3220520R4051 Amendment 00011.docx DOCX document
N2.35.6100.1-Q Novel Coronavirus Disease Response Plan_Rev 4_5-8-2020.pdf PDF
Directive Interim Change Notice 05 Novel Coronavirus Disease Response Plan Rev 4 Chg 1_051520.pdf PDF
0026_A_VESSEL FINAL CLEANING REV A.docx DOCX document
Products List.pdf PDF
0513_B_LAGGING AND INSULATION REPAIRS modified for cost.doc DOC document
N3220520R4051 Amendment 00010.docx DOCX document
0010_A_FURNISH OFFICE FOR OMT REV 20May20.doc DOC document
0011_A_GENERAL SERVICES FOR THE SHIP (T-AOE)REV 23Apr20 PORTAL (002).docx DOCX document
0514_A_CHT piping repairsrev 20may20.doc DOC document
N3220520R4051 Amendment 00009.docx DOCX document
N3220520R4051_0008.docx DOCX document
N3220520R4051_0007.docx DOCX document
J - 2 Category A Items SUPPLY_AMEND_7.xls XLS spreadsheet
N3220520R4051_0006.docx DOCX document
N3220520R4051_0005.docx DOCX document
N3220520R4051_0004.docx DOCX document
N3220520R4051_0003.docx DOCX document
SUPPLY J4 VERS 2-1 2020 ROH.xlsx XLSX spreadsheet
J - 2 Category A Items SUPPLY_AMEND_2.xls XLS spreadsheet
JA N3220520R4051 USNS SUPPLY 2020 ROH_REV4__Redacted.pdf PDF
FY20 4TH QRT ROH WI Index_FINAL_REVISED.xlsx XLSX spreadsheet
N3220520R4051_0001.docx DOCX document
J - 2 Category A Items SUPPLY.xls XLS spreadsheet
JA N3220520R4051 USNS SUPPLY 2020 ROH_REV (003)_Redacted.pdf PDF
J ATTACHMENTS.zip ZIP file
SUPPLY N3220520R4051_ FINAL.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220520R4051

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

AMENDMENT 2 RFCS

SPECIFICATION ITEM NO.: _____________________

PARAGRAPH / SECTION NO: ____________________

TITLE: __________________________________

QUESTION: 1

Is paint intended to be government furnished throughout the specification? Paint is listed as government furnished for major items (hull, freeboard, tanks, anchor chain, etc) but is not listed as government furnished for other items (103, 104, 105, 107, 111, etc). Please clarify.

ANSWER: All paint is GFM

SPECIFICATION ITEM NO.: ___103__________________

PARAGRAPH / SECTION NO: __7.4, 7.5, 7.6__________________

TITLE: __Tank Inspection & Boundary Testing ________________________________

QUESTION: 2

7.4, 7.5 & 7.6 refer to 8.1 for tanks to be pressure tested & hydro tested but 8.1 does not state which tanks should be pressure tested and which should be hydro tested, please clarify.

7.4 states to accomplish internal inspections of tanks in 8.1. Many of these tanks (DFM & lube oil) are not included in item 021. Is the intent to open, gas free, inspect & close the tanks not in item 021 as part of item 103 without cleaning them?

ANSWER: Please see revised WI 0021

SPECIFICATION ITEM NO.: ___107__________________

PARAGRAPH / SECTION NO: __________________________

TITLE: __Flight Deck Drain Piping Replacement_____________________________

QUESTION: 3

Please confirm the bunker fuel tanks in 7.3.1(h) are included in tanks cleaned and gas freed in item 021.

ANSWER: Please see revised WI 0021

SPECIFICATION ITEM NO.: ___111__________________

TITLE: __Fwd CHT Tank Maintenance_____________________________

QUESTION: 4

1.2 states 2 areas 86-sq ft and 7.7.1 states 1 area 86 sq ft, please clarify.

