This document outlines requirements for lagging and insulation repairs aboard the USNS SUPPLY (T-AOE 6). The solicitation was issued by the Department of the Navy Military Sealift Command under number N3220520R4051. Repairs are needed in various locations throughout the vessel, including machinery spaces, equipment spaces, habitability spaces, and cargo/weapons holds. Specific requirements include renewing pipe, ventilation, and valve lagging; and renewing existing bulkhead and overhead insulation. Materials include fiberglass cloth, rubber lagging, polyamide foam, and calcium silicate. Pricing is requested for typical quantities of various pipe sizes, valve blankets, bulkhead insulation, ventilation duct insulation, and SSDG exhaust insulation. The contractor must comply with all applicable General Technical Requirements and review other work items under the contract.

View the file

Other files for this federal contract opportunity

Other files attached to USNS SUPPLY ROH/DD, newest first.
File Type Posted
N3220520R4051 Amendment 00011.docx DOCX document
N2.35.6100.1-Q Novel Coronavirus Disease Response Plan_Rev 4_5-8-2020.pdf PDF
Directive Interim Change Notice 05 Novel Coronavirus Disease Response Plan Rev 4 Chg 1_051520.pdf PDF
0026_A_VESSEL FINAL CLEANING REV A.docx DOCX document
Products List.pdf PDF
N3220520R4051 Amendment 00010.docx DOCX document
0010_A_FURNISH OFFICE FOR OMT REV 20May20.doc DOC document
0011_A_GENERAL SERVICES FOR THE SHIP (T-AOE)REV 23Apr20 PORTAL (002).docx DOCX document
0514_A_CHT piping repairsrev 20may20.doc DOC document
N3220520R4051 Amendment 00009.docx DOCX document
N3220520R4051_0008.docx DOCX document
N3220520R4051_0007.docx DOCX document
J - 2 Category A Items SUPPLY_AMEND_7.xls XLS spreadsheet
N3220520R4051_0006.docx DOCX document
N3220520R4051_0005.docx DOCX document
N3220520R4051_0004.docx DOCX document
N3220520R4051_0003.docx DOCX document
SUPPLY J4 VERS 2-1 2020 ROH.xlsx XLSX spreadsheet
J - 2 Category A Items SUPPLY_AMEND_2.xls XLS spreadsheet
JA N3220520R4051 USNS SUPPLY 2020 ROH_REV4__Redacted.pdf PDF
N3220520R4051_0002.docx DOCX document
FY20 4TH QRT ROH WI Index_FINAL_REVISED.xlsx XLSX spreadsheet
N3220520R4051_0001.docx DOCX document
J - 2 Category A Items SUPPLY.xls XLS spreadsheet
JA N3220520R4051 USNS SUPPLY 2020 ROH_REV (003)_Redacted.pdf PDF
J ATTACHMENTS.zip ZIP file
SUPPLY N3220520R4051_ FINAL.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SUPPLY

(T-AOE 6)

MACHINERY, AUXILIARY

N32205-20-R-4051

26 OCTOBER 2019

ITEM NO. 513

CATEGORY “B”

MSC/N756/DRM

LAGGING AND INSULATION REPAIRS

1.0 ABSTRACT:

1.1. This item describes the repair and renewal of insulation and lagging in various locations.

2.0 REFERENCES/ENCLOSURES:

2.1. References:

2.1.1. NSTM Chapter 635; Thermal Fire and Acoustic Insulation

2.1.2. NAVSEA Drawing 500-6360816, Insulation Schedule for Piping Ventilation and Equipment

2.1.3. MSC Standard Item No. 22, Insulation and Lagging

2.2. Enclosures:

2.2.1. Lagging & Insulation Renewal - Location and Quantity Matrix for area yet unidentified.

3.0 ITEM LOCATION/DESCRIPTION:

3.1. Location: Various locations throughout the Vessel

3.1.1. Quantity: Various quantities.

3.2. Item Description/Manufacturer's Data: None Additional

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1. The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 22, 23, and 29.

5.2. The contractor and all subcontractors regardless of tier are advised to review ALL other work items under this contract, to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0 STATEMENT OF WORK REQUIRED:

7.1. Provide Labor and materials to renew pipe lagging; ventilation lagging; renew valve blankets; and renew existing bulkhead and overhead insulation, Install lagging on designated pipe areas. Install insulation on designated bulkheads and overheads, following Paragraph 2.1 References. Exact areas as designated by Ship Force Chief Engineer.

