0609_A_FIRE DOOR MAINT REV A.docx

DOCX document 42 KB Posted

Attached to
USNS SPEARHEAD Federal contract opportunity
Solicitation number
N32205-15-R-4006
Issued by
Department of the Navy Military Sealift Command

About this file

WI 0609

View the file

Other files for this federal contract opportunity

Other files attached to USNS SPEARHEAD, newest first.
File Type Posted
N32205-15-R-4006-0005.doc DOC document
RFP_Q_ _A_13.docx DOCX document
0910_A_RIDE_CONTROL_SCF_BEARING_SUPPORT_REV_A_(TALT_XXR).docx DOCX document
RFP_Q_ _A_10.docx DOCX document
0011_A_GENERAL_SERVICES_FOR_SHIP_REV_A.docx DOCX document
J_-_1_SPEARHEAD-_ROH_WI_Index_ROH.docx DOCX document
0304_A_MODIFY_EXTERIOR_FLOOD_LIGHTING_REV_A.docx DOCX document
AMENDMENT_N32205-14-R-4006-0004.doc DOC document
RFP_Q_ _A_11.docx DOCX document
J_-_2_Category_A_Items_Spearhead_ROH.xls XLS spreadsheet
RFP_Q_ _A_10.docx DOCX document
RFP_Q_ _A_11.docx DOCX document
N32205-15-R-4006-03.doc DOC document
RFP Q A 6.docx DOCX document
RFP Q A 9.docx DOCX document
RFP Q A 8.docx DOCX document
RFP Q A 7.docx DOCX document
RFP Q A 12.docx DOCX document
0907_A_WATERJET MAINTENANCE REV A.docx DOCX document
0903_A_ INSPECT SEA VALVES AND SEA CHESTS REV A.docx DOCX document
0506_A_TEST MAIN AIR RECEIVERS REV A.docx DOCX document
0905_A_INSPECT AND REPAIR UW HULL COATING REV A.docx DOCX document
0510_A_REBUILD FIREPUMP REV A.docx DOCX document
0302_A_ PLC SURVEY REV A.docx DOCX document
0101_A_ INSPECT FLIGHT DECK TIE DOWNS REV A.docx DOCX document
0102_A_STRUCTURAL INSPECTIONS REV A.docx DOCX document
RFP_Q_ _A_2.docx DOCX document
RFP_Q_ _A_3.docx DOCX document
0803_A_HVAC SYSTEM ANNUAL MAINT REV A.docx DOCX document
0011_A_GENERAL SERVICES FOR SHIP REV A.docx DOCX document
0908_B_REMOVE WATERJET JETAVATOR REV A.doc DOC document
J A_Mod_1_OEM_Reps_-_USNS_SPEARHEAD_(FebBizOps).docx DOCX document
RFP_Q_ _A_4.docx DOCX document
0304_A_MODIFY_EXTERIOR_FLOOD_LIGHTING REV A.docx DOCX document
0910_A_RIDE CONTROL SCF BEARING SUPPORT REV A —
RFP_Q_ _A_5.docx DOCX document
0906_A_RIDE CONTROL SYSTEM MAINT REV A.docx DOCX document
AMENDMENT_N32205-15-R-4006-02.doc DOC document
N32205-15-R-4006_P00001.doc DOC document
RFP-RFQ_Q_ A__1.docx DOCX document
SPHD_15-R-4006_CDRLS.zip ZIP file
N32205-15-R-4006.doc DOC document
Spearhead_J A.PDF PDF
SPHD_15-R-4006_J_Attachments.zip ZIP file
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SPEARHEAD

(JHSV 1)