ANSWER: One (1) area only Please see revised WI 0111

SPECIFICATION ITEM NO.: ___114__________________

TITLE: __Replace 04 Level Non-Skid_____________________________

QUESTION: 5

3.2.2 states to bid replacement of 250 sq ft of steel inserts but there is no mention elsewhere, are steel inserts included in scope?

ANSWER: Steel Inserts may be required after removal of the 04 Level Non skid. 21 areas required inserting when this WI was conducted on the Sister Ship. The 04 level area is the overhead of the 03 Aft Staterooms. There is extensive interference below the 04 level deck

SPECIFICATION ITEM NO.: ___125__________________

TITLE: __Cargo TLI System Sensor Install_____________________________

QUESTION: 6

Please state which tanks are currently painted and will need touch up painting within the tank, beneath the installation flange after welding.

ANSWER: Please see revised WI 125

SPECIFICATION ITEM NO.: ___510__________________

PARAGRAPH / SECTION NO: __________________________

TITLE: __Pallet Conveyer Restoration_____________________________

QUESTION: 7

Please provide suggested NAVSEA approved conveyor representative(s).

ANSWER: NAVSEA Rep will be provided by the Government

SPECIFICATION ITEM NO.: ___535__________________

TITLE: __Piping Repairs Various_____________________________

QUESTION: 8

Please identify pipe diameter, length and materials for each location and if staging is needed for any repairs.

ANSWER:

**** All fittings and piping should be at least 250W***** *No staging is required, a 6ft ladder should suffice for all repairs*

2-163-4 Fire Station Supply Pipe Repair Contractor Supply

5ft length of 2 ½ in diameter CuNi pipe
One 2 ½ inch diameter 90⁰ Braze Elbow 400W
One 2 ½ inch diameter Sweeping 90⁰ Braze Elbow 400W
Two 2 ½ inch diameter 45⁰ Braze Elbow 400W
One 2 ½ inch diameter 6 Bolt Flange 250W

01-183-3 Loop Pressure Cutout Isolation Pipe Repair Contractor Supply

One ¼ inch Tig weld pipe bushing
6in length of ¼ inch diameter CuNi Pipe
One ¼ inch union gate valve
One ¼ inch pipe to ¼ inch tubing, tig weld bushing

01-248-1 Spool Piece, firemain isolation to Cla-VALVE Contractor Supply

1ft length of 4inch diameter CuNi Pipe
Two 4inch diameter tig welded 8 bolt flanges
One ¼ inch tig weld pipe bushing
5ft of ¼ inch diameter CuNi pipe
Four ¼ inch braze elbows
One ¼ inch braze union gate valve

1-510-0 Fire Main Piping Weld Joint Contractor Supply

One 10”x6”x10” CuNi Tee
1ft length of 6 inch diameter CuNi Pipe
One 6 inch 8 bolt braze flange 250W
One ¼ inch tig weld pipe bushing
1ft length of ¼ inch diameter CuNi pipe
One ¼ inch braze union gate valve

1-520-1 Gasket Replacement Ship’s force will repair when firemain is down – appears to just need new gaskets on the valve.

SPECIFICATION ITEM NO.: ___541__________________

TITLE: __Install Gas Turbine Fuel Sensors and Item 54, Install SSDGs & Aux Boilers Fuel Sensors_____________________________

QUESTION: 9

Please confirm that all manufacturer’s representatives for this item (including sensors & L3) will be provided by the government.

ANSWER: Confirmed Sensors and programming Rep (L3) are Government provided

SPECIFICATION ITEM NO.: ___555__________________

TITLE: __Install OWS Unit TA301_____________________________

QUESTION: 10

7.4.3: Please confirm the subcontractor incorporating signals into the Machinery Control System is government furnished.

