The file's text, extracted by GovTribe without its formatting.
USNS SPEARHEAD WORK ITEM INDEX 31 May 15 N32205-15-R-4006
MILITARY SEALIFT COMMAND - NORFOLK
NORFOLK, VIRGINIA
S P E C I F I C A T I O N S
FOR
USNS SPEARHEAD (JHSV 1)
| IMO No.: | | 9647992 |
| ABS Class No.: | 12203458 | |
RFP NO.:N32205-15-R-4006
(31 MAY 2015)
19 OCT thru 30 NOV 2015 ROH AVAILABILITY
PRINCIPLE DIMENSIONS
LENGTH 103.0 m (337.9 ft)
BEAM 28.5 m (93.5 ft)
DRAFT FULL LOAD (mean) 3.92 m (12.85 ft)
ESTIMATED GROSS TONNAGE 2500 TONNES
DESIGN DEADWEIGHT 9154 TONNES
| ESTIMATED ARRIVAL DRAFT | 3.4M (11.0 FT) FWD | |
| | 3.4M (11.0 FT) Aft |
AIR DRAFT WITH MAST DOWN 25.3M(83 ft)
THIS SPECIFICATION CONSISTS OF THE FOLLOWING PAGES
INDEX PAGES 3 THRU 6
LIST OF REFERENCES PAGES 7 THRU 15
WORK ITEMS PAGES 0001-1 THRU 1002-2
THIS PAGE INTENTIONALLY LEFT BLANK.
SECTION 0000 GENERAL REQUIREMENTS
NOT SEPARATELY PRICED (NSP) REQUIREMENTS Rev Date
| 0001 | Intent, Scope, General Conditions and Definitions | 31 May 15 | | | |
| 0002 | Technical and Manufacturer’s Representatives | | 31 May 15 | | |
| 0003 | Approach, Berth, and Mooring Requirements | | 31 May 15 | | |
| 0004 | Testing and Quality Assurance | | | 31 May 15 | |
| 0005 | Electrical Safety Procedure Requirements | | 31 May 15 | | |
| 0006 | Heavy Weather Plan | | | | 31 May 15 |
| 0007 | Cold Weather Plan | | | | 31 May 15 |
CATEGORY “A” WORK ITEMS Rev Date
| 0010 | Furnish Office for Overhaul Management Team (OMT) | 31 May 15 | | | | | | |
| 0011 | Furnish General Services | Rev B | | | | 01 Jul 15 | | |
| 0012 | Telephone Services | | | | | | | 31 May 15 |
| 0013 | Project Planning and Production Status | | | 31 May 15 | | | | |
| Monitoring Reports | | | | | | | |
| 0014 | Preparation of Weight and Moment Report | | | 31 May 15 | | | | |
| 0015 | Integrated Logistics and GFM Support Requirements | 31 May 15 | | | | | | |
| 0016 | Fire Protection and Ship’s Safety Program | | 31 May 15 | | | | | |
| 0017 | Handling Ship’s Stores | | | | | | 31 May 15 | |
| 0018 | Delivery and Redelivery of the Vessel | | | 31 May 15 | | | | |
| 0019 | Shipboard Access and Security | | | | | 31 May 15 | | |
| 0020 | Gas Free Certificates | | | | | | 31 May 15 | |
| 0021 | Clean and Gas Free Tanks, Voids, | | | | 31 May 15 | | | |
| Cofferdams and Spaces | | | | | | | |
| 0022 | Dock Trials and Sea Trial | | | | | 31 May 15 | | |
| 0023 | Hazardous Waste Disposal | | | | | | 31 May 15 | |
| 0024 | Physical Security at Private Contractor’s | | 31 May 15 | | | | | |
| Facility | | | | | | | |
CATEGORY “B” WORK ITEMS Rev Date
0025 Physical Security at Private Contractor’s 31 May 15 Facility CATB 0030 Continuation of Services 31 May 15
SECTION 0100 HULL STRUCTURE
CATEGORY “A” WORK ITEMS Rev Date
