0304_A_MODIFY_EXTERIOR_FLOOD_LIGHTING REV A.docx

DOCX document 43 KB Posted

Attached to
USNS SPEARHEAD Federal contract opportunity
Solicitation number
N32205-15-R-4006
Issued by
Department of the Navy Military Sealift Command

About this file

WI 0304

View the file

Other files for this federal contract opportunity

Other files attached to USNS SPEARHEAD, newest first.
File Type Posted
N32205-15-R-4006-0005.doc DOC document
0910_A_RIDE_CONTROL_SCF_BEARING_SUPPORT_REV_A_(TALT_XXR).docx DOCX document
RFP_Q_ _A_10.docx DOCX document
0011_A_GENERAL_SERVICES_FOR_SHIP_REV_A.docx DOCX document
J_-_1_SPEARHEAD-_ROH_WI_Index_ROH.docx DOCX document
0304_A_MODIFY_EXTERIOR_FLOOD_LIGHTING_REV_A.docx DOCX document
AMENDMENT_N32205-14-R-4006-0004.doc DOC document
RFP_Q_ _A_11.docx DOCX document
J_-_2_Category_A_Items_Spearhead_ROH.xls XLS spreadsheet
RFP_Q_ _A_13.docx DOCX document
RFP_Q_ _A_10.docx DOCX document
RFP_Q_ _A_11.docx DOCX document
RFP Q A 6.docx DOCX document
RFP Q A 9.docx DOCX document
RFP Q A 8.docx DOCX document
RFP Q A 7.docx DOCX document
RFP Q A 12.docx DOCX document
N32205-15-R-4006-03.doc DOC document
0510_A_REBUILD FIREPUMP REV A.docx DOCX document
0302_A_ PLC SURVEY REV A.docx DOCX document
0101_A_ INSPECT FLIGHT DECK TIE DOWNS REV A.docx DOCX document
0102_A_STRUCTURAL INSPECTIONS REV A.docx DOCX document
RFP_Q_ _A_2.docx DOCX document
RFP_Q_ _A_3.docx DOCX document
0803_A_HVAC SYSTEM ANNUAL MAINT REV A.docx DOCX document
0011_A_GENERAL SERVICES FOR SHIP REV A.docx DOCX document
0908_B_REMOVE WATERJET JETAVATOR REV A.doc DOC document
J A_Mod_1_OEM_Reps_-_USNS_SPEARHEAD_(FebBizOps).docx DOCX document
RFP_Q_ _A_4.docx DOCX document
0609_A_FIRE DOOR MAINT REV A.docx DOCX document
0910_A_RIDE CONTROL SCF BEARING SUPPORT REV A —
RFP_Q_ _A_5.docx DOCX document
0906_A_RIDE CONTROL SYSTEM MAINT REV A.docx DOCX document
AMENDMENT_N32205-15-R-4006-02.doc DOC document
0907_A_WATERJET MAINTENANCE REV A.docx DOCX document
0903_A_ INSPECT SEA VALVES AND SEA CHESTS REV A.docx DOCX document
0506_A_TEST MAIN AIR RECEIVERS REV A.docx DOCX document
0905_A_INSPECT AND REPAIR UW HULL COATING REV A.docx DOCX document
N32205-15-R-4006_P00001.doc DOC document
RFP-RFQ_Q_ A__1.docx DOCX document
N32205-15-R-4006.doc DOC document
Spearhead_J A.PDF PDF
SPHD_15-R-4006_J_Attachments.zip ZIP file
SPHD_15-R-4006_CDRLS.zip ZIP file
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SPEARHEAD

(JHSV 1)

ELECTRICALRFP NO. N32205-15-R-4006
25 MAY 2015
ITEM NO. 0304Category "A"MSCHQ N7/RP/SM

MODIFY EXTERIOR FLOOD LIGHTING

1.0 ABSTRACT:

This item describes the modifications required to change the 22 exterior flood lighting lights to LED.