ANSWER: See Revised WI 555. Contractor shall coordinate with Control System OEM (L3) for completion of WI

SPECIFICATION ITEM NO.: ___903__________________

TITLE: __Sea Valves_____________________________

QUESTION: 11

Please provide reference 2.4, Sea Valve List

ANSWER: Please see REF 2.4 Sea valve list

SPECIFICATION ITEM NO.: ___913__________________

TITLE: __Main Propulsion Shafting_____________________________

QUESTION: 12

Please provide all references

ANSWER: References sent to KO

SPECIFICATION ITEM NO.: ___1006__________________

TITLE: __Winch Control Booth Window Replacement__________________________

QUESTION: 13

7.2: Please clarify the amount of metal required, is it 50 sq ft since only one booth is being worked?

ANSWER:100 sqFt, please see revised Wi 1006

SPECIFICATION ITEM NO.: ___101__________________

TITLE: __Shipyard Support for ABS Survey__________________________

QUESTION: 14

Paragraph 7.7.1 it states to update the drawing 6360536 BGP, but in the abstract section, 1.1, it is also asking for updates to 6362912_B, General Arrangement, please clarify.

Is the CAD file for the Booklet of General Plans available for updating?

ANSWER: PARA graph 7.7.1 drawing should be 6362912_B General Arrangements. 6360536 should be a reference only drawing for the ABS Close up support. See revised WI CAD file is available

SPECIFICATION ITEM NO.: ___535__________________

TITLE: __Various Piping Repairs ___________________________________________

QUESTION: 15

Please provide missing Enclosure 2.2.1.

ANSWER: Enclosure 2.2.1 was answered under Question Nr8.

**** All fittings and piping should be at least 250W***** *No staging is required, a 6ft ladder should suffice for all repairs*

2-163-4 Fire Station Supply Pipe Repair Contractor Supply

5ft length of 2 ½ in diameter CuNi pipe
One 2 ½ inch diameter 90⁰ Braze Elbow 400W
One 2 ½ inch diameter Sweeping 90⁰ Braze Elbow 400W
Two 2 ½ inch diameter 45⁰ Braze Elbow 400W
One 2 ½ inch diameter 6 Bolt Flange 250W

01-183-3 Loop Pressure Cutout Isolation Pipe Repair Contractor Supply

One ¼ inch Tig weld pipe bushing
6in length of ¼ inch diameter CuNi Pipe
One ¼ inch union gate valve
One ¼ inch pipe to ¼ inch tubing, tig weld bushing

01-248-1 Spool Piece, firemain isolation to Cla-VALVE Contractor Supply

1ft length of 4inch diameter CuNi Pipe
Two 4inch diameter tig welded 8 bolt flanges
One ¼ inch tig weld pipe bushing
5ft of ¼ inch diameter CuNi pipe
Four ¼ inch braze elbows
One ¼ inch braze union gate valve

1-510-0 Fire Main Piping Weld Joint Contractor Supply

One 10”x6”x10” CuNi Tee
1ft length of 6 inch diameter CuNi Pipe
One 6 inch 8 bolt braze flange 250W
One ¼ inch tig weld pipe bushing
1ft length of ¼ inch diameter CuNi pipe
One ¼ inch braze union gate valve

Ship’s force will repair when firemain is down – appears to just need new gaskets on the valve.

SPECIFICATION ITEM NO.: ___605__________________

PARAGRAPH / SECTION NO: __7.4.2________________________

TITLE: __Refurbish Main Scullery ___________________________________________

QUESTION: 16

Paragraph. 7.4.2 - Please provide more information if available such as vendor and photos of the two CFM flexible spray nozzles and associated piping/flex lines.

ANSWER: Wi 605 was cancelled in its entirety by Engineering on 16 March 2020. Electrical , Steam and Condensate impact study will not be completed until FY21

SPECIFICATION ITEM NO.: ___918__________________

PARAGRAPH / SECTION NO: ___________________________________________

TITLE: __Sea Suction & Discharge Lines ____________________________________

QUESTION: 17

Please provide the below references:

2.1 Drawing 500-6361307

2.2 Drawing 163-7345805

2.3 drawing 803-1749026

2.4 AOE-8 List of Waster Sleeves

ANSWER: See provided drawings and list

SPECIFICATION ITEM NO.: ___125__________________

TITLE: __Cargo TLI System Sensor Install ________________________________

QUESTION: 18

Please confirm the tank numbers are correct.