| 0101 | Inspect Flight Deck Tie Downs | Rev A | 09 Jun 15 | | | |
| 0102 | Structural Inspections Rev A | | | 09 Jun 15 | | |
| 0103 | Hull Weld Repairs | | | | | 31 May 15 |
| 0104 | Forepeak Deck Grating | | | | 31 May 15 | |
| 0105 InstallL Nonskid Paint on Aft Mission Bay | | 31 May 15 | | | | |
SECTION 0200 PROPULSION MACHINERY
CATEGORY “A” WORK ITEMS Rev Date
| 0201 | Clean Heat Exchanges | | 31 May 15 |
| 0202 | Reduction Gear Maintenance | 31 May 15 | |
SECTION 0300 ELECTRICAL
CATEGORY “A” WORK ITEMS Rev Date
| 0301 | Clean Ship Service Switchboard and Load Center | 31 May 15 | | |
| 0302 PLC Survey Rev B | | | | 01 Jul 15 |
| 0303 Install Ground Fault Monitoring TALT (052R) | | 31 May 15 | | |
| 0304 | Modify Exterior Flood Lighting Rev A | | 09 Jun 15 | |
SECTION 0400 COMMUNICATION AND NAVIGATION
CATEGORY “A” WORK ITEMS Rev Date
| 0401 | Renew NAVIBS Radio Safety Survey | 31 May 15 |
| 0402 Install SSAS System | (TALT 078R) | 31 May 15 |
SECTION 0500 AUXILIARY MACHINERY SYSTEMS
CATEGORY “A” WORK ITEMS Rev Date
| 0501 | Perform 5 Year Stern Ramp Maintenance | | 31 May 15 |
| 0502 | Perform Annual Stores Crane Maintenance | 31 May 15 | |
0503 Perform Annual Sewage Treatment Plant Maintenance 31 May 15
| 0504 Perform Annual MSD Vacuum System Maintenance | 31 May 15 | | | | |
| 0505 Support Store Crane Mod. | | | | 31 May 15 | |
| 0506 Test Main Air Receivers | Rev A | | 09 Jun 15 | | |
| 0507 Firemain Cooling Water Crossover (TALT 066R) | | 31 May 15 | | | |
| 0508 Install SSDG Sea Water Strainers (TALT 076R) | | 31 May 15 | | | |
| 0509 Replace Fire Main Check Valves (TALT 077R) | | 31 May 15 | | | |
| 0510 | Rebuild Firepump Rev A | | | | 09 Jun 15 |
| 0511 | Waste Oil Tank Repair Rev B | | | 22 Jun 15 | |
SECTION 0600 OUTFIT, FURNISHINGS and HABITABILITY
CATEGORY “A” WORK ITEMS Rev Date
| 0601 | Marine Evacuation System Annual Certification | 31 May 15 | | | | |
| 0602 | Rescue Boat and Davit Annual Inspection | | | 31 May 15 | | |
| 0603 | SCBA Annual Certification | | | | | 31 May 15 |
| 0604 | Firefighting System Certification | | | | 31 May 15 | |
| 0605 Calibrate Galley Equipment | | | | | 31 May 15 | |
| 0606 Galley Roller Door Replacement (TALT 070) | | 31 May 15 | | | | |
| 0607 Install Carpet on 03 Level Passageway (TALT) | | 31 May 15 | | | | |
| 0608 Install Interior Deck Coverings (TALT) | | | 31 May 15 | | | |
| 0609 | Fire Door Maintenance Rev A | | | | | 09 Jun 15 |
SECTION 0800 HEATING, VENTILATION and AIR CONDITIONING
CATEGORY “A” WORK ITEMS Rev Date
| 0801 | Clean Galley Exhaust Ducts | | | | 31 May 15 |
| 0802 | Clean Laundry Exhaust Ducts | | | | 31 May 15 |
| 0803 | HVAC System Annual Maintenance Rev A | | 09 Jun 15 | | |
