0101_A_ INSPECT FLIGHT DECK TIE DOWNS REV A.docx

DOCX document 46 KB Posted

Attached to
USNS SPEARHEAD Federal contract opportunity
Solicitation number
N32205-15-R-4006
Issued by
Department of the Navy Military Sealift Command

About this file

WI 0101

View the file

Other files for this federal contract opportunity

Other files attached to USNS SPEARHEAD, newest first.
File Type Posted
N32205-15-R-4006-0005.doc DOC document
0910_A_RIDE_CONTROL_SCF_BEARING_SUPPORT_REV_A_(TALT_XXR).docx DOCX document
RFP_Q_ _A_10.docx DOCX document
0011_A_GENERAL_SERVICES_FOR_SHIP_REV_A.docx DOCX document
J_-_1_SPEARHEAD-_ROH_WI_Index_ROH.docx DOCX document
0304_A_MODIFY_EXTERIOR_FLOOD_LIGHTING_REV_A.docx DOCX document
AMENDMENT_N32205-14-R-4006-0004.doc DOC document
RFP_Q_ _A_13.docx DOCX document
RFP_Q_ _A_11.docx DOCX document
J_-_2_Category_A_Items_Spearhead_ROH.xls XLS spreadsheet
RFP_Q_ _A_10.docx DOCX document
RFP_Q_ _A_11.docx DOCX document
RFP Q A 6.docx DOCX document
RFP Q A 9.docx DOCX document
RFP Q A 8.docx DOCX document
RFP Q A 7.docx DOCX document
RFP Q A 12.docx DOCX document
N32205-15-R-4006-03.doc DOC document
0510_A_REBUILD FIREPUMP REV A.docx DOCX document
0302_A_ PLC SURVEY REV A.docx DOCX document
0102_A_STRUCTURAL INSPECTIONS REV A.docx DOCX document
RFP_Q_ _A_2.docx DOCX document
RFP_Q_ _A_3.docx DOCX document
0803_A_HVAC SYSTEM ANNUAL MAINT REV A.docx DOCX document
0011_A_GENERAL SERVICES FOR SHIP REV A.docx DOCX document
0908_B_REMOVE WATERJET JETAVATOR REV A.doc DOC document
0907_A_WATERJET MAINTENANCE REV A.docx DOCX document
0903_A_ INSPECT SEA VALVES AND SEA CHESTS REV A.docx DOCX document
0506_A_TEST MAIN AIR RECEIVERS REV A.docx DOCX document
0905_A_INSPECT AND REPAIR UW HULL COATING REV A.docx DOCX document
J A_Mod_1_OEM_Reps_-_USNS_SPEARHEAD_(FebBizOps).docx DOCX document
RFP_Q_ _A_4.docx DOCX document
0609_A_FIRE DOOR MAINT REV A.docx DOCX document
0304_A_MODIFY_EXTERIOR_FLOOD_LIGHTING REV A.docx DOCX document
0910_A_RIDE CONTROL SCF BEARING SUPPORT REV A —
RFP_Q_ _A_5.docx DOCX document
0906_A_RIDE CONTROL SYSTEM MAINT REV A.docx DOCX document
AMENDMENT_N32205-15-R-4006-02.doc DOC document
N32205-15-R-4006_P00001.doc DOC document
RFP-RFQ_Q_ A__1.docx DOCX document
N32205-15-R-4006.doc DOC document
Spearhead_J A.PDF PDF
SPHD_15-R-4006_CDRLS.zip ZIP file
SPHD_15-R-4006_J_Attachments.zip ZIP file
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SPEARHEAD

(JHSV 1)

