0908_B_REMOVE WATERJET JETAVATOR REV A.doc

DOC document 53 KB Posted

Attached to
USNS SPEARHEAD Federal contract opportunity
Solicitation number
N32205-15-R-4006
Issued by
Department of the Navy Military Sealift Command

About this file

WI0908

View the file

Other files for this federal contract opportunity

Other files attached to USNS SPEARHEAD, newest first.
File Type Posted
N32205-15-R-4006-0005.doc DOC document
0910_A_RIDE_CONTROL_SCF_BEARING_SUPPORT_REV_A_(TALT_XXR).docx DOCX document
RFP_Q_ _A_10.docx DOCX document
0011_A_GENERAL_SERVICES_FOR_SHIP_REV_A.docx DOCX document
J_-_1_SPEARHEAD-_ROH_WI_Index_ROH.docx DOCX document
0304_A_MODIFY_EXTERIOR_FLOOD_LIGHTING_REV_A.docx DOCX document
AMENDMENT_N32205-14-R-4006-0004.doc DOC document
RFP_Q_ _A_11.docx DOCX document
J_-_2_Category_A_Items_Spearhead_ROH.xls XLS spreadsheet
RFP_Q_ _A_13.docx DOCX document
RFP_Q_ _A_10.docx DOCX document
RFP_Q_ _A_11.docx DOCX document
RFP Q A 6.docx DOCX document
RFP Q A 9.docx DOCX document
RFP Q A 8.docx DOCX document
RFP Q A 7.docx DOCX document
RFP Q A 12.docx DOCX document
N32205-15-R-4006-03.doc DOC document
0510_A_REBUILD FIREPUMP REV A.docx DOCX document
0302_A_ PLC SURVEY REV A.docx DOCX document
0101_A_ INSPECT FLIGHT DECK TIE DOWNS REV A.docx DOCX document
0102_A_STRUCTURAL INSPECTIONS REV A.docx DOCX document
RFP_Q_ _A_2.docx DOCX document
RFP_Q_ _A_3.docx DOCX document
0803_A_HVAC SYSTEM ANNUAL MAINT REV A.docx DOCX document
0011_A_GENERAL SERVICES FOR SHIP REV A.docx DOCX document
J A_Mod_1_OEM_Reps_-_USNS_SPEARHEAD_(FebBizOps).docx DOCX document
RFP_Q_ _A_4.docx DOCX document
0609_A_FIRE DOOR MAINT REV A.docx DOCX document
0304_A_MODIFY_EXTERIOR_FLOOD_LIGHTING REV A.docx DOCX document
0910_A_RIDE CONTROL SCF BEARING SUPPORT REV A —
RFP_Q_ _A_5.docx DOCX document
0906_A_RIDE CONTROL SYSTEM MAINT REV A.docx DOCX document
AMENDMENT_N32205-15-R-4006-02.doc DOC document
0907_A_WATERJET MAINTENANCE REV A.docx DOCX document
0903_A_ INSPECT SEA VALVES AND SEA CHESTS REV A.docx DOCX document
0506_A_TEST MAIN AIR RECEIVERS REV A.docx DOCX document
0905_A_INSPECT AND REPAIR UW HULL COATING REV A.docx DOCX document
N32205-15-R-4006_P00001.doc DOC document
RFP-RFQ_Q_ A__1.docx DOCX document
N32205-15-R-4006.doc DOC document
Spearhead_J A.PDF PDF
SPHD_15-R-4006_J_Attachments.zip ZIP file
SPHD_15-R-4006_CDRLS.zip ZIP file
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SPEARHEAD

(JHSV 1)

DRYDOCKING AND UNDOCKING

N32205-15-R-4006

31 May 2015

ITEM NO. 0908

Category "B" MSC-Norfolk/Palandro/RP

REMOVE WATERJET JETAVATOR

1.0 ABSTRACT:

1.1 This item describes removal and inspection of Waterjet Jetavator No. 3 for close inspection of impeller.

2.0 REFERENCES:

2.1 T/M S9230-AL-MMC-010, Waterjet Propulsors Model WLD 1400 SR

2.2 MSC Standard Item 25 Prop Blade Polishing

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity

3.1.1 Location:

-Jetavator #3, Frame 82

3.1.2 Quantity:

-Jetavator, 1 each

4.0 GOVERNMENT-FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0

NOTES:

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.

5.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 The Shipyard shall furnish, fabricate, procure as necessary, all tools and equipment recommended by the O.E.M. Wartsila to perform the removals and installations. This includes all lifting and rigging equipment.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0 STATEMENT OF WORK REQUIRED:

7.1 The Shipyard shall furnish the services of a Wartsila Technical Representative to oversee and perform all waterjet work described by this work item.

7.2 Remove Jetavator Unit IAW Wartsila procedures.

7.3 Clean all mating surfaces. Re-install Jetavator with contractor furnished materials.

7.4 During a dry docking, the water in the stator bowl must be drained from all waterjets. Neglecting this can cause corrosion damage.

7.5 Before and after Jetavator removal and contractor shall perform Jetavator to vessel hull isolation electrical continuity readings. Readings shall be recorded in Megohms and provided to MSC Rep.

7.6 Provide a service report from the technical representatives indicating conditions found and work performed.

7.7 Covered under WI 0908. Perform NDT dye penetrate examination of each impeller. Dye-check the blade palms and the blade leading and trailing faces. NDT shall be observed by the MSCREP and ABS Surveyor.

7.8 Covered under WI 0908. Perform final checks and adjustments to include calibrations of steering and reversing system to be tested during dock and sea trials by Wartsila Representative.

Inspections and Testing:

7.9 Painting, Labeling and Markings:

7.9.1 Touch up disturbed surfaces to match surrounding surfaces. Waterjet coated surfaces are SEASPEED Product.

7.10 Manufacturers Representative:

7.10.1 Provide the services of a manufacturer's representative during installation testing and repairs.

Wartsila Defense Inc.

Tony Hughes

3617 Koppens Way

Chesapeake, VA 23323

Office: 757-966-5438

Fax: 757-966-3627

Cell: 757-409-7426 Tony.Hughes@wartsiladefense.com 8.0 GENERAL REQUIREMENTS: None additional.