| 0804 Install 02-03 Level Insulation (TALT) | | 31 May 15 | | | |
| 0805 Topside Deck Coating (TALT) | | | | 31 May 15 | |
| 0806 Clean Machinery Ventilation Screens | | 31 May 15 | | | |
| 0807 HVAC S.W. Strainer & Chill Piping Repair (TALT) | 31 May 15 | | | | |
SECTION 0900 DRYDOCKING
CATEGORY “A” WORK ITEMS Rev Date
| 901 | Dry Docking and Undocking | | | 31 May 15 | |
| 902 | Renew Anodes | | | | 31 May 15 |
| 903 | Inspect Sea Valves and Seachests Rev A | | 09 Jun 15 | | |
| 904 | Cathodic Monitoring System Inspection/Maintenance 31 May 15 | | | | |
| 905 | Inspect and Repair Underwater Hull Coating Rev A | 09 Jun 15 | | | |
| 906 | Ride Control System Maintenance Rev A | | 09 Jun 15 | | |
| 907 | Waterjet Maintenance Rev A | | | 09 Jun 15 | |
| 910 | Ride Control SCF Bearing Support Rev B (TALT XXR) | 01 Jul 15 | | | |
CATEGORY “B” WORK ITEMS Rev Date
0908 Remove Waterjet Jetavator Rev A 09 Jun 15
SECTION 1000 UNREP
CATEGORY “A” WORK ITEMS Rev Date
| 1001 Weight Test Flight Deck Nets | | 31 May 15 |
| 1002 | Flight Deck Coating Renewal | |
DRAWING/REFERENCE INDEX
USNS SPEARHEAD (JHSV 1)
| Work Item |
| Reference |
| Drawing/Reference Title |
| 001 |
| 2.1 |
| MSC 803-7081122, Military Sealift Command General Technical Requirements (GTR's) |
| 003 |
| 2.1 |
| Mil STD Mil-DTL-28628D, dtd July 1991; Camels |
| 003 |
| 2.2 |
| Mil STD Mil-F-29248, dtd 21 November 1986; Fenders, Marine, Foam Filled, Netless |
| 003 |
| 2.3 |
| NAVSEA 8443364_F General Arrangement Plan |
| 003 |
| 2.4 |
| NAVSEA 835-7489033, Rev C, Mooring Analysis |
| 004 |
| 2.1 |
| Mil-I-45208, (Series), Inspection Systems |
| 005 |
| 2.3 |
| MSC Safety Management System Procedure 2.1-004-All, Lock-out/ Tag-out |
| 006 |
| 2.1.1 |
| MSC Drawing 8445392, Trim and Stability Booklet |
| 007 |
| 2.1 |
| MSC Drawing 8445392, Trim and Stability Booklet |
| 008 |
| 2.1 |
| COMSCINST 5530.3 Series, Military Sealift Command (MSC) Shipboard Antiterrorism |
| 008 |
| 2.2 |
| NAVSEA Standard Item 009-72, Physical Security at Private Contractor’s Facility |
| 011 |
| 2.1.1 |
| NAVSEA 802-8386797, General Arrangement |
| 011 |
| 2.1.2 |
| MSC Chemical Treatment Handbook |
| 015 |
| 2.1 |
| DOD Security Manual for Safeguarding Classified Information, DOD Manual 220.22-M |
| 016 |
| 2.1 |
| NFPA 321, Standard for Fire Protection of Vessels During Construction, Repair and Lay-Up |
| 016 |
| 2.2 |
| NFPA 51B, Standard for Fire Prevention in use of Cutting and Welding Processes |
| 018 |
| 2.1 |
| NAVMED P-5010-6, Manual of Naval Preventive Medicine, Chapter 6, Water Supply Afloat |
| 019 |
| 2.1 |
| COMSCINST 5530.3C, MSC Shipboard AT/FP Program |
| 019 |
| 2.2 |
| NAVSEA Standard Item 009-72 |
| 021 |
| 2.1.1 |
| MSC Dwg 801-8386809, Capacity Plan |
| 021 |
| 2.1.2 |
