MarineTuff - Cat6 Cable Specification.pdf

PDF 119 KB Posted

Attached to
DORFP 1305M224R0041 – NOAA Ship Henry Bigelow FY25 Dockside Repairs
Solicitation number
1305M224R0041
Issued by

About this file

This document is a technical specification for MarineTuff Cat6 cables. The specification outlines the key requirements and characteristics of the Cat6 cables, including physical dimensions, electrical performance, and testing/certification criteria. The cables are required for the NOAA Ship Henry Bigelow FY25 Dockside Repairs, which is a special notice issued under the NOAA Region 1 Dockside Repair and Ship Maintenance IDIQ contract. The repairs are being procured by the Department of Commerce National Oceanic and Atmospheric Administration. The specification provides detailed technical details that potential vendors would need to meet in order to supply the required Cat6 cables for this federal contract opportunity.

View the file

Other files

File Type Posted
Wet Lab Conveyor System Parts Manual.pdf PDF
Immersion Suit Inventory (05-2-24).xlsx XLSX spreadsheet
HB-167-002 Wet Lab Door Modification REV A - Approved_143748972.pdf PDF
HB-583-03 (FRV40-225-093-010) Rescue Boat Handling System.pdf PDF
00 51 21.01 Vent Duct Cleaning.pdf PDF
HB-085 FF01 Insulation Arrangement.pdf PDF
Bigelow 2024 GMDSS Inspection Certificates.pdf PDF
3-ZF 63 Marine Propulsion Systems Operator_s Manual.pdf PDF
Steering Gear Handwheel Pump H330 and Piping Drawings.pdf PDF
HB-512 FV02 HVAC Diagram.pdf PDF
DWG MOCA-HB-434A-02 INSTALLATION Rev B (As Built).pdf PDF
Carsoe REPORT No 2 Conveyor Overhaul.pdf PDF
HB-631 FF04 Paint Schedule r1.0.pdf PDF
HB-170 FH22 Mast Rigging Flagstaff Layout Details.pdf PDF
DWG MOCA-HB-434A-02 INSTALLATION Rev C (New System).pdf PDF
HB-801 FC05 Tank Capacity Curves.pdf PDF
HB-167-001 Hydro Lab Door Modification REV A - Approved_143742608.pdf PDF
Immersion Suit Pressure Testing.pdf PDF
2-Volvo Penta D3 Operator_s Manual.pdf PDF
HB-985 FA05 Fire Control Plan.pdf PDF
SECNAV FORM 5512-NSNPT - JUL 2023 - HIGHLIGHTED.pdf PDF
Installation Guide TracVision UHD7 SWM Expansion Kit.pdf PDF
OLEX processor location and dimensions.pdf PDF
15732 Henry Bigelow_Lab Manual.pdf PDF
SECNAV FORM 5512 - Quick Guide.pdf PDF
HB-568 PE32 Bow Thruster Control System Terminal List.pdf PDF
Newport Naval Station Base Access Map.pdf PDF
New KVH UDH-7 and old Intellian HD6 Antenna footprint.pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
4-HJ-274 Water Jet Installation and Service Manual.pdf PDF
FRV40-226-008-010 Bow Thruster Model 40 T3S.zip ZIP file
HB-506 FP02 Vents Sounds System Diagram.pdf PDF
HB-085 FA02 General Arrangements.pdf PDF
HVAC Systems for Duct Cleaning (04-25-24).xlsx XLSX spreadsheet
AMC-583-1B General Requirements for Liferaft Inspections.pdf PDF
Installation Guide - TracVision UDH7 - 54-1308_UHD7_IG.pdf PDF
00 00 01.07 General Requirements.pdf PDF
FRV40-225-058-010 Motor Propulsion DC.pdf PDF
Bigelow Direct TV Box Inventory March 2024.xlsx XLSX spreadsheet
Newport Naval Station-Pier 2 Load Restrictions 7-15-19.pdf PDF
Bow Thruster HMI Cutout Pictures.pdf PDF
IEEE 45 Recommended Practice for Electrical Installations on Shipboard.pdf PDF
HB Fire System Inventory (05-3-24).xlsx XLSX spreadsheet
Rescue Boat Manual - 670 SOLAS - Willard Marine.zip ZIP file
Siemens Report - How to built a NOAA SPDM.pdf PDF
HB-512 FV04 Fan List.pdf PDF
HB-561 02 (FRV40-225-128-010) Steering Gear Model 1xSR662.pdf PDF
HB Fire System Inspection Report - FEB 2024.pdf PDF
13603 Manual Complete.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .