FY20 4TH QRT ROH WI Index_FINAL_REVISED.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- USNS SUPPLY ROH/DD Federal contract opportunity
- Solicitation number
- N3220520R4051
About this file
This document contains a work item index for repair, overhaul, and drydocking of the USNS Supply under solicitation N3220520R4051 issued by the Department of the Navy Military Sealift Command. The index lists over one hundred work items covering areas including structural, main propulsion machinery, electrical systems, electronics, auxiliary equipment, habitability, heating/ventilation/air conditioning, docking and undocking, unrep/vertrep, and includes items such as tank inspection and boundary testing, flight deck safety net and drain pipe replacement, line shaft bearing inspection, radar and antenna preventative maintenance, firefighting system inspection, galley and scullery equipment maintenance, drydocking and sea trials, anchor windlass brake repair, and topping winch refurbishment.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
USNS SUPPLY (T-AOE 6)
FY2020 4TH QRT ROH
AUGUST 1 - NOVENBER 4, 2020
Work Item Index N3220520R4051
| WI | CAT | ITEM | VR # |
| 0000 GENERAL REQUIREMENTS | |||
| 0001 | NSP | INTENT SCOPE GENERAL REQUIREMENTS AND DEFINITIONS REV MAY 16 | |
| 0002 | NSP | TECHNICAL AND MANUFACTURER REPRESENTATIVES REV 08Nov17 | |
| 0003 | NSP | APPROACH, BERTH, AND MOORING REQUIREMENTS REV 08Nov17 | |
| 0004 | NSP | TESTING AND QUALITY ASSURANCE REV 08Nov17 | |
| 0005 | NSP | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS, REV FEB 14 | |
| 0006 | NSP | HEAVY WEATHER PLAN, REV FEB 14 | |
| 0007 | NSP | COLD WEATHER PLAN, REV FEB 14 | |
| 0010 | A | FURNISH OFFICE FOR OMT REV 16Jul18 | |
| 0011 | A | GENERAL SERVICES FOR SHIP, T AOE, REV FEB 14 | |
| 0012 | A | INFORMATION TECHNOLOGY SERVICES REV 16Jul18 | |
| 0013 | A | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS-Final-12APR18 | |
| 0014 | A | WEIGHT MOMENT REPORT, REV FEB 14 | |
| 0015 | A | INTEGRATED LOGISITICS AND GFM SUPPORT, REV FEB 14 | |
| 0016 | A | FIRE PROTECTION AND SHIPS SAFETY PROGRAM REV 28Sep17 | |
| 0017 | A | HANDLING SHIPS STORES, REV FEB 14 | |
| 0018 | A | DELIVERY AND REDELIVERY, REV MAY 16 | |
| 0019 | A | SHIPBOARD ACCESS, REV AUG 15 | |
| 0020 | A | GAS FREE CERTIFICATES, REV FEB 14 | |
| 0021 | A | CLEAN AND GAS FREE TANKS, VOIDS AND COFFERDAMS, REV OCT 2012 | |
| 0022 | A | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS REV 28Sept17 | |
| 0023 | A | HAZARDOUS WASTE DISPOSAL, REV MAY 16 | |
| 0024 | A | PHYSICAL SECURITY AT CONTRACTORS FACILITY | |
| 0025 | B | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY | |
| 0030 | B | CONTINUATION OF SERVICES, REV FEB 14 |
| 0100 STRUCTURAL | |||
| 0101 | A | SHIPYARD SUPPORT FOR ABS SURVEY | |
| 0103 | A | TANK INSPECTION AND BOUNDARY TESTING ( ABS Special Survey) | |