| MSC Dwg 835-8195240, Trim and Stability Booklet |
| 023 |
| 2.1.1 |
| Resource Conservation and Recovery Act (RCRA) as Amended |
| 023 |
| 2.1.3 |
| Applicable Uniform Hazard Waste Manifest Form |
| 023 |
| 2.1.4 |
| Test Methods for Evaluating Solid Waste, Physical/Chemical Methods; EPA Document, SW-846: The Official compendium of analytical and sampling methods that have been evaluated and approved for use in complying with the RCRA regulations. |
| 023 |
| 2.1.5 |
| OPNAVINST 5090.1C |
| 101 |
| 2.1 |
| JHSV NTA Recommended Tiedown Fitting Maintenance Orig |
| 101 |
| 2.2 |
| Flight Deck Tie Down Numbering Scheme NAVSEA 588-001 |
| 101 |
| 2.3 |
| SPEARHEAD Checklist Fligh Deck Tie Down Record |
| 101 |
| 2.4 |
| ALCOA Fligt Deck Tie Down DWG 05003554 |
| 101 |
| 2.5 |
| Work Instructions for USNS SPD |
| 102 |
| 2.1 |
| JHSV_Structural_Inspection_Guide_ |
| 102 |
| 2.2 |
| 8443364_F General_Arrangement |
| 102 |
| 2.3 |
| 8444521_A Tunnel FR 8-24 |
| 102 |
| 2.4 |
| 8444522_A Tunnel FR 25-41 |
| 102 |
| 2.5 |
| 8444524_A Tunnel FR 52-70 |
| 103 |
| 2.1 |
| 8442785 B Molded Lines and Offsets |
| 103 |
| 2.2 |
| 8442878 B Standard Structural Details |
| 103 |
| 2.3 |
| 8442879 B Weld Schedule |
| 103 |
| 2.4 |
| 8442880 B Weld Details Construction |
| 103 |
| 2.6 |
| 8442884 A Shell Expansion |
| 103 |
| 2.7 |
| 8442887 F Structural Fr 7 Forepeak |
| 103 |
| 2.8 |
| 20110805 Fwd lkg aft zoom |
| 103 |
| 2.9 |
| Crack Close up, PIC |
| 103 |
| 2.10 |
| Crack Location, PIC |
| 103 |
| 2.11 |
| 8443364_F General_Arrangement |
| 104 |
| 2.1 |
| MSC Drawing 8393749, Gratings and Handrails |
| 104 |
| 2.2 |
| MSC Standard Drawing 803-7080803, Computer Aided Designed |
| 201 |
| 2.1 |
| S9233-EM-MMC-010: Main Propulsion Diesel Engine Operation, Maintenance, Service |
| 201 |
| 2.2 |
| S9241-DA-MMC-010: Marine Reduction Gear, Model ZF 60000 |
| 201 |
| 2.3 |
| Tech Manual S9560-ES-MMC-010: Ride Control System (RCS) With Hydraulic Power Packs |
| 201 |
| 2.4 |
| Tech Manual S9241-DA-MMC-010: Marine Reduction Gear |
| 201 |
| 2.5 |
| 5206-HD-310 Wartsila Thrust Bearing Lubrication DWG |
| 202 |
| 2.1 |
| NAVSEA Tech Manual S9241-DA-MMC-010: Marine Reduction Gear, Model ZF 60000 NR2H |
| 202 |
| 2.2 |
| 2014 ZF Service Report |
| 301 |
| 2.1 |
| NAVSEA T/M S9324-L3-MMC-010, Load Centers Model |
| 301 |
| 2.2 |
| NAVSEA T/M S9324-LZ-MMC-010, Main Switchboard |
| 301 |
| 2.3 |
| MSFSC Standard Work Item 20 |
| 302 |
| 2.1 |
| Drawing No. 8443074_A, Electrical System Overview Layout of Panels |
| 302 |
| 2.2 |
| Drawing No. 8442941_B, Electric Plan Control System |
| 302 |
| 2.3 |
| Drawing No. 8442940_C, Machinery Control System and Monitoring System |
| 302 |
| 2.4 |
| JHSV Software 3_2012 |
| 302 |