7.1.1. For bidding purposes:

a. Material and labor shall not exceed $100,000.00. Any quantities above this amount will be handled with a separate change order.

b. Assume the areas listed are as follows:

1) Areas are within various machinery spaces, equipment spaces, habitability spaces, or Cargo / Weapons Holds.

2) Specific locations are relatively accessible.

3) An overhead location is no higher than 7 feet above deck level.

4) Bulkhead and overheads require fibrous cloth insulation.

5) Pipes require cloth wrapped rubber lagging or lagging blankets/pads.

6) Ventilation ducts require one-inch polyamide foam or Fibrous Glass per Reference 2.1.1 and 2.1.2.

7) SSDG Exhaust Flues require Calcium Silicate

7.2. Staging required to accomplish work will be handled with a Contract Change order. Remove staging after completion of work.

7.3. Record and document existing labels and stenciling on lagged and insulated areas to be replaced. Renew labels and stenciling upon completion of installations. Renew and apply flow direction and service markings and labels on all new and disturbed pipe lagging and bulkhead/overhead insulation where disturbed.

7.4. Mechanically scale and power tool clean to a surface prep SSPC-SP3, all underlying pipe, bulkhead, and overhead surface areas where damaged lagging or insulation was removed.

7.5. Apply two (2) coats of low heat emission / resistant aluminum paint to underlying pipes and bulkhead surface areas where high temperatures are existing, prior to the installation of new lagging or insulation.

7.6. Prime and paint all new and disturbed surfaces to match surroundings. Do not paint lagging blankets or pads.

7.7. Preparation of Drawings: None

7.8. Manufacturer's Representative: None Additional

8.0 GENERAL REQUIREMENTS:

8.1. for the TYPICAL quantities listed in enclosure 2.2.1. Price submitted shall be inclusive of labor, materials, rigging, staging, special tools, and miscellaneous support equipment. QUANTITIES ARE ESTIMATES BASED ON HISTORICAL TYPES OF REPAIRS.

ENCLOSURE 2.2.1: Lagging & Insulation Renewal - Location and Quantity Matrix for area yet unidentified.

Pipe Lagging

Steam, Seawater, or Chilled Water Unit

Measure

Units
Extended Price
1- IPS
Linear foot
30 linear ft
1-1/2 IPS
Linear foot
30 linear ft
2 IPS
Linear foot
30 Linear ft
2-1/2 IPS
Linear foot
20 linear ft
3 IPS
Linear foot
10 linear ft
4 Inch IPS
Linear foot
20 linear ft
5 Inch IPS
Linear foot
20 linear ft
6 Inch IPS
Linear foot
20 linear ft
8 Inch IPS
Linear foot
10 linear ft
10 Inch IPS
Linear foot
10 linear ft

Valve Blankets

Steam or Chilled Unit

Measure Unit price

Units
Extended Price
1 Inch Valve
1 Blanket

10 Blankets

1-1/2 Inch Valve
1 Blanket

10 Blankets

2 Inch Valve
1 Blanket

5 Blankets

2-1/2 Inch Valve
1 Blanket

10 Blankets

3 Inch Valve
1 Blanket

5 Blankets

4 Inch Valve
1 Blanket

5 Blankets

5 Inch Valve
1 Blanket

5Blankets

6 Inch Valve
1 Blanket

5 Blankets

8 Inch Valve
1 Blanket

5Blankets

10 Inch Valve
1 Blanket

5 Blankets

Insulation

Bulkhead Unit

Unit price

Units
Extended Price
1 Inch thick fiberglass, cloth backed
Square foot

20 sq. ft.

2 Inch thick fiberglass, cloth backed
Square foot

25 sq. ft.

3 Inch thick fiberglass, cloth backed
Square foot

80 sq. ft.

4 Inch thick fiberglass, cloth backed
Square foot

5 sq. ft.

Vent / Intake Duct*

Insulation Unit

Unit price

Units
Extended Price

Round and Oval

Fiberglass or Block Foam Square Foot

250 Sq Ft

Square and Rectangular

Fiber Glass or Block Foam Square Foot

250 Sq Ft

SSDG Exhaust
Unit

Unit price

Units
Extended Price

Calcium Silicate

Up to 4.5” thk Square Foot

50 Sq Ft

* This includes but is not limited to Cargo Weapons Hold and Waste Processing Areas 513-1