ANSWER: See revised WI 125

SPECIFICATION ITEM NO.: ___428__________________

TITLE: __TV-DVTS Satellite System Upgrades ________________________________

QUESTION: 19

Please provide the below references:

Ref 2.1 Dwg#: 7349185;

Ref 2.2 Dwg#: 7425274;

Ref 2.3 Dwg#: 7427421;

Ref 2.4 Dwg#: 7349095;

Ref 2.5 Dwg#: 7349481;

Ref 2.7 SEATEL INSTALL Arrangement 76-IN RAYDOME DWG Ref 2.9 Dwg#: 8394022;

Ref 2.10 Dwg#: 6360269;

Ref 2.11 SEATEL Manual 134136 Rev A, 6011-4 Installation Manual"

ANSWER: See submitted Drawings

SPECIFICATION ITEM NO.: 510

PARAGRAPH / SECTION NO: 4.1

TITLE: Pallet Conveyor Restoration

QUESTION: 20

Will the GF Rep from section 4.1 be accomplishing the work and only require yard support? Please clarify intent of work item.

ANSWER: No GF rep is only provided for oversight and testing

SPECIFICATION ITEM NO.: 535

PARAGRAPH / SECTION NO: 3.2.1

TITLE: Piping Repair, Various

QUESTION: 21

Please provide missing Enclosure 2.2.1.

ANSWER:

**** All fittings and piping should be at least 250W***** *No staging is required, a 6ft ladder should suffice for all repairs* 2-163-4 Fire Station Supply Pipe Repair Contractor Supply

5ft length of 2 ½ in diameter CuNi pipe
One 2 ½ inch diameter 90⁰ Braze Elbow 400W
One 2 ½ inch diameter Sweeping 90⁰ Braze Elbow 400W
Two 2 ½ inch diameter 45⁰ Braze Elbow 400W
One 2 ½ inch diameter 6 Bolt Flange 250W

01-183-3 Loop Pressure Cutout Isolation Pipe Repair Contractor Supply

One ¼ inch Tig weld pipe bushing
6in length of ¼ inch diameter CuNi Pipe
One ¼ inch union gate valve
One ¼ inch pipe to ¼ inch tubing, tig weld bushing

01-248-1 Spool Piece, firemain isolation to Cla-VALVE Contractor Supply

1ft length of 4inch diameter CuNi Pipe
Two 4inch diameter tig welded 8 bolt flanges
One ¼ inch tig weld pipe bushing
5ft of ¼ inch diameter CuNi pipe
Four ¼ inch braze elbows
One ¼ inch braze union gate valve

1-510-0 Fire Main Piping Weld Joint Contractor Supply

One 10”x6”x10” CuNi Tee
1ft length of 6 inch diameter CuNi Pipe
One 6 inch 8 bolt braze flange 250W
One ¼ inch tig weld pipe bushing
1ft length of ¼ inch diameter CuNi pipe
One ¼ inch braze union gate valve

Ship’s force will repair when firemain is down – appears to just need new gaskets on the valve.

SPECIFICATION ITEM NO.: 918

PARAGRAPH / SECTION NO: 2.0

TITLE: Sea Suction & Discharge Lines

QUESTION: 22

Please provide missing References 2.1 through 2.4.