| 2.5 |
| JHSV PC PSWD LIST |
| 302 |
| 2.6 |
| T-AKE PLC Summary |
| 302 |
| 2.7 |
| TAKE-2 Automation Survey Results |
| 302 |
| 2.8 |
| Load CTR Batteries |
| 302 |
| 2.9 |
| Tech Manual S92247-AM-MMC-010; Lipstronic Waterjet Control System |
| 304 |
| 2.1 |
| Dwg. No. 633-D49497 B018 |
| 304 |
| 2.2 |
| Dwg. No. 630-324-01-737 DB34 |
| 304 |
| 2.3 |
| Dwg. No. 630-324-01-738 DB35 |
| 402 |
| 2.1 |
| DWG 630-601-01-202 – General Arrangement and Profile Drawing (NAVSEA DWG 8443364 Rev C) |
| 402 |
| 2.2 |
| DWG 630-400-01-718 – 2D Topside Configuration Drawing (NAVSEA DWG 8444334 Rev C) |
| 402 |
| 2.3 |
| Furuno Felcom 19 Ship Security Alert System Operator’s Manual |
| 402 |
| 2.4 |
| Furuno Felcom 19 Ship Security Alert System Installation Drawing. |
| 402 |
| 2.5 |
| Furuno Felcom 19 SSAS USCG Certificate |
| 402 |
| 2.6 |
| Photograph Felcome 19 SSAS Antenna (USNS Millinocket) |
| 402 |
| 2.7 |
| MSCHQ SSAS Test Procedure |
| 501 |
| 2.1 |
| Weight Test Report B081-03_411_0std6388 |
| 501 |
| 2.2 |
| JHSV Hose to Tubing PPT. |
| 502 |
| 2.1 |
| 16731-JHSV Bearing Tilt Test |
| 503 |
| 2.1 |
| Navsea Technical Manual S9593-FP-MMC-010 Export: TW-HMX-8104 maintenance requirements. |
| 504 |
| 2.1 |
| T/M SG811-CT-MMC-010: Hydraulic Extend Boom Crane, Model EB 230-49-33 |
| 504 |
| 2.2 |
| 631-573-09-601TR Cargo Crane Weight Test |
| 504 |
| 2.3 |
| C-2688 JHSV Crane Outline |
| 506 |
| 2.1 |
| DWG 8445351 Compressed Air System |
| 507 |
| 2.1 |
| Drawing No. 8443230: Schematic- Fire Main System |
| 507 |
| 2.2 |
| Drawing No. 8445490: Schematic- Machinery Cooling System |
| 507 |
| 2.3 |
| MSC Drawing No. 8495803: Firemain Cross-Connect Piping Modifications |
| 507 |
| 2.4 |
| MSC Drawing No. 7080803, Preparation of CAD Drawings for USNS Ships |
| 508 |
| 2.1 |
| Drawing No. 8445385: Schematic- Machinery Cooling System |
| 508 |
| 2.2 |
| MSC Drawing No. 7080803, Preparation of CAD Drawings for USNS Ships |
| 509 |
| 2.1 |
| Drawing 8443230: Schematic, Fire Main System |
| 509 |
| 2.2 |
| Cut sheet: Space SMV-BC-150P-2-12B |
| 509 |
| 2.3 |
| Cut sheet: Milwaukee 1291-N |
| 511 |
| 2.1 |
| DWG 8444467_D Waste Oil Tank 4000L |
| 511 |
| 2.2 |
| DWG 8442868_D Material List |
| 511 |
| 2.3 |
| DWG 8443695_C Module H04P Machinery Space Arrangement |
| 511 |
| 2.4 |
| DWG 8443696_D Module H04P Equipment Removal Route |
| 511 |
| 2.5 |
| DWG 8442890_C Typical Structural Frames Hull Void 42-51 |
| 511 |
| 2.6 |
| DWG 8442897_F Structural Plan Main Deck |
| 602 |
| 2.1 |
| IMO MSC.1/Circ.1206, Measures to Prevent Accidents with Lifeboat |
| 602 |
| 2.2 |
| IMO MSC.1/Circ.1277 Interim Recommendation On Conditions for Authorization of Service Providers for Lifeboat, Launching Appliances and On Load Release Gear |