2.0 References/Enclosures:

2.1 References

2.1.1 DWG No. 632-D49497_B018

2.1.2 DWG No. 630-324-01-737: DB34

2.1.3 DWG No. 630-324-01-738: DB35

2.2 Enclosures:

2.2.1 Exterior Lighting Locations

3.0 ITEM LOCATION/QUANTITY :

3.1 Location/Quantity: 22 LIGHTS ON HULL EXTERIOR/DECK EDGE.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 22 Each: Phoenix Lighting EcoMod LED medium floodlight, 120-277V, 50-60Hz, Part Number EM300-MF-120-277.

4.2 22 each: Phoenix Lighting Mounting Kit

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s, including but not limited to GTR’s 1 through 7, 23, 26, and 29.

5.2 The contractor and all subcontractors, regardless of tier are advised to review all other work items under this contract, to determine their effect on the work required under this work item.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Arrangements/Outfitting: None

7.2 Structural:

7.2.1 Modify existing eighteen (18) hull mounting stanchions to fit new GFM mounts. Lighting fixtures shall be installed in same locations as existing.

7.2.2 Provide all labor and materials to install four (4) additional mounting stanchions along the transom using existing as templates. Mounts shall be installed in empty locations listed in enclosure 2.2.1 Fixture angles shall be iaw enclosure 2.2.1.

7.3 Mechanical/Fluid: None

7.4 Electrical:

7.4.1 Removals:

7.4.2 Remove the existing exterior flood lights. The lights shall be turned over to ships force.

7.4.3 Installations:

a. Install GFM LED fixtures listed in section 4.0.

a. Provide all material required to modify power circuit listed in ref 2.1.2 and 2.1.3 as required for operation of new fixtures. Install additional cabling, penetrations and junction boxes required at all locations.

b. Install water tight receptacles and plugs, Pauluhn 2632B-125 or equal at each of the twenty two (22) locations vice hard wiring. Receptacle plugs shall have a threaded water tight cap and be mounted with the pug on the underside to prevent water intrusion.

7.4 Electronics: None

7.5 Preparation of Drawings/Documentation: Provide the MSFSC Representative three hard copies and one electronic (PDF or AutoCAD 2004) copy of as-built drawing of Ref 2.1.1 and red-line markup of Ref 2.1.2 and 2.1.3.

7.7 Inspection/Test: All tests and inspections listed below are to be witnessed by the MSFSC Representative. Tests a and b are also to be witnessed by the ABS Surveyor.

a. Perform visual test to verify that an appropriate light level exists for perimeter lighting during night operations.

b. Perform operational test of newly installed circuit.

c. Test all installed electrical cable for continuity and insulation resistance.

7.8 Painting/Surface repair:

a. Prime and paint all new and disturbed surfaces to match surrounding surfaces. Do not paint circuit labels.

b. Repair all surface covering disturbed by work performed under this item. This shall include damage bulkheads, lagging or decking material.

7.9 Marking: Provide circuit and cable labels according to GTR 29.

7.10 Manufacturer’s Representative: None

8.0 GENERAL REQUIREMENTS: None

Enclosure 2.2.1:

Exterior Lighting Locations

Frame
Deck
P/S
Horizonal angle to hull
Vertical angle to hull
1
95.5
Main
Port
90
30
2
Transom
Main
Port
130
30
3
81.5
02 Level
Port
90
25
4
66
03 Level
Port
90
25
5
52
03 Level
Port
90
25
6
25.5
03 Level
Port
90
25
7
35.5
03 Level
Port
90
25
8
16
03 Level
Port
85
25
9
5
02 Level
Port
50
40
10
Transom
Main
4M port of CL
155
45
11
Bow
02 Level
5M port of CL
30
30
12
Transom
Main
4M stbd of CL
205
45
13
Bow
02 Level
5M stbd of CL
330
30
14
Transom
Main
Stbd
220
35
15
95.5
Main
Stbd
270
35
16
81.5
02 Level
Stbd
270
25
17
66
03 Level
Stbd
270
25
18
51.5
03 Level
Stbd
270
25
19
25.5
03 Level
Stbd
270
25
20
35.5
03 Level
Stbd
270
25
21
16
03 Level
Stbd
275
25
22
5
02 Level
Stbd
310
40

0304-2

File details come from the government source that posted it. Updated .