ANSWER: See issued references

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C – 2 List of Standard WIs included for this solicitation:

CATEGORY A

0001INTENT, SCOPE, GENERAL CONDITION AND DEFINITIONS
0002TECHNICAL AND MANUFACTURER’S REPRESENTATIVES
0003APPROACH, BERTH AND MOORING REQUIREMENTS
0004TESTING AND QUALITY ASSURANCE
0005ELECTRICAL SAFETY PROCEDURE REQUIREMENTS
0006HEAVY WEATHER PLAN
0007COLD WEATHER PLAN
0010FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM
0011GENERAL SERVICES FOR SHIP, T-AOE
0012INFORMATION TECHNOLOGY SERVICES
0013PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS
0014WEIGHT AND MOMENT REPORT
0015INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS
0016FIRE PROTECTION AND SHIP'S SAFETY PROGRAM
0017HANDLING OF SHIP'S STORES
0018DELIVERY AND REDELIVERY OF THE VESSEL
0019SHIPBOARD ACCESS AND SECURITY
0020GAS FREE CERTIFICATES
0021CLEAN AND GAS FREE TANKS, VOIDS, AND COFFERDAMS
0022MACHINERY SPACE TURNOVER, DOCK TRIALS AND SEA TRIALS
0023HAZARDOUS WASTE DISPOSAL AT CONTRACTOR’S FACILITY
0024PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY
0101SHIP YARD SUPPORT FOR ABS SURVEY
0103TANK INSPECTION AND BOUNDARY TESTING (ABS)
0104TANK ENTRANCE COMBING REPAIR (3C & 4C)
0105FLIGHT DECK SAFETY NET REPAIRS
0107FLIGHT DECK DRAIN PIPING REPLACEMENT
0110AFT CHT TANKS MAINTENANCE COAT REV
0111FWD CHT TANKS MAINTENANCE COAT REV - FWD
0112FWD AFT MSD V1 AND V2 TANKS CLEANING AND PAINTING
0113WEATHERDECK HANDRAILS, BULWARK EDGES REPLACEMENT
0114REPLACE 04 LEVEL NON SKID
0115REPLACEMENT OF STEEL DECK BENEATH STATION 9 TOPPING WINCH
0116LADDER PLATFORM INSERT REPAIR
0117SHAFT ALLEY WORKING PLATFORM (T-ALT 17-326)
0120CARGO TIE DOWN DECK SOCKET REPLACMENT
0125CARGO TLI SYSTEM SENSOR INSTALL
0133POTABLE WATER TANKS CLEANING AND PAINTING
0201LINE SHAFT BEARINGS OPEN & INSPECT
0209PORT AND STBD LINE SHAFT BEARING REACTIONS
0215GAS TURBINE INTAKE INSPECTION AND REPAIR
0301STUFFING TUBE REPLACEMENT
0310SSDG TOP END OVERHAUL (20,000 HR) SSDG 2 & 5
0315CAPSTAN CONTROLLER OVERHAUL AND REPAIR
0328SSDG HEAT EXCHANGER REPAIRS (TWO SSDG)
0329SSDG FUEL OIL COOLER REPLACEMENT
0401GMDSS SAFETY RADIO CERTIFICATION
0402RADAR PREVENTATIVE MAINTENANCE
0403ANTENNA PREVENTATIVE MAINTENANCE
0406UHF TRANSCEIVER GROOM
0407OE-82B ANTENNA GROUP MAINTENANCE
0410FATHOMETER PREVENTATIVE MAINTENANCE AND REPAIR
04111B CLUTCH CANNON PLUG REPLACEMENT
0412S/Y SUPPORT FOR PELCO CAMERA INSTALLATION
0413STEERING CONTROL CIRCUIT CARD MAINTENANCE
0415GYROCOMPASS AND REPEATER GRROM
0428TV-DTS SATELLITE SYSTEM UPGRADES (T-AOE 6-13-023R)