| 602 |
| 2.3 |
| Checklist for Fast RSQ Rescue Boat/Davit (Weekly and Monthly) |
| 602 |
| 2.4 |
| Checklist for Fast RSQ Rescue Boat/Davit (Annual Thorough Examination) |
| 604 |
| 2.1 |
| USCG CFR 46 (latest revision) as applicable for Fire Fighting, Extinguishing and Detection Systems |
| 604 |
| 2.2 |
| MSFSC Standard Item 028, Fire Fighting System Inspection and Testing. |
| 604 |
| 2.3 |
| NAVSEA DWG. 8443287, AUSTAL DWG. 630-555-01-608, Fire Control and Safety Plan |
| 604 |
| 2.4 |
| JHSV HEF (and Firemain) Preventative Maintenance Sched. |
| 604 |
| 2.5 |
| JHSV Class Post-Delivery Engine Room HEF Test Procedure REV 3 |
| 606 |
| 2.1 |
| Tech manual S5320-AA-MMC-010, Doors, Fire Roller Galley, Model UL-9 with Firegard BB |
| 606 |
| 2.2 |
| Drawing 8494884: Food service MOD Ckt K-SC, Door Indication Alarm mods Block Wiring Diagram |
| 606 |
| 2.3 |
| Drawing 8494885: Food Service MOD CKT K-EC Emergency Shutdown mods Block Wiring Diagram |
| 606 |
| 2.4 |
| Drawing 8444998: Ceiling Arrangements |
| 606 |
| 2.5 |
| Drawing 8442968: Emergency Shutdown Panels |
| 606 |
| 2.6 |
| Data sheet: Bolton Gate Fireroll Door A0 Class (Tubular Motor) |
| 606 |
| 2.7 |
| Installation and operating manual: Fireroll A0 Class (Tubular Motor) |
| 606 |
| 2.8 |
| Data sheet: Bolton Gate Powerdrive P80F Controller |
| 801 |
| 2.1 |
| MSFSC Standard Item No. 4, “Ventilation System Cleaning Requirements” 22 Mar 2010 |
| 801 |
| 2.2 |
| NAVSEA Dwg 512-8443207, Arrangement Air Conditioning System |
| 802 |
| 2.1 |
| MSFSC Standard Item No. 4, “Ventilation System Cleaning Requirements” 22 Mar 2010 |
| 802 |
| 2.2 |
| NAVSEA Dwg 512-8443207, Arrangement Air Conditioning System |
| 804 |
| 2.1 |
| Drawing 8446959, General Arrangement |
| 804 |
| 2.2 |
| NAVSEA Dwg 8444321, Schedule of Thermal Insulation |
| 805 |
| 2.2 |
| MSC Standard Item 8, Topsides Painting |
| 806 |
| 2.2 |
| 8443211 Ventilation Schem. |
| 807 |
| 2.1 |
| 8444465_G Schematic HVAC Chill Water Sys |
| 807 |
| 2.2 |
| HVAC Piping Mod. .PPT |
| 807 |
| 2.3 |
| Keckly Duplex Strainer .PDF |
| 807 |
| 2.4 |
| Leslie Navy Strainer .PDF |
| 807 |
| 2.5 |
| MSC Drawing No. 7080803, Preparation of CAD Drawings for USNS Ships |
| 901 |
| 2.1.1 |
| Trim & Stability Booklet, Dwg. 097-8442863 |
| 901 |
| 2.1.2 |
| JHSV-1 Docking Plan, Dwg. 997-8388185 |
| 901 |
| 2.1.3 |
| Capacity Plan, Dwg. 097-8442862 |
| 901 |
| 2.1.4 |
| Safety Certification Program for Dry-docking Facilities and Shipbuilding Ways for U.S. Navy Ships, MIL-STD 1625C (SH) |
| 901 |
| 2.1.5 |
| COMSC Instruction 9997.1A, Dry dock Standards for MSC Ship Availabilities |
| 902 |
| 2.1 |
| MSC Drawing No. 8443389, “Anode Arrangement and Installation Drawing” |
| 902 |
