0906_A_RIDE CONTROL SYSTEM MAINT REV A.docx

DOCX document 41 KB Posted

Attached to
USNS SPEARHEAD Federal contract opportunity
Solicitation number
N32205-15-R-4006
Issued by
Department of the Navy Military Sealift Command

About this file

WI 0906

View the file

Other files for this federal contract opportunity

Other files attached to USNS SPEARHEAD, newest first.
File Type Posted
N32205-15-R-4006-0005.doc DOC document
0910_A_RIDE_CONTROL_SCF_BEARING_SUPPORT_REV_A_(TALT_XXR).docx DOCX document
RFP_Q_ _A_10.docx DOCX document
0011_A_GENERAL_SERVICES_FOR_SHIP_REV_A.docx DOCX document
J_-_1_SPEARHEAD-_ROH_WI_Index_ROH.docx DOCX document
0304_A_MODIFY_EXTERIOR_FLOOD_LIGHTING_REV_A.docx DOCX document
AMENDMENT_N32205-14-R-4006-0004.doc DOC document
RFP_Q_ _A_11.docx DOCX document
J_-_2_Category_A_Items_Spearhead_ROH.xls XLS spreadsheet
RFP_Q_ _A_13.docx DOCX document
RFP_Q_ _A_10.docx DOCX document
RFP_Q_ _A_11.docx DOCX document
RFP Q A 6.docx DOCX document
RFP Q A 9.docx DOCX document
RFP Q A 8.docx DOCX document
RFP Q A 7.docx DOCX document
RFP Q A 12.docx DOCX document
N32205-15-R-4006-03.doc DOC document
0510_A_REBUILD FIREPUMP REV A.docx DOCX document
0302_A_ PLC SURVEY REV A.docx DOCX document
0101_A_ INSPECT FLIGHT DECK TIE DOWNS REV A.docx DOCX document
0102_A_STRUCTURAL INSPECTIONS REV A.docx DOCX document
RFP_Q_ _A_2.docx DOCX document
RFP_Q_ _A_3.docx DOCX document
0803_A_HVAC SYSTEM ANNUAL MAINT REV A.docx DOCX document
0011_A_GENERAL SERVICES FOR SHIP REV A.docx DOCX document
0908_B_REMOVE WATERJET JETAVATOR REV A.doc DOC document
J A_Mod_1_OEM_Reps_-_USNS_SPEARHEAD_(FebBizOps).docx DOCX document
RFP_Q_ _A_4.docx DOCX document
0609_A_FIRE DOOR MAINT REV A.docx DOCX document
0304_A_MODIFY_EXTERIOR_FLOOD_LIGHTING REV A.docx DOCX document
0910_A_RIDE CONTROL SCF BEARING SUPPORT REV A —
RFP_Q_ _A_5.docx DOCX document
AMENDMENT_N32205-15-R-4006-02.doc DOC document
0907_A_WATERJET MAINTENANCE REV A.docx DOCX document
0903_A_ INSPECT SEA VALVES AND SEA CHESTS REV A.docx DOCX document
0506_A_TEST MAIN AIR RECEIVERS REV A.docx DOCX document
0905_A_INSPECT AND REPAIR UW HULL COATING REV A.docx DOCX document
N32205-15-R-4006_P00001.doc DOC document
RFP-RFQ_Q_ A__1.docx DOCX document
N32205-15-R-4006.doc DOC document
Spearhead_J A.PDF PDF
SPHD_15-R-4006_J_Attachments.zip ZIP file
SPHD_15-R-4006_CDRLS.zip ZIP file
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SPEARHEAD

(JHSV 1)

MACHINERY, AUXILIARY SYSTEMSN32205-15-R-4006
31 May 2015
ITEM NO. 0906Category “A”MSC/PALANDRO/RP

RIDE CONTROL SYSTEM MAINTENANCE

1.0 ABSTRACT:

1.1 This item describes Annual Inspection and Maintenance for the Interceptors and Single Cantilever Foils of the Ride Control System.

2.0 REFERENCES:

2.1 DWG. Roll Fin Mechanical Assy. AUSTAL A318 ROLL FIN MECHANICAL ASSY.

2.2 DWG. Roll Fin Mechanical Assy. AUSTAL A318 ROLL FIN BEARING ASSY.

2.3 RCS Installation Instruction DWG JHSV 510 A100

2.4 SPD RCS Report 12-2014

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity

3.1.1 Single Cantilever Foil Port Fwd 4-7-2

3.1.2 Single Cantilever Foil Stbd Fwd 5-7-1

3.1.3 Interceptor Aft Peak Port 3-78-2

3.1.4 Interceptor Aft Peak Stbd 3-78-2

4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIAL / SERVICE:

4.1 None

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.

5.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Contractor shall furnish an AUSTAL USA Authorized Service Representative to perform the following.

7.2 Furnish labor and materials to replace Port and Starboard Single Cantilever Foil (SCF) Shaft Seals.

7.2.1 4EA Shaft Seals It 35 PN 98002

7.3 For Single Cantilever Foils, Perform inspection of Upper/ Lower level Clevis Pins, Upper/ Lower Hydraulic Cylinder Thrust Washer.

7.4 Grease Upper/ Lower Actuator Spherical Bearings.

7.5 For Interceptors, Inspect the following; Earth Straps, Inspect Cylinder Rod Surface Condition.

7.5.1 Inspect Lower Interceptor Bearings, Clevis Bearing, Skeg Bearings, And Hydraulic Cylinders.

7.6 Furnish labor and materials to replace Stbd skeg bearing at interceptor jet fence. Reference 2.4.

7.7 Perform inspection of Single Cantilever Foil P & S Taper Bearing Bush assemblies as assembled. Check all hardware and check the housing bolts by torque wrench per 2.3. Furnish condition report of torque settings.

7.8 All lubricants used shall be O.E.M. compatible Shell Products.

7.9 Perform full operational test upon completion with vessel representative. Test shall include a dock trial with Austal representative.

7.10 Perform inspection and adjustment of the hydraulic filter unit pressure switches.

7.11 Perform an inspection of Ride Control System Hydraulic System.

7.12 Furnish a condition Report of Findings and work performed.

7.13 Manufacturer’s Representative:

Terry Kennedy Post Delivery Program Manager Austal USA Tel 251 445 5129 Cell 251 222 7863 Terry Kennedy <terry.kennedy@austalusa.com>

8.0 General Requirements: NONE

0906-2

File details come from the government source that posted it. Updated .