HULL STRUCTUREN32205-15-R-4006
31 MAY 2015
ITEM NO. 0101Category “A”MSC/PALANDRO/RP

INSPECT FLIGHT DECK TIE DOWNS

1.0 ABSTRACT

1.1 This item describes inspection of the Flight Deck Tie-Downs.

2.0 REFERENCES

2.1 JHSV-1 FD Tiedown Fitting Maint Orig

2.2 Flight Deck Tie Down Numbering Scheme NAVSEA 588-001

2.3 SPEARHEAD Checklist Flight Deck Tie Down Record

2.4 ALCOA Flight Deck Tie Down DWG. 05003554

2.5 Work Instructions for USNS Spearhead FDTD Fittings 20130212.pdf

3.0 ITEM LOCATION/DESCRIPTION

3.1 Location

3.1.1 Flight Deck 02-55-0

3.2 Quantity

Item Description
MFR
Part No.
U/I
QTY
Button Head Bolt 3/4-10
Alcoa Inc
05003578
EA
5
Button Head Screw 5/8-11
Alcoa Inc
05003577
EA
20
Gasket, Outer, Bottom, Rectangular
Alcoa Inc
05033570
EA
140
Gasket, Center, Bottom
Alcoa Inc
05003571
EA
40
Gasket, Outer, Top
Alcoa Inc
05003572
EA
140
Gasket, Center, Top
Alcoa Inc
05003573
EA
40
Recoil Threaded Insert Locking 5/8-11
Alcoa Inc
13103Y
EA
30
Recoil Threaded Insert Locking 3/4-10
Alcoa Inc
13123Y
EA
10

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE

4.1 Alcoa Cross Bar Removal Tool

5.0 NOTES

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.

5.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 The contractor shall furnish the services of an Alcoa Manufacturer’s Representative to supervise and document all steps of the SOW.

6.0 QUALITY ASSURANCE REQUIREMENTS

6.1 The contractor shall record the findings as stated in this SOW.

7.0 STATEMENT OF WORK REQUIRED

7.1 Prior to start of work obtain the latest version of 2.3 Flight Deck Tie Down Record for use throughout this SOW.

7.2 Perform the following inspections of 73 FDTDs using reference 2.1 as guidance. The MSC Rep will determine which FDTDs will be inspected using references 2.2 and 2.3 as guidance.

7.2.1 CROSSBARS: The crossbars shall be visually checked for deformation and checked for excessive wear using a Go-No-Go gage of type identified in maintenance requirement card (MRC) C1 8VVK N, enclosure(4). If visual indications exist where it appears crossbar material has been removed through corrosion or damage and has been painted over, then the paint in the vicinity of the reduced cross-sectional area shall be stripped prior to the Go-No-Go test.

7.2.2 FASTENER TORQUE: Each of the bolted fasteners of the crossbars to the cup should have a visible paint marking to identify the final bolt orientation at installation. A visible inspection of these markings shall be performed to ensure the fastener has maintained torque and has not loosened. Any bolted fastener with cracked, misaligned, or missing markings shall be checked for tension using a torque wrench. The torque wrench shall be set to 57 ft-lbs for the perimeter bolts and 95 ft-lbs for the center bolt. A maximum rotation of 1/24 turn (15 degrees) from the initial position of the torque wrench is allowable. Record the location of each bolt that exceeds maximum allowed rotation with respect to the orienting dimple on the cup.

7.2.3 TOPSIDE WELD: The welded interface of the tiedown fitting cup to the top of the Flight Deck planking shall be inspected. To determine that weld integrity has been retained, either magnetic particle testing, liquid penetrant testing, or visual inspection using 5X magnification, in accordance with NAVSEA Technical Publication T9074-AS-GIB-010/271, is acceptable. If the top weld fails the inspection, the cup’s bottom weld seam must also be inspected. This inspection will require removal and replacement of structural fire protection installed on the underside of the flight deck, 15’6” above the main deck, to gain access to the weld interface with the bottom skin of the flight deck planking. Removal of structural fire protection to inspect the underside of weld shall be by an approved Change Order.

7.2.4 TIEDOWN FITTING CUP: Visual inspection of cleaned top surfaces of the tiedown fitting cup for evidence of cracking, corrosion, or pitting should be made and results recorded.