OUTFIT, FURNISHINGS AND HABITABILITYN32205-15-R-4006
25 MAY 2015
ITEM NO. 0609Category “A”MSC/MIDKIFF/SM

FIRE DOOR MAINTENANCE

1.0 ABSTRACT:

1.1 This item describes the disassembly, inspection and maintenance for the ships fire doors.

2.0 REFERENCES: None

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantities

3.1.1 Mfr: MML:

3.1.1.1 Door,flight deck, exterior with fast acting dog lever

3.1.1.1.1 02-55-1, P/N 566.1

3.1.1.1.2 02-55-2, P/N 586.1

3.1.1.1.3 02-55-3, P/N 584.1

3.1.1.1.4 02-55-4, P/N 597.1

3.1.1.1.5 02-55-5, P/N 598.1

3.1.1.1.6 02-55-6, P/N 585.1

3.1.1.1.7 02-55-8, P/N 565.2

3.1.1.1.8 02-55-10, P/N 841.1

3.1.1.1.9 02-43-1, P/N 560.1 (double door)

3.1.1.2 Door, interior smoke tight

3.1.1.2.1 01-77-2, P/N 814.1

3.1.1.2.2 03-25-2, P/N 816.1

3.1.1.2.3 02-33-1, P/N 583.1

3.1.1.3 Door 1-12-2, P/N 592.1, Magazine double door, blast door with surelock hardware

3.1.2 Mfr: Freeman/PCM:

3.1.2.1 Door, exterior with fast-acting dog lever

3.1.2.1.1 03-43-4, P/N 573.1

3.1.2.1.2 03-50-1, P/N 574.1

3.1.2.1.3 03-43-2, P/N 572.1

3.1.2.2 Door 01-74-3, P/N 561.1 weather deck aft, blast door with surelock hardware

3.1.3 MFR: Austal:

3.1.3.1 Door interior lightweight hexcell

01-77-4, 01-12-1, 01-12-2, 02-31-3

3.1.4 MFR: Norac:

3.1.4.1 Door 02-31-1, P/N 690.1, mess, interior smoke tight

3.2 Quantities:

3.2.1.1 20 EA, single doors

3.2.1.2 2 EA, double doors

3.3 Item Description/Manufacturer’s Data:

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 23, and 29.

5.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS

6.1 All work shall be by A U.S.C.G. and American Bureau of Shipping (ABS), authorized representative of the manufacturer. All work to be performed to ABS HSNC regulations.

7.0 STATEMENT Of WORK REQUIRED

7.1 All work specificed herein shall be performed under the supervision of manufacturers authorized service representative. Manufacturers are MML, Norac and Freeman.

7.2 All parts and material shall be OEM.

7.3 Perform the following for all doors listed in section 3.0:

7.3.1 Perform initial operational inspection and provide MSCREP report with recommended repairs.

7.3.2 Perform all periodic maintenance, adjustments, alignments and lubrication recommended by the door OEM.

7.4 Remove from ship each door listed in section 3.1.1.1. Erect temporary doors iwo removed.

7.4.1 Prep, prime and paint each door and frame.

7.4.2 Crop out and replace the following in two (2) doors/frames: four(4)feet of steel channel and 3 square feet of plate. Care shall be taken to prevent warping.

7.5 Provide and replace the following:

7.5.1 All hinges in location 3.1.4.

7.5.2 Closer assemblies in locations 3.1.3 and location 03-43-4.

7.5.3 One (1) lockset, WILKA master key system compatable in location 01-77-2.

7.5.4 All door gaskets and striker plates. All material shall be OEM approved, documentation shall be provide to ensure fire tight integrity is maintained.

7.5.5 One (1) each trigger catch, center module, bolt socket, lower throw bar and window blinder latch compatable with doors listed in section 3.1.1.1.

7.6 Troubleshoot and repair non-functional secondary door latches in location 1-12-2. Estimate entire latch system will require replacement.

7.7 Turn over all removed and unused parts to ships force.

7.8 Inspection/Test

7.8.1 Contractor shall perform operational tests, chalk tests and water tight testing of each door upon completion of repairs. MSCREP and ABS shall witness testing.

7.9 Provide a final report of all completed repairs to MSCREP.

8.0 GENERAL REQUIREMENTS: None

609-2