| 0104 | A | TANK ENTRANCE COMBING REPAIR | Combing at entrance |
to referenced tanks have developed pin holes at tank top interface
| 0105 | A | FLIGHT DECK SAFETY NETS REPAIR | Frames require new. | |
| 0107 | A | FLIGHT DECK DRAIN PIPING REPLACEMENT | 18-148 | |
| 0110 | A | AFT CHT TANKS MAINTENANCE COAT REV | Standard WI added |
Belzona across tank bottom and bulkhead
| 0111 | A | FWD CHT TANKS MAINTENANCE COAT REV-FWD | Standard WI | |
| 0112 | A | FWD AFT MSD V1 AND V2 TANKS CLEANING AND PAINTING | Standard WI | |
| 0113 | A | WEATHERDECK HANDRAILS, BULWARK EDGES REPLACEMENT | ||
| 0114 | A | REPLACE 04 LEVEL NON SKID | 19-0038 | |
| 0115 | A | REPLACEMENT OF STEEL DECK BENEATH STATION 9 TOPPING WINCH | 19-007 | |
| 0116 | A | LADDER PLATFORM INSERT REPAIR | ||
| 0117 | A | SHAFT ALLEY WORKING PLATFORM T-ALT 17-326 | ||
| 0120 | A | CARGO TIE DOWN DECK SOCKET REPLACMENT | ||
| 0125 | A | CARGO TLI SYSTEM SENSOR INSTALL | ||
| 0133 | A | POTABLE WATER TANKS CLEANING AND PAINTING |
| 0200 MAIN PROPULSION MACHINERY | ||
| 0201 | A | LINE SHAFT BEARINGS OPEN AND INSPECT |
| 0209 | A | PORT AND STBD LINE SHAFT BEARING REACTIONS |
| 0215 | A | GAS TURBINE INTAKE INSPECTION AND REPAIR |
| 0300 ELECTRICAL | |||
| 0301 | A | STUFFING TUBE REPLACEMENT | |
| 0304 | B | STUFFING TUBE REPLACEMENT | |
| 0305 | B | MULTIPLE CABLE TRANSIT REPAIRS | |
| 0310 | A | SSDG TOP END OVHL (20,000 HR) REV- | |
| 0315 | A | CAPSTAN CONTROLLER OVERHAUL AND REPAIR | 18-137 |
| 0328 | A | SSDG HEAT EXCHANGER REPAIRS | 18-132, |
19-050 0329 A SSDG FUEL OIL COOLER REPLACEMENT multiple VR's
| 0400 ELECTRONICS | ||
| 0401 | A | GMDSS SAFETY RADIO CERTIFICATION |
| 0402 | A | RADAR PREVENTATIVE MAINTENANCE |
| 0403 | A | ANTENNA PREVENTATIVE MAINTENANCE |
| 0406 | A | UHF TRANSCEIVER GROOM |
| 0407 | A | OE-82B ANTENNA GROUP MAINTENANCE |
| 0410 | A | FATHOMETER PM AND REPAIR |
| 0411 | A | 1B CLUTCH CANNON PLUG REPLACEMENT |
| 0412 | A | S/Y SUPPORT FOR PELCO CAMERA INSTALLATION |
| 0413 | A | STEERING CONTROL CIRCUIT CARD MAINTENANCE |
| 0415 | A | GYRO COMPASS AND REPEATER GROOM |
| 0428 | A | TV-DTS SATELLITE SYSTEM UPGRADES (TAOE 6-13-023R) |
| 0500 AUX EQUIPMENT | |||
| 0501 | A | ASSIST SHIPS FORCE | |
| 0502 | A | FIREFIGHTING SYSTEM ANNUAL INSPECTION | |
| 0503 | A | SCBA COMPRESSOR MAINTENANCE AND CERTIFICATION | |
| 0504 | A | PORT AND STBD RHIB DAVIT INSPECTION | |
| 0505 | A | PORT AND STBD RHIB INSPECTION | |
| 0506 | A | AUXILIARY BOILER INSPECTION REV | |
| 0510 | A | PALLET CONVEYOR RESTORATION | 18-068 |
| 0513 | B | LAGING AND INSULATION REPAIR | |
| 0514 | A | PIPING REPAIRS REV B | 19-004, 056 |
| 0515 | A | ASSIST L3 BUILD 26 SUPPORT AND ETHERNET REDUNDANT LOOP | 17-095 |
| 0516 | A | REPLACE PURIFIER FLEX HOSES | 19-034 |
| 0517 | A | WATERTIGHT DOOR REFURBISHMENT | 18-134 |