7.2.5 CROSSBAR and FASTENERS: The interface of the crossbars to the cup shall be visually examined for any pitting of material due to dissimilar metal corrosion. Any visible dissimilar metal corrosion shall be cause for disassembly of the tiedown fitting to examine for any further corrosion in the area of the inserts into the fitting cup.

7.3 Provide the services of an Alcoa Manufacturer OEM to supervise and document the removal and installation of 30 FDTD crossbars.

7.4 Provide the parts listed in paragraph 3.2 to use during the crossbar inspections. Turn over any parts not used to the MSC Rep.

7.5 Remove 10 each FDTD crossbars and renew coating in accordane with ref 2.4. Reinstall and touch up any flight deck lines and coatings which extended to the cross bars.

7.6 Remove 30 FDTD crossbars using reference 2.1 and 2.5 as guidance.

7.6.1 Prior to disassembly, check the bolt torque.

7.6.2 Disassembly entails the removal of the five crossbar bolts and crossbar to permit a visual inspection of the ten sealing gaskets for cracks, cuts and permanent compression set.

7.6.3 Visually inspect the five threaded holes for corrosion or debris that would indicate seawater, fuel or other liquids have breached a seal.

7.6.4 Regardless of condition, the replacement of all five of the round gaskets directly under the bolt heads must be made every time the tiedown fitting is disassembled.

7.6.5 If any of the rectangular gaskets are damaged or deemed suspect, replace them and record their location with respect to the orienting dimple on the cup. No gaskets shall be re-used.

7.6.6 Corroded or damaged fasteners shall be replaced at ALCOA and MSCREP discretion.

7.6.7 Photographs shall be taken of the disassembled fasteners, seals, crossbars and if removed, the recoil inserts.

7.6.8 If corrosion is identified beyond 2 threads of the bolt, the bolt and the recoil insert should be replaced. If a visual inspection of the threaded inserts reveals the presence of the recoil “tang” at the bottom of the insert, it shall be removed and the bottom of the fastener shall be further examined for thread damage. If 1 full thread or more of the bottom of the bolt is damaged due to the presence of the recoil “tang”, that bolt shall be replaced.

7.6.9 Replacement of fastener bolts or recoil inserts requires a pull test. These tiedowns shall be marked out of service until their components are replaced.

7.6.10 If no corrosion or evidence of liquid intrusion is found and the required torques are achieved during reassembly utilizing the original fasteners, pull testing is not required. This would also include cases where only the cross bar is replaced.

7.7 Install the same 30 FDTD crossbars using reference 2.1 and 2.5 as guidance.

7.7.1 It is imperative that the sequencing and fastener torque during reassembly be conducted as per the following sections:

7.7.1.1 Torque the center bolt to 68 Nm (50 ft-lbs), then torque the perimeter bolts to 41 nm (30 ft-lbs) by first torqueing two bolts opposite each other and then the other two bolts opposite each other.

7.7.1.2 Continue with a final torque in the same sequence as above with a torque value of 136 Nm +/-6.8 (100 ft-lbs, +/-5.0) for the center bolt and 81 Nm +/-5.04 (60 ft-lbs+/-3.0) for the perimeter bolts.

7.7.2 For efficiency of future inspection, it is also imperative that bolts are paint marked to indicate final position after achieving the required torque.

7.8 Repairs or pull tests required due to the inspections will be the subject of a change order.

7.9 Perform topside weld repairs in two (2) tie down locations, tie down numbers C-8 and B-9. Remove underside fire protection panels and inspect underside weld. Prior to welding submit ABS welder qualifications and weld procedure to MSCREP.

7.9.1 Perform pull test in and post pull test inspection accordance with reference 2.1.

7.10 Record the results of the inspections on reference 2.3. Provide an electronic copy of the completed spreadsheet and photographs to the MSC Rep.

7.11 Manufacturer’s Representative:

William H. Grassel Senior Technical Specialist Alcoa Defense Alcoa Technical Center 100 Technical Drive Alcoa Center, PA 15069-0001 724-337-5813

8.0 General Requirements: None additional.