0905_A_INSPECT AND REPAIR UW HULL COATING REV A.docx

DOCX document 36 KB Posted

Attached to
USNS SPEARHEAD
Solicitation number
N32205-15-R-4006
Issued by

About this file

WI 0905

View the file

Other files

File Type Posted
N32205-15-R-4006-0005.doc DOC document
0910_A_RIDE_CONTROL_SCF_BEARING_SUPPORT_REV_A_(TALT_XXR).docx DOCX document
RFP_Q_ _A_10.docx DOCX document
0011_A_GENERAL_SERVICES_FOR_SHIP_REV_A.docx DOCX document
RFP_Q_ _A_11.docx DOCX document
J_-_1_SPEARHEAD-_ROH_WI_Index_ROH.docx DOCX document
RFP_Q_ _A_13.docx DOCX document
J_-_2_Category_A_Items_Spearhead_ROH.xls XLS spreadsheet
0304_A_MODIFY_EXTERIOR_FLOOD_LIGHTING_REV_A.docx DOCX document
AMENDMENT_N32205-14-R-4006-0004.doc DOC document
RFP_Q_ _A_11.docx DOCX document
RFP_Q_ _A_10.docx DOCX document
N32205-15-R-4006-03.doc DOC document
RFP Q A 6.docx DOCX document
RFP Q A 9.docx DOCX document
RFP Q A 7.docx DOCX document
RFP Q A 8.docx DOCX document
RFP Q A 12.docx DOCX document
RFP_Q_ _A_3.docx DOCX document
0906_A_RIDE CONTROL SYSTEM MAINT REV A.docx DOCX document
AMENDMENT_N32205-15-R-4006-02.doc DOC document
J A_Mod_1_OEM_Reps_-_USNS_SPEARHEAD_(FebBizOps).docx DOCX document
0907_A_WATERJET MAINTENANCE REV A.docx DOCX document
0903_A_ INSPECT SEA VALVES AND SEA CHESTS REV A.docx DOCX document
0506_A_TEST MAIN AIR RECEIVERS REV A.docx DOCX document
0510_A_REBUILD FIREPUMP REV A.docx DOCX document
0302_A_ PLC SURVEY REV A.docx DOCX document
0101_A_ INSPECT FLIGHT DECK TIE DOWNS REV A.docx DOCX document
0102_A_STRUCTURAL INSPECTIONS REV A.docx DOCX document
0609_A_FIRE DOOR MAINT REV A.docx DOCX document
0304_A_MODIFY_EXTERIOR_FLOOD_LIGHTING REV A.docx DOCX document
RFP_Q_ _A_4.docx DOCX document
RFP_Q_ _A_2.docx DOCX document
RFP_Q_ _A_5.docx DOCX document
0910_A_RIDE CONTROL SCF BEARING SUPPORT REV A —
0803_A_HVAC SYSTEM ANNUAL MAINT REV A.docx DOCX document
0908_B_REMOVE WATERJET JETAVATOR REV A.doc DOC document
0011_A_GENERAL SERVICES FOR SHIP REV A.docx DOCX document
RFP-RFQ_Q_ A__1.docx DOCX document
N32205-15-R-4006_P00001.doc DOC document
Spearhead_J A.PDF PDF
SPHD_15-R-4006_CDRLS.zip ZIP file
SPHD_15-R-4006_J_Attachments.zip ZIP file
N32205-15-R-4006.doc DOC document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SPEARHEAD

(JHSV 1)

DRYDOCKING AND UNDOCKINGN32205-15-R-4006
31 May 2015
ITEM NO. 0905Category "A"MSC/Palandro/RP

INSPECT AND REPAIR UW HULL COATING REV A

1.0 ABSTRACT:

1.1 This item describes the inspection and repair of the ship’s underwater hull coating.

2.0 REFERENCES:

2.1 SPD Paint Schedule 9_27_13

2.2 Sea Speed Field Repair Procedure_001.pdf

2.3 MSC Standard Item 13, Underwater Hull Preservation

2.4 8443388 External Painting Details

2.5 8494845 REV A Under Water HULL Markings

3.0 ITEM DESCRIPTION/LOCATION:

3.1 Location/Quantity:

3.1.1 Ship's underwater hulls, including water jet tunnels, sea chests, mud boxes, NACA boxes and overboard pipes, are to be inspected. Assume total 1000 sq. ft. of coating requires repair over 20 locations.

3.1.2 Amercoat 240 (Grey), 10 Gallons

3.1.3 Sea Speed DTM V4/V5 Top Coat (Black), 20 gallons

3.1.4 Nova Plate, Red Oxide, 5 gallons

3.1.5 Nova Plate, Red, 5 gallons

3.1.6 Nova Plate, Black, 5 gallons

3.1.7 Interguard 264, Grey, 15 gallons

3.1.8 Interguard 264, Red, 15 gallons

3.1.9 Intersleek 731, Pink, 15 gallons

3.1.10 Intersleek 970, Black, 15 gallons

3.1.11 Intersleek 970, White, 15 gallons

3.2 Description:

3.2.1 Painting Systems are described in reference 2.1. Note SPEARHEAD has Intersleek and Seaspeed products on Underwater Hull.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None.

5.0 NOTES

5.1 The Contractor shall furnish all paint, coatings, solvents for thinning purposes, and the paint manufacturer’s technical representative.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 All work performed on this item shall be under the direct supervision of the contractor furnished paint manufacturer’s representative.

6.2 All work performed shall be to the satisfaction of the Paint Manufacturer's Representative, the Port Engineer, Master, and the Chief Engineer.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Provide the services an International Intersleek Coating representative to inspect the underwater hull coating system.

7.2 Immediately following the completion of high pressure fresh water washing of the vessel’s underwater hull surfaces, as detailed in ref 2.3, conduct a hull coatings survey with the following personnel in attendance: Paint Manufacturer’s Representative, Contractor’s paint representative, Port Engineer, and the ship’s Master.

7.3 Provide all labor and material to repair approximately 1000 sq. ft. of underwater hull coating under the direct supervision of the International representative and using reference 2.1 as guidance.

7.4 Apply one 3mil coat of Seaspeed to all four Waterjet Jetavators per manufactures coating specifications. This item shall not be included in the 1000 Sq.Ft. of underwater hull repairs.

7.4.1 All anode studs, hydraulic cylinder rods, hoses, and areas that don’t require coating shall be protected.

7.5 Restore underwater hull markings to include UWILD Markings in accordance with reference 2.5.

7.5.1 Apply one coat of Intersleek White to all Underwater Hull Markings using coating manufactures application procedure.

7.6 Paint Representative shall provide a complete report of findings and completion status.

7.7 Manufacturer's Representative:

International Paint LLC 6001 Antoine Drive Houston, TX 77091

8.0 GENERAL REQUIREMENTS: None additional.

0905-1