| 2.2 |
| MSC Drawing No. 8442909, “Jet Duct Anode Arrangement” |
| 902 |
| 2.3 |
| MSC Drawing No. 8443385, “Corrosion Prevention and Control Plan” |
| 902 |
| 2.4 |
| Austal 630-633-09-201, “Stage II Equipment Test Procedure for Anodes” |
| 902 |
| 2.5 |
| Wartsila DWG DAAK009698 |
| 903 |
| 2.1.1 |
| MSC Standard Item No. 21, “Sea Valves & Overboard Discharge Overhaul” |
| 903 |
| 2.1.2 |
| MSC Drawing No. 8443037, “Arrangement – Sea Intakes” |
| 903 |
| 2.1.3 |
| MSC Drawing No. 8443038, “Details – Sea Intakes” |
| 903 |
| 2.1.4 |
| MSC Drawing No. 8443385, “Corrosion Prevention and Control Plan” |
| 903 |
| 2.1.5 |
| Stbd Main Engine Room AFT Sea Chest PPT. |
| 904 |
| 2.1 |
| Corrosion Monitoring System Model CA44702 Tech Manual |
| 905 |
| 2.1 |
| SPD Paint Schedule 9_27_13 |
| 905 |
| 2.2 |
| Sea Speed Field Repair Procedure_001.pdf |
| 905 |
| 2.3 |
| MSC Standard Item 13, Underwater Hull Preservation |
| 905 |
| 2.4 |
| 8443388 External Painting Details |
| 905 |
| 2.5 |
| 8494845 REV A Under Water HULL Markings |
| 906 |
| 2.1 |
| DWG. Roll Fin Mechanical Assy. AUSTAL A318 ROLL FIN MECHANICAL ASSY. |
| 906 |
| 2.2 |
| DWG. Roll Fin Mechanical Assy. AUSTAL A318 ROLL FIN BEARING ASSY. |
| 906 |
| 2.3 |
| RCS Installation Instruction DWG JHSV 510 A100 |
| 906 |
| 2.4 |
| SPD RCS Report 12-2014 |
| 907 |
| 2.1 |
| T/M S9230-AL-MMC-010, Waterjet Propulsors Model WLD 1400 SR |
| 907 |
| 2.2 |
| MSC Standard Item 25 Prop Blade Polishing |
| 907 |
| 2.3 |
| Removal of Seat Ring without Shaft or Impeller Removal |
| 907 |
| 2.4 |
| Reversing Bucket NDT |
| 907 |
| 2.5 |
| JHSV-1WJ Reversing Plate Failures_SEPT2014 |
| 908 |
| 2.1 |
| T/M S9230-AL-MMC-010, Waterjet Propulsors Model WLD 1400 SR |
| 908 |
| 2.2 |
| MSC Standard Item 25 Prop Blade Polishing |
| 910 |
| 2.1 |
| AUSTAL A318 Roll fin mechanical assy |
| 910 |
| 2.2 |
| AUSTAL A318 Roll fin bearing assy |
| 910 |
| 2.3 |
| RCS installation instruction dwg. JHSV 510 A100 |
| 1001 |
| 2.1 |
| Load Test Nylon Net PMS Card AP-1.pdf |
| 1002 |
| 2.1 |
| Naval Ships’ Technical Manual (NSTM) Chapter 634 (“Deck Coverings”) |
| 1002 |
| 2.2 |
| Aviation Support Facilities, NAVSEA Dwg 588-7488997(H) |
| 1002 |
| 2.3 |
| Surface Preparation Standard SSPC-SP11, Power Tool Cleaning To Bare Metal. |
| 1002 |
| 2.4 |
| Air Capable Ship Aviation Facilities |
| 1002 |
| 2.5 |
| Surface Preparation Standard, SSPC-SP-12/NACE 5, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating. |
| 1002 |
| 2.6 |
| 630-492-01-701 JHSV Aviation Visual Landing |
| 1002 |
| 2.7 |
| 630-631-04-301 JHSV External Painting Details |
| 1002 |
| 2.8 |
| 8443391-D JHSV Deck Covering Schedule |
| 1002 |
| 2.9 |
| MIL-PRF-24667C 22 May 2008 NAVSEA Nonskid Performance |