0501ASSIST SHIPS FORCE
0502FIREFIGHTING SYSTEM ANNUAL INSPECTION
0503SCBA COMPRESSOR MAINTENANCE AND CERTIFICATION
0504PORT AND STBD RHIB DAVIT INSPECTION
0505PORT AND STBD RHIB INSPECTION
0506AUXILARY BOILER INSPECTION
0510PALLET CONVEYOR RESTORATION
0513LAGING AND INSULATION REPAIR
0514PIPING REPAIRS REV B
0515ASSIST L3 BUILD 26 SUPPORT AND ETHERNET REDUNDANT LOOP
0516REPLACE PURIFIER FLEX HOSES
0517WATERTIGHT DOOR REFURBISHMENT
0518AIR COMPRESSOR GROOM AND REPAIR
0525FAIRLEAD CONTROLLER INSPECTION
0530STEERING PUMP OVEHAUL
0531MISC EQUIPMENT AND MOTOR OVERHAUL
0535PIPING REPAIRS VARIOUS
0536CARGO REFRIGERATION PLENUM REPAIRS
0540E1-257-1 EXHAUST PLENUM REPAIRS
0541INSTALL GAS TURBINE FUEL SENSORS IN FUEL OIL SERVICE SYSTEM (ABS)
0542INSTALL SSDGs AND AUX BOILERS FUEL SENSORS IN FUEL OIL SERVICE SYSTEM (ABS)
0543DEGAUSSING QIQP COIL CONDUIT PRESERVATION
0552STEERING AND RUDDER ANGLE INDICATOR CHECKS
0555INSTALL OILY WATER SEPARATOR (OWS) UNIT TA301
0601GALLEY AND SCULLERY EQUIPMENT MAINTENANCE
0604LIFE RAFTS AND EMBARKATION LADDER CERTIFICATION
0606INTERIOR TILE REPLACEMENT WITH STRATICA FLOORING
0607INTERIOR CPC DECK REPLACMENT REV 1
0608INTERIOR CPC DECK REPLACMENT CPO
0801HABITABILITY SPACES VENT SYSTEMS CLEANING
0901DRY-DOCKING AND UNDOCKING VESSEL
0903SEA VALVES
0904RUDDER AND STERN FRAME EXAMINATION
0905BILGE KEEL EXAMINATION
0906CATHODIC PROTECTION SYSTEM MAINTENANCE
0907CATHELCO PROTECTION SYSTEM PREVENTATIVE MAINTENANCE
0908ZINC RENEWAL
0909ULTRA SONIC TESTING
0910CHAIN AND LOCKER PAINTING
0911HULL FREEBOARD CLEANING AND PAINTING
0912HULL FREEBOARD CLEANING AND PAINTING 30%
0913MAIN PROPULSION SHAFTING
0914REPLACE STERN TUBE SHAFT BEARING LINERS
0915PROPELLER CLEAN AND REPAIR
0916PROPELLER SHAFT INSTALLATION PREPARATIONS
0917PROPELLER AND RUDDER STOCK CLEARANCES
0918SEA SUCTION AND DISCHARGE LINES (ABS)
0919FOREPEAK TANK REPAIR (ABS OSR)
0920PORT & STBD ANCHOR WINDLASS BRAKE REPAIR
0921SHELL PLATE WELDING AND REPAIR (ABS OSR)
1002HIGH PRESSURE AIR RELIEF VALVE CALIBRATION
1003TOPPING WINCH FOUNDATION AND WINCH REFURB
1004GYPSY WINCH FOUNDATION AND WINCH REPAIRS
1005SLIDING BLOCK CHAIN REPLACEMENT
1006WINCH CONTROL BOOTH WINDOW REPLACEMENT, LATCHES AND STOPS

CATEGORY B

0025PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTIONCONDITIONS CHARLIE – DELTA
0030CONTINUATION OF SERVICES
0304STUFFING TUBE REPLACEMENT
0305MULTIPLE CABLE TRANSIT REPAIRS
0513LAGGING AND INSULATION REPAIR
0902DRY DOCKING AND UNDOCKING VESSEL
0928SHELL PLATE AND WELDING REPAIR
0929STEEL RENEWAL
0932ULTRASONIC TESTING

(End of Summary of Changes) image1.wmf