| 0518 | A | AIR COMPRESSOR GROOM AND REPAIR | |
| 0525 | A | FAIRLEAD CONTROLLER INSPECTION | |
| 0530 | A | STEERING PUMP OVEHAUL | 19-006 |
| 0531 | A | MISC EQUIPMENT AND MOTOR OVERHAUL | 18-020, 116, |
117, 19-049
| 0535 | A | PIPING REPAIR VARIOUS | 19-060 |
| 0536 | A | CARGO REFRIGERATION PLENUM REPAIRS | 18-119 |
| 0540 | A | E1-257-1 EXHAUST PLENUM REPAIRS | 18-098 |
| 0541 | A | INSTALL GAS TURBINE FUEL SENSORS IN FUEL OIL SERVICE SYSTEM (ABS) T-ALT | |
| 0542 | A | INSTALL SSDGs AND AUX BOILERS FUEL SENSORS IN FUEL OIL SERVICE SYSTEM (ABS) T-ALT | |
| 0543 | A | DEGAUSSING QIQP COIL CONDUIT PRESERVATION | 18-125 |
| 0552 | A | STEERING AND RUDDER ANGLE INDICATOR CHECKS | |
| 0555 | A | INSTALL OILY WATER SEPARATOR (OWS) UNIT TA301 |
| 0600 HABITABILITY | |||
| 0601 | A | GALLEY AND SCULLERY EQUIPMENT MAINTENANCE | |
| 0604 | A | LIFE RAFTS AND EMBARKATION LADDER CERTIFICATION | |
| 0605 | A | REFURBISH MAIN SCULLERY T-ALT | |
| 0606 | A | INTERIOR TILE REPLACEMENT WITH STRATICA FLOORING | 18-135, 165 |
| 0607 | A | INTERIOR CPC DECK REPLACEMENT REV 1 | 18-135, 165 |
| 0608 | A | INTERIOR CPC DECK REPLACMENT CPO |
| 0800 HEATING , VENELATION AND AIR CONDITIONING | ||
| 0801 | A | HABITABILITY SPACES VENT SYSTEMS CLEANING |
| 0900 DOCKING AND UNDOCKING | |||
| 0901 | A | DRY DOCKING AND UNDOCKING VESSEL | |
| 0902 | B | DRY DOCKING AND UNDOCKING VESSEL | |
| 0903 | A | SEA VALVES | |
| 0904 | A | RUDDERS AND STERN FRAME EXAMINATION | |
| 0905 | A | BILGE KEEL EXAMINATION | |
| 0906 | A | CATHODIC PROTECTION SYSTEM MAINTENANCE | 19-016 |
| 0907 | A | CATHELCO PROTECTION SYSTEM PM | |
| 0908 | A | ZINC RENEWAL | |
| 0909 | A | ULTRASONIC TESTING | |
| 0910 | A | CHAIN AND LOCKER PAINTING | |
| 0911 | A | HULL FREEBOARD CLEANING AND PAINTING | |
| 0912 | A | HULL FREEBOARD CLEANING AND PAINTING 30% | |
| 0913 | A | MAIN PROPULSION SHAFTING | |
| 0914 | A | REPLACE STERN TUBE SHAFT BEARING LINERS | |
| 0915 | A | PROPELLER CLEAN AND REPAIR | |
| 0916 | A | PROPELLER SHAFT INSTALLATION PREPARATIONS | |
| 0917 | A | PROPELLER AND RUDDER STOCK CLEARANCES | |
| 0918 | A | SEA SUCTION AND DISCHARGE LINES (ABS) | |
| 0919 | A | FOREPEAK TANK REPAIR (ABS OSR) | 19-044 |
| 0920 | A | PORT & STBD ANCHOR WINDLASS BRAKE REPAIR | 18-039, 040 |
| 0921 | A | SHELL PLATE WELDING AND REPAIR (ABS OSR) | |
| 0928 | B | SHELL PLATE WELDING AND REPAIR B-ITEM | |
| 0929 | B | STEEL RENEWEL B-ITEM | |
| 0932 | B | ULTRASONIC TESTING B-ITEM |
| 1000 UNREP/VERTREP | |||
| 1002 | A | HIGH PRESSURE AIR RELIEF VALVE CALIBRATION | |
| 1003 | A | TOPPING WINCH FOUNDATION AND WINCH REFURB | |
| 1004 | A | GYPSY WINCH FOUNDATION AND WINCH REPAIRS | |
| 1005 | A | SLIDING BLOCK CHAIN REPLACEMENT | |
| 1006 | A | WINCH CONTROL BOOTH WINDOW REPLACEMENT, LATCHES AND STOPS | 